CN210067410U - Support device for climbing scaffold - Google Patents

Support device for climbing scaffold Download PDF

Info

Publication number
CN210067410U
CN210067410U CN201920880481.8U CN201920880481U CN210067410U CN 210067410 U CN210067410 U CN 210067410U CN 201920880481 U CN201920880481 U CN 201920880481U CN 210067410 U CN210067410 U CN 210067410U
Authority
CN
China
Prior art keywords
wall
plate
scaffold
fixing plate
clamping plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920880481.8U
Other languages
Chinese (zh)
Inventor
段英梅
朱凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yishuntian Technology Development Co Ltd
Original Assignee
Beijing Yishuntian Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Yishuntian Technology Development Co Ltd filed Critical Beijing Yishuntian Technology Development Co Ltd
Priority to CN201920880481.8U priority Critical patent/CN210067410U/en
Application granted granted Critical
Publication of CN210067410U publication Critical patent/CN210067410U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a support arrangement for scaffold frame climbs belongs to scaffold frame technical field. The supporting device of the climbing scaffold comprises a first fixing plate and a scaffold sliding rod, wherein one end, away from the first fixing plate, of the partition plate is connected with a second fixing plate, the outer wall of the second fixing plate is connected with a supporting rod, one end, away from the second fixing plate, of the supporting rod is connected with a first clamping plate, the inner wall of the first clamping plate is connected with a fixed shaft, the outer wall of the fixed shaft is rotatably connected with a sleeve, the outer wall of the sleeve is respectively connected with a first stop lever and a second stop lever, the inner wall of the scaffold sliding rod is connected with a fixed rod matched with the first stop lever, a groove is formed in the inner wall of the first clamping plate, and the second stop lever abuts against the; the utility model discloses can effectually prevent that the scaffold from falling, avoid the scaffold to appear the phenomenon of landing after rising or falling suitable position, guarantee workman's safety, make it connect more stably simultaneously.

