- CN207079909U CN207079909U CN201720878871.2U CN201720878871U CN207079909U CN 207079909 U CN207079909 U CN 207079909U CN 201720878871 U CN201720878871 U CN 201720878871U CN 207079909 U CN207079909 U CN 207079909U
- Authority
- CN
- China
- Prior art keywords
- groove
- projection
- connecting structure
- horizon bar
- lug
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
- Ladders (AREA)
Abstract
The utility model discloses a kind of peripheral scaffold connecting structure, including horizon bar and vertical rod, multiple lugs are provided with described vertical rod with described horizon bar junction, the cross section that described lug is provided with upper end open is "T"-shaped groove;The end of described horizon bar is the "T"-shaped projection corresponding with described groove provided with cross section, and described projection is plugged in described groove;Described groove is inverted trapezoidal with described projection.The scaffold connecting structure can quickly be set up, so as to accelerating construction progress.
Description
Technical field
Building field is the utility model is related to, more particularly to a kind of perimeter defense scaffold connecting structure.
Background technology
Scaffold refers to that the various supports set up vertically and horizontally are transported in job site for operation and solution, mainly
In order to which workmen works or perimeter security net is gone along with sb. to guard him and high-altitude installation component lamp and plays certain protective action up and down.According to pin
The application environment of hand cradle is divided into again:The interior protective scaffold of building and building external protective scaffold.
The building external protective scaffold of currently available technology is taken using horizon bar, vertical rod and detachable moving fastening
Build, by pulling by hand for fastening on the moving fastening between horizon bar and vertical rod multiple bolts to set up so that set up process
Very slowly, it have impact on the construction speed of architectural engineering.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of perimeter defense scaffold connecting structure, the scaffold
Attachment structure can quickly be set up, so as to accelerating construction progress.
Technical solution of the present utility model is to provide a kind of peripheral scaffold connecting structure with following structure,
Including horizon bar and vertical rod, multiple lugs are provided with described horizon bar junction in described vertical rod, are set on described lug
The cross section for having upper end open is "T"-shaped groove;The end of described horizon bar be provided with cross section for it is "T"-shaped with it is described
The corresponding projection of groove, described projection are plugged in described groove;Described groove is down ladder with described projection
Shape.
After above structure, peripheral scaffold connecting structure of the present utility model, compared with prior art, have following
Advantage:
Because peripheral scaffold connecting structure of the present utility model includes being provided with described horizon bar junction in vertical rod
Multiple lugs, the cross section that described lug is provided with upper end open is "T"-shaped groove;The end of described horizon bar is provided with
Cross section is the "T"-shaped projection corresponding with described groove, and described projection is plugged in described groove, structure letter
It is single, can quickly it set up, so as to accelerating construction progress.
As an improvement, hemispherical groove is equipped with described two relative inwalls of groove, described two phases of projection
To outer wall on be equipped with the hemispherical projections corresponding with described hemispherical groove.After adopting the structure so that projection
Connection between lug is relatively reliable.
As an improvement, the side wall of the side of described groove is provided with through hole, the phase of described projection and described through hole
Corresponding outer wall is provided with threaded connection hole, is bolted between described projection and lug, the screw rod of described bolt
Screwed through described through hole in described threaded connection hole.After adopting the structure so that the company between projection and lug
Connect relatively reliable.
As an improvement, the opposite side that the outer wall of described lug is located at described groove is provided with for blocking described level
The baffle plate of boom end, described baffle plate outer end are rushed examination in the outer end of described lug.After adopting the structure, when horizon bar is remote
The side of baffle plate is after by external force, and described baffle plate has the function that to stop, use is safer.
Brief description of the drawings
Fig. 1 is the structural representation of peripheral scaffold connecting structure of the present utility model.
Fig. 2 is the structural representation of the vertical rod of peripheral scaffold connecting structure of the present utility model.
Fig. 3 is the structural representation of the horizon bar of peripheral scaffold connecting structure of the present utility model.
Shown in figure:1st, horizon bar, 2, vertical rod, 3, lug, 301, groove, 302, hemispherical groove, 303, through hole, 4, convex
Block, 401, hemispherical projections, 402, threaded connection hole, 5, baffle plate.
Embodiment
It is specific embodiment of the utility model and with reference to accompanying drawing below, the technical solution of the utility model is made further
Description, but the utility model is not limited to these embodiments.
As shown in Figure 1 to Figure 3, peripheral scaffold connecting structure of the present utility model, including horizon bar 1 and vertical rod 2, it is described
Vertical rod 2 on the described junction of horizon bar 1 be provided with multiple lugs 3, described lug 3 is provided with the cross section of upper end open
For "T"-shaped groove 301;It is "T"-shaped corresponding with described groove 301 that the end of described horizon bar 1, which is provided with cross section,
Projection 4, described projection 4 is plugged in described groove 301;Described groove 301 is down ladder with described projection 4
Shape.
