CN205276849U - A a fixing device climbs for avoid damage exterior finish - Google Patents

A a fixing device climbs for avoid damage exterior finish Download PDF

Info

Publication number
CN205276849U
CN205276849U CN201521062400.1U CN201521062400U CN205276849U CN 205276849 U CN205276849 U CN 205276849U CN 201521062400 U CN201521062400 U CN 201521062400U CN 205276849 U CN205276849 U CN 205276849U
Authority
CN
China
Prior art keywords
montant
fixing device
plate
climbing frame
connecting bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201521062400.1U
Other languages
Chinese (zh)
Inventor
程美涛
邱迪
罗心枫
朱磊
翁佳飞
王威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Priority to CN201521062400.1U priority Critical patent/CN205276849U/en
Application granted granted Critical
Publication of CN205276849U publication Critical patent/CN205276849U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

Be fixed in the problem that the wall face destroyed the risk of exterior finish increase later stage seepage to climbing the frame among the prior art, the utility model provides a fixing device climbs for avoid damage exterior finish should climb a fixing device, included: cantilever frame, cantilever frame includes cantilever beam and montant, the montant connect perpendicularly in cantilever beam's below, cantilever beam is last to keep away from the one end of montant and climbs a fixed connection, and be used for being fixed in the fixed establishment on the floor with the montant, fixed establishment includes base, lower base, connecting bolt and nut, reserve on the floor and supply the through -hole that connecting bolt passed through, it leads to with lower base to go up the base connecting bolt and nut are fixed in respectively the upper and lower side of floor, the upper base stationary ladle is drawn together one and is used for the holding the sleeve of montant. The utility model discloses a suspension and fixed establishment will climb on the frame is fixed in the floor, avoid destroying under the prerequisite of wall face, not only easy dismounting, safe and reliable moreover.

