CN103866693A - Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge - Google Patents

Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge Download PDF

Info

Publication number
CN103866693A
CN103866693A CN201410090163.3A CN201410090163A CN103866693A CN 103866693 A CN103866693 A CN 103866693A CN 201410090163 A CN201410090163 A CN 201410090163A CN 103866693 A CN103866693 A CN 103866693A
Authority
CN
China
Prior art keywords
bridge
arch
rib
bowstring
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410090163.3A
Other languages
Chinese (zh)
Other versions
CN103866693B (en
Inventor
曾文利
戚瑞安
孙周
彭玉红
胡小川
张洪生
张志芳
杨景皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Triumph construction engineering corporation, Ltd of China Petrochemical Industry
Sinopec Oilfield Service Corp
Original Assignee
Triumph Construction Engineering Corp Ltd Of China Petrochemical Industry
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Triumph Construction Engineering Corp Ltd Of China Petrochemical Industry filed Critical Triumph Construction Engineering Corp Ltd Of China Petrochemical Industry
Priority to CN201410090163.3A priority Critical patent/CN103866693B/en
Publication of CN103866693A publication Critical patent/CN103866693A/en
Application granted granted Critical
Publication of CN103866693B publication Critical patent/CN103866693B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses an installing method of reinforced concrete bowstring rod arch bridge arch ribs and a hanging auxiliary bridge. The method and the hanging auxiliary bridge are used for installation of the reinforced concrete bowstring rod arch bridge arch ribs during the first-beam and second-arch construction and the in-site casting of bowstring rods. According to the method, an arch rib hanging auxiliary bridge is built in a riverway along the ridge direction of a bowstring rod arch bridge, the arch rib hanging auxiliary bridge comprises a reinforced concrete carrying table, a support pier and a hanging table top. A bowstring rod cast-in-place support frame and an arch rib installing support frame are built on the arch rib hanging auxiliary bridge, and the bowstring rod in-site casting is carried out by using the bowstring rod cast-in-place support frame; through the arch rib installing support frame, a truck crane is used for installing arch ribs of the bowstring rod arch bridge on the arch rib hanging auxiliary bridge. The method and the hanging auxiliary bridge provided by the invention are applicable to navigable riverways, are also applicable to unnavigable riverways, and have the advantages that the construction is convenient, the greatest difficult problems of arch rib installation can be solved, meanwhile, the problems of in-site casting of the bowstring rod, the deck construction of the arch bridge and the like can be solved, the building cost of the bowstring rod arch bridge is greatly reduced, the construction safety is improved, and the building application range of the bowstring rod arch bridge is expanded.

