CN207436545U - A kind of pin-connected panel building hoist returns back to top device - Google Patents

A kind of pin-connected panel building hoist returns back to top device Download PDF

Info

Publication number
CN207436545U
CN207436545U CN201721436309.0U CN201721436309U CN207436545U CN 207436545 U CN207436545 U CN 207436545U CN 201721436309 U CN201721436309 U CN 201721436309U CN 207436545 U CN207436545 U CN 207436545U
Authority
CN
China
Prior art keywords
support section
montant
water flatrack
pin
returns back
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721436309.0U
Other languages
Chinese (zh)
Inventor
韦应彬
王志刚
李永杰
陈明
孟柯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201721436309.0U priority Critical patent/CN207436545U/en
Application granted granted Critical
Publication of CN207436545U publication Critical patent/CN207436545U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

It returns back to top device the utility model discloses a kind of pin-connected panel building hoist, including:Top braces section, top braces section include the first top water flatrack, top montant, the second top water flatrack;Top montant is connected between the first top water flatrack and the second top water flatrack;Top plate is fixed on first top water flatrack top;Second top horizontal frame sets bolt hole;Midfoot support section, midfoot support section include the first middle part level frame, middle part montant, the second middle part level frame;Bottom support section, bottom support section include the first bottom water flatrack, bottom montant, the second bottom water flatrack;Top braces section is connected with midfoot support section, midfoot support section and bottom support section connection.Pin-connected panel return back to top device top braces section and midfoot support section it is reusable, save material.It returns back to top to be detachably connected between the support section of device, assembling is attached using bolt, assembly and disassembly are quick, conveniently, save manpower, assembling can be completed in live common instrument and material.

