CN212507332U - Automatic adjusting sleeve groove triangular support structure of climbing frame - Google Patents

Automatic adjusting sleeve groove triangular support structure of climbing frame Download PDF

Info

Publication number
CN212507332U
CN212507332U CN202021918209.3U CN202021918209U CN212507332U CN 212507332 U CN212507332 U CN 212507332U CN 202021918209 U CN202021918209 U CN 202021918209U CN 212507332 U CN212507332 U CN 212507332U
Authority
CN
China
Prior art keywords
fixed
cylinder
adjusting
seat
thick bamboo
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021918209.3U
Other languages
Chinese (zh)
Inventor
黎泽盛
黎鹏
黎龙
黎战
林维钧
李桂酉
叶浩康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beiliu branch of Guangxi Jingtong kelide Engineering Technology Co.,Ltd.
Guangxi Jingtong kelide Engineering Technology Co., Ltd
Original Assignee
Beiliu Branch Of Guangxi Jingtong Kelide Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beiliu Branch Of Guangxi Jingtong Kelide Engineering Technology Co ltd filed Critical Beiliu Branch Of Guangxi Jingtong Kelide Engineering Technology Co ltd
Priority to CN202021918209.3U priority Critical patent/CN212507332U/en
Application granted granted Critical
Publication of CN212507332U publication Critical patent/CN212507332U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a climb a automatically regulated grooving triumphal strut structure, the characteristic is installation fixed sleeve between fixed cylinder base and the adjusting cylinder base, fixed core section of thick bamboo, the slot breach section of thick bamboo, adjust the core section of thick bamboo, fixed core section of thick bamboo one end welds the adjusting cylinder base inboardly, the fixed core section of thick bamboo other end embolias the fixed sleeve inner chamber from a fixed sleeve port, and through the lock pin, radial lock pin is fixed, another port of fixed sleeve welds admittedly at fixed cylinder base inboardly, adjust the solid welding of core section of thick bamboo one end and weld at adjusting cylinder base inboardly, the adjusting core section of thick bamboo other end embolias the inner chamber from the bottom surface slot breach of slot breach section of thick bamboo, another port of slot breach section of thick bamboo welds admittedly at fixed cylinder base inboardly, fixed cylinder base passes through the fixing base nail rigid coupling and. The novel structure, simple structure, it is easy to make, and installation convenient to use economizes the material and economizes the material, and light body simple dress is with low costs, realizes automatically regulated and climbs the frame and reach and the room wall between the interval, adapts to the job site, safe and reliable.

