CN210067401U - Positioning Adjustment Device for Climbing Scaffolding - Google Patents
Positioning Adjustment Device for Climbing Scaffolding Download PDFInfo
- Publication number
- CN210067401U CN210067401U CN201920880405.7U CN201920880405U CN210067401U CN 210067401 U CN210067401 U CN 210067401U CN 201920880405 U CN201920880405 U CN 201920880405U CN 210067401 U CN210067401 U CN 210067401U
- Authority
- CN
- China
- Prior art keywords
- rod
- plate
- bracket
- wall
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
本实用新型公开了爬升脚手架的定位调节装置,属于脚手架技术领域。爬升脚手架的定位调节装置,包括支架,所述支架的外壁连接有限位杆,所述限位杆的顶部外壁通过第一螺栓连接有第一支撑板,所述第一支撑板的顶部通过第二螺栓连接有第一钢脚手板,所述支架为相互对称的两组,两组所述支架之间连接有支撑杆,所述支架的顶部连接有固定杆,所述固定杆和支架的外壁均连接有第一安装板,所述第一安装板上设有安装孔,所述支撑杆的两端均连接有第二安装板,所述第二安装板上设有与第一安装孔相配合的第二安装孔,所述固定杆的顶部连接有第二钢脚手板;本实用新型可根据需求调节工作空间,方便拆卸和安装,使整体的脚手架装配拆除简单。
The utility model discloses a positioning adjustment device for a climbing scaffold, which belongs to the technical field of scaffolds. The positioning adjustment device of the climbing scaffold includes a bracket, the outer wall of the bracket is connected with a limit rod, the top outer wall of the limit rod is connected with a first support plate through a first bolt, and the top of the first support plate is connected with a second support plate. Bolts are connected with a first steel scaffolding board, the brackets are two symmetrical groups, a support rod is connected between the two groups of the brackets, a fixing rod is connected to the top of the bracket, and the fixing rod and the outer wall of the bracket are both A first mounting plate is connected, the first mounting plate is provided with mounting holes, both ends of the support rod are connected with a second mounting plate, and the second mounting plate is provided with matching with the first mounting holes The top of the fixing rod is connected with a second steel scaffolding board; the utility model can adjust the working space according to the requirements, facilitate disassembly and installation, and make the assembly and disassembly of the whole scaffolding simple.
Description
技术领域technical field
本实用新型涉及脚手架技术领域,尤其涉及爬升脚手架的定位调节装置。The utility model relates to the technical field of scaffolding, in particular to a positioning adjustment device of a climbing scaffold.
背景技术Background technique
脚手架是指施工现场为工人操作并解决垂直和水平运输而搭设的各种支架,建筑界的通用术语,指建筑工地上用在外墙、内部装修或层高较高无法直接施工的地方,主要为了施工人员上下干活或外围安全网围护及高空安装构件等,说白了就是搭架子;爬升式脚手架又叫爬架,它是近年来开发的新型脚手架体系,主要应用于高层剪力墙式楼盘,它能沿着建筑物往上攀升或下降。Scaffolding refers to various brackets erected on the construction site for workers to operate and solve vertical and horizontal transportation. A general term in the construction industry refers to the use of external walls, interior decoration or high storey heights on construction sites where direct construction cannot be carried out, mainly for the purpose of Construction workers work up and down or surrounding safety net enclosures and high-altitude installation components, etc., to put it bluntly; climbing scaffolding, also known as climbing frame, is a new type of scaffolding system developed in recent years, mainly used in high-rise shear wall real estate , it can climb or descend along the building.