Description

A kind of pin-connected panel building hoist returns back to top device
Technical field
The utility model belongs to building hoist installation Technology field, constructs and lifts more particularly to a kind of pin-connected panel Machine returns back to top device.
Background technology
During high-building construction, building hoist is as personnel, the main tool of material vertical transport, generally It uses.It may be arranged at close to agent structure on backfill or basement roof.Construction liter on ceiling plate located underground Drop machine, due to work when load it is larger, need to return back to top to top plate.
Method conventionally employed at present is mainly returned back to top using steel pipe scaffold, and this method is primarily present problems with:By Smaller in common steel tube section size, the area that causes to return back to top is often excessive, and building hoist generally removes evening time, causes ground Lower room long-term existence large area steel pipe returns back to top region, influences electromechanical pipeline installation.In addition, steel pipe lease and labour cost are high, apply Work elevator existence time is long, and steel pipe lease expenses is big, and it is big manually to take the amount of tearing open, and comprehensive cost is high.
Utility model content
The purpose of this utility model is to provide a kind of pin-connected panel building hoist and returns back to top device, is returned with solving steel pipe scaffold The problem of other constructions of the existing influence in top and high operating expenses.
The technical solution that the utility model solves above-mentioned technical problem is as follows:A kind of pin-connected panel building hoist returns back to top dress It puts, including:
Top braces section, the top braces section include the first top water flatrack, top montant, the second top water flatrack; Top montant is connected between the first top water flatrack and the second top water flatrack;Top plate is fixed on first top water flatrack top; Second top horizontal frame sets bolt hole;
Midfoot support section, the midfoot support section include the first middle part level frame, middle part montant, the second middle part level frame; Middle part montant is connected between the first middle part level frame and the second middle part level frame;First middle part level frame and the second middle part are horizontal Frame is respectively provided with bolt hole;
Bottom support section, the bottom support section include the first bottom water flatrack, bottom montant, the second bottom water flatrack; Bottom montant is connected between the first bottom water flatrack and the second bottom water flatrack;First bottom level frame sets bolt hole;
Top braces section is connected with midfoot support section, midfoot support section and bottom support section connection.
The utility model pin-connected panel building hoist as described above returns back to top device, further, in top plate and top montant Between welding strengthen gusset.
The utility model pin-connected panel building hoist as described above returns back to top device, further, further includes bottom plate, bottom branch Second bottom water flatrack of support section is welded to connect by connecting plate and bottom plate;In bottom plate top casting concrete reinforcing member.
The utility model pin-connected panel building hoist as described above returns back to top device, and further, the top braces section is also Strengthen lacing including top, one end that lacing is strengthened at the top connects the first top water flatrack, and it is perpendicular that the other end is connected to top The medium position of bar.
The utility model pin-connected panel building hoist as described above returns back to top device, and further, the midfoot support section is also Strengthen lacing including middle part, one end that lacing is strengthened at the middle part connects the first middle part level frame, and it is perpendicular that the other end is connected to middle part The medium position of bar.
The utility model pin-connected panel building hoist as described above returns back to top device, and further, the bottom support section is also Strengthen lacing including bottom, one end that lacing is strengthened in the bottom connects the first bottom water flatrack, and the other end is connected to bottom and erects The medium position of bar.
The beneficial effects of the utility model are:
1st, pin-connected panel return back to top device top braces section and midfoot support section it is reusable, save material.
2nd, return back to top to be detachably connected between the support section of device, assembling is attached using bolt, assembly and disassembly are quick, just Just, manpower is saved, assembling can be completed in the common instrument in scene and material.
3rd, the installation area that returns back to top is small, does not influence the installation of basement electromechanical pipeline.
Description of the drawings
By the detailed description made in conjunction with the following drawings, the above-mentioned and/or otherwise advantage of the utility model will It becoming more apparent upon and is easier to understand, these attached drawings are simply schematical, are not intended to limit the utility model, wherein:
Fig. 1 is that a kind of pin-connected panel building hoist of embodiment of the utility model returns back to top schematic device;
Fig. 2 is a kind of top braces section schematic diagram of embodiment of the utility model;
Fig. 3 is a kind of midfoot support section schematic diagram of embodiment of the utility model;
Fig. 4 is a kind of midfoot support section schematic top plan view of embodiment of the utility model;
Fig. 5 is a kind of bottom support section schematic diagram of embodiment of the utility model.
In attached drawing, parts list represented by the reference numerals is as follows:
1st, top braces section, the 11, first top water flatrack, 12, top montant, the 13, second top water flatrack, 14, top plate, 15th, strengthen gusset, 16, top strengthen lacing, 2, midfoot support section, the 21, first middle part level frame, 22, middle part montant, 23, the Two middle part level frames, 24, middle part strengthen lacing, 3, bottom support section, the 31, first bottom water flatrack, 32, bottom montant, 33, the Two bottom water flatracks, 34, bottom strengthen lacing, 4, connecting plate, 5, bottom plate, 6, concrete reinforcement, 7, basement roof, 8, apply Work elevator guide bracket, 9, bolt.
Specific embodiment
