CN205876348U - Multi -level advance support structure of transverse passage -way vault under complex geological condition - Google Patents
Multi -level advance support structure of transverse passage -way vault under complex geological condition Download PDFInfo
- Publication number
- CN205876348U CN205876348U CN201620828911.8U CN201620828911U CN205876348U CN 205876348 U CN205876348 U CN 205876348U CN 201620828911 U CN201620828911 U CN 201620828911U CN 205876348 U CN205876348 U CN 205876348U
- Authority
- CN
- China
- Prior art keywords
- way
- transverse passage
- vault
- support structure
- ductule
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The utility model discloses a transverse passage -way vault advance support structure under the complex geological condition, reinforce the major structure, adopt the reinforcement auxiliary structure I of transverse passage -way hunch portion of advanced small pipe grouting formation and adopt the face reinforced structure of half section slant deep - hole grouting ductule slip casting formation and hunch portion to reinforce auxiliary structure II including the head of the horse gate arch portion reinforced structure of the horizontal deep - hole grouting ductule slip casting of adoption formation, the transverse passage -way hunch portion of adoption bassoon canopy slip casting formation. The utility model discloses a beat and to establish horizontal deep - hole grouting ductule, bassoon canopy, leading ductule, half section slant deep - hole grouting ductule and form a multi -level support system at the transverse passage -way vault, eliminated vault landslide risk to through leading stratum slip casting pre -reinforcing, solidify the transverse passage -way hunch portion soil body, form a duricrust, can effectually keep vault stability of surrounding rock, control vault settlement.
Description
Technical field
This utility model relates to a kind of transverse passage-way vault advance support structure, under particularly one is positioned at the existing underground space
Transverse passage-way vault advance support structure square and close together.
Background technology
The most domestic metro industry is in the ascendant, the whole nation one, tier 2 cities flourish, shallow burial hidden digging is as one
The more construction method of science, is verified the most in practice and is widely used in Subway Tunnel construction.But big-and-middle-sized
In city, especially center, old city, urban ground skyscraper is intensive, and underground building thing is various, and pipe network is intricate, horizontal logical
Road construction faces problems with: one) transverse passage-way position selects difficulty, needs more closely to construct apart from existing underground building thing;Two)
Survey position, hole and cannot meet requirement, below existing underground building thing, geological condition cannot be verified, and ground is surveyed reported low, no
Certainty factor is many, and existing underground building thing construction the most repeatedly disturbed strata, and periphery miscellaneous fill is deep, and geological conditions is multiple
Miscellaneous, construction easily occurs the situations such as the landslide of the vault soil body, settling amount are big;Three) transverse passage-way structure closes on underground building thing, is difficult to
Possess the pre-reinforcement conditions such as surface grout injection.
Further, since construction site limits, derrick, Tu Cang, concrete batch plant, coagulation necessary to adit construction
Soil tank etc. is both needed to closing foundation ditch limit, it is difficult to meets and cheats outer preloading design requirement, there is potential safety hazard, cause center, city underground structure
The subway adit construction surrouding rock deformation of intensive position increases with Land-Subsidence Control, surrounding enviroment protection difficulty, traditional shallow embedding
Subsurface excavation method vault support form be difficult to meet transverse passage-way under complex geological condition be positioned at below the existing underground space and with both
When having the underground space nearer, construction settlement controls and the requirement of environmental conservation.
Summary of the invention
This utility model provides horizontal logical under a kind of complex geological condition for solving technical problem present in known technology
Road vault multi-level advance support structure, uses this structure can reduce Vault settlement amount, avoid the vault soil body to cave in.
This utility model is adopted the technical scheme that by solving technical problem present in known technology: one is intricately
Transverse passage-way vault advance support structure under the conditions of matter, it is characterised in that include that employing horizontal deep hole grouting grouting with small pipe is formed
Ingate arch ruggedized construction, the transverse passage-way arch that uses steel tube shed slip casting to be formed reinforces agent structure, uses and the least lead
The transverse passage-way arch that pipe slip casting is formed reinforces supplementary structure I and the palm using half section oblique deep hole grouting grouting with small pipe to be formed
Sub-face ruggedized construction and arch reinforce supplementary structure II.
Described horizontal deep hole grouting ductule has set five rings, pipe range 9 meters, hoop tube pitch 0.3 meter, adjacent ring spacing 1
Rice.
Described steel tube shed has set a ring, the long 35m of canopy, hoop tube pitch 0.3m.
Described advanced tubule length 3 meters, hoop tube pitch 0.3 meter.
Described half section oblique deep hole grouting ductule sets a ring, pipe range 8m, hoop tube pitch 9 °.
This utility model has the advantage that with good effect: by setting horizontal deep hole grouting ductule, steel tube shed, surpassing
Front ductule, half section oblique deep hole grouting ductule form a multi-level support system at transverse passage-way vault, eliminate arch
Top landslide risk, and by advanced stratum slip casting pre-reinforcement, the consolidation transverse passage-way arch soil body, form one piece of duricrust, can be effective
Holding vault adjoining rock stability, control Vault settlement.