Description

Support device for climbing scaffold
Technical Field
The utility model relates to a scaffold technical field especially relates to a strutting arrangement of scaffold that climbs.
Background
The scaffold is various supports erected for workers to operate and solve vertical and horizontal transportation on a construction site, and a general term of a building boundary refers to a place which is used on an outer wall, interior decoration or high floor height on a construction site and cannot be directly constructed, and is mainly used for up and down dry work of constructors or enclosure of a peripheral safety net, high-altitude installation components and the like, so that the scaffold is erected; the climbing scaffold is also called climbing frame, is a novel scaffold system developed in recent years, is mainly applied to high-rise shear wall type building plates, and can ascend or descend along buildings.
Because climbing formula scaffold frame need be along building up climbing or decline, and the support effect of current climbing formula scaffold frame is relatively poor, consequently climbing formula scaffold frame appears the landing phenomenon easily after rising or descending suitable position, can cause the scaffold frame to fall even when serious, influences workman's life safety.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problems existing in the prior art and providing a support device of a climbing scaffold.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
support arrangement of scaffold that climbs, including first fixed plate and scaffold slide bar, first fixed plate is connected on the wall body, the outer wall connection of first fixed plate has the baffle, the one end that first fixed plate was kept away from to the baffle is connected with the second fixed plate, the outer wall connection of second fixed plate has the bracing piece, the one end that the second fixed plate was kept away from to the bracing piece is connected with first cardboard, the inner wall connection of first cardboard has the fixed axle, the outer wall rotation of fixed axle is connected with the sleeve, telescopic outer wall is connected with first pin and second pin respectively, the inner wall connection of scaffold slide bar has the dead lever with first pin matched with, the inner wall of first cardboard is dug flutedly, the second pin offsets with the inner wall of recess.
Preferably, the outer wall of fixed axle has cup jointed the torsional spring, the torsional spring is connected between the outer wall of sleeve and first cardboard.
Preferably, the inner wall of the partition is connected with a cross rod, the outer walls of the first fixing plate, the second fixing plate and the cross rod are all provided with first threaded holes, and the first threaded holes are internally connected with first screws.
Preferably, the outer wall of the second fixing plate is connected with a supporting plate, the supporting plate abuts against the outer wall of the second fixing plate, a second threaded hole is formed in the outer wall of the supporting plate in a chiseled mode, and a second screw is connected in the second threaded hole.
Preferably, a limiting rod is connected between the supporting rod and the second fixing plate.
Preferably, the outer wall of the first clamping plate is connected with a second clamping plate, the first clamping plate and the second clamping plate are connected through a first bolt, and the scaffold sliding rod is slidably connected between the first clamping plate and the second clamping plate.
Preferably, the top of the supporting rod is connected with a connecting rod through a second bolt, and the bottom of the connecting rod is connected with a hook.
Compared with the prior art, the utility model provides a support arrangement of scaffold frame climbs possesses following beneficial effect:
1. the support device of the climbing scaffold fixes a first fixing plate and a second fixing plate on a wall body by connecting the first screw in a first threaded hole, the first fixing plate and the second fixing plate can have a certain gap by a clapboard, so that the first fixing plate and the second fixing plate are connected with the wall body more stably, and the second screw can be connected in a second threaded hole on a support plate, so that the support plate is connected with the wall body, the connection between the first fixing plate and the wall body is more stable, the support rod can play a supporting effect on a first clamping plate, the limiting rod can make the supporting effect better, then a scaffold slide bar is matched with the first clamping plate, the second clamping plate is abutted against the first clamping plate, the first clamping plate is connected with the second clamping plate through a first bolt, so that the scaffold slide bar can conveniently slide, then a chain or an electric block or the like is connected on a hook at the bottom of a connecting rod, so that the scaffold slide bar can conveniently move, thereby the scaffold is convenient to move, the connecting rod is connected on the supporting rod through the second bolt, the connection is more stable, then when the fixed rod moves, the first stop lever which touches the outer wall of the sleeve is driven, thereby the first stop lever rotates on the outer wall of the fixed shaft, thereby the fixed rod is convenient to move, when the fixed rod rotates to the upper part of the first stop lever, the torsion spring between the sleeve and the first clamping plate can lead the first stop lever to automatically reset, when the scaffold slide bar slides down, the fixed rod can lead the fixed rod to drive the first stop lever to move, thereby the first stop lever drives the second stop lever to move through the sleeve, thereby the second stop lever props against the inner wall of the groove, thereby the position of the second stop lever is fixed, the position of the first stop lever is fixed, thereby the first stop lever props against the fixed rod, the scaffold slide bar is fixed, the scaffold slide bar is prevented from falling, the scaffold is prevented from rising up or, the phenomenon of slipping occurs, and the safety of workers is ensured.
Drawings
Fig. 1 is a first schematic structural view of a support device of a climbing scaffold according to the present invention;
fig. 2 is a second schematic structural view of the support device of the climbing scaffold according to the present invention;
FIG. 3 is a schematic structural view of the bottom of the support device of the climbing scaffold according to the present invention;
fig. 4 is a third schematic structural view of the support device of the climbing scaffold according to the present invention;
fig. 5 is a cross-sectional view of a support device of a climbing scaffold according to the present invention;
fig. 6 is a schematic structural view of a portion a in fig. 5 of a support device for a climbing scaffold according to the present invention.
In the figure: 1. a first fixing plate; 101. a second fixing plate; 102. a partition plate; 103. a cross bar; 2. a support bar; 201. a limiting rod; 3. a first clamping plate; 301. a second clamping plate; 302. a fixed shaft; 303. a first bar; 304. a second bar; 305. a groove; 306. a torsion spring; 4. a support plate; 5. a scaffold slide bar; 501. fixing the rod; 6. a connecting rod; 601. and (4) hanging hooks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-6, a supporting device of a climbing scaffold comprises a first fixing plate 1 and a scaffold sliding rod 5, the first fixing plate 1 is connected to a wall, the outer wall of the first fixing plate 1 is connected with a partition plate 102, one end, away from the first fixing plate 1, of the partition plate 102 is connected with a second fixing plate 101, the outer wall of the second fixing plate 101 is connected with a supporting rod 2, one end, away from the second fixing plate 101, of the supporting rod 2 is connected with a first clamping plate 3, the inner wall of the first clamping plate 3 is connected with a fixing shaft 302, the outer wall of the fixing shaft 302 is rotatably connected with a sleeve, the outer wall of the sleeve is respectively connected with a first stop lever 303 and a second stop lever 304, the inner wall of the scaffold sliding rod 5 is connected with a fixing lever 501 matched with the first stop lever 303, a groove 305.
