CN205894639U - Supplementary turnover subassembly that climbs from platform that climbs - Google Patents

Supplementary turnover subassembly that climbs from platform that climbs Download PDF

Info

Publication number
CN205894639U
CN205894639U CN201620623789.0U CN201620623789U CN205894639U CN 205894639 U CN205894639 U CN 205894639U CN 201620623789 U CN201620623789 U CN 201620623789U CN 205894639 U CN205894639 U CN 205894639U
Authority
CN
China
Prior art keywords
flange plate
auxiliary
connecting post
climbed
climbing platforms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620623789.0U
Other languages
Chinese (zh)
Inventor
吕黄兵
刘曙
王朝阳
龚俊伟
梁明雨
甘霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science And Industry Co ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201620623789.0U priority Critical patent/CN205894639U/en
Application granted granted Critical
Publication of CN205894639U publication Critical patent/CN205894639U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model is suitable for a construction technical field provides a supplementary turnover subassembly that climbs from climbing platform. Hang from the platform that climbs and establish on hanging boots, hang boots and install on hanging the box, have enough to meet the need the subassembly and include suspension bolt, turnover nut and construction bolt, and suspension bolt welds on the steel sheet wall, and the one end of turnover nut is installed on suspension bolt, and construction bolt will hang the box and fix on the relative other end of turnover nut. The utility model discloses an installation of turnover nut increases the distance of hanging between box and the steel sheet wall to the increase is from the distance between platform and the steel sheet wall that climbs, makes when climbing on the steel sheet wall of installing the peg or putting more energy into the rib from the platform that climbs, is difficult for receiving the hindrance of peg or putting more energy into the rib, guarantees from climbing smoothly of platform.

