CN205636773U - Rim of a cup basis steel column positioning system - Google Patents

Rim of a cup basis steel column positioning system Download PDF

Info

Publication number
CN205636773U
CN205636773U CN201620348694.2U CN201620348694U CN205636773U CN 205636773 U CN205636773 U CN 205636773U CN 201620348694 U CN201620348694 U CN 201620348694U CN 205636773 U CN205636773 U CN 205636773U
Authority
CN
China
Prior art keywords
steel column
rim
fixed frame
bar planting
cup basis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620348694.2U
Other languages
Chinese (zh)
Inventor
王保健
黄革
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUASHEN STEEL STRUCTURE SICHUAN LLC
Original Assignee
HUASHEN STEEL STRUCTURE SICHUAN LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUASHEN STEEL STRUCTURE SICHUAN LLC filed Critical HUASHEN STEEL STRUCTURE SICHUAN LLC
Priority to CN201620348694.2U priority Critical patent/CN205636773U/en
Application granted granted Critical
Publication of CN205636773U publication Critical patent/CN205636773U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a rim of a cup basis steel column positioning system, including rim of a cup basis, steel column, steel column bottom plate and fixed frame, steel column bottom plate and steel column bottom welded connection, steel column bottom plate is perpendicular with the steel column, the basic lateral wall of rim of a cup is provided with the bar planting, and the bar planting level sets up, and the bar planting has 8, upper and lower two -layer arranging, 4 every layer, taking root in the muscle with 4 of layer and lie in same horizontal plane and two liang of mutual dispositions, fixed frame has two, and with upper and lower two -layer bar planting welded connection, the steel column passes fixed frame and fixed frame welded connection respectively. The utility model discloses can fix a position the steel column at the basis center simply swiftly and can prevent that the steel column from destroying the basis.