Referring to fig. 5 to 6, the outer wall of the fixed shaft 302 is sleeved with a torsion spring 306, and the torsion spring 306 is connected between the sleeve and the outer wall of the first clamping plate 3; the torsion spring 306 may automatically reset the first lever 303.
Referring to fig. 2, a cross bar 103 is connected to the inner wall of the partition plate 102, first threaded holes are drilled in the outer walls of the first fixing plate 1, the second fixing plate 101 and the cross bar 103, and first screws are connected to the first threaded holes; the connection can be made more stable.
Referring to fig. 1 to 3, a supporting plate 4 is connected to an outer wall of the second fixing plate 101, the supporting plate 4 abuts against the outer wall of the second fixing plate 101, a second threaded hole is drilled in the outer wall of the supporting plate 4, and a second screw is connected to the second threaded hole; the connection can be made more stable.
Referring to fig. 1 to 4, a limit rod 201 is connected between the support rod 2 and the second fixing plate 101; the connection of the support rods 2 can be more stable.
Referring to fig. 1 to 5, the outer wall of the first clamping plate 3 is connected with a second clamping plate 301, the first clamping plate 3 is connected with the second clamping plate 301 through a first bolt, and the scaffold slide bar 5 is slidably connected between the first clamping plate 3 and the second clamping plate 301; so that the scaffold slide bar 5 can conveniently slide.
Referring to fig. 4, the top of the support rod 2 is connected with a connecting rod 6 through a second bolt, and the bottom of the connecting rod 6 is connected with a hook 601; the scaffold is convenient to ascend or descend.
The first fixing plate 1 and the second fixing plate 101 are fixed on the wall by connecting the first screw in the first threaded hole, the partition plate 102 can make the first fixing plate 1 and the second fixing plate 101 have a certain gap to make the connection with the wall more stable, and the second screw can be connected in the second threaded hole on the support plate 4 to make the support plate 4 connected with the wall, so that the connection between the first fixing plate 1 and the second fixing plate 101 and the wall is more stable, the support rod 2 can play a role in supporting the first clamping plate 3, and the spacing rod 201 can make the supporting effect better, then the scaffold slide bar 5 is matched with the first clamping plate 3, the second clamping plate 301 is abutted against the first clamping plate 3, so that the first clamping plate 3 is connected with the second clamping plate 301 through the first screw, thereby the scaffold slide bar 5 can slide conveniently, then the hook 601 at the bottom of the connecting rod 6 is connected with a chain or an electric hoist, etc., thereby making the scaffold slide bar 5 conveniently move, thereby making the scaffold conveniently move, the connecting rod 6 is connected to the supporting rod 2 through the second bolt, so that the connection is more stable, then when the fixing rod 501 moves, the first blocking rod 303 touching the outer wall of the sleeve is driven, thereby making the first blocking rod 303 rotate on the outer wall of the fixing shaft 302, thereby making the fixing rod 501 conveniently move, when the fixing rod 501 rotates to the upper side of the first blocking rod 303, the torsion spring 306 between the sleeve and the first clamping plate 3 can make the first blocking rod 303 automatically reset, when the scaffold slide bar 5 slides down, the fixing rod 501 can drive the first blocking rod 303 to move, thereby making the first blocking rod 303 drive the second blocking rod 304 to move through the sleeve, thereby making the second blocking rod 304 abut against the inner wall of the groove 305, thereby making the position of the second blocking rod 304 fixed, making the position of the first blocking rod 303 fixed, thereby making it abut against the fixing rod 501, the scaffold slide bar 5 is fixed to prevent falling, so that the scaffold is prevented from falling after rising or falling to a proper position, and the safety of workers is guaranteed.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. A supporting device of a climbing scaffold comprises a first fixing plate (1) and scaffold sliding rods (5), wherein the first fixing plate (1) is connected to a wall body, and is characterized in that the outer wall of the first fixing plate (1) is connected with a partition plate (102), one end, far away from the first fixing plate (1), of the partition plate (102) is connected with a second fixing plate (101), the outer wall of the second fixing plate (101) is connected with a supporting rod (2), one end, far away from the second fixing plate (101), of the supporting rod (2) is connected with a first clamping plate (3), the inner wall of the first clamping plate (3) is connected with a fixing shaft (302), the outer wall of the fixing shaft (302) is rotatably connected with a sleeve, the outer wall of the sleeve is respectively connected with a first stop lever (303) and a second stop lever (304), and the inner wall of the scaffold sliding rods (5) is connected with a fixing lever (501, a groove (305) is formed in the inner wall of the first clamping plate (3), and the second stop lever (304) abuts against the inner wall of the groove (305).
2. The support device of a climbing scaffold according to claim 1, characterized in that the outer wall of the fixed shaft (302) is sleeved with a torsion spring (306), and the torsion spring (306) is connected between the sleeve and the outer wall of the first clamping plate (3).
3. The support device for climbing scaffolding according to claim 1, characterized in that a cross bar (103) is connected to an inner wall of the spacer (102), and first threaded holes are bored in outer walls of the first fixing plate (1), the second fixing plate (101) and the cross bar (103), and first screws are connected to the first threaded holes.
4. The support device for climbing scaffolds according to claim 3, wherein a support plate (4) is connected to the outer wall of the second fixing plate (101), the support plate (4) abuts against the outer wall of the second fixing plate (101), a second threaded hole is chiseled in the outer wall of the support plate (4), and a second screw is connected in the second threaded hole.
5. Support arrangement for climbing scaffolding according to claim 1, characterized in that a stop bar (201) is connected between the support bar (2) and the second fixing plate (101).
6. Support arrangement for a climbing scaffold according to claim 2, characterized in that the outer wall of the first clamping plate (3) is connected with a second clamping plate (301), the first clamping plate (3) and the second clamping plate (301) are connected by a first bolt, and the scaffold slide (5) is slidably connected between the first clamping plate (3) and the second clamping plate (301).
7. A support arrangement for a climbing scaffold according to any of claims 1-6, characterized in that the top of the support bar (2) is connected with a link (6) by a second bolt, and the bottom of the link (6) is connected with a hook (601).
CN201920880481.8U 2019-06-12 2019-06-12 Support device for climbing scaffold Active CN210067410U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920880481.8U CN210067410U (en) 2019-06-12 2019-06-12 Support device for climbing scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920880481.8U CN210067410U (en) 2019-06-12 2019-06-12 Support device for climbing scaffold

Publications (1)

Publication Number Publication Date
CN210067410U true CN210067410U (en) 2020-02-14

Family

ID=69457354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920880481.8U Active CN210067410U (en) 2019-06-12 2019-06-12 Support device for climbing scaffold

Country Status (1)

Country Link
CN (1) CN210067410U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047601A (en) * 2021-03-22 2021-06-29 江苏鑫宸宇建设有限公司 External wall construction operation platform and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047601A (en) * 2021-03-22 2021-06-29 江苏鑫宸宇建设有限公司 External wall construction operation platform and construction method thereof

Similar Documents

Publication Publication Date Title
CN102168484B (en) External hanging scaffold and application method thereof
CN210067410U (en) Support device for climbing scaffold
CN209958708U (en) Scaffold for construction site construction
CN202055504U (en) Externally-hung scaffold
CN208310154U (en) A kind of construction scaffold
CN209429487U (en) A kind of scaffold of architectural engineering
CN204590555U (en) Assembling elevator hoistway construction platform
CN204676865U (en) A kind of building scaffold
CN111350337A (en) Bearing frame for building construction
CN201502170U (en) Horizontal supporting device of building external frame
CN210342611U (en) Scaffold frame of building engineering construction usefulness
CN215254436U (en) Scaffold with adjustable height
CN210067401U (en) Positioning and adjusting device for climbing scaffold
CN210976566U (en) Ladder for scaffold
CN109779223B (en) Assembly type building external hanging platform
CN216380487U (en) Telescopic scaffold suitable for indoor use
CN206110643U (en) Scaffold frame perpendicular fixed knot construct
CN213115416U (en) Combined aluminum frame
CN217557575U (en) Lifting type building scaffold
CN220377806U (en) Building scaffold for building engineering
CN214462389U (en) Scaffold for building engineering
CN216476248U (en) Adjustable usable floor area's for building engineering hanging flower basket
CN220451359U (en) Security protection device for construction
CN214402640U (en) Installation mechanism of steel frame for building
CN217871724U (en) Overturn preventing device of all-steel climbing frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant