CN207436545U - A kind of pin-connected panel building hoist returns back to top device - Google Patents
A kind of pin-connected panel building hoist returns back to top device Download PDFInfo
- Publication number
- CN207436545U CN207436545U CN201721436309.0U CN201721436309U CN207436545U CN 207436545 U CN207436545 U CN 207436545U CN 201721436309 U CN201721436309 U CN 201721436309U CN 207436545 U CN207436545 U CN 207436545U
- Authority
- CN
- China
- Prior art keywords
- support section
- montant
- water flatrack
- pin
- returns back
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
It returns back to top device the utility model discloses a kind of pin-connected panel building hoist, including:Top braces section, top braces section include the first top water flatrack, top montant, the second top water flatrack;Top montant is connected between the first top water flatrack and the second top water flatrack;Top plate is fixed on first top water flatrack top;Second top horizontal frame sets bolt hole;Midfoot support section, midfoot support section include the first middle part level frame, middle part montant, the second middle part level frame;Bottom support section, bottom support section include the first bottom water flatrack, bottom montant, the second bottom water flatrack;Top braces section is connected with midfoot support section, midfoot support section and bottom support section connection.Pin-connected panel return back to top device top braces section and midfoot support section it is reusable, save material.It returns back to top to be detachably connected between the support section of device, assembling is attached using bolt, assembly and disassembly are quick, conveniently, save manpower, assembling can be completed in live common instrument and material.
Description
Technical field
The utility model belongs to building hoist installation Technology field, constructs and lifts more particularly to a kind of pin-connected panel
Machine returns back to top device.
Background technology
During high-building construction, building hoist is as personnel, the main tool of material vertical transport, generally
It uses.It may be arranged at close to agent structure on backfill or basement roof.Construction liter on ceiling plate located underground
Drop machine, due to work when load it is larger, need to return back to top to top plate.
Method conventionally employed at present is mainly returned back to top using steel pipe scaffold, and this method is primarily present problems with:By
Smaller in common steel tube section size, the area that causes to return back to top is often excessive, and building hoist generally removes evening time, causes ground
Lower room long-term existence large area steel pipe returns back to top region, influences electromechanical pipeline installation.In addition, steel pipe lease and labour cost are high, apply
Work elevator existence time is long, and steel pipe lease expenses is big, and it is big manually to take the amount of tearing open, and comprehensive cost is high.
Utility model content
The purpose of this utility model is to provide a kind of pin-connected panel building hoist and returns back to top device, is returned with solving steel pipe scaffold
The problem of other constructions of the existing influence in top and high operating expenses.
The technical solution that the utility model solves above-mentioned technical problem is as follows:A kind of pin-connected panel building hoist returns back to top dress
It puts, including:
Top braces section, the top braces section include the first top water flatrack, top montant, the second top water flatrack;
Top montant is connected between the first top water flatrack and the second top water flatrack;Top plate is fixed on first top water flatrack top;
Second top horizontal frame sets bolt hole;
Midfoot support section, the midfoot support section include the first middle part level frame, middle part montant, the second middle part level frame;
Middle part montant is connected between the first middle part level frame and the second middle part level frame;First middle part level frame and the second middle part are horizontal
Frame is respectively provided with bolt hole;
Bottom support section, the bottom support section include the first bottom water flatrack, bottom montant, the second bottom water flatrack;
Bottom montant is connected between the first bottom water flatrack and the second bottom water flatrack;First bottom level frame sets bolt hole;
Top braces section is connected with midfoot support section, midfoot support section and bottom support section connection.
The utility model pin-connected panel building hoist as described above returns back to top device, further, in top plate and top montant
Between welding strengthen gusset.
The utility model pin-connected panel building hoist as described above returns back to top device, further, further includes bottom plate, bottom branch
Second bottom water flatrack of support section is welded to connect by connecting plate and bottom plate;In bottom plate top casting concrete reinforcing member.
The utility model pin-connected panel building hoist as described above returns back to top device, and further, the top braces section is also
Strengthen lacing including top, one end that lacing is strengthened at the top connects the first top water flatrack, and it is perpendicular that the other end is connected to top
The medium position of bar.
The utility model pin-connected panel building hoist as described above returns back to top device, and further, the midfoot support section is also
Strengthen lacing including middle part, one end that lacing is strengthened at the middle part connects the first middle part level frame, and it is perpendicular that the other end is connected to middle part
The medium position of bar.
The utility model pin-connected panel building hoist as described above returns back to top device, and further, the bottom support section is also
Strengthen lacing including bottom, one end that lacing is strengthened in the bottom connects the first bottom water flatrack, and the other end is connected to bottom and erects
The medium position of bar.
The beneficial effects of the utility model are:
1st, pin-connected panel return back to top device top braces section and midfoot support section it is reusable, save material.
2nd, return back to top to be detachably connected between the support section of device, assembling is attached using bolt, assembly and disassembly are quick, just
Just, manpower is saved, assembling can be completed in the common instrument in scene and material.
3rd, the installation area that returns back to top is small, does not influence the installation of basement electromechanical pipeline.
Description of the drawings
By the detailed description made in conjunction with the following drawings, the above-mentioned and/or otherwise advantage of the utility model will
It becoming more apparent upon and is easier to understand, these attached drawings are simply schematical, are not intended to limit the utility model, wherein:
Fig. 1 is that a kind of pin-connected panel building hoist of embodiment of the utility model returns back to top schematic device;
Fig. 2 is a kind of top braces section schematic diagram of embodiment of the utility model;
Fig. 3 is a kind of midfoot support section schematic diagram of embodiment of the utility model;
Fig. 4 is a kind of midfoot support section schematic top plan view of embodiment of the utility model;
Fig. 5 is a kind of bottom support section schematic diagram of embodiment of the utility model.
In attached drawing, parts list represented by the reference numerals is as follows:
1st, top braces section, the 11, first top water flatrack, 12, top montant, the 13, second top water flatrack, 14, top plate,
15th, strengthen gusset, 16, top strengthen lacing, 2, midfoot support section, the 21, first middle part level frame, 22, middle part montant, 23, the
Two middle part level frames, 24, middle part strengthen lacing, 3, bottom support section, the 31, first bottom water flatrack, 32, bottom montant, 33, the
Two bottom water flatracks, 34, bottom strengthen lacing, 4, connecting plate, 5, bottom plate, 6, concrete reinforcement, 7, basement roof, 8, apply
Work elevator guide bracket, 9, bolt.
Specific embodiment
Hereinafter, the pin-connected panel building hoist for describing the utility model with reference to the accompanying drawings returns back to top the embodiment of device.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model
Design, is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model
System.In addition to the embodiment recorded herein, those skilled in the art can also be based on the application claims and specification institute is public
The content opened includes doing using the embodiment to recording herein using obvious other technical solutions, these technical solutions
Go out the technical solution of any obvious substitutions and modifications.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each several part
Shape and its correlation.It note that clearly to show the structure of each component of the utility model embodiment, respectively
It is not drawn between attached drawing according to identical ratio.Identical reference marker is used to represent identical part.
Fig. 1 shows that a kind of pin-connected panel building hoist of embodiment of the utility model returns back to top device, including:
Top braces section 1, top braces section 1 include the first top water flatrack 11, top montant 12, the second top water flatrack
13;Top montant 12 is connected between the first top water flatrack 11 and the second top water flatrack 13;In first top water flatrack 11
Top plate 14 is fixed in portion;Second top water flatrack 13 sets bolt hole;
Midfoot support section 2, midfoot support section 2 include the first middle part level frame 21, middle part montant 22, the second middle part level frame
23;Middle part montant 22 is connected between the first middle part level frame 21 and the second middle part level frame 23;First middle part level frame, 21 He
Second middle part level frame 23 is respectively provided with bolt hole;
Bottom support section 3, bottom support section 3 include the first bottom water flatrack 31, bottom montant 32, the second bottom water flatrack
33;Bottom montant 32 is connected between the first bottom water flatrack 31 and the second bottom water flatrack 33;First bottom water flatrack 31 is set
Put bolt hole;
Top braces section 1 is connected with midfoot support section 2 by bolt 9, and midfoot support section 2 educates bottom support section 3 and passes through spiral shell
Bolt 9 connects.
On the basis of above-described embodiment, in order to reduce the displacement for the bottom of device that returns back to top, it is further improved:It spells
The dress formula building hoist device that returns back to top further includes bottom plate 5, the second bottom water flatrack 33 of bottom support section 3 by connecting plate 4 with
Bottom plate 5 is welded to connect;In 5 top casting concrete reinforcing member 6 of bottom plate.
The pin-connected panel building hoist of above-described embodiment device work progress that returns back to top is as follows:
Step 1, building hoist guide rail bracket 8 are installed by the lifter foundation between ceiling plate located underground and guide rail bracket
On 7 top of basement roof;Building hoist guide rail bracket actual installation position is projected on basement bottom board, to determine to return back to top
The corner location of device.