Description

Rim of a cup basis steel column alignment system
Technical field
This utility model relates to a kind of steel construction, particularly relates to a kind of rim of a cup basis steel column alignment system.
Background technology
In the installation process of steel construction, the installation of steel column occupies the biggest proportion, and the installation rate of steel column and installation quality decide vivid progress and the installation quality of superstructure of structural steelwork.General rim of a cup Inserted Foundation roofbolt length is longer, generally uses crane to be sling steel column one end, puts into rim of a cup, then carry out steel column horizontal location.Rim of a cup basis there is problems in that when steel column is installed rim of a cup basis is deep, there is certain difficulty, it is impossible to see that steel column the most accurately falls in base center during steel column location;During steel column lifting, it is strong to suspend stability in the air in midair, when rim of a cup entrance easily by rim of a cup at concrete destruction, impact is installed.Traditional localization method is with the multi-faceted horizontal level determining steel column of steel wire rope by workman, wastes time and energy, affects construction period, and installation accuracy is relatively difficult to ensure card.
Utility model content
This utility model aims to provide a kind of rim of a cup basis steel column and installs alignment system, it is possible to steel column navigates to base center quickly and easily and can prevent steel column from destroying basis.
For reaching above-mentioned purpose, the technical solution adopted in the utility model is as follows:
Rim of a cup basis steel column alignment system disclosed in this utility model, including rim of a cup basis, steel column, steel column base plate and fixed frame, described steel column base plate is connected with steel column bottom welding, steel column base plate is vertical with steel column, the sidewall on described rim of a cup basis is provided with bar planting, described bar planting is horizontally disposed with, bar planting has 8, two-layer arrangement up and down, 4 every layer, taking root in muscle with the 4 of layer and be positioned at same level the most positioned opposite, described fixed frame has two, being welded to connect with bilevel bar planting respectively, described steel column through fixed frame and is welded to connect with fixed frame.
Preferably, described fixed frame is rectangle frame, and four limits of described rectangle frame are all welded to connect with steel column.
Preferably, described fixed frame is that 4 fixing post welding are constituted.
Further, this utility model also includes cushion block, and described cushion block pad is below steel column base plate.
Preferably, described bar planting, fixing post are the screw thread steel column of a diameter of 22mm.
This utility model can navigate to rim of a cup base center in steel column installation process simply, quickly and accurately by steel column, it is ensured that steel column locations size, and it can be avoided that porch, rim of a cup basis concrete suffers that when installing steel column steel column clashes into and destroys.
Accompanying drawing explanation
Fig. 1 is top view of the present utility model;
Fig. 2 is sectional view of the present utility model.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing, this utility model is further elaborated.
Such as Fig. 1, shown in Fig. 2, rim of a cup basis steel column alignment system disclosed in this utility model, including rim of a cup basis 4, steel column 1, steel column base plate 6 and fixed frame, steel column base plate 6 is connected with steel column 1 bottom welding, steel column base plate 6 is vertical with steel column 1, the sidewall on rim of a cup basis 4 is provided with bar planting 3, bar planting is horizontally disposed with 3, bar planting 3 has 8, two-layer arrangement up and down, 4 every layer, take root in muscle 4 with the 4 of layer and be positioned at same level the most positioned opposite, fixed frame has two, it is welded to connect with bilevel bar planting 3 respectively, steel column 1 through fixed frame and is welded to connect with fixed frame.Fixed frame is rectangle frame, and four limits of rectangle frame are all welded to connect with steel column 1.Fixed frame uses 4 fixing post 2 welding to constitute.Bar planting 3, fixing post 2 are the screw thread steel column of a diameter of 22mm.
This utility model also includes that cushion block 5, cushion block 5 pad below steel column base plate, and cushion block 5 can have multiple, can overlapping place.
Actual installation process is as follows: checks and does not has during any omission to start to lift by crane steel column 1, the braking quality of crane is detected after lifting by crane liftoff 10cm, then proceed to promote, it is promoted to about 50cm, by steel column base plate 6 centrage alignment rim of a cup basis 4 centrages, then by steel column 1 slowly Panasonic, make the orientation axis on 4, the centre of location alignment rim of a cup basis of steel column base plate 6, steel column 1 is fixed and welds by the first fixing post 2 at solid line position shown in Fig. 1, steel column locations is finely tuned again by cushion block 5, then at the fixing spiral 2 of dotted line position shown in Fig. 1 steel column 1 fixed and weld, afterwards, in relevant position embedment bar planting 4 and weld with fixing spiral 2.
Certainly; this utility model also can have other various embodiments; in the case of without departing substantially from this utility model spirit and essence thereof; those of ordinary skill in the art can make various corresponding change and deformation according to this utility model, but these change accordingly and deformation all should belong to the scope of the claims appended by this utility model.

Claims (5)

1. rim of a cup basis steel column alignment system, it is characterised in that: include at the bottom of rim of a cup basis, steel column, steel column Plate and fixed frame, described steel column base plate is connected with steel column bottom welding, and steel column base plate is vertical with steel column, The sidewall on described rim of a cup basis is provided with bar planting, and described bar planting is horizontally disposed with, and bar planting has 8, and upper and lower two Layer arrangement, takes root in muscle with the 4 of layer and is positioned at same level the most positioned opposite by 4 every layer, described Fixed frame has two, is welded to connect with bilevel bar planting respectively, and described steel column passes fixed frame And be welded to connect with fixed frame.
Rim of a cup basis the most according to claim 1 steel column alignment system, it is characterised in that: described solid Determining framework is rectangle frame, and four limits of described rectangle frame are all welded to connect with steel column.
Rim of a cup basis the most according to claim 2 steel column alignment system, it is characterised in that: described solid Determining framework is that 4 fixing post welding are constituted.
Rim of a cup basis the most according to claim 1 steel column alignment system, it is characterised in that: also include Cushion block, described cushion block pad is below steel column base plate.
Rim of a cup basis the most according to claim 3 steel column alignment system, it is characterised in that plant described in: Muscle, fixing post are the screw thread steel column of a diameter of 22mm.
CN201620348694.2U 2016-04-22 2016-04-22 Rim of a cup basis steel column positioning system Expired - Fee Related CN205636773U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620348694.2U CN205636773U (en) 2016-04-22 2016-04-22 Rim of a cup basis steel column positioning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620348694.2U CN205636773U (en) 2016-04-22 2016-04-22 Rim of a cup basis steel column positioning system

Publications (1)

Publication Number Publication Date
CN205636773U true CN205636773U (en) 2016-10-12

Family

ID=57063346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620348694.2U Expired - Fee Related CN205636773U (en) 2016-04-22 2016-04-22 Rim of a cup basis steel column positioning system

Country Status (1)

Country Link
CN (1) CN205636773U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035375A (en) * 2018-01-03 2018-05-15 太原理工大学 A kind of concrete assembled rim of a cup basis
CN110409481A (en) * 2019-08-08 2019-11-05 中冶天工集团天津有限公司 A kind of rim of a cup formula concrete foundation pit column fixed device and its installation method
CN110904987A (en) * 2019-11-13 2020-03-24 中国矿业大学 Belly expansion cup mouth type connecting structure and method for reinforced concrete column and foundation
CN112459101A (en) * 2020-11-12 2021-03-09 中冶天工集团有限公司 Method for temporarily fixing steel column in cup foundation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035375A (en) * 2018-01-03 2018-05-15 太原理工大学 A kind of concrete assembled rim of a cup basis
CN110409481A (en) * 2019-08-08 2019-11-05 中冶天工集团天津有限公司 A kind of rim of a cup formula concrete foundation pit column fixed device and its installation method
CN110904987A (en) * 2019-11-13 2020-03-24 中国矿业大学 Belly expansion cup mouth type connecting structure and method for reinforced concrete column and foundation
CN110904987B (en) * 2019-11-13 2020-10-30 中国矿业大学 Belly expansion cup mouth type connecting structure and method for reinforced concrete column and foundation
CN112459101A (en) * 2020-11-12 2021-03-09 中冶天工集团有限公司 Method for temporarily fixing steel column in cup foundation

Similar Documents

Publication Publication Date Title
CN205636773U (en) Rim of a cup basis steel column positioning system
CN106276577B (en) A kind of suspension bracket and operating method of framework isolated footing
CN103276895B (en) Die supporting method of reversed-cone-shaped column cap die
CN105735471A (en) Connecting structure for steel-structure box columns
CN203626055U (en) Super-high-rise large-section half-embedded type intensive anchor bar steel column base locating support
CN202577925U (en) Lifting type platform in elevator shaft
CN204376279U (en) Hydroelectric station GIS bus auxiliary repair adjustable supporting device
CN204876525U (en) On turn over girder construction with outrigger support of encorbelmenting
CN206108705U (en) Gallows of frame isolated footing
CN206783098U (en) A kind of lifting structure for vertical natural gas modular unit
CN203018951U (en) Fast pairing jig frame for seal end of hot air furnace shell ball crown
CN214530683U (en) Connection structure of steel lattice column and steel reinforcement cage
CN206888535U (en) A kind of moulding bed
CN209244236U (en) A kind of attachment type raise scaffold support device for high Stilt layer structure
CN204850068U (en) Connection structure of side column and crane beam tip in steel construction
CN202611250U (en) Concreting platform for concrete filled steel tube column
CN203889946U (en) Cantilever crane
CN203222810U (en) Steel column and base structure system
CN206734106U (en) A kind of built-in compensation device for preventing clamping stagnation
CN206801086U (en) A kind of rigid mouth on support column
CN205476507U (en) Inside pump line fixing device of jacking platform
CN205077519U (en) Protection device of inspection shaft well lid
CN209538033U (en) A kind of customization bridge pier template
CN203821817U (en) Oppositely-buckling buckle device
CN205276849U (en) A a fixing device climbs for avoid damage exterior finish

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161012

CF01 Termination of patent right due to non-payment of annual fee