Hemispherical groove 302 is equipped with described 301 two relative inwalls of groove, described projection 4 two is relative
Outer wall on be equipped with the hemispherical projections 401 corresponding with described hemispherical groove 302.
The side wall of the side of described groove 301 is provided with through hole 303, the phase of described projection 4 and described through hole 303
Corresponding outer wall is provided with threaded connection hole 402, is fixed between described projection 4 and lug 3 by bolt 6, described bolt 6
Screw rod screwed through described through hole 303 in described threaded connection hole 402.The outer wall of described lug 3 is positioned at described
The opposite side of groove 301 be provided with the baffle plate 5 for being used for blocking the described end of horizon bar 1, the described outer end of baffle plate 5 is rushed examination in institute
The outer end for the lug 3 stated.
The assembling process of peripheral scaffold connecting structure of the present utility model is as follows:By the grafting of projection 4 of the end of horizon bar 1
In the groove 301 of described lug 3, the hemispherical projections 401 on described projection 4 are buckled in described hemispherical groove 302
It is interior, then bolt 6 is locked in through hole 303 and threaded connection hole 402.
Claims (4)
- A kind of 1. peripheral scaffold connecting structure, it is characterised in that:Including horizon bar and vertical rod, in described vertical rod with it is described Horizon bar junction is provided with multiple lugs, and the cross section that described lug is provided with upper end open is "T"-shaped groove;Described The end of horizon bar is the "T"-shaped projection corresponding with described groove provided with cross section, and described projection is plugged on described Groove in;Described groove is inverted trapezoidal with described projection.
- 2. peripheral scaffold connecting structure according to claim 1, it is characterised in that:Relative interior of described groove two Hemispherical groove is equipped with wall, is equipped with described two relative outer walls of projection corresponding with described hemispherical groove Hemispherical projections.
- 3. peripheral scaffold connecting structure according to claim 2, it is characterised in that:The side wall of the side of described groove Be provided with through hole, the described projection outer wall corresponding with described through hole is provided with threaded connection hole, described projection with It is bolted between lug, the screw rod of described bolt is screwed in described threaded connection hole through described through hole.
- 4. peripheral scaffold connecting structure according to claim 3, it is characterised in that:The outer wall of described lug is located at institute The opposite side for the groove stated is provided with the baffle plate for being used for blocking described horizontal boom end, and described baffle plate outer end is rushed examination in described The outer end of lug.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720878871.2U CN207079909U (en) | 2017-07-19 | 2017-07-19 | Peripheral scaffold connecting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720878871.2U CN207079909U (en) | 2017-07-19 | 2017-07-19 | Peripheral scaffold connecting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207079909U true CN207079909U (en) | 2018-03-09 |
Family
ID=61423873
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720878871.2U Expired - Fee Related CN207079909U (en) | 2017-07-19 | 2017-07-19 | Peripheral scaffold connecting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207079909U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469314A (en) * | 2018-12-12 | 2019-03-15 | 严晓安 | A kind of square tube scaffold connector and square tube scaffold |
-
2017
- 2017-07-19 CN CN201720878871.2U patent/CN207079909U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469314A (en) * | 2018-12-12 | 2019-03-15 | 严晓安 | A kind of square tube scaffold connector and square tube scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203499229U (en) | Operating platform for construction of elevator shaft | |
CN204960269U (en) | Integral pylon | |
CN208454342U (en) | A kind of safety of tower crane platform and standard knot install conjoined device | |
CN207079909U (en) | Peripheral scaffold connecting structure | |
CN204571261U (en) | A kind of ring attaching skirt hand cradle for removing chimney and water tower | |
CN204164505U (en) | Universal Joining clasp lifting device | |
CN202990406U (en) | Bowl buckle type scaffold | |
CN209817386U (en) | Outer enclosure structure of overhanging balcony position of prefabricated building | |
CN214246573U (en) | Can dismantle fast and climb a net | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN211342729U (en) | Length-adjustable hanging ladder for factory building installation | |
CN207974544U (en) | Outer wall template steel pipe storing unit | |
CN205382718U (en) | Sparse passway for escaping of steel platform die carrier system | |
CN209855190U (en) | Assembled building external protection frame | |
CN209145257U (en) | Hang lift-type pit shaft platform | |
CN207314813U (en) | A kind of periphery scaffold connecting structure | |
KR200465907Y1 (en) | scaffolding frame for turbine case | |
CN207402705U (en) | Sunpender Fast Installation spanner | |
CN204001673U (en) | Expanded metal lath fastening devices | |
CN205421892U (en) | Even wall scaffold for building | |
CN206800975U (en) | A kind of foot guard plate of scaffold sets up system | |
CN205976389U (en) | Hanger rod installation tool | |
CN208950274U (en) | A kind of architectural engineering overhanging scaffold | |
CN205822763U (en) | A kind of bowl fastening type steel pipe scaffold being easy to assemble | |
CN205894641U (en) | Elevartor shaft lifting platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180309 Termination date: 20180719 |
|
CF01 | Termination of patent right due to non-payment of annual fee |