Description

The turnover assembly that a kind of auxiliary is climbed from climbing platforms
Technical field
This utility model belongs to technical field of building construction, the turnover group that more particularly, to a kind of auxiliary is climbed from climbing platforms Part.
Background technology
With science and technology and expanding economy, the steel construction accounting in domestic skyscraper is gradually increased, and technological requirement is more next Higher.For ensureing the safe and reliable of steel construction, skyscraper light plate shear wall and steel column structure gradually replace traditional reinforcing bar Xoncrete structure, and gradually optimize for the construction technology of steel plate shear force wall and reinforced concrete column.
At present, for improving efficiency of construction, gradually instead of traditional steel pipe scaffold from climbing platforms, in steel plate shear force wall More and more extensive with the utilization in steel column construction, thus avoid repeatedly setting up manpower and materials caused by dismounting steel pipe scaffold and Waste on duration.As shown in figure 1, the mode being hung on steel plate wall a ' from climbing platforms e ' is to hang in upper welding of steel plate wall a ' Hang bolt 1 ', by Hanging bolt 1 ' and nut 2 ' by extension box c ' it is attached fixing, the d ' that quits is arranged on extension box c ' on, certainly climb Rise platform e ' and be hung on the d ' that quits above such that it is able to make to climb upwards from climbing platforms d '.However, on a lot of engineering steel plate wall a ' It is fitted with increasing the peg b ' of shearing strength or ribbed stiffener, due to extension box c ' close together apart from steel plate wall a ', this A little peg b ' and ribbed stiffener can cause to hinder to from the climbing platforms process of climbing, thus impact normally climbing from climbing platforms e ' Rise.
Utility model content
Technical problem to be solved in the utility model is the turnover assembly providing a kind of auxiliary to climb from climbing platforms, Aiming to solve the problem that in prior art is subject to peg or ribbed stiffener to hinder and affect it and smoothly climb from climbing platforms during climbing Problem.
This utility model is achieved in that the turnover assembly that a kind of auxiliary is climbed from climbing platforms, hangs from climbing platforms It is located on quitting, quits and be arranged in extension box, described turnover assembly includes Hanging bolt, and described Hanging bolt is welded on steel plate wall On, described turnover assembly also includes all turn nuts and installation bolt, and one end of described all turn nuts is arranged on described Hanging bolt On, extension box are fixed in the opposite other end of described all turn nuts described installation bolt.
Further, described Hanging bolt includes the welding block being mutually permanently connected and threaded rod, described welding block welding On steel plate wall, described threaded rod is connected with described turnover nut thread.
Further, described all turn nuts include connecting post, the first flange plate and second flange plate with screwed hole, Described first flange plate and the second flange plate are separately fixed at the two ends of described connecting post, and described flag nut, installation bolt are equal Threaded with described connecting post.
Further, the cross section of described first flange plate and the second flange plate is all rounded.
Further, described connecting post is cylindrical.
Further, one end of described connecting post offers the groove communicating with described screwed hole, when described connecting post with After described threaded rod is threaded, described welding block is located in described groove, and described second flange plate abuts on steel plate wall.
Further, after extension box lock onto in described connecting post described installation bolt screw thread, described first edge of a wing Plate abuts in the side of extension box.
Further, described all turn nuts also include some floors, and the two ends of described floor are installed in described first edge of a wing Between plate and the second flange plate, the side wall of described floor is fixed on the side wall of described connecting post.
Further, the shape of described floor is trapezoidal.
Further, described some floors are evenly distributed on the outer peripheral edge of described connecting post.
This utility model compared with prior art, has the beneficial effects that: Hanging bolt is weldingly fixed on by this utility model On steel plate wall, and one end of all turn nuts is fixedly mounted on flag nut, finally by installation bolt, extension box is fixed on In the opposite other end of all turn nuts, so, the distance between extension box and steel plate wall are increased by the installation of all turn nuts, from And increase from the distance between climbing platforms and steel plate wall so that from climbing platforms in the steel plate being provided with peg or ribbed stiffener When climbing on wall, be not easily susceptible to peg or ribbed stiffener hinders it is ensured that smoothly climbing from climbing platforms.
Brief description
Fig. 1 be prior art provide hang the structural representation that assembly will be hung on steel plate wall from climbing platforms;
Fig. 2 is that extension box are fixed on the structural representation on steel plate wall by the turnover assembly that this utility model embodiment provides;
Fig. 3 is the structural representation of all turn nuts in Fig. 2;
Fig. 4 is the perspective view of Hanging bolt in Fig. 2;
Fig. 5 is longitudinal cross-sectional schematic of Hanging bolt shown in Fig. 4.
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage become more apparent, below in conjunction with accompanying drawing and enforcement Example, is further elaborated to this utility model.It should be appreciated that specific embodiment described herein is only in order to explain This utility model, is not used to limit this utility model.
As shown in Figures 2 and 3, it is that auxiliary of the present utility model is preferably implemented from the turnover assembly one that climbing platforms climb Example, is hung on from climbing platforms (not shown) and quits in (not shown), quit and be arranged in extension box c, has enough to meet the need assembly Including Hanging bolt 1, all turn nuts 2 and installation bolt 3.Hanging bolt 1 is welded on steel plate wall a, specifically, Hanging bolt 1 includes the welding block 11 being mutually permanently connected and threaded rod 12, and welding block 11 is welded on steel plate wall a, threaded rod 12 and turnover Nut 2 is threaded.One end of all turn nuts 2 is arranged on Hanging bolt 1, and extension box c are fixed on all turn nuts by installation bolt 3 In 2 opposite other end, thus all turn nuts 2 are fixedly mounted between extension box c and steel plate wall a, and then increase flat from climbing The distance between platform and steel plate wall a are so that be provided with the steel plate wall a of the peg b increasing shearing strength from climbing platforms On when climbing, not can smoothly climb by the obstruction of peg b.
Please referring collectively to as shown in Figures 4 and 5, all turn nuts 2 of this utility model embodiment are included with screwed hole 210 connecting post 21, the first flange plate 22 and the second flange plate 23, the first flange plate 22 and the second flange plate 23 are respectively welded It is fixed on the two ends of connecting post 21, flag nut 1, installation bolt 3 are all threadeded with connecting post 21.In the present embodiment, The cross section of one flange plate 22 and the second flange plate 23 is all rounded, and connecting post 21 is cylindrical, opens in one end of connecting post 21 It is provided with the groove 24 communicating with screwed hole 210, the space size of this groove 24 is more bigger than the volume of welding block 11, when connecting post 21 After threadeding with threaded rod 12, welding block 11 is located in groove 24, the second flange plate 23 abut on steel plate wall a it is ensured that Stability and the lateral carrying shearing of all turn nuts 2 that all turn nuts 2 connect.When extension box c are lock onto connecting post by installation bolt 3 After on 21, the first flange plate 22 abuts in the side of extension box c it is ensured that the stability of extension box c.
In above-described embodiment, all turn nuts 2 also include some floors 25, and the two ends of floor 25 are installed in first by welding Between flange plate 22 and the second flange plate 23, the side wall of floor 25 is weldingly fixed on the outer peripheral edge of connecting post 21, in this reality Apply in example, the shape of floor 21 is in a rectangular trapezoid, and some floors 25 are evenly distributed on connecting post 21 outer peripheral edge, to ensure The stability of the carrying shearing of the first flange plate 22 and the second flange plate 23.
In sum, the installation of turnover assembly of the present utility model increases the distance between extension box c and steel plate wall a, from And increase from the distance between climbing platforms and steel plate wall a so that from climbing platforms in the steel plate being provided with peg b or ribbed stiffener When climbing on wall a, be not easily susceptible to peg b or ribbed stiffener hinders it is ensured that smoothly climbing from climbing platforms.In addition, this turnover Establishment of component facilitates, simple shape, installs and convenient disassembly, and all turn nuts 2 are dismountable independent component, detachably repeat to make With reducing construction and wasting.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all this Any modification, equivalent and improvement made within the spirit of utility model and principle etc., should be included in this utility model Protection domain within.