Step 2 places 700 × 700 × 10 steel plates as bottom plate on bottom plate, and the central point of bottom plate is overlapped with support section.
Step 3, from top to bottom assembling support section first fill top braces section, refill midfoot support section, finally assemble bottom
Support section.
Step 4, support are saved after the completion of being bolted, correction support section verticality, it is ensured that verticality≤4/1000.
Step 5, bottom support save bottom surrounding is placed by the use of 10 steel plates as connecting plate and before 700 × 700 × 10
Steel plate full weld.
Step 6 supports section bottom to pour 800 × 800 × 100C35 concrete in bottom;
Step 7 checks again for verticality, and return back to top completion.
The pin-connected panel building hoist of the utility model above-described embodiment returns back to top device, moreover it is possible to be improved, pushed up as follows
Gusset 15 is strengthened in welding between plate 14 and top montant 12, as shown in Fig. 2, welded on each top montant two it is adjacent plus
Strong gusset 15;The effect for strengthening gusset 15 is secured connection top plate 14 and top montant.
The pin-connected panel building hoist of the utility model above-described embodiment returns back to top device, as shown in Figure 2, moreover it is possible to carry out as follows
It improves, top braces section 1 further includes top and strengthens lacing 16, and one end that lacing 16 is strengthened at top connects the first top water flatrack
11, the other end is connected to the medium position of top montant 12.Strengthening lacing can prevent support section when being subject to external force in longitudinal direction
It deforms.In a further preferred embodiment, reinforcement lacing in top is welded to connect with backing plate, and backing plate is welded with top montant
Connection, said structure can optimize welding sequence in construction, improve welding efficiency.
The pin-connected panel building hoist of the utility model above-described embodiment returns back to top device, as shown in Figure 3 and Figure 4, moreover it is possible into
Row is following to be improved, and midfoot support section 2 further includes middle part and strengthens lacing 24, and one end that lacing 24 is strengthened at middle part connects the first middle part water
Flatrack 21, the other end are connected to the medium position of middle part montant 22.
The pin-connected panel building hoist of the utility model above-described embodiment returns back to top device, as shown in Figure 5, moreover it is possible to carry out as follows
It improves, bottom support section 3 further includes bottom and strengthens lacing 34, and one end that lacing 34 is strengthened in bottom connects the first bottom water flatrack
31, the other end is connected to the medium position of bottom montant 32.
It is moved when top braces section is contacted with basement roof in order to prevent, the pin-connected panel construction of above-described embodiment rises
Drop machine returns back to top device, moreover it is possible to be improved as follows:Increase locating pin on the top plate of top braces section, which is driven underground
In ceiling plate.Alternatively, increasing antiskid pad between the top plate and basement roof of top braces section, provided more by the antiskid pad
Big frictional force.It is constructed and summed up for a long time by inventor, in there is provided the technical solution of positioning staple cartridge antiskid pad, can kept away
Exempt from top braces section to move, and other schemes then easily move, and cause construction risk.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and other feature combination, and those skilled in the art are also
Other combinations between each technical characteristic can be carried out according to the purpose of invention, are subject to the purpose for realizing the utility model.
Claims (6)
- The device 1. a kind of pin-connected panel building hoist returns back to top, which is characterized in that including:Top braces section, the top braces section include the first top water flatrack, top montant, the second top water flatrack;Top Montant is connected between the first top water flatrack and the second top water flatrack;Top plate is fixed on first top water flatrack top;Second Top horizontal frame sets bolt hole;Midfoot support section, the midfoot support section include the first middle part level frame, middle part montant, the second middle part level frame;Middle part Montant is connected between the first middle part level frame and the second middle part level frame;First middle part level frame and the second middle part level frame are equal Bolt hole is set;Bottom support section, the bottom support section include the first bottom water flatrack, bottom montant, the second bottom water flatrack;Bottom Montant is connected between the first bottom water flatrack and the second bottom water flatrack;First bottom level frame sets bolt hole;Top braces section is connected with midfoot support section, midfoot support section and bottom support section connection.
- The device 2. pin-connected panel building hoist according to claim 1 returns back to top, which is characterized in that further include bottom plate, bottom Second bottom water flatrack of support section is welded to connect by connecting plate and bottom plate;In bottom plate top casting concrete reinforcing member.
- The device 3. pin-connected panel building hoist according to claim 1 or 2 returns back to top, which is characterized in that in top plate and top Gusset is strengthened in welding between montant.