Description

Automatic adjusting sleeve groove triangular support structure of climbing frame
Technical Field
The utility model relates to a construction machinery, especially a climb a frame automatically regulated cover ditch triangular supports structure.
Background
The traditional building bent is formed by building a brick wall and building steel pipes, and the periphery of the bent is surrounded by plastic mesh bags, so that the grid is convenient and quick to build. However, in modern buildings, the buildings are all dozens of stories, one pipe is limited in height, and pipe sections have to be additionally arranged on the pipe sections at the existing height to be lifted, so that construction workers can complete high-altitude operation. However, the structure has the defects of more materials, incapability of adjusting the climbing frame and the house wall, and insecure connection when the height is increased, and accidents are easy to happen. Reference 1, application No.: CN201821763817, invention name: a support frame that attaches wall support for climbing frame, building include first floor and the second floor that sets up in turn, first floor extends towards the outside along the face direction and is formed with the extension that is used for installing first attaching wall support, the support frame includes: a first transverse support mounted on the extension, the first transverse support having a first end distal from the first floor and a second end proximal to the first floor; a vertical support for mounting a second wall-attached support, the vertical support having opposite top and bottom ends, the bottom end of the vertical support being connected to the first end of the first transverse support; and the first inclined supporting piece is obliquely connected between the second end of the first transverse supporting piece and the top end of the vertical supporting piece. Reference 2, application No.: CN201821170261, invention name: the wall-attached supporting seat of the internal guide type lifting scaffold has higher stress strength by arranging the wall-attached plate with the groove steel structure, and can reduce material consumption and weight under the same load; the double-screw structure is arranged, so that the rotation of the attached wallboard can be prevented, and the capability of bearing external force impact of the whole body is improved; the guide wheel frame installation barrel with the cylindrical structure is convenient for key connection with the guide wheel system and installation and disassembly. The structural features of the comparison documents 1 and 2 are different from those of the present disclosure.
Disclosure of Invention
An object of the utility model is to provide an overcome prior art defect, innovative design one kind can resist wind and rain and beat, and is firm reliable, high random adjustment, and the high distance automatically regulated between climbing frame and the room wall is adapted to building material and stacks, transports building material, and the walking is convenient, and convenient operation, novel structure, the light body economizes the material, and is with low costs, simple structure, and it is easy to make, installation convenient to use's a climbing frame automatically regulated trepanning triangle brace structure.
The technical solution of the utility model is that, a climb a automatically regulated grooving triangular supports structure, including fixed cylinder base, fixed sleeve, the lock pin, fixed cylinder base top surface, radial locking hole, a slot breach section of thick bamboo, radial lock pin, a fixed core section of thick bamboo, an adjusting core section of thick bamboo, the fixing base nail, an adjusting cylinder base, the slot breach, the inner chamber, the fixing base mounting hole, an adjusting base mounting hole, above the passageway board, the through-hole, cross the road board bottom surface, cross the road board terminal surface, passageway board bottom hook, adjust the lockhole, radial lockhole, fixed locking hole and passageway board, its characterized in that installs fixed sleeve 2 between fixed cylinder base 1 and the adjusting cylinder base 11, a fixed core section of thick bamboo 8, a slot breach section of thick bamboo 6, an adjusting core section of thick bamboo 9, fixed core section of thick bamboo 8 one end is welded firmly in adjusting cylinder base 11 inboardly, the fixed core section of thick bamboo 8 other end is from a fixed sleeve 2 end mouth cover income fixed sleeve 2 inner, Radial lock pin 7 is fixed, the solid welding of 2 another ports of fixed sleeve is 1 inboards at fixed cylinder base, it is inboard at regulation cylinder base 11 to adjust the solid welding of 9 one ends of core section of thick bamboo, it embolias inner chamber 13 from the bottom surface slot breach 12 of a slot breach section of thick bamboo 6 to adjust the 9 other end of core section of thick bamboo, the solid welding of 6 another ports of a slot breach section of thick bamboo is 1 inboards at fixed cylinder base, fixed cylinder base 1 is climbing the frame through fixing base nail 10 rigid couplings, it is on the house wall through fixing base nail 10 rigid couplings to adjust cylinder base 11.
The outer diameter of the groove gap 12 is larger than or equal to the outer diameter of the adjusting core barrel 9.
The fixed locking hole 23 is a screw hole, the radial locking hole 22 is a screw hole, the adjusting locking hole 21 is a screw hole, the fixing seat mounting hole 14 is a screw hole, and the adjusting seat mounting hole 15 is a screw hole.
The climbing frame automatic adjusting sleeve ditch triangular support consisting of the fixed cylinder seat 1, the adjusting cylinder seat 11, the fixed core cylinder 8, the adjusting core cylinder 9 and the groove gap cylinder 6 moves up and down on a climbing frame and a house wall and is fastened by the fixed seat nails 10.
The fixed core cylinder 8, the adjusting core cylinder 9, the fixed cylinder base 1 and the adjusting cylinder base 11 are one of a square pipe and a circular pipe.
And the top surfaces of the fixed barrel seat 4 and the fixed core barrel 8 are provided with a passage plate 24.
The groove gap cylinder 6 and the adjusting core cylinder 9 are arranged between the fixed cylinder base 1 and the adjusting cylinder base 11 in an inclined supporting mode.
The utility model discloses the outstanding effect compared with the conventional art is, the modern design, simple structure, and it is easy to make, and installation convenient to use economizes the material and economizes the material, and light body simple dress is with low costs, realize automatically regulated climb the frame and with the room wall between the interval, the adaptation job site accepts the material and stacks, transports, workman's walking is convenient. High working efficiency, safety, reliability and convenient disassembly, assembly and transportation.
Drawings
Fig. 1 is a schematic view of the assembly front view of the present invention.
Fig. 2 is a schematic top view of the assembly of the present invention.
Fig. 3 is a schematic top view of the sleeve body according to the present invention.
Fig. 4 is a schematic view of the sleeve bottom with a groove gap according to the present invention.
Fig. 5 is a schematic bottom view of the sleeve according to the present invention.
Fig. 6 is a schematic front view of the sleeve body of the present invention.
Fig. 7 is a left side view of the sleeve body of the present invention.
Fig. 8 is a schematic front view of the seat body of the adjusting tube of the present invention.
Fig. 9 is a right-side view of the seat body of the adjusting tube of the present invention.