Description

A kind of for preventing the fixing device of climbing frame damaging exterior finish
Technical field
This utility model relates to the technical field of auxiliary equipment of building structure, particularly to being used for preventing the climbing frame damaging exterior finish from fixing device.
Background technology
At present, it is adaptable to prefabricated concrete structure system climbing frame is desirable that and is attached on cast-in-place structural. And will be attached on exterior wall suitable in prefabricated concrete structure system climbing frame, it is necessary for reserved opening on precast facade component, not only waste material and the duration, and exterior finish (counter especially break stone material or instead beat the exterior finish such as face brick) can be destroyed, once destroy exterior finish can increase the risk of later stage seepage, reduce construction quality and the life-span of building.
Therefore, precast wall panel exterior finish is not damaged how to provide one can ensure that, it is to avoid punch at precast facade, and the fixing device of climbing frame of minimizing wall face later stage risk of leakage is the technical problem that this area is urgently to be resolved hurrily.
Utility model content
It is fixed on wall face for climbing frame in prior art and destroys the problem that exterior finish increases the risk of later stage seepage, this utility model provides a kind of for preventing the fixing device of climbing frame damaging exterior finish, by suspension and fixed mechanism, climbing frame is fixed on floor, avoid damage to wall face, not only easy accessibility, and the safe and reliable fixing of climbing frame can be realized.
This utility model solves its technical problem and be the technical scheme is that
A kind of for preventing the fixing device of climbing frame damaging exterior finish, including some spaced mechanisms of encorbelmenting up and down, each mechanism of encorbelmenting includes:
Suspension scaffold, described suspension scaffold includes Cantilever Beams and montant, and described montant is vertically connected at the lower section of described Cantilever Beams, and described Cantilever Beams is connected away from one end of described montant and climbing frame are fixing;
And for montant being fixed on the fixed mechanism on floor, described fixed mechanism includes upper bed-plate, lower bottom base, connecting bolt and nut, described floor is reserved for the through hole that described connecting bolt passes through, described upper bed-plate and lower bottom base lead to described connecting bolt and nut is individually fixed in the upper and lower of described floor, and described upper bed-plate includes one for housing the sleeve of described montant.
Preferably, in the above-mentioned fixing device of the climbing frame being used for preventing damaging exterior finish, also including at least one pitman, described sleeve is corresponding with on described montant offers the through hole passed through for described pitman.
Preferably, in the above-mentioned fixing device of the climbing frame being used for preventing damaging exterior finish, the quantity of described pitman is more than two, and horizontal spaced set.
Preferably, in the above-mentioned fixing device of the climbing frame being used for preventing damaging exterior finish, described upper bed-plate also includes upper junction plate, and described sleeve is fixedly connected on described upper junction plate, and the through hole passed through for described connecting bolt is offered at the middle part of described upper junction plate.
Preferably, in the above-mentioned fixing device of the climbing frame being used for preventing damaging exterior finish, described upper bed-plate also includes some epiplastrons, described epiplastron is distributed in the surrounding of described sleeve, and fixing with described sleeve and upper junction plate is respectively connected, the through hole that the described connecting bolt of confession passes through is offered at the middle part of described lower connecting plate.
Preferably, fixing in device at the above-mentioned climbing frame being used for preventing damaging exterior finish, described lower bottom base includes lower connecting plate and some bottom webs, and described bottom web and described bottom web are correspondingly arranged up and down, and the fixing connection of the described bottom web described lower connecting plate of difference.
Preferably, in the above-mentioned fixing device of the climbing frame being used for preventing damaging exterior finish, the quantity of described connecting bolt is four, described upper junction plate is corresponding with the four of lower connecting plate Angle Position offers the bolt hole passed through for described connecting bolt, or, the quantity of described connecting bolt is one, and described upper junction plate is corresponding with the middle part of lower connecting plate offers the bolt hole passed through for described connecting bolt.
Preferably, in the above-mentioned fixing device of the climbing frame being used for preventing damaging exterior finish, described suspension scaffold is " �� " type, and on every described Cantilever Beams, interval arranges two described montants.
Compared with prior art, the beneficial effects of the utility model are in that:
Of the present utility model for preventing the fixing device of climbing frame damaging exterior finish, by arranging the described suspension scaffold including Cantilever Beams with montant, described Cantilever Beams is connected away from one end of described montant and climbing frame are fixing; And adopt fixed mechanism to be fixed on floor by the montant of suspension scaffold, without climbing frame being fixed on wall face as prior art, it is damaged thus avoiding wall face (have especially and instead break stone material or instead beat the wall face of the exterior finish such as face brick) causes deuterogenesis's risk of leakage because of fixing climbing frame. Owing to described fixed mechanism includes upper bed-plate, lower bottom base, connecting bolt and nut, described floor is reserved for the through hole that described connecting bolt passes through, described upper bed-plate and lower bottom base lead to described connecting bolt and nut is individually fixed in the upper and lower of described floor, after described upper bed-plate is fixed on floor, the montant of suspension scaffold is inserted in the sleeve of described upper bed-plate, thus just completing, the effectively reliable of suspension scaffold is fixed, there is the advantage that construction is simple and easy, safe and reliable. More optimizedly, due to easy accessibility between this fixed mechanism and suspension scaffold, repetitive cycling should be thus advantageous to and uses, it is possible to effectively reduce construction costs.
In addition, upper bed-plate, lower bottom base and suspension scaffold are prefabricated components, such that it is able to part building element is transferred to factory's batch production by cast in situs, are greatly improved building industrialization level, significantly lifting construction quality and efficiency, and contribute to energy-saving and emission-reduction.
Accompanying drawing explanation