目前,在以混凝土剪力墙、楼板结构为主的多层建筑中,墙体混凝土施工通常采取逐层分层浇筑,由于分项内容多,工程量较大,因此对操作平台的装拆速度、占用空间与安全承载等方面都提出了更高的要求,且传统的钢管脚手架通常都是采用焊接式的结构,造成安装拆除费时,且工作空间不可调节,导致整体的脚手架的装配拆除困难。At present, in multi-storey buildings with concrete shear wall and floor structure as the main structure, the wall concrete construction usually adopts layer-by-layer pouring. Higher requirements have been put forward in terms of occupancy space and safe bearing capacity, and traditional steel scaffolds are usually welded structures, resulting in time-consuming installation and dismantling, and the unadjustable working space, which makes the assembly and dismantling of the overall scaffolding difficult.
实用新型内容Utility model content
本实用新型的目的是为了解决现有技术中存在的问题,而提出的爬升脚手架的定位调节装置。The purpose of the utility model is to solve the problems existing in the prior art, and propose a positioning adjustment device for a climbing scaffold.
为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions:
爬升脚手架的定位调节装置,包括支架,所述支架的外壁连接有限位杆,所述限位杆的顶部外壁通过第一螺栓连接有第一支撑板,所述第一支撑板的顶部通过第二螺栓连接有第一钢脚手板,所述支架为相互对称的两组,两组所述支架之间连接有支撑杆,所述支架的顶部连接有固定杆,所述固定杆和支架的外壁均连接有第一安装板,所述第一安装板上设有安装孔,所述支撑杆的两端均连接有第二安装板,所述第二安装板上设有与第一安装孔相配合的第二安装孔,所述固定杆的顶部连接有第二钢脚手板。The positioning adjustment device of the climbing scaffold includes a bracket, the outer wall of the bracket is connected with a limit rod, the top outer wall of the limit rod is connected with a first support plate through a first bolt, and the top of the first support plate is connected with a second support plate. A first steel scaffolding board is connected with bolts, the brackets are two symmetrical groups, a support rod is connected between the two groups of the brackets, a fixing rod is connected to the top of the bracket, and the outer wall of the fixing rod and the bracket are both A first mounting plate is connected, the first mounting plate is provided with mounting holes, both ends of the support rod are connected with a second mounting plate, and the second mounting plate is provided with a matching first mounting hole The second installation hole of the fixing rod is connected with a second steel scaffolding plate on the top of the fixing rod.
优选的,所述支架的底部连接有套筒,所述套筒内螺纹连接有支座,所述套筒的外壁还连接有第一法兰盘。Preferably, the bottom of the bracket is connected with a sleeve, the sleeve is internally threaded with a support, and the outer wall of the sleeve is also connected with a first flange.
优选的,所述固定杆的顶部连接有与第一法兰盘相对应的第二法兰盘,所述第二法兰盘的顶部连接有与套筒相配合的插杆。Preferably, the top of the fixing rod is connected with a second flange corresponding to the first flange, and the top of the second flange is connected with an insert rod matched with the sleeve.
优选的,所述第二法兰盘的底部连接有固定板,所述固定板通过第三螺栓连接有第二支撑板,所述第二钢脚手板通过第四螺栓连接在第二支撑板的外壁。Preferably, the bottom of the second flange is connected with a fixing plate, the fixing plate is connected with a second supporting plate through a third bolt, and the second steel scaffolding plate is connected with the second supporting plate through a fourth bolt. outer wall.
优选的,所述固定杆的底部转动连接有转动杆,所述转动杆的底部连接有丝杆,所述丝杆与支架螺纹相连,所述丝杆的外壁连接有螺母。Preferably, a rotating rod is rotatably connected to the bottom of the fixed rod, a screw rod is connected to the bottom of the rotating rod, the screw rod is threadedly connected to the bracket, and a nut is connected to the outer wall of the screw rod.
优选的,所述支撑杆主要有第一连杆和第二连杆组成,所述第一连杆上设有凹槽,所述第二连杆的外壁连接有与凹槽相配合的第三连杆。Preferably, the support rod is mainly composed of a first connecting rod and a second connecting rod, the first connecting rod is provided with a groove, and the outer wall of the second connecting rod is connected with a third connecting rod matched with the groove. link.