Fig. 10 is a schematic front view of the aisle board of the present invention.
Fig. 11 is a rear view of the crossing plate of the present invention.
Fig. 12 is a right-side view schematic diagram of the aisle board of the present invention.
Fig. 13 is a schematic cross-sectional view of the aisle board of the present invention shown in fig. 12C-C.
Fig. 14 is a schematic cross-sectional view of the aisle board of fig. 10M-M according to the present invention.
Fig. 15 is a schematic view of the assembly and use state of the present invention.
Fig. 16 is a schematic bottom view of fig. 1 according to the present invention.
Fig. 17 is a schematic view of the aisle board installed on the cross arm of the support seat.
Fig. 18 is a schematic top view of the aisle board of the present invention installed on the cross arm of the support seat.
Fig. 19 is a left-side sectional view of the aisle board installed on the cross arm of the support seat.
Reference numerals: fixed cylinder base 1, fixed sleeve 2, lock pin 3, fixed cylinder base top surface 4, radial locking hole 5, a slot breach section of thick bamboo 6, radial lock pin 7, fixed core section of thick bamboo 8, adjust core section of thick bamboo 9, fixing base nail 10, adjust cylinder base 11, slot breach 12, inner chamber 13, fixing base mounting hole 14, adjust a mounting hole 15, passageway board higher authority 16, through-hole 17, cross board bottom surface 18, passageway board terminal surface 19, passageway board bottom hook 20, adjust lockhole 21, radial lockhole 22, fixed locking hole 23, passageway board 24.
Detailed Description
The invention will be further described with reference to the accompanying drawings
In embodiment 1, referring to the attached drawings, a fixed sleeve 2, a groove gap cylinder 6, a fixed core cylinder 8 and an adjusting core cylinder 9 are installed between a fixed cylinder seat 1 and an adjusting cylinder seat 11, the fixed core cylinder 8 is sleeved in an inner cavity of the fixed sleeve 2, and a radial lock pin 7 penetrates through a radial lock hole 22 to fix the fixed core cylinder 8. The radial lock pin 7 fixes the adjusting core barrel 9 through the adjusting lock hole 21. The bottom surface of the groove gap cylinder 6 is provided with a groove gap 12 for accommodating the adjusting core cylinder 9 into or pulling out the groove gap cylinder 6,
and is secured by radial locking pins 7. The fixed cylinder seat 1 and the adjusting cylinder seat 11 are fixed on the climbing frame and the house wall through fixed seat nails 10. The locking pin 3 fixes the fixed core cylinder 8 in the inner cavity of the fixed sleeve 2 through the fixed locking hole 23. The fixed locking hole 23 is a screw hole, and the adjusting locking hole 21 and the radial locking hole 22 are screw holes. The fixed barrel seat 1 can move up and down on the left and right climbing frames and is fixed by the fixed seat nail 10. The adjusting cylinder seat 11 can move up and down on the house wall and is fixed by the fixing seat nail 10. The channel plate 24 is fixed on the fixed sleeve 2 and the fixed core barrel 8. The bottom surface 18 of the passageway plate is arranged on the top surface 4 of the fixed cylinder seat and the top surface of the fixed core cylinder 8, and the number of the pieces of the passageway plate 24 is determined by the distance between the fixed cylinder seat 1 and the adjusting cylinder seat 11. The installation passageway plates 24 are installed between the climbing frame and the house wall, the blocks are connected with connecting hooks, and the passageway plates 24 are arranged in a vertical and horizontal sequence.
Embodiment 2, a climbing frame automatic adjusting casing ditch triangular support structure, comprising a fixed cylinder base, a fixed sleeve, a locking nail, a fixed cylinder base top surface, a radial locking hole, a groove gap cylinder, a radial locking nail, a fixed core cylinder, an adjusting core cylinder, a fixed seat nail, an adjusting cylinder base, a groove gap, an inner cavity, a fixed seat mounting hole, an adjusting seat mounting hole, an upper surface of a passageway plate, a through hole, a bottom surface of the passageway plate, an end surface of the passageway plate, a bottom edge hook of the passageway plate, an adjusting locking hole, a radial locking hole, a fixed locking hole and a passageway plate, characterized in that the fixed sleeve 2, the fixed core cylinder 8, the groove gap cylinder 6 and the adjusting core cylinder 9 are arranged between the fixed cylinder base 1 and the adjusting cylinder base 11, one end of the fixed core cylinder 8 is fixedly welded at the inner side of the adjusting cylinder base 11, the other end of the fixed core cylinder 8 is sleeved into the inner cavity of the fixed sleeve 2 from one end opening of the fixed sleeve 2, another port of fixed sleeve 2 welds admittedly in fixed cylinder base 1 inboard, and it is inboard in adjusting cylinder base 11 to adjust the solid welding of 9 one end of core section of thick bamboo, and the bottom surface slot breach 12 of adjusting the core section of thick bamboo 6 from the slot breach section of thick bamboo 9 other end embolias inner chamber 13, and another port of slot breach section of thick bamboo 6 welds admittedly in fixed cylinder base 1 inboard, and fixed cylinder base 1 is climbing the frame through fixing base nail 10 rigid coupling, and adjusting cylinder base 11 is on the house wall through fixing base nail 10 rigid coupling. The climbing frame automatic adjusting sleeve ditch triangular support consisting of the fixed cylinder seat 1, the adjusting cylinder seat 11, the fixed core cylinder 8, the adjusting core cylinder 9 and the groove gap cylinder 6 moves up and down on a climbing frame and a house wall and is fastened by the fixed seat nails 10. The fixed core cylinder 8, the adjusting core cylinder 9, the fixed cylinder base 1 and the adjusting cylinder base 11 are one of a square pipe and a circular pipe. And the top surfaces of the fixed barrel seat 4 and the fixed core barrel 8 are provided with a passage plate 24.
When the adjustable cylinder is installed and used, the fixed cylinder 8 is installed in the fixed sleeve 2 and is fixed by the locking nail 3 and the radial locking nail 7, the adjustable cylinder 9 is installed in the inner cavity 13 from the groove gap 12 on the bottom surface of the groove gap cylinder 6 and is fixed by the radial locking nail 7, and the adjustable cylinder 9 and the groove gap cylinder 6 are installed between the fixed cylinder seat 1 and the adjustable cylinder seat 11 in a diagonal bracing mode. The adjusting core barrel 9 can move left and right, and after the required distance is adjusted, the adjusting core barrel 9 is fixed in the inner cavity 13 of the groove gap barrel 6 through the radial locking nails 7, so that the distance between the climbing frame and the house wall can be adjusted. The fixed sleeve 2 and the groove gap cylinder 6 are fixedly connected behind the fixed cylinder base 1, and the fixed cylinder base 1 can move up and down to be fixedly connected on the climbing frame. The fixed core cylinder 8 and the adjusting core cylinder 9 are fixedly connected to the fixed sleeve 2, the fixed sleeve 2 is fixedly connected to the fixed sleeve seat 1, and the fixed sleeve seat 1 can be vertically moved and installed on the climbing frame. The fixed core cylinder 8 and the adjusting core cylinder 9 are fixedly connected on the adjusting cylinder seat 11, and the adjusting cylinder seat 11 is fixedly connected on the house wall, so that the purpose that the climbing frame automatic adjusting sleeve groove triangular support can automatically lift and the purpose that the distance and the width can be adjusted left and right is achieved.

Claims (7)

1. A climbing frame automatic adjusting sleeve groove triangular brace structure comprises a fixed cylinder seat, a fixed sleeve, a locking nail, a fixed cylinder seat top surface, a radial locking hole, a groove gap cylinder, a radial locking nail, a fixed core cylinder, an adjusting core cylinder, a fixed seat nail, an adjusting cylinder seat, a groove gap, an inner cavity, a fixed seat mounting hole, an adjusting seat mounting hole, a passageway plate upper surface, a through hole, a passageway plate bottom surface, a passageway plate end surface, a passageway plate bottom edge hook, an adjusting locking hole, a radial locking hole, a fixed locking hole and a passageway plate, and is characterized in that the fixed sleeve (2), the fixed core cylinder (8), the groove gap cylinder (6) and the adjusting core cylinder (9) are arranged between the fixed cylinder seat (1) and the adjusting cylinder seat (11), one end of the fixed core cylinder (8) is fixedly welded on the inner side of the adjusting cylinder seat (11), the other end of the fixed core cylinder (8) is sleeved into the inner cavity of the fixed sleeve (2) from one end opening of the, and through check pin (3), radial lock pin (7) are fixed, the solid welding of another port of fixed sleeve (2) is inboard in fixed cylinder base (1), it is inboard in regulation cylinder base (11) to adjust the solid welding of a cylinder (9) one end, it embolias inner chamber (13) from bottom surface slot breach (12) of slot breach section of thick bamboo (6) to adjust the cylinder (9) other end, and fixed through radial lock pin (7), the solid welding of another port of slot breach section of thick bamboo (6) is inboard in fixed cylinder base (1), fixed cylinder base (1) is on climbing the frame through fixing base nail (10) rigid coupling, it is on the room wall through fixing base nail (10) to adjust cylinder base (11).
2. The climbing frame automatic adjusting sleeve groove triangular support structure according to claim 1, wherein the outer diameter of the groove gap (12) is larger than or equal to the outer diameter of the adjusting core barrel (9).
3. The triangular support structure for the automatic adjustment sleeve groove of the climbing frame according to claim 1, wherein the fixed locking hole (23) is a screw hole, the radial locking hole (22) is a screw hole, the adjustment locking hole (21) is a screw hole, the fixing seat mounting hole (14) is a screw hole, and the adjustment seat mounting hole (15) is a screw hole.
4. The climbing frame automatic adjustment sleeve groove triangular brace structure according to claim 1, characterized in that the climbing frame automatic adjustment sleeve groove triangular brace composed of a fixed cylinder seat (1), an adjustment cylinder seat (11), a fixed core cylinder (8), an adjustment core cylinder (9) and a groove gap cylinder (6) moves up and down on the climbing frame and the house wall and is fastened through a fixed seat nail (10).
5. The climbing frame automatic adjusting sleeve groove triangular brace structure according to claim 1, wherein the fixed core cylinder (8), the adjusting core cylinder (9), the fixed cylinder seat (1) and the adjusting cylinder seat (11) are one of a square tube and a circular tube.
6. The climbing frame automatic adjustment sleeve groove triangular support structure according to claim 1, wherein a passage plate (24) is installed on the top surface of the fixed cylinder base (4) and the top surface of the fixed core cylinder (8).
7. The climbing frame automatic adjusting sleeve groove triangular support structure according to claim 1, characterized in that the groove gap cylinder (6) and the adjusting core cylinder (9) are installed between the fixed cylinder seat (1) and the adjusting cylinder seat (11) in a diagonal support mode.
CN202021918209.3U 2020-09-05 2020-09-05 Automatic adjusting sleeve groove triangular support structure of climbing frame Active CN212507332U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021918209.3U CN212507332U (en) 2020-09-05 2020-09-05 Automatic adjusting sleeve groove triangular support structure of climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021918209.3U CN212507332U (en) 2020-09-05 2020-09-05 Automatic adjusting sleeve groove triangular support structure of climbing frame

Publications (1)

Publication Number Publication Date
CN212507332U true CN212507332U (en) 2021-02-09

Family

ID=74384186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021918209.3U Active CN212507332U (en) 2020-09-05 2020-09-05 Automatic adjusting sleeve groove triangular support structure of climbing frame

Country Status (1)

Country Link
CN (1) CN212507332U (en)

Similar Documents

Publication Publication Date Title
CN211736298U (en) Double-rod diagonal cantilever scaffold
CN212507332U (en) Automatic adjusting sleeve groove triangular support structure of climbing frame
CN106939690A (en) The anti-load-bearing scaffold that inclines of one kind
CN206034875U (en) Supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device
CN101906870A (en) Suspended scaffolding
CN107338965A (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN111894259A (en) Climb frame automatically regulated cover ditch triangular support structure
CN216949411U (en) Be used for inserted lift scaffold to hang and establish protection pocket net device
CN201502170U (en) Horizontal supporting device of building external frame
CN202990406U (en) Bowl buckle type scaffold
CN211920714U (en) Support system of pull-up and pull-down type external hanging self-climbing tower crane
CN211396530U (en) Detachable lifting platform special for stair construction
CN211341846U (en) Novel walling installation of assembly type structure prevents empting barrier plate
CN210067410U (en) Support device for climbing scaffold
CN201730306U (en) Light-weight scaffold
CN207110500U (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
KR200288007Y1 (en) Rail railing (scaffolding) clamping device in the construction site.
CN205894639U (en) Supplementary turnover subassembly that climbs from platform that climbs
CN217458557U (en) Attachment structure of main building tower crane
CN219411759U (en) Assembled lower hanging operation platform based on sliding mode lifting system
CN217518218U (en) High-rise construction ALC strip shaped plate promotes installation device
CN213174745U (en) Support bracket device for climbing frame
CN213115437U (en) Wall-attached type operation platform module under overhanging roof
CN217711323U (en) Joint formula buckle installation component
CN213174717U (en) Circular structure of cross arm of support seat of climbing frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210826

Address after: 537400 west of Min'an waste treatment plant, Beiliu City, Yulin City, Guangxi Zhuang Autonomous Region (in Beiliu Qibao fertilizer technology company)

Patentee after: Guangxi Jingtong kelide Engineering Technology Co., Ltd

Patentee after: Beiliu branch of Guangxi Jingtong kelide Engineering Technology Co.,Ltd.

Address before: 537400 west of Min'an waste treatment plant, Beiliu City, Yulin City, Guangxi Zhuang Autonomous Region

Patentee before: Beiliu branch of Guangxi Jingtong kelide Engineering Technology Co.,Ltd.

TR01 Transfer of patent right