- The device 4. pin-connected panel building hoist according to claim 1 or 2 returns back to top, which is characterized in that the top braces Section further includes top and strengthens lacing, and one end that lacing is strengthened at the top connects the first top water flatrack, and the other end is connected to top The medium position of portion's montant.
- The device 5. pin-connected panel building hoist according to claim 1 or 2 returns back to top, which is characterized in that the midfoot support Section further includes middle part and strengthens lacing, and one end that lacing is strengthened at the middle part connects the first middle part level frame, during the other end is connected to The medium position of portion's montant.
- The device 6. pin-connected panel building hoist according to claim 1 or 2 returns back to top, which is characterized in that the bottom support Section further includes bottom and strengthens lacing, and one end that lacing is strengthened in the bottom connects the first bottom water flatrack, and the other end is connected to bottom The medium position of portion's montant.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721436309.0U CN207436545U (en) | 2017-11-01 | 2017-11-01 | A kind of pin-connected panel building hoist returns back to top device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721436309.0U CN207436545U (en) | 2017-11-01 | 2017-11-01 | A kind of pin-connected panel building hoist returns back to top device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207436545U true CN207436545U (en) | 2018-06-01 |
Family
ID=62291744
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721436309.0U Expired - Fee Related CN207436545U (en) | 2017-11-01 | 2017-11-01 | A kind of pin-connected panel building hoist returns back to top device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207436545U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114562096A (en) * | 2022-03-18 | 2022-05-31 | 四川华远建设工程有限公司 | Semi-self-supporting type steel supporting platform with high-altitude large-cantilever steel reinforced concrete structure |
-
2017
- 2017-11-01 CN CN201721436309.0U patent/CN207436545U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114562096A (en) * | 2022-03-18 | 2022-05-31 | 四川华远建设工程有限公司 | Semi-self-supporting type steel supporting platform with high-altitude large-cantilever steel reinforced concrete structure |
CN114562096B (en) * | 2022-03-18 | 2023-12-05 | 四川华远建设工程有限公司 | Semi-self-supporting type high-altitude large cantilever steel reinforced concrete structure steel support platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107299643B (en) | Steel lattice column combined type tower crane foundation structure in foundation pit and construction method | |
CN204551483U (en) | A kind of to be used for " Two walls unite as one " ground-connecting-wall-Vierendeel girder Joint's connection fabrication | |
CN101851917B (en) | Connection structure used for pull-out resistant pile foundation and connecting method thereof | |
CN204899204U (en) | Mouthful structure concrete structure's of department a template system fetches earth among reverse construction method | |
CN102587387A (en) | Construction method for foundation pit in Larson steel sheet pile retaining and protecting river | |
CN101775844A (en) | Connecting joint of ring beam of steel core concrete column used for topdown construction method foundation pit engineering | |
CN103628571B (en) | Beam-column joint for reverse construction method and construction method | |
CN207436545U (en) | A kind of pin-connected panel building hoist returns back to top device | |
CN205676882U (en) | A kind of novel supporting construction | |
CN203200745U (en) | Strengthening support of underground diaphragm wall in inverse construction method | |
CN208701698U (en) | A kind of foundation pit recoverable concrete support | |
CN208982068U (en) | The full section of tunnel construction integer support steel arch-shelf fixed device of jacking | |
CN206752533U (en) | A kind of uplift pile reaction frame experimental rig | |
CN206816278U (en) | The new recyclable supporting steel arch-shelf of horizontal ground settlement and tunnel | |
CN208563658U (en) | A kind of prefabricated lattice compound shear wall assembly monomer | |
CN209066594U (en) | The connection structure of contrary sequence method foundation pit construction central sill and steel core concrete column | |
CN208379874U (en) | A kind of concrete folding plate | |
CN214993888U (en) | Ground supporting device for rock-soil construction | |
CN201598734U (en) | Concrete filled steel tubular column ring beam joint for topdown construction method foundation pit engineering | |
CN107916798A (en) | The building structure of skyscraper is built suitable for tier building set | |
CN208981334U (en) | Go along with sb. to guard him ruggedized construction in underground | |
CN205976151U (en) | Side fascia installation node | |
CN206737358U (en) | A kind of prefabricated assembled steel reinforced concrete framework elevator shaft structure | |
CN207829208U (en) | A kind of connection structure of the prefabricated steel tube shear horizontal joint with otic placode | |
CN206127859U (en) | Portable construction operation platform of drilled pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180601 Termination date: 20181101 |
|
CF01 | Termination of patent right due to non-payment of annual fee |