Description

A kind of mounting method of steel concrete bowstring arch bridge arch rib and lift auxiliary bridge
Technical field
The present invention relates to the construction method of steel concrete bowstring arch bridge, particularly a kind of mounting method of steel concrete bowstring arch bridge arch rib and lift auxiliary bridge, the installation of the steel concrete bowstring arch bridge arch rib during for first beam rear arch and the cast in situs of tie-rod.
Background technology
Steel concrete bowstring arch bridge is a kind of bridge type that integrates arch and the advantage of beam, and it combines arch and two kinds of basic structure forms of beam, forms inner statically indeterminate system, and outside is static determinacy, therefore pier differential settlement on it without impact.This bridge type, have larger development in China recent years, is especially with comparatively outstanding with Jiangsu and Zhejiang Provinces one.Meanwhile, this bridge type is also the conventional selection scheme of one of crossing over the bridge construction form in navigation channel in China Express Railway construction.In large and medium-sized bridge, be also widely used abroad.
At present, the construction method of steel concrete bowstring arch bridge mainly contains cast-in-place and two kinds of construction methods of precast assembly, and precast assembly is most widely used, precast assembly is divided into again the cable crane adopting under erection without scaffolding condition and installs and adopt the crane barge ship under limited bracket execution conditions that two kinds of methods, wherein the installation difficulty maximum of arch rib are installed.Cable crane mounting cost is high, and construction difficulty is large, does not generally adopt construction in this way in the situation that can adopting other forms of construction work; And if while adopting the construction method that crane barge ship installs, must there be the larger depth of water in the river course that newly building bridge is crossed over, to guarantee the draft of crane barge ship, river course must meet navigation condition, otherwise crane barge ship cannot enter simultaneously.Due to above reason, the construction accommodation of steel concrete bowstring arch bridge is subject to larger restriction always, although this bridge Stability Analysis of Structures, good looking appearance is generous, generally all only build on navigable river, and inland river is not rarely found on navigable river.Job site needs a kind of construction method to break through the restriction of current steel concrete bowstring arch bridge construction accommodation.
Summary of the invention
The object of this invention is to provide a kind of mounting method of steel concrete bowstring arch bridge arch rib and lift auxiliary bridge, overcome the applicable limitation of current steel concrete bowstring arch bridge construction technique, expand the construction accommodation of this kind of bridge type, improve the safety and stability of construction.
Technical solution of the present invention is:
The mounting method of steel concrete bowstring arch bridge arch rib be in river course along the bridge of bowstring arch bridge to building the auxiliary bridge of rib-hoisting, on the auxiliary bridge of rib-hoisting, set up tie-rod cast-in-place support and arch rib mounting bracket, by tie-rod cast-in-place support to tie-rod cast in situs; By arch rib mounting bracket, use mobile crane that the arch rib of bowstring arch bridge is installed on the auxiliary bridge of rib-hoisting.
The auxiliary bridge of rib-hoisting that is used for a kind of mounting method of steel concrete bowstring arch bridge arch rib comprises reinforced concrete pile cap, support pier and lifting table top, support pier is arranged on reinforced concrete pile cap and fixes by activity crab-bolt, support pier bottom is fixed on reinforced concrete pile cap by activity crab-bolt, when dismounting, can entirety sling, the activity crab-bolt Automatic-falling of support pier bottom; Lifting table top is arranged on support pier, uses connecting bolt to fix.
For a kind of mounting method of steel concrete bowstring arch bridge arch rib and the construction technology of the auxiliary bridge of rib-hoisting, as following:
A, select the type of service of supporting pile and complete the construction of reinforced concrete pile cap according to the regimen in river course or gully;
B, assembling and fixed support pier and lifting table top, make to lift the two ends of table top and the bridge pier of bowstring arch bridge is connected, and completes the construction of the auxiliary bridge of rib-hoisting;
C, on the auxiliary bridge of rib-hoisting, set up arch rib mounting bracket and tie-rod cast-in-place support, at the bottom welding i iron collet of arch rib mounting bracket, then i iron collet is welded on the bridge deck of lifting table top; Can use tie-rod cast-in-place support cast in situs tie-rod, use the auxiliary arch rib that bowstring arch bridge is installed of arch rib mounting bracket;
D, at the top of arch rib mounting bracket installed thrust conversion bearing, it contact with the bottom surface of arch rib, facilitate installation;
The height of E, arch rib mounting bracket surmounts the height of tie-rod cast-in-place support and tie-rod, and the radian that multiple arch rib mounting brackets arrange formation conforms to the radian forming after arch rib installation;
F, mobile crane is left to the auxiliary bridge of upper rib-hoisting, use mobile crane that the arch rib of bowstring arch bridge is installed by arch rib mounting bracket.
Remarkable result of the present invention is: the present invention provides a new solution for the construction of steel concrete bowstring arch bridge, in river course or gully, set up an auxiliary bridge of rib-hoisting, solve prior art and in navigable river not, build bowstring arch bridge crane barge ship and cannot enter, use the problem that cable crane mounting cost is high, construction difficulty is large.The present invention is not only applicable to navigable river, is applicable to not navigable river yet, and the safety and stability performance of pontic is high simultaneously, prior art easy construction relatively.Not only can solve arch rib this maximum difficult problem is installed, can solve the cast in situs of tie-rod and the construction of arch bridge bridge floor etc. problem, greatly reduce construction cost simultaneously.The present invention has broken through the limitation that can only adopt cable crane and the lifting of crane barge ship when steel concrete bowstring arch bridge arch rib is prefabricated to be installed, and has expanded the construction scope of application of bowstring arch bridge, has improved the safety of construction in reducing construction cost.The integrated support pier of arch rib mounting bracket and tie-rod cast-in-place support and the auxiliary bridge of rib-hoisting and lifting table top are removed with completing of each operation in construction, all can in lower bridge block construction, again come into operation, and have significant economic benefit and effect.
Accompanying drawing explanation
Fig. 1 is the top view of reinforced concrete pile cap.
Fig. 2 is the front view of support pier.
Fig. 3 is the front view of the auxiliary bridge of rib-hoisting.
Fig. 4 is Construction Principle schematic diagram of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing in detail the present invention is described in detail, not limits the scope of the invention.
Referring to Fig. 4, a kind of mounting method of steel concrete bowstring arch bridge arch rib be in river course along the bridge of bowstring arch bridge to building the auxiliary bridge of rib-hoisting, on the auxiliary bridge of rib-hoisting, set up tie-rod cast-in-place support 9 and arch rib mounting bracket 10, by tie-rod cast-in-place support 9 cast in situs tie-rods 14; By arch rib mounting bracket 10, use mobile crane 11 that the arch rib of bowstring arch bridge is installed on the auxiliary bridge of rib-hoisting.
Referring to Fig. 1, Fig. 2 and Fig. 3, a kind of auxiliary bridge of rib-hoisting of mounting method of steel concrete bowstring arch bridge arch rib comprises reinforced concrete pile cap, support pier and lifting table top, support pier is arranged on reinforced concrete pile cap fixing by activity crab-bolt 5, support pier bottom is fixed on reinforced concrete pile cap by activity crab-bolt 5, when dismounting, can entirety sling, activity crab-bolt 5 Automatic-fallings of support pier bottom; Lifting table top is arranged on support pier, uses connecting bolt 8 fixing.Reinforced concrete pile cap comprises supporting pile 2 and accepts table top 1, and supporting pile 2 is crisscross arranged and is driven underground, and accepts table top 1 and be cast in the stake top of supporting pile 2, and reinforced concrete pile cap is rectangle, transverse to bowstring arch bridge.Supporting pile 2 is bored pile or steel pipe pile, and bored pile is for river course or gully under shallow water or anhydrous condition, and steel pipe pile is for navigable river course or gully; When supporting pile 2 is selected bored pile, after building, accept table top 1 not higher than river bed, when supporting pile 2 is selected steel pipe pile, after building, accept table top 1 higher than the water surface.Support pier is monolithic, comprises pier Bailey truss 3 and interlayer connecting bolt 4, and pier Bailey truss 3 is provided with bridging, vertical folded spelling, and each layer of pier Bailey truss 3 utilizes interlayer connecting bolt 4 to connect by the bolt hole on truss.Lifting table top comprises table top Bailey truss 6 and bridge deck 7, by table top Bailey truss 6 along the bridge of bowstring arch bridge to assembled rear being vertically placed on support pier, fixing by connecting bolt 8, on table top Bailey truss 6, lay bridge deck 7.The lifting two ends of table top and the bridge pier of bowstring arch bridge are connected, and its length is crossed over tie-rod 14 and tie-rod cast-in-place support 9.
For a kind of mounting method of steel concrete bowstring arch bridge arch rib and the construction technology of the auxiliary bridge of rib-hoisting, as following:
A, select the type of service of supporting pile 2 and complete the construction of reinforced concrete pile cap according to the regimen in river course or gully;
B, assembling and fixed support pier and lifting table top, make to lift the two ends of table top and the bridge pier of bowstring arch bridge is connected, and completes the construction of the auxiliary bridge of rib-hoisting;
C, on the auxiliary bridge of rib-hoisting, set up arch rib mounting bracket 10 and tie-rod cast-in-place support 9, at the bottom welding i iron collet 12 of arch rib mounting bracket 10, then i iron collet 12 is welded on the bridge deck 7 of lifting table top; Can use tie-rod cast-in-place support 9 cast in situs tie-rods 14, use the auxiliary arch rib that bowstring arch bridge is installed of arch rib mounting bracket 10;
D, at the top of arch rib mounting bracket 10 installed thrust conversion bearing 13, thrust conversion bearing 13 contact with the bottom surface of arch rib, facilitate installation;
The height of E, arch rib mounting bracket 10 surmounts the height of tie-rod cast-in-place support 9 and tie-rod 14, and the radian that multiple arch rib mounting brackets 10 arrange formation conforms to the radian forming after arch rib installation;
F, mobile crane 11 is left to the auxiliary bridge of upper rib-hoisting, use mobile crane 11 that the arch rib of bowstring arch bridge is installed by arch rib mounting bracket 10.
Above-mentioned tie-rod cast-in-place support 9 uses bowl fastening type support assembled; Arch rib mounting bracket 10 is steel pipe trusses, is provided with bridging, its steel pipe bore is greater than 30cm.The area of the i iron collet 12 of arch rib mounting bracket 10 bottom weldings is greater than the base area of arch rib mounting bracket 10, dispersibles the stress of arch rib mounting bracket 10.
Tie-rod cast-in-place support 9, arch rib mounting bracket 10 and the auxiliary bridge of rib-hoisting complete and are removed with corresponding user demand operation, and said apparatus all can again come into operation in lower bridge block construction.What adopt concrete bearing platform that steel pipe pile builds accepts table top 1 and supporting pile 2 complete removals, so that navigation.Do not open the navigation or air flight in the river course that requires or gully, adopt concrete bearing platform that bored pile builds accept table top 1 and supporting pile 2 because not higher than river bed without dismounting.