Hereinafter, the pin-connected panel building hoist for describing the utility model with reference to the accompanying drawings returns back to top the embodiment of device.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model Design, is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be based on the application claims and specification institute is public The content opened includes doing using the embodiment to recording herein using obvious other technical solutions, these technical solutions Go out the technical solution of any obvious substitutions and modifications.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each several part Shape and its correlation.It note that clearly to show the structure of each component of the utility model embodiment, respectively It is not drawn between attached drawing according to identical ratio.Identical reference marker is used to represent identical part.
Fig. 1 shows that a kind of pin-connected panel building hoist of embodiment of the utility model returns back to top device, including:
Top braces section 1, top braces section 1 include the first top water flatrack 11, top montant 12, the second top water flatrack 13;Top montant 12 is connected between the first top water flatrack 11 and the second top water flatrack 13;In first top water flatrack 11 Top plate 14 is fixed in portion;Second top water flatrack 13 sets bolt hole;
Midfoot support section 2, midfoot support section 2 include the first middle part level frame 21, middle part montant 22, the second middle part level frame 23;Middle part montant 22 is connected between the first middle part level frame 21 and the second middle part level frame 23;First middle part level frame, 21 He Second middle part level frame 23 is respectively provided with bolt hole;
Bottom support section 3, bottom support section 3 include the first bottom water flatrack 31, bottom montant 32, the second bottom water flatrack 33;Bottom montant 32 is connected between the first bottom water flatrack 31 and the second bottom water flatrack 33;First bottom water flatrack 31 is set Put bolt hole;
Top braces section 1 is connected with midfoot support section 2 by bolt 9, and midfoot support section 2 educates bottom support section 3 and passes through spiral shell Bolt 9 connects.
On the basis of above-described embodiment, in order to reduce the displacement for the bottom of device that returns back to top, it is further improved:It spells The dress formula building hoist device that returns back to top further includes bottom plate 5, the second bottom water flatrack 33 of bottom support section 3 by connecting plate 4 with Bottom plate 5 is welded to connect;In 5 top casting concrete reinforcing member 6 of bottom plate.
The pin-connected panel building hoist of above-described embodiment device work progress that returns back to top is as follows:
Step 1, building hoist guide rail bracket 8 are installed by the lifter foundation between ceiling plate located underground and guide rail bracket On 7 top of basement roof;Building hoist guide rail bracket actual installation position is projected on basement bottom board, to determine to return back to top The corner location of device.
Step 2 places 700 × 700 × 10 steel plates as bottom plate on bottom plate, and the central point of bottom plate is overlapped with support section.
Step 3, from top to bottom assembling support section first fill top braces section, refill midfoot support section, finally assemble bottom Support section.
Step 4, support are saved after the completion of being bolted, correction support section verticality, it is ensured that verticality≤4/1000.
Step 5, bottom support save bottom surrounding is placed by the use of 10 steel plates as connecting plate and before 700 × 700 × 10 Steel plate full weld.
Step 6 supports section bottom to pour 800 × 800 × 100C35 concrete in bottom;
Step 7 checks again for verticality, and return back to top completion.
The pin-connected panel building hoist of the utility model above-described embodiment returns back to top device, moreover it is possible to be improved, pushed up as follows Gusset 15 is strengthened in welding between plate 14 and top montant 12, as shown in Fig. 2, welded on each top montant two it is adjacent plus Strong gusset 15;The effect for strengthening gusset 15 is secured connection top plate 14 and top montant.
The pin-connected panel building hoist of the utility model above-described embodiment returns back to top device, as shown in Figure 2, moreover it is possible to carry out as follows It improves, top braces section 1 further includes top and strengthens lacing 16, and one end that lacing 16 is strengthened at top connects the first top water flatrack 11, the other end is connected to the medium position of top montant 12.Strengthening lacing can prevent support section when being subject to external force in longitudinal direction It deforms.In a further preferred embodiment, reinforcement lacing in top is welded to connect with backing plate, and backing plate is welded with top montant Connection, said structure can optimize welding sequence in construction, improve welding efficiency.
The pin-connected panel building hoist of the utility model above-described embodiment returns back to top device, as shown in Figure 3 and Figure 4, moreover it is possible into Row is following to be improved, and midfoot support section 2 further includes middle part and strengthens lacing 24, and one end that lacing 24 is strengthened at middle part connects the first middle part water Flatrack 21, the other end are connected to the medium position of middle part montant 22.
The pin-connected panel building hoist of the utility model above-described embodiment returns back to top device, as shown in Figure 5, moreover it is possible to carry out as follows It improves, bottom support section 3 further includes bottom and strengthens lacing 34, and one end that lacing 34 is strengthened in bottom connects the first bottom water flatrack 31, the other end is connected to the medium position of bottom montant 32.
It is moved when top braces section is contacted with basement roof in order to prevent, the pin-connected panel construction of above-described embodiment rises Drop machine returns back to top device, moreover it is possible to be improved as follows:Increase locating pin on the top plate of top braces section, which is driven underground In ceiling plate.Alternatively, increasing antiskid pad between the top plate and basement roof of top braces section, provided more by the antiskid pad Big frictional force.It is constructed and summed up for a long time by inventor, in there is provided the technical solution of positioning staple cartridge antiskid pad, can kept away Exempt from top braces section to move, and other schemes then easily move, and cause construction risk.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and other feature combination, and those skilled in the art are also Other combinations between each technical characteristic can be carried out according to the purpose of invention, are subject to the purpose for realizing the utility model.

Claims (6)

  1. The device 1. a kind of pin-connected panel building hoist returns back to top, which is characterized in that including:
    Top braces section, the top braces section include the first top water flatrack, top montant, the second top water flatrack;Top Montant is connected between the first top water flatrack and the second top water flatrack;Top plate is fixed on first top water flatrack top;Second Top horizontal frame sets bolt hole;
    Midfoot support section, the midfoot support section include the first middle part level frame, middle part montant, the second middle part level frame;Middle part Montant is connected between the first middle part level frame and the second middle part level frame;First middle part level frame and the second middle part level frame are equal Bolt hole is set;
    Bottom support section, the bottom support section include the first bottom water flatrack, bottom montant, the second bottom water flatrack;Bottom Montant is connected between the first bottom water flatrack and the second bottom water flatrack;First bottom level frame sets bolt hole;
    Top braces section is connected with midfoot support section, midfoot support section and bottom support section connection.
  2. The device 2. pin-connected panel building hoist according to claim 1 returns back to top, which is characterized in that further include bottom plate, bottom Second bottom water flatrack of support section is welded to connect by connecting plate and bottom plate;In bottom plate top casting concrete reinforcing member.
  3. The device 3. pin-connected panel building hoist according to claim 1 or 2 returns back to top, which is characterized in that in top plate and top Gusset is strengthened in welding between montant.
  4. The device 4. pin-connected panel building hoist according to claim 1 or 2 returns back to top, which is characterized in that the top braces Section further includes top and strengthens lacing, and one end that lacing is strengthened at the top connects the first top water flatrack, and the other end is connected to top The medium position of portion's montant.
  5. The device 5. pin-connected panel building hoist according to claim 1 or 2 returns back to top, which is characterized in that the midfoot support Section further includes middle part and strengthens lacing, and one end that lacing is strengthened at the middle part connects the first middle part level frame, during the other end is connected to The medium position of portion's montant.
  6. The device 6. pin-connected panel building hoist according to claim 1 or 2 returns back to top, which is characterized in that the bottom support Section further includes bottom and strengthens lacing, and one end that lacing is strengthened in the bottom connects the first bottom water flatrack, and the other end is connected to bottom The medium position of portion's montant.
CN201721436309.0U 2017-11-01 2017-11-01 A kind of pin-connected panel building hoist returns back to top device Expired - Fee Related CN207436545U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721436309.0U CN207436545U (en) 2017-11-01 2017-11-01 A kind of pin-connected panel building hoist returns back to top device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721436309.0U CN207436545U (en) 2017-11-01 2017-11-01 A kind of pin-connected panel building hoist returns back to top device

Publications (1)

Publication Number Publication Date
CN207436545U true CN207436545U (en) 2018-06-01

Family

ID=62291744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721436309.0U Expired - Fee Related CN207436545U (en) 2017-11-01 2017-11-01 A kind of pin-connected panel building hoist returns back to top device

Country Status (1)

Country Link
CN (1) CN207436545U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114562096A (en) * 2022-03-18 2022-05-31 四川华远建设工程有限公司 Semi-self-supporting type steel supporting platform with high-altitude large-cantilever steel reinforced concrete structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114562096A (en) * 2022-03-18 2022-05-31 四川华远建设工程有限公司 Semi-self-supporting type steel supporting platform with high-altitude large-cantilever steel reinforced concrete structure
CN114562096B (en) * 2022-03-18 2023-12-05 四川华远建设工程有限公司 Semi-self-supporting type high-altitude large cantilever steel reinforced concrete structure steel support platform

Similar Documents

Publication Publication Date Title
CN107299643B (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN204551483U (en) A kind of to be used for " Two walls unite as one " ground-connecting-wall-Vierendeel girder Joint's connection fabrication
CN101851917B (en) Connection structure used for pull-out resistant pile foundation and connecting method thereof
CN204899204U (en) Mouthful structure concrete structure's of department a template system fetches earth among reverse construction method
CN102587387A (en) Construction method for foundation pit in Larson steel sheet pile retaining and protecting river
CN101775844A (en) Connecting joint of ring beam of steel core concrete column used for topdown construction method foundation pit engineering
CN103628571B (en) Beam-column joint for reverse construction method and construction method
CN207436545U (en) A kind of pin-connected panel building hoist returns back to top device
CN205676882U (en) A kind of novel supporting construction
CN203200745U (en) Strengthening support of underground diaphragm wall in inverse construction method
CN208701698U (en) A kind of foundation pit recoverable concrete support
CN208982068U (en) The full section of tunnel construction integer support steel arch-shelf fixed device of jacking
CN206752533U (en) A kind of uplift pile reaction frame experimental rig
CN206816278U (en) The new recyclable supporting steel arch-shelf of horizontal ground settlement and tunnel
CN208563658U (en) A kind of prefabricated lattice compound shear wall assembly monomer
CN209066594U (en) The connection structure of contrary sequence method foundation pit construction central sill and steel core concrete column
CN208379874U (en) A kind of concrete folding plate
CN214993888U (en) Ground supporting device for rock-soil construction
CN201598734U (en) Concrete filled steel tubular column ring beam joint for topdown construction method foundation pit engineering
CN107916798A (en) The building structure of skyscraper is built suitable for tier building set
CN208981334U (en) Go along with sb. to guard him ruggedized construction in underground
CN205976151U (en) Side fascia installation node
CN206737358U (en) A kind of prefabricated assembled steel reinforced concrete framework elevator shaft structure
CN207829208U (en) A kind of connection structure of the prefabricated steel tube shear horizontal joint with otic placode
CN206127859U (en) Portable construction operation platform of drilled pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180601

Termination date: 20181101

CF01 Termination of patent right due to non-payment of annual fee