Accompanying drawing explanation
Fig. 1 is cross-sectional view of the present utility model;
Fig. 2 is this utility model section structure schematic diagram at horizontal deep hole grouting ductule;
Fig. 3 is this utility model section structure schematic diagram at half section oblique deep hole grouting ductule;
Fig. 4 is this utility model cross-sectional view at half section oblique deep hole grouting ductule.
In figure: 1, preliminary bracing structure;2, horizontal deep hole grouting ductule;3, advanced tubule;4, steel tube shed;5, half is disconnected
Face oblique deep hole grouting ductule.
Detailed description of the invention
For summary of the invention of the present utility model, feature and effect can be further appreciated that, hereby enumerate following example, and coordinate
Accompanying drawing describes in detail as follows:
Referring to Fig. 1~Fig. 4, transverse passage-way vault advance support structure under a kind of complex geological condition, including employing level
Ingate arch ruggedized construction, the transverse passage-way arch of employing steel tube shed 4 slip casting formation that deep hole grouting ductule 2 slip casting is formed add
Gu agent structure, the transverse passage-way arch using advanced tubule 3 slip casting to be formed are reinforced supplementary structure I and use half section oblique deeply
Solidifying of the working face structure and arch that hole slip casting ductule 5 slip casting is formed reinforce supplementary structure II.
In the present embodiment, described horizontal deep hole grouting ductule 2 has set five rings, pipe range 9 meters, hoop tube pitch 0.3
Rice, adjacent ring spacing 1 meter.Described steel tube shed 4 has set a ring, the long 35m of canopy, hoop tube pitch 0.3m.Described advanced tubule
Long 3 meters, hoop tube pitch 0.3 meter.Described half section oblique deep hole grouting ductule 5 sets a ring, pipe range 8m, hoop tube pitch
9°。
During construction, the ingate arch ruggedized construction formed initially with horizontal deep hole grouting ductule 2 slip casting, use big
The transverse passage-way arch that pipe canopy 4 slip casting is formed reinforces agent structure, then During Initial Stage Construction supporting construction 1, subsequently according in advance
Matter forecast determines that the transverse passage-way arch using advanced tubule 3 slip casting to be formed reinforces supplementary structure I or uses half section oblique deeply
Solidifying of the working face structure and arch that hole slip casting ductule 5 slip casting is formed reinforce supplementary structure II, and the two selects one.
Although being described preferred embodiment of the present utility model above in conjunction with accompanying drawing, but this utility model is not
Being confined to above-mentioned detailed description of the invention, above-mentioned detailed description of the invention is only schematically, is not restrictive, ability
The those of ordinary skill in territory is under enlightenment of the present utility model, without departing from this utility model objective and claimed
In the case of scope, it is also possible to make a lot of form, within these belong to protection domain of the present utility model.
Claims (5)
1. transverse passage-way vault advance support structure under a complex geological condition, it is characterised in that include that the horizontal deep hole of employing is noted
Ingate arch ruggedized construction, the transverse passage-way arch of employing steel tube shed slip casting formation that slurry grouting with small pipe is formed reinforce body junction
Structure, the transverse passage-way arch using per-fore pouring liquid with small pipe to be formed are reinforced supplementary structure I and use the half oblique deep hole grouting of section little
Solidifying of the working face structure and arch that conduit slip casting is formed reinforce supplementary structure II.
Transverse passage-way vault advance support structure under complex geological condition the most according to claim 1, it is characterised in that described
Horizontal deep hole grouting ductule has set five rings, pipe range 9 meters, hoop tube pitch 0.3 meter, adjacent ring spacing 1 meter.
Transverse passage-way vault advance support structure under complex geological condition the most according to claim 1, it is characterised in that described
Steel tube shed has set a ring, the long 35m of canopy, hoop tube pitch 0.3m.
Transverse passage-way vault advance support structure under complex geological condition the most according to claim 1, it is characterised in that described
Advanced tubule length 3 meters, hoop tube pitch 0.3 meter.