与现有技术相比,本实用新型提供了爬升脚手架的定位调节装置,具备以下有益效果:Compared with the prior art, the utility model provides a positioning adjustment device for a climbing scaffold, which has the following beneficial effects:
1、该爬升脚手架的定位调节装置,使用时,首先转动支座,使其与套筒螺纹连接,从而通过调节支座的高度,使支架保持水平,然后转动固定杆底部的转动杆,从而使转动杆带动丝杆转动,从而调整固定杆的高度,然后拧动螺母,使其与支架的顶部外壁相抵,从而使丝杆的位置固定,然后将两组支架上的固定杆依次装入,使其保持水平,然后拉动第二连杆,使第三连杆在第一连杆上的凹槽内滑动,且第三连杆的外壁设有限位块,可使第三连杆在凹槽内滑动更平稳,增强连接的稳定性,然后支撑杆两端外壁的第二安装板与支架外壁的第一安装板相配合,使第一安装孔和第二安装孔相配合,从而使其固定,且支撑杆可以倾斜设置在两组支架之间,使其连接更稳定,且支架的两侧外壁均设有第一安装板,可根据需要选择增大操作空间,且可将插杆插接在套筒内,使第一法兰盘与第二法兰盘相配合,对其进行固定连接,然后在限位杆上通过第一螺栓连接第一支撑板,从而方便使第一钢脚手板通过第二螺栓连接在第一支撑板上,然后在第二法兰盘上连接固定板,使固定板通过第三螺栓连接第二支撑板,则方便使第二支撑板通过第四螺栓连接第二钢脚手板,从而方便工人行走操作,本实用新型可根据需求调节工作空间,方便拆卸和安装,使整体的脚手架装配拆除简单。1. When using the positioning adjustment device of the climbing scaffold, firstly rotate the support to make it threadedly connected with the sleeve, so as to adjust the height of the support to keep the support level, and then rotate the rotating rod at the bottom of the fixed rod, so as to make the The rotating rod drives the screw rod to rotate, so as to adjust the height of the fixed rod, and then screw the nut to make it abut against the top outer wall of the bracket, so that the position of the screw rod is fixed, and then install the fixed rods on the two sets of brackets in turn to make the position of the screw rod fixed. It keeps it level, and then pulls the second connecting rod, so that the third connecting rod slides in the groove on the first connecting rod, and the outer wall of the third connecting rod is provided with a limit block, so that the third connecting rod can be in the groove The sliding is more stable and the stability of the connection is enhanced, and then the second mounting plates on the outer walls of the two ends of the support rod are matched with the first mounting plates on the outer wall of the bracket, so that the first mounting holes and the second mounting holes are matched, so as to be fixed, And the support rod can be inclined between the two sets of brackets to make the connection more stable, and the outer walls of both sides of the bracket are provided with first mounting plates, which can be selected to increase the operating space according to needs, and the insertion rod can be inserted into the bracket. In the sleeve, the first flange plate is matched with the second flange plate to be fixedly connected, and then the first support plate is connected to the limit rod through the first bolt, so as to facilitate the passage of the first steel scaffolding plate The second bolt is connected to the first support plate, and then the fixed plate is connected to the second flange, so that the fixed plate is connected to the second support plate through the third bolt, so that the second support plate can be connected to the second support plate through the fourth bolt. The steel scaffolding board is convenient for workers to walk and operate, the utility model can adjust the working space according to requirements, facilitate disassembly and installation, and make the assembly and disassembly of the whole scaffolding simple.