Claims (10)

1. the mounting method of a steel concrete bowstring arch bridge arch rib, in river course, the bridge of suitable bowstring arch bridge is to building the auxiliary bridge of rib-hoisting, on the auxiliary bridge of rib-hoisting, set up tie-rod cast-in-place support (9) and arch rib mounting bracket (10), by tie-rod cast-in-place support (9) cast in situs tie-rod (14); By arch rib mounting bracket (10), use mobile crane (11) that the arch rib of bowstring arch bridge is installed on the auxiliary bridge of rib-hoisting.
2. for the auxiliary bridge of rib-hoisting of the mounting method of a claim 1 steel concrete bowstring arch bridge arch rib, it is characterized in that, comprise reinforced concrete pile cap, support pier and lifting table top, support pier is arranged on reinforced concrete pile cap fixing by activity crab-bolt (5); Lifting table top is arranged on support pier, uses connecting bolt (8) fixing.
3. the auxiliary bridge of rib-hoisting according to claim 2, it is characterized in that, described reinforced concrete pile cap comprises supporting pile (2) and accepts table top (1), supporting pile (2) is crisscross arranged and is driven underground, accept table top (1) and be cast in the stake top of supporting pile (2), reinforced concrete pile cap is rectangle, transverse to bowstring arch bridge.
4. the auxiliary bridge of rib-hoisting according to claim 3, is characterized in that, described supporting pile (2) is bored pile or steel pipe pile, and bored pile is for river course or gully under shallow water or anhydrous condition, and steel pipe pile is for navigable river course or gully; When supporting pile (2) is selected bored pile, after building, accept table top (1) not higher than river bed, when supporting pile (2) is selected steel pipe pile, after building, accept table top (1) higher than the water surface.
5. the auxiliary bridge of rib-hoisting according to claim 2, it is characterized in that, described support pier is monolithic, comprise pier Bailey truss (3) and interlayer connecting bolt (4), pier Bailey truss (3) is provided with bridging, vertical folded spelling, and each layer of pier Bailey truss (3) utilizes interlayer connecting bolt (4) to connect by the bolt hole on truss.
6. the auxiliary bridge of rib-hoisting according to claim 2, it is characterized in that, described lifting table top comprises table top Bailey truss (6) and bridge deck (7), by table top Bailey truss (6) along the bridge of bowstring arch bridge to assembled rear being vertically placed on support pier, fixing by connecting bolt (8), at the upper bridge deck (7) of laying of table top Bailey truss (6).
7. according to the auxiliary bridge of the rib-hoisting described in claim 2 or 6, it is characterized in that, the two ends of described lifting table top are connected with the bridge pier of bowstring arch bridge, and its length is crossed over tie-rod (14) and tie-rod cast-in-place support (9).
8. for the construction technology of the auxiliary bridge of rib-hoisting described in the mounting method of a kind of steel concrete bowstring arch bridge arch rib described in claim 1 and claim 2, as following:
A, select the type of service of supporting pile (2) and complete the construction of reinforced concrete pile cap according to the regimen in river course or gully;
B, assembling and fixed support pier and lifting table top, make to lift the two ends of table top and the bridge pier of bowstring arch bridge is connected, complete the construction of the auxiliary bridge of rib-hoisting, C, on the auxiliary bridge of rib-hoisting, set up arch rib mounting bracket (10) and tie-rod cast-in-place support (9), at the bottom welding i iron collet (12) of arch rib mounting bracket (10), then i iron collet (12) is welded on the bridge deck (7) of lifting table top;
D, at the top of arch rib mounting bracket (10) installed thrust conversion bearing (13);
The height of E, arch rib mounting bracket (10) surmounts the height of tie-rod cast-in-place support (9) and tie-rod (14), and the radian that multiple arch rib mounting brackets (10) arrange formation conforms to the radian forming after arch rib installation;
F, mobile crane (11) is left to the auxiliary bridge of upper rib-hoisting, use mobile crane (11) that the arch rib of bowstring arch bridge is installed by arch rib mounting bracket (10).
9. construction technology according to claim 8, is characterized in that, tie-rod cast-in-place support (9) uses bowl fastening type support assembled; Arch rib mounting bracket (10) is steel pipe truss, is provided with bridging, its steel pipe bore is greater than 30cm.
10. construction technology according to claim 8, is characterized in that, the area of the i iron collet (12) of described arch rib mounting bracket (10) bottom welding is greater than the base area of arch rib mounting bracket (10).
CN201410090163.3A 2014-03-13 2014-03-13 A kind of mounting method of steel concrete bowstring arch bridge arch rib Active CN103866693B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410090163.3A CN103866693B (en) 2014-03-13 2014-03-13 A kind of mounting method of steel concrete bowstring arch bridge arch rib

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410090163.3A CN103866693B (en) 2014-03-13 2014-03-13 A kind of mounting method of steel concrete bowstring arch bridge arch rib

Publications (2)

Publication Number Publication Date
CN103866693A true CN103866693A (en) 2014-06-18
CN103866693B CN103866693B (en) 2016-04-06

Family

ID=50905674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410090163.3A Active CN103866693B (en) 2014-03-13 2014-03-13 A kind of mounting method of steel concrete bowstring arch bridge arch rib

Country Status (1)

Country Link
CN (1) CN103866693B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104986663A (en) * 2015-05-21 2015-10-21 中交一航局安装工程有限公司 Lifting installation technology for steel structure arched door
CN106087769A (en) * 2016-08-12 2016-11-09 中铁十局集团有限公司 A kind of steel bowstring arch bridge entirety crane barge erection construction method
CN106812064A (en) * 2015-11-27 2017-06-09 重庆标王集成房屋科技开发有限公司 Parallel-moving type bridge bow member
CN109518587A (en) * 2019-01-22 2019-03-26 中铁二院工程集团有限责任公司 A kind of board-like sunpender inhibiting Vortex-excited vibration
CN112128064A (en) * 2020-09-23 2020-12-25 上海电气风电集团股份有限公司 Floating type fan power generation system
CN112411342A (en) * 2020-12-16 2021-02-26 昆山同济市政工程有限公司 Construction method of prefabricated steel box girder pedestrian landscape bridge
CN113202033A (en) * 2021-04-29 2021-08-03 中交路桥建设有限公司 Arch beam cross installation construction method of half-through tied steel box arch bridge
CN114016434A (en) * 2021-12-29 2022-02-08 山东天齐置业集团股份有限公司 Construction method of large-span space torsional cross-section double-arch bridge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2248948A1 (en) * 2009-05-06 2010-11-10 The European Union, represented by the European Commission Supporting arch structure construction method
CN201671050U (en) * 2010-05-19 2010-12-15 中铁二十局集团有限公司 Through tie bar rigid frame arch bridge of inter-city express railway
CN102261039A (en) * 2011-04-25 2011-11-30 长沙理工大学 Integral thrusting construction method of network tied arch bridge
CN102425119A (en) * 2011-12-28 2012-04-25 中铁十九局集团有限公司 Method for building prestressed concrete through bowstring arch bridge
CN102995553A (en) * 2012-11-27 2013-03-27 胜利油田胜利工程建设(集团)有限责任公司 Arch rib of reinforced concrete arch bridge and erection support and manufacture method of arch rib

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2248948A1 (en) * 2009-05-06 2010-11-10 The European Union, represented by the European Commission Supporting arch structure construction method
CN201671050U (en) * 2010-05-19 2010-12-15 中铁二十局集团有限公司 Through tie bar rigid frame arch bridge of inter-city express railway
CN102261039A (en) * 2011-04-25 2011-11-30 长沙理工大学 Integral thrusting construction method of network tied arch bridge
CN102425119A (en) * 2011-12-28 2012-04-25 中铁十九局集团有限公司 Method for building prestressed concrete through bowstring arch bridge
CN102995553A (en) * 2012-11-27 2013-03-27 胜利油田胜利工程建设(集团)有限责任公司 Arch rib of reinforced concrete arch bridge and erection support and manufacture method of arch rib