Transverse passage-way vault advance support structure under complex geological condition the most according to claim 1, it is characterised in that described
Half section oblique deep hole grouting ductule sets a ring, pipe range 8m, hoop tube pitch 9 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620828911.8U CN205876348U (en) | 2016-07-28 | 2016-07-28 | Multi -level advance support structure of transverse passage -way vault under complex geological condition |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620828911.8U CN205876348U (en) | 2016-07-28 | 2016-07-28 | Multi -level advance support structure of transverse passage -way vault under complex geological condition |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205876348U true CN205876348U (en) | 2017-01-11 |
Family
ID=57702300
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620828911.8U Expired - Fee Related CN205876348U (en) | 2016-07-28 | 2016-07-28 | Multi -level advance support structure of transverse passage -way vault under complex geological condition |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205876348U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060778A (en) * | 2017-06-15 | 2017-08-18 | 中铁十局集团第五工程有限公司 | Pass through high-rise building group back filled region method for tunnel construction |
CN107201909A (en) * | 2017-06-16 | 2017-09-26 | 中铁二十四局集团安徽工程有限公司 | Swelled ground tunnel support structure and method |
CN107725056A (en) * | 2017-10-13 | 2018-02-23 | 中铁五局集团有限公司 | One kind passes through silly stratum tunnel loopful quick grouting construction method in advance |
CN108547639A (en) * | 2018-03-13 | 2018-09-18 | 北京市政路桥股份有限公司 | Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings |
CN109139053A (en) * | 2018-09-30 | 2019-01-04 | 淮矿西部煤矿投资管理有限公司 | A kind of water conductive fault comprehensive treatment parallel construction system and construction method |
CN109695453A (en) * | 2018-12-07 | 2019-04-30 | 中铁四局集团第一工程有限公司 | Excavation construction method is assisted at a kind of vertical shaft main tunnel crossings on different level |
CN110005442A (en) * | 2019-04-26 | 2019-07-12 | 中铁二十三局集团第六工程有限公司 | Under wear existing building Urban Underground mining sectbn surrounding rock consolidation technique |
-
2016
- 2016-07-28 CN CN201620828911.8U patent/CN205876348U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060778A (en) * | 2017-06-15 | 2017-08-18 | 中铁十局集团第五工程有限公司 | Pass through high-rise building group back filled region method for tunnel construction |
CN107201909A (en) * | 2017-06-16 | 2017-09-26 | 中铁二十四局集团安徽工程有限公司 | Swelled ground tunnel support structure and method |
CN107201909B (en) * | 2017-06-16 | 2023-06-13 | 中铁二十四局集团安徽工程有限公司 | Expansive soil tunnel supporting structure and method |
CN107725056A (en) * | 2017-10-13 | 2018-02-23 | 中铁五局集团有限公司 | One kind passes through silly stratum tunnel loopful quick grouting construction method in advance |
CN108547639A (en) * | 2018-03-13 | 2018-09-18 | 北京市政路桥股份有限公司 | Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings |
CN108547639B (en) * | 2018-03-13 | 2019-12-03 | 北京市政路桥股份有限公司 | Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings |
CN109139053A (en) * | 2018-09-30 | 2019-01-04 | 淮矿西部煤矿投资管理有限公司 | A kind of water conductive fault comprehensive treatment parallel construction system and construction method |
CN109695453A (en) * | 2018-12-07 | 2019-04-30 | 中铁四局集团第一工程有限公司 | Excavation construction method is assisted at a kind of vertical shaft main tunnel crossings on different level |
CN110005442A (en) * | 2019-04-26 | 2019-07-12 | 中铁二十三局集团第六工程有限公司 | Under wear existing building Urban Underground mining sectbn surrounding rock consolidation technique |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205876348U (en) | Multi -level advance support structure of transverse passage -way vault under complex geological condition | |
CN101440708B (en) | PBA shallow buried underground excavating close range large section three-hole separated island type structure construction method | |
CN101994513B (en) | Method for constructing tunnel by finishing full section curtain grouting from upper-half section | |
CN106567717B (en) | It is a kind of to double as construction access ramp structure and construction method using subway entrance | |
CN106436720B (en) | The construction method of jacking construction small size deep foundation pit supporting structure | |
CN103206219A (en) | Holed excavation supporting structure for light and dark junction section of tunnel in bias pressure state and construction method | |
CN101122131B (en) | Foundation pit supporting pile using pipe casting pile embedding in rock | |
CN103835729B (en) | Deep distance roadway surrounding rock pre grouting from the surface reinforcement process | |
CN103161476B (en) | Mechanical shaft-forming method of shield cutterhead maintenance shaft in tunnel and underground construction | |
CN106013171B (en) | A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall | |
CN103711492B (en) | A kind of jacking-type cable sleeve channel construction method | |
CN105840207A (en) | Cross shallow buried bias pressure loose accumulation body large-span tunnel comprehensive entrance structure construction method | |
CN108547639B (en) | Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings | |
CN102748040A (en) | Main structure for metro long-span station and pillar arching construction method thereof | |
CN105821889A (en) | Loess platform landslip comprehensive treatment method based on underground water level control | |
CN102628372A (en) | Method for determining minimum buried depth of underground tunnel based on engineering control measures | |
CN105909263A (en) | Eolian sand stratum highway tunnel structure and construction method thereof | |
CN106640096A (en) | Construction method for penetrating through tunnel of backfilling soil section and transition section | |
CN103410522A (en) | Continuous close-range underpass railway bridge construction method employing shallow tunneling method | |
CN107965325A (en) | Just branch bow member replaces construction method to a kind of small interval shallow tunnel | |
CN207878473U (en) | Layer depth foundation pit hangs foot stake supporting construction to Tu Yan in combination | |
CN107191206B (en) | A kind of six step construction method of Shallow-buried Large-span Tunnel Unit two | |
CN109518699A (en) | Miniature steel pipe pile adds grid spray anchor deep foundation ditch combination supporting scheme system and its construction method | |
CN102808627A (en) | Underground excavation construction method of steel pipe shed | |
CN102995647B (en) | Underground water control method used for grouting and seepage insulation of pile hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170111 Termination date: 20210728 |
|
CF01 | Termination of patent right due to non-payment of annual fee |