附图说明Description of drawings
图1为本实用新型提出的爬升脚手架的定位调节装置的结构示意图一;Fig. 1 is the structural representation one of the positioning adjustment device of the climbing scaffold proposed by the utility model;
图2为本实用新型提出的爬升脚手架的定位调节装置的结构示意图二;Fig. 2 is the second structural schematic diagram of the positioning adjustment device of the climbing scaffold proposed by the utility model;
图3为本实用新型提出的爬升脚手架的定位调节装置底部的结构示意图;3 is a schematic structural diagram of the bottom of the positioning adjustment device of the climbing scaffold proposed by the utility model;
图4为本实用新型提出的爬升脚手架的定位调节装置丝杆的结构示意图;Fig. 4 is the structural schematic diagram of the screw rod of the positioning adjustment device of the climbing scaffold proposed by the utility model;
图5为本实用新型提出的爬升脚手架的定位调节装置支撑杆的结构示意图;Fig. 5 is the structural schematic diagram of the support rod of the positioning adjustment device of the climbing scaffold proposed by the utility model;
图6为本实用新型提出的爬升脚手架的定位调节装置图2中A部分的结构示意图。FIG. 6 is a schematic structural diagram of part A in FIG. 2 of the positioning adjustment device of the climbing scaffold proposed by the utility model.
图中:1、支架;101、限位杆;102、第一安装板;103、套筒;104、第一法兰盘;105、支座;2、第一钢脚手板;201、第一支撑板;3、支撑杆;301、第一连杆;302、第二连杆;303、第三连杆;304、凹槽;305、第二安装板;4、固定杆;401、第二法兰盘;402、插杆;403、固定板;404、转动杆;405、螺母;406、丝杆;5、第二钢脚手板;501、第二支撑板。In the figure: 1, bracket; 101, limit rod; 102, first mounting plate; 103, sleeve; 104, first flange; 105, support; 2, first steel scaffolding plate; 201, first support plate; 3, support rod; 301, first link; 302, second link; 303, third link; 304, groove; 305, second mounting plate; 4, fixing rod; 401, second Flange plate; 402, insert rod; 403, fixed plate; 404, rotating rod; 405, nut; 406, screw rod; 5, second steel scaffolding plate; 501, second support plate.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example.
在本实用新型的描述中,需要理解的是,术语“上”、“下”、“前”、“后”、“左”、“右”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inside", The orientation or positional relationship indicated by "outside" is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation , are constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention.
参照图1-6,爬升脚手架的定位调节装置,包括支架1,支架1的外壁连接有限位杆101,限位杆101的顶部外壁通过第一螺栓连接有第一支撑板201,第一支撑板201的顶部通过第二螺栓连接有第一钢脚手板2,支架1为相互对称的两组,两组支架1之间连接有支撑杆3,支架1的顶部连接有固定杆4,固定杆4和支架1的外壁均连接有第一安装板102,第一安装板102上设有安装孔,支撑杆3的两端均连接有第二安装板305,第二安装板305上设有与第一安装孔相配合的第二安装孔,固定杆4的顶部连接有第二钢脚手板5。1-6, the positioning adjustment device of the climbing scaffold includes a
参照图1-3,支架1的底部连接有套筒103,套筒103内螺纹连接有支座105,套筒103的外壁还连接有第一法兰盘104。Referring to FIGS. 1-3 , a
参照图1-3,固定杆4的顶部连接有与第一法兰盘104相对应的第二法兰盘401,第二法兰盘401的顶部连接有与套筒103相配合的插杆402。1-3 , the top of the
参照图1,第二法兰盘401的底部连接有固定板403,固定板403通过第三螺栓连接有第二支撑板501,第二钢脚手板5通过第四螺栓连接在第二支撑板501的外壁。Referring to FIG. 1 , a
参照图4,固定杆4的底部转动连接有转动杆404,转动杆404的底部连接有丝杆406,丝杆406与支架1螺纹相连,丝杆406的外壁连接有螺母405。4, the bottom of the
参照图5,支撑杆3主要有第一连杆301和第二连杆302组成,第一连杆301上设有凹槽304,第二连杆302的外壁连接有与凹槽304相配合的第三连杆303。5 , the