Fig. 1 is the structural representation of the fixing device of climbing frame for preventing damage exterior finish of this utility model one embodiment;
Fig. 2 is the structural representation that in this utility model one embodiment, montant is fixed on floor by fixed mechanism.
Fig. 3 is the A-A schematic diagram of Fig. 2.
Fig. 4 is the B-B schematic diagram of Fig. 2.
Fig. 5 is the C-C schematic diagram of Fig. 2.
In figure: 1-Cantilever Beams, 2-montant, 3-climbing frame, 4-floor, 5-fixed mechanism, 6-upper bed-plate, 6a-sleeve, 6b-upper junction plate, 6c-epiplastron, 7-lower bottom base, 7a-lower connecting plate, 7b-bottom web, 8-connecting bolt, 9-nut, 10-pitman.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, a kind of framed bent template system that the utility model proposes is described in further detail. According to description below and claims, advantage of the present utility model and feature will be apparent from. Hereinafter by cited embodiment in conjunction with accompanying drawing, technology contents of the present utility model and feature will be described in detail. Need to additionally illustrating, accompanying drawing all adopts the form simplified very much and all uses non-ratio accurately, only in order to purpose convenient, aid illustration this utility model embodiment lucidly. For sake of convenience, described below " on ", the upper and lower direction of D score and accompanying drawing consistent, but this can not become the restriction of technical solutions of the utility model.
Referring to Fig. 1 to Fig. 5, present embodiments provide a kind of for preventing the fixing device of climbing frame damaging exterior finish, some spaced mechanisms of encorbelmenting up and down, each mechanism of encorbelmenting includes:
Suspension scaffold, described suspension scaffold includes Cantilever Beams 1 and montant 2, and described montant 2 is vertically connected at the lower section of described Cantilever Beams 1, and described Cantilever Beams 1 is connected away from one end of described montant 2 is fixing with climbing frame 3;
And for montant 2 being fixed on the fixed mechanism 5 on floor 4, described fixed mechanism 5 includes upper bed-plate 6, lower bottom base 7, connecting bolt 8 and nut 9, described floor 4 is reserved for the through hole (not shown) that described connecting bolt 8 passes through, described upper bed-plate 6 and lower bottom base 7 lead to described connecting bolt 8 and nut 9 is individually fixed in the upper and lower of described floor 4, and described upper bed-plate 6 includes one for housing the sleeve 6a of described montant 2.
The present embodiment is by adopting the described suspension scaffold including Cantilever Beams 1 with montant 2, described Cantilever Beams 1 is connected away from one end of described montant 2 is fixing with climbing frame 3, fixed mechanism 5 is adopted to be fixed on floor 4 by the montant 2 of suspension scaffold, climbing frame 3 is made to be fixed on floor 4 by suspension scaffold and fixed mechanism 5, without climbing frame 3 being fixed on wall face as prior art, thus avoiding the later stage risk of leakage that causing occurs in wall face (have especially and instead break stone material or instead beat the wall face of the exterior finish such as face brick) because fixing climbing frame is damaged. furthermore, owing to described fixed mechanism 5 includes upper bed-plate 6, lower bottom base 7, connecting bolt 8 and nut 9, described floor 4 is reserved for the through hole that described connecting bolt 8 passes through, described upper bed-plate 6 leads to described connecting bolt 8 with lower bottom base 7 and nut 9 is individually fixed in the upper of described floor 4, lower section, after described upper bed-plate 6 is fixed on floor 4, the montant 2 of suspension scaffold is inserted in the sleeve 6a of described upper bed-plate 6, thus very convenient just can complete suspension scaffold effective, reliable fixing, therefore, it is simple and easy that this climbing frame 3 fixed form has construction, safe and reliable advantage. more optimizedly, due to easy accessibility between this fixed mechanism 5 and suspension scaffold, parts repetitive cycling should be thus advantageous to and uses, effectively reduce construction costs. additionally, in order to improve site operation efficiency, described upper bed-plate 6, lower bottom base 7 and suspension scaffold are preferably prefabrication.
Preferably, in the above-mentioned fixing device of the climbing frame being used for preventing damaging exterior finish, also including at least one pitman 10, described sleeve 6a is corresponding with on described montant 2 offers the through hole (not shown) passed through for described pitman 10. By arranging pitman 10, it is possible to prevent montant 2 from occurring rocking in sleeve 6a, it is possible to say montant 2 more firm be fixed in described sleeve 6a so that the secure more of the connection between suspension scaffold and upper fixed mechanism 5.
For further raising, the connection reliability between montant 2 and sleeve 6a, improve the bulk strength of the fixing device of whole climbing frame, preferably, in the above-mentioned fixing device of the climbing frame being used for preventing damaging exterior finish, the quantity of described pitman 10 is at least more than two, and horizontal spaced set. In the present embodiment, the quantity of described pitman 10 is three, and horizontal spaced set.
For the ease of sleeve 6a firmly and is easily fixed on floor 4, preferably, in the present embodiment, described upper bed-plate 6 also includes upper junction plate 6b, described sleeve 6a is fixedly connected on described upper junction plate 6b by being fixedly welded on, and the through hole passed through for described connecting bolt 8 is offered at the middle part of described upper junction plate 6b.
In order to improve the intensity of upper bed-plate 6, and then improve intensity and the reliability of the fixing device of whole climbing frame, preferably, in the above-mentioned fixing device of the climbing frame being used for preventing damaging exterior finish, described upper bed-plate 6 also includes some epiplastron 6c, described epiplastron 6c is distributed in the surrounding of described sleeve 6a, and fixing with described sleeve 6a and upper junction plate 6b is respectively connected.
Preferably, in the above-mentioned fixing device of the climbing frame being used for preventing damaging exterior finish, described lower bottom base 7 includes lower connecting plate 7a and some bottom web 7b, described bottom web 7b and described bottom web 7b is correspondingly arranged up and down, and the described bottom web 7b fixing connection of described lower connecting plate 7a respectively, the through hole passed through for described connecting bolt 8 is offered at the middle part of described lower connecting plate 7a. By arranging lower connecting plate 7a, match with upper junction plate 6b, it is possible to conveniently sleeve 6a is fixed on floor 4. Additionally, by setting up bottom web 7b, it is possible to improve the intensity of lower bottom base 7, and then improve intensity and the reliability of the fixing device of whole climbing frame.
Preferably, in the above-mentioned fixing device of the climbing frame being used for preventing damaