CN205742283U - Leveling hydraulic system corrected by a kind of steel construction - Google Patents
Leveling hydraulic system corrected by a kind of steel construction Download PDFInfo
- Publication number
- CN205742283U CN205742283U CN201620536190.3U CN201620536190U CN205742283U CN 205742283 U CN205742283 U CN 205742283U CN 201620536190 U CN201620536190 U CN 201620536190U CN 205742283 U CN205742283 U CN 205742283U
- Authority
- CN
- China
- Prior art keywords
- steel construction
- column
- hydraulic system
- leveling
- columns
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Leveling hydraulic system corrected by the open a kind of steel construction of this utility model, including being positioned at four columns of corner, rectangle place and for the assembled hydraulic unit of force bottom steel construction;Respectively it is fixedly connected with horizontal rail between two columns in front side and between two columns of rear side, between the column of two, left side and between the column of two, right side, is respectively fixedly connected with the placement platform for placing steel construction;Placement platform is provided above steel construction fixing device;Described assembled hydraulic unit is slidably connected with horizontal rail.This utility model simple in construction, it is easy to operation, expense cost is low, corrects leveling quality and is easily guaranteed that, it is possible to effectively accelerating construction progress.
Description
Technical field
This utility model relates to hydraulic pressure correcting technology field, is specially a kind of steel construction and corrects leveling hydraulic system.
Background technology
Construction of Civil Engineering needs use welded steel to be combined into steel construction as hole, hole cover plate, cable duct, draining
Trench cover, acts on for blind hole, hole and pedestrian, driving, storing etc..In conventional construction, after combination welding for steel structure
In the case of deformation is relatively big or steel construction use for a long time can be deformed, the general mode using hammering corrects leveling steel knot
Structure.The way using hammering is applied relatively wide in practice, but the method exists following problem.One, large-scale combined steel construction
Hammering flatness effect is poor;Two, hammering lifting surface area is less, causes local uneven, produces new deformation, and quality is difficult to protect
Card;Three, hammering typically uses manually, costly, and inefficiency.
Utility model content
The purpose of this utility model is to provide a kind of steel construction to correct leveling hydraulic system, and this system is easily operated, takes
By low cost, correct leveling quality and be easily guaranteed that, and can accelerating construction progress.Technical scheme is as follows:
Leveling hydraulic system corrected by a kind of steel construction, including being positioned at four columns of corner, rectangle place and for tying steel
The assembled hydraulic unit of force bottom structure;Horizontal rail respectively it is fixedly connected with between two columns in front side and between two columns of rear side
Road, is respectively fixedly connected with the placement platform for placing steel construction between the column of two, left side and between the column of two, right side;Put
Horizontalization platform is provided above steel construction fixing device;Described assembled hydraulic unit is slidably connected with horizontal rail.
Further, described assembled hydraulic unit includes connecting rod and is positioned at the horizontal plate bottom steel construction, horizontal plate two
Side is connected to the lower end of connecting rod, and the upper end of connecting rod coordinates with the slide to horizontal rail;Liquid it is provided with below horizontal plate
Bearing down on one, hydraulic top is connected to hydraulic operation control station by fluid pressure line.
Further, described hydraulic top is the multiple of or parallel connection.
Further, described steel construction fixing device includes the upper cross bar being correspondingly arranged in above placement platform, on
Portion's crossbar end is positioned on the connecting plate being arranged on column, and is fixed with column by snap ring.
Further, described column includes left cylinder and right cylinder, and described connecting plate is arranged on left cylinder and right cylinder
Between, described snap ring is through being arranged on the through hole on left cylinder and right cylinder.
Further, described column bottom is fixing with the built-in fitting being arranged in cast concrete base is connected.
Further, described cast concrete base is additionally provided with the basic joint bar of insertion ground.
The beneficial effects of the utility model are: this utility model combination steel construction be applicable to Construction of Civil Engineering and
The steel construction that use process is deformed, efficiently solves conventional hammering levelling effect poor, and quality is difficult to ensure, consumes height, effect
The problems such as rate is low;And system structure is simple, it is easy to operation, expense cost is low, corrects leveling quality and is easily guaranteed that, it is possible to effectively adds
Fast construction speed.
Accompanying drawing explanation
Fig. 1 is that leveling hydraulic system floor map corrected by this utility model steel construction.
Fig. 2 is A-A generalized section in Fig. 1.
Fig. 3 is B-B generalized section in Fig. 1.
Fig. 4 is C-C generalized section in Fig. 1.
In figure: 1-basis;2-horizontal rail;3-placement platform;4-assembled hydraulic unit;5-fluid pressure line;6-hydraulic pressure is grasped
Make control station;7-basis joint bar;8-built-in fitting;9-column;10-connecting plate;11-snap ring;12-upper cross bar;13-coagulation soil matrix
The end;14-connecting rod;15-horizontal plate;16-hydraulic top;17-steel construction.
Detailed description of the invention
With embodiment, this utility model is described further below in conjunction with the accompanying drawings.As it is shown in figure 1, a kind of steel construction is corrected
Leveling hydraulic system, including being positioned at four columns 9 of corner, rectangle place and for the combination liquid of force bottom steel construction 17
Pressure unit 4;Respectively being fixedly connected with horizontal rail 2 between two columns 9 in front side and between two columns 9 of rear side, two, left side is stood
The placement platform 3 for placing steel construction 17 respectively it is fixedly connected with between the column 9 of two, between post 9 and right side;On placement platform 3
Side is provided with steel construction fixing device;Described assembled hydraulic unit 4 is slidably connected with horizontal rail 2.Horizontal rail 2 is for basis
Need to move freely assembled hydraulic unit 4, make rectification Levelling operation more convenient.
As in figure 2 it is shown, the steel construction fixing device of the present embodiment includes being correspondingly arranged in the upper lateral above placement platform 3
Bar 12, upper cross bar 12 end is positioned on the connecting plate 10 being arranged on column 9, and is fixed with column 9 by snap ring 11.Its
In, column 9 includes that left cylinder and right cylinder, described connecting plate 10 are arranged between left cylinder and right cylinder, and described snap ring 11 is worn
Cross the through hole being arranged on left cylinder and right cylinder.This steel construction fixing device convenient disassembly, fixation.
As it is shown on figure 3, the assembled hydraulic unit 4 of the present embodiment includes connecting rod 14 and is positioned at the level bottom steel construction 17
Plate 15, horizontal plate 15 both sides are connected to the lower end of connecting rod 14, and the upper end of connecting rod 14 is joined with the slide to horizontal rail 2
Close;Being provided with hydraulic top 16 below horizontal plate 15, hydraulic top 16 is connected to hydraulic operation control station 6 by fluid pressure line 5.This enforcement
Example hydraulic top 16 is formed in parallel by 4, and the quantity of hydraulic top 16 can use the multiple of 1 or parallel connection as required.During use,
All can also move together or be individually moved as required.By horizontal plate 15, steel construction 17 is uniformly pressed, can effectively protect
Card leveling quality.
As shown in Figure 4, fixing with the built-in fitting 8 being arranged in cast concrete base 13 bottom the column 9 of the present embodiment it is connected.
Cast concrete base 13 is additionally provided with the basic joint bar 7 inserting ground.This structure increases the steadiness of column 9, and construction letter
Single, cheap.
First basis 1 is cleaned out during construction, then carry out basis joint bar 7, built-in fitting 8 and arrange, then carry out coagulation soil matrix
The pouring construction at the end 13.Carry out again carrying out placement platform 3, column 9, connecting plate 10, snap ring 11, top during 1 cleaning of basis simultaneously
The Combined machining of cross bar 12.Concreting carries out welding of column 9 and built-in fitting 8 after completing 3 days.
Column 9 and built-in fitting 8 welding procedure carry out the welding procedure of horizontal rail 2 and column 9 after completing, then by connecting rod
14, horizontal plate 15, hydraulic top 16 combination constitute assembled hydraulic unit 4, finally the hydraulic top 16 of assembled hydraulic unit 4 are passed through liquid
Pressure pipe road 5 is attached with hydraulic operation control station 6.
During use, unload card bad 11 and upper cross bar 12, by manufactured steel construction 17 by crane lifting to placing
Above platform 3, and need that of leveling to face down, then upper cross bar 12 is installed, snap ring 11 is locked, by solid for steel construction 17
Fixed firm.Check the position needing leveling, by horizontal rail 2, assembled hydraulic unit 4 is moved in place, operate hydraulic operation control
Platform 6 processed starts hydraulic top 16 needs the position force of leveling to carry out correcting leveling by horizontal plate 15 to steel construction 17.Repeatedly follow
Ring above step is until leveling corrected by steel construction 17 completes.Then unload card bad 11 and upper cross bar 12, will correct leveling
Steel construction 17 hangs away.
Claims (7)
1. leveling hydraulic system corrected by a steel construction, it is characterised in that include four columns (9) being positioned at corner, rectangle place
With the assembled hydraulic unit (4) for steel construction (17) bottom is exerted a force;With two columns of rear side between two columns (9) in front side
(9) horizontal rail (2) respectively it is fixedly connected with between, each fixing between the column (9) of two, left side and between the column (9) of two, right side
Connect and have the placement platform (3) for placing steel construction (17);Placement platform (3) is provided above steel construction fixing device;Institute
State assembled hydraulic unit (4) to be slidably connected with horizontal rail (2).
Leveling hydraulic system corrected by steel construction the most according to claim 1, it is characterised in that described assembled hydraulic unit
(4) including connecting rod (14) and be positioned at the horizontal plate (15) of steel construction (17) bottom, horizontal plate (15) both sides are connected to connecting rod
(14) lower end, the upper end of connecting rod (14) coordinates with the slide to horizontal rail (2);Horizontal plate (15) lower section is provided with liquid
Bearing down on one (16), hydraulic top (16) is connected to hydraulic operation control station (6) by fluid pressure line (5).
Leveling hydraulic system corrected by steel construction the most according to claim 2, it is characterised in that described hydraulic top (16) is one
Individual or in parallel is multiple.
Leveling hydraulic system corrected by steel construction the most according to claim 1, it is characterised in that described steel construction fixing device
Including the upper cross bar (12) being correspondingly arranged in above placement platform (3), upper cross bar (12) end is positioned over and is arranged on column
(9) on the connecting plate (10) on, and fixed with column (9) by snap ring (11).
Leveling hydraulic system corrected by steel construction the most according to claim 4, it is characterised in that described column (9) includes a left side
Cylinder and right cylinder, described connecting plate (10) is arranged between left cylinder and right cylinder, and described snap ring (11) is through being arranged on a left side
Through hole on cylinder and right cylinder.
Steel construction the most according to claim 1 correct leveling hydraulic system, it is characterised in that described column (9) bottom with
The built-in fitting (8) being arranged in cast concrete base (13) is fixing to be connected.
Leveling hydraulic system corrected by steel construction the most according to claim 6, it is characterised in that described cast concrete base (13)
In be additionally provided with insert ground basic joint bar (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620536190.3U CN205742283U (en) | 2016-06-02 | 2016-06-02 | Leveling hydraulic system corrected by a kind of steel construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620536190.3U CN205742283U (en) | 2016-06-02 | 2016-06-02 | Leveling hydraulic system corrected by a kind of steel construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205742283U true CN205742283U (en) | 2016-11-30 |
Family
ID=57359765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620536190.3U Withdrawn - After Issue CN205742283U (en) | 2016-06-02 | 2016-06-02 | Leveling hydraulic system corrected by a kind of steel construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205742283U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926681A (en) * | 2016-06-02 | 2016-09-07 | 中国水利水电第五工程局有限公司 | Hydraulic system for straightening and levelling steel structure |
CN108316357A (en) * | 2018-01-29 | 2018-07-24 | 南华大学 | A kind of well lid repair system and restorative procedure |
-
2016
- 2016-06-02 CN CN201620536190.3U patent/CN205742283U/en not_active Withdrawn - After Issue
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926681A (en) * | 2016-06-02 | 2016-09-07 | 中国水利水电第五工程局有限公司 | Hydraulic system for straightening and levelling steel structure |
CN105926681B (en) * | 2016-06-02 | 2017-12-05 | 中国水利水电第五工程局有限公司 | A kind of steel construction corrects leveling hydraulic system |
CN108316357A (en) * | 2018-01-29 | 2018-07-24 | 南华大学 | A kind of well lid repair system and restorative procedure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106065577B (en) | A kind of structure and method of new pile foundation underpinning | |
CN209636847U (en) | Adjustable tower crane basis built-in fitting accurate positioning instrument | |
CN205742283U (en) | Leveling hydraulic system corrected by a kind of steel construction | |
CN105586833B (en) | Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method | |
CN104310165A (en) | Guide rail type adhesion construction lifter and construction method thereof | |
CN104372799B (en) | Rigid unearthing platform foundation pit inner support structure and construction method | |
CN106401207A (en) | Superimposed connection structure for additionally arranging column foundation on existing building and construction method of superimposed connection structure | |
CN103866693A (en) | Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge | |
CN202481956U (en) | Attached climbing type conventionalized dual-purpose platform | |
CN205840892U (en) | Ditch mould bases is surveyed in self-propelled tunnel | |
CN105926681B (en) | A kind of steel construction corrects leveling hydraulic system | |
CN209260565U (en) | Assembled prefabricated lifts beam and ships interspersed vehicle | |
CN110512474A (en) | A kind of railroad track makes somebody a mere figurehead ruggedized construction and method | |
CN207260156U (en) | It is a kind of to lift steel trestle device for what large volume grinding coagulation soil put in storage | |
CN206108705U (en) | Gallows of frame isolated footing | |
CN206752538U (en) | A kind of steel construction jacking apparatus for settlement stability | |
CN211439831U (en) | Multipurpose auxiliary drilling device | |
CN107642232A (en) | The horizontal connection structure and system and construction method of a kind of shuttering supporting | |
CN209703317U (en) | Draw counter-force seat | |
CN206800204U (en) | A kind of highway bridge bent cap reinforcement cage mold | |
CN207436545U (en) | Pin-connected panel construction elevator returns top device | |
CN207268089U (en) | Tool-type hoisting bracket device | |
CN206693513U (en) | A kind of concrete mats block assembly for spacer bar | |
CN105696596A (en) | Positioner for steel pipe guard post construction and construction method of steel pipe guard post | |
CN206942197U (en) | House hydraulic pressure entirety lifting apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20161130 Effective date of abandoning: 20171205 |
|
AV01 | Patent right actively abandoned |