使用时,首先转动支座105,使其与套筒103螺纹连接,从而通过调节支座105的高度,使支架1保持水平,然后转动固定杆4底部的转动杆404,从而使转动杆404带动丝杆406转动,从而调整固定杆4的高度,然后拧动螺母405,使其与支架1的顶部外壁相抵,从而使丝杆406的位置固定,然后将两组支架1上的固定杆4依次装入,使其保持水平,然后拉动第二连杆302,使第三连杆303在第一连杆301上的凹槽304内滑动,且第三连杆303的外壁设有限位块,可使第三连杆303在凹槽304内滑动更平稳,增强连接的稳定性,然后支撑杆3两端外壁的第二安装板305与支架1外壁的第一安装板102相配合,使第一安装孔和第二安装孔相配合,从而使其固定,且支撑杆3可以倾斜设置在两组支架1之间,使其连接更稳定,且支架1的两侧外壁均设有第一安装板102,可根据需要选择增大操作空间,且可将插杆402插接在套筒103内,使第一法兰盘104与第二法兰盘401相配合,对其进行固定连接,然后在限位杆101上通过第一螺栓连接第一支撑板201,从而方便使第一钢脚手板2通过第二螺栓连接在第一支撑板201上,然后在第二法兰盘401上连接固定板403,使固定板403通过第三螺栓连接第二支撑板501,则方便使第二支撑板501通过第四螺栓连接第二钢脚手板5,从而方便工人行走操作,本实用新型,可根据需求调节工作空间,方便拆卸和安装,使整体的脚手架装配拆除简单。When in use, firstly rotate the
以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. Equivalent replacement or modification of the new technical solution and its utility model concept shall be included within the protection scope of the present utility model.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920880405.7U CN210067401U (en) | 2019-06-12 | 2019-06-12 | Positioning Adjustment Device for Climbing Scaffolding |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920880405.7U CN210067401U (en) | 2019-06-12 | 2019-06-12 | Positioning Adjustment Device for Climbing Scaffolding |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210067401U true CN210067401U (en) | 2020-02-14 |
Family
ID=69457281
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920880405.7U Expired - Fee Related CN210067401U (en) | 2019-06-12 | 2019-06-12 | Positioning Adjustment Device for Climbing Scaffolding |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210067401U (en) |
-
2019
- 2019-06-12 CN CN201920880405.7U patent/CN210067401U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102877637B (en) | Method for implementing operating platform in bottom wall construction of cantilever beam | |
| CN204715722U (en) | A kind of all steel attachment type raise scaffold | |
| CN203654692U (en) | Overhanging type mobile scaffold | |
| CN215253499U (en) | Scaffold device | |
| CN214195484U (en) | An all-steel attached lifting scaffold | |
| CN211499713U (en) | All-steel attached lifting scaffold | |
| CN105019657A (en) | Building construction system | |
| CN205577383U (en) | Attached lifting scaffold | |
| CN204876578U (en) | Building construction system | |
| CN116005949A (en) | A device for erecting a double-layer concrete beam formwork at a stairway and its application method | |
| CN210067401U (en) | Positioning Adjustment Device for Climbing Scaffolding | |
| CN207582929U (en) | Adhesion type elevating construction platform | |
| CN206376507U (en) | Prefabrication outrigger | |
| CN204676865U (en) | A kind of building scaffold | |
| CN205171979U (en) | Integrated form all steel lift platform | |
| CN209429487U (en) | A kind of scaffold of architectural engineering | |
| CN206376514U (en) | Tool climbing scaffold | |
| CN207079889U (en) | A kind of working assembling type mobile construction platform of ceiling | |
| CN212053696U (en) | A steel beam wall high-altitude welding safety protection operation platform | |
| CN210067410U (en) | Support device for climbing scaffold | |
| CN209457361U (en) | Scalable hanging basket | |
| CN207974499U (en) | A kind of whole hanger of movable type outer wall of basement | |
| CN212507124U (en) | Steel assembled stair | |
| CN213115416U (en) | Combined aluminum frame | |
| CN206873494U (en) | A kind of operating platform for narrow space on the outside of barricade |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200214 |