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
孔繁龙: ""施桥运河大桥水上支架施工控制研究"", 《西部交通科技》 *
袁小兵: ""三跨连续钢管混凝土拱桥的施工要点"", 《城市道桥与防洪》 *
袁小兵: ""三跨连续钢管混凝土拱桥的施工要点"", 《城市道桥与防洪》, no. 2, 15 February 2009 (2009-02-15) *
郑方慧: ""钢筋混凝土系杆拱拱肋与吊杆施工技术"", 《上海铁道科技》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104986663A (en) * 2015-05-21 2015-10-21 中交一航局安装工程有限公司 Lifting installation technology for steel structure arched door
CN106812064A (en) * 2015-11-27 2017-06-09 重庆标王集成房屋科技开发有限公司 Parallel-moving type bridge bow member
CN106087769A (en) * 2016-08-12 2016-11-09 中铁十局集团有限公司 A kind of steel bowstring arch bridge entirety crane barge erection construction method
CN106087769B (en) * 2016-08-12 2017-10-10 中铁十局集团有限公司 A kind of overall crane barge erection construction method of steel bowstring arch bridge
CN109518587A (en) * 2019-01-22 2019-03-26 中铁二院工程集团有限责任公司 A kind of board-like sunpender inhibiting Vortex-excited vibration
CN109518587B (en) * 2019-01-22 2023-09-29 中铁二院工程集团有限责任公司 Plate-type suspender for inhibiting vortex-induced resonance
CN112128064A (en) * 2020-09-23 2020-12-25 上海电气风电集团股份有限公司 Floating type fan power generation system
CN112128064B (en) * 2020-09-23 2022-01-28 上海电气风电集团股份有限公司 Floating type fan power generation system
CN112411342A (en) * 2020-12-16 2021-02-26 昆山同济市政工程有限公司 Construction method of prefabricated steel box girder pedestrian landscape bridge
CN113202033A (en) * 2021-04-29 2021-08-03 中交路桥建设有限公司 Arch beam cross installation construction method of half-through tied steel box arch bridge
CN114016434A (en) * 2021-12-29 2022-02-08 山东天齐置业集团股份有限公司 Construction method of large-span space torsional cross-section double-arch bridge

Also Published As

Publication number Publication date
CN103866693B (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN103866693B (en) A kind of mounting method of steel concrete bowstring arch bridge arch rib
CN105088957B (en) Construction method for underwater reinforced concrete composite pile of cast-in-situ support of concrete ballast box beam of cable-stayed bridge
CN106012864A (en) Method for lifting and installing whole bridge arch rib
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN107090975A (en) A kind of big across the cast-in-situ concrete beam Bailey bracket formwork construction method of superelevation
CN103741657A (en) Construction method of large multifunctional over-water construction platform
CN106012960A (en) Assembly type long piled wharf upper structure system and construction method thereof
CN106087746A (en) A kind of cast-in-situ box girder falsework construction method and bridge
CN103334379A (en) Construction method for hanging part of anti-collision guardrail on expressway
CN103866696A (en) Cast-in-situ support of long-cantilever zero segment of short-pylon cable-stayed bridge
CN104805857A (en) Detachable cyclic utilization bottomless steel jacket box and construction method thereof
CN203654196U (en) Guide apparatus for large and multifunctional over-water construction platform
CN208701698U (en) A kind of foundation pit recoverable concrete support
CN106032704A (en) Construction method for using concrete columns to support structures on both sides of post-pouring strip
CN102425190A (en) Superposed tower crane foundation
CN113774936A (en) Floating transportation, positioning and sinking construction method for double-wall steel cofferdam with pile foundation firstly and cofferdam secondly
CN210737607U (en) A hang braced system for reverse construction method beam slab construction
CN205242437U (en) A redundant formula vertical braces structure for protection of 220kV cable normal position
CN203821248U (en) Steel pipe arch main arch assembling supporting system
CN207862964U (en) A kind of land bearing platform construction system
CN203947417U (en) A kind of realization without the cast-in-place supporting structure of cushion cap approach viaduct concrete case beam limited bracket
CN205296206U (en) Tower cane foundation
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN103981810A (en) Steel tube arch main arch splicing and supporting system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180202

Address after: 100101 Chaoyang District, Jilin City, Beijing mouth road, No. 9

Co-patentee after: Triumph construction engineering corporation, Ltd of China Petrochemical Industry

Patentee after: SINOPEC OILFIELD SERVICE CORPORATION

Address before: 257000 No. two, 755 North Road, Dongying District, Shandong, Dongying

Patentee before: Triumph construction engineering corporation, Ltd of China Petrochemical Industry

TR01 Transfer of patent right