Claims (10)

1. the turnover assembly that a kind of auxiliary is climbed from climbing platforms, is hung on from climbing platforms on quitting, quits and be arranged on extension box On, described turnover assembly includes Hanging bolt, and described Hanging bolt is welded on steel plate wall it is characterised in that described turnover group Part also includes all turn nuts and installation bolt, and one end of described all turn nuts is arranged on described Hanging bolt, described installation spiral shell Extension box are fixed in the opposite other end of described all turn nuts bolt.
2. auxiliary as claimed in claim 1 is climbed from climbing platforms turnover assembly is it is characterised in that described Hanging bolt bag Include the welding block being mutually permanently connected and threaded rod, described welding block is welded on steel plate wall, described threaded rod and described turnover Nut thread connects.
3. auxiliary as claimed in claim 2 is climbed from climbing platforms turnover assembly is it is characterised in that described week turn nut bag Include connecting post, the first flange plate and second flange plate with screwed hole, described first flange plate and the second flange plate are respectively It is fixed on the two ends of described connecting post, described flag nut, installation bolt are all threadeded with described connecting post.
4. auxiliary as claimed in claim 3 is climbed from climbing platforms turnover assembly is it is characterised in that described first flange plate All rounded with the cross section of the second flange plate.
5. the turnover assembly that auxiliary as claimed in claim 3 is climbed from climbing platforms is it is characterised in that described connecting post is in circle Column.
6. as claimed in claim 3 auxiliary from climbing platforms climb turnover assembly it is characterised in that described connecting post one End offers the groove communicating with described screwed hole, after described connecting post is threadeded with described threaded rod, described welding block In described groove, described second flange plate abuts on steel plate wall.
7. the turnover assembly that auxiliary as claimed in claim 3 is climbed from climbing platforms is it is characterised in that work as described installation bolt After extension box lock onto in described connecting post screw thread, described first flange plate abuts in the side of extension box.
8. the auxiliary as described in any one in claim 3 to 7 is climbed from climbing platforms turnover assembly it is characterised in that Described week, turn nut also included some floors, the two ends of described floor be installed in described first flange plate and the second flange plate it Between, the side wall of described floor is fixed on the side wall of described connecting post.
9. the turnover assembly that auxiliary as claimed in claim 8 is climbed from climbing platforms is it is characterised in that the shape of described floor Trapezoidal.
10. auxiliary as claimed in claim 8 is climbed from climbing platforms turnover assembly is it is characterised in that described some ribs Plate is evenly distributed on the outer peripheral edge of described connecting post.
CN201620623789.0U 2016-06-22 2016-06-22 Supplementary turnover subassembly that climbs from platform that climbs Active CN205894639U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620623789.0U CN205894639U (en) 2016-06-22 2016-06-22 Supplementary turnover subassembly that climbs from platform that climbs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620623789.0U CN205894639U (en) 2016-06-22 2016-06-22 Supplementary turnover subassembly that climbs from platform that climbs

Publications (1)

Publication Number Publication Date
CN205894639U true CN205894639U (en) 2017-01-18

Family

ID=57769795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620623789.0U Active CN205894639U (en) 2016-06-22 2016-06-22 Supplementary turnover subassembly that climbs from platform that climbs

Country Status (1)

Country Link
CN (1) CN205894639U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719837A (en) * 2019-03-19 2020-09-29 韦森多夫系统涂料有限公司 Scaffold device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719837A (en) * 2019-03-19 2020-09-29 韦森多夫系统涂料有限公司 Scaffold device

Similar Documents

Publication Publication Date Title
CN101397844B (en) Construction method of special section steel concrete composite structure inclined wall mould base engineering
CN205894639U (en) Supplementary turnover subassembly that climbs from platform that climbs
CN101906870A (en) Suspended scaffolding
CN108412231A (en) Assembled is bolted reinforcing steel processing shed and its assemble method entirely
CN204238537U (en) A kind of elevated hoistway operation platform
CN216038325U (en) Tower crane internal climbing frame fixing frame
CN207905389U (en) Assembled is bolted reinforcing steel processing shed entirely
CN203891442U (en) High-rise elevator shaft template supporting platform
CN208039666U (en) Assembled stairs module
CN206707318U (en) A kind of construction safety column
CN206158146U (en) Novel building section of thick bamboo well construction operation platform
CN214462401U (en) Double-layer protection frame with novel structure
CN213204913U (en) Modular prefabricated staircase operation platform
CN208577361U (en) Removable monoblock type lifting protection frame structure
CN204038917U (en) Detachable external hanging type operating platform
CN219411759U (en) Assembled lower hanging operation platform based on sliding mode lifting system
CN204626931U (en) In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform
CN207420069U (en) A kind of guard rail being used in turn
CN217998903U (en) Prevent footboard that punches a hole of turning on one's side
CN207079909U (en) Peripheral scaffold connecting structure
CN205976413U (en) A hang cage subassembly for installing tower crane support side pipe
CN206205768U (en) Combined type hangs cat ladder
CN218715112U (en) Fast-assembling quick detach device for sideboard of building floor template
CN204590563U (en) A kind of Novel dismountable scaffold
CN212507332U (en) Automatic adjusting sleeve groove triangular support structure of climbing frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Science And Industry Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Futian District Che Kung Temple Binhe Tairan industry tipping 17 storey building No. 17A

Patentee before: China Construction Steel Structure Corp.,Ltd.

CP03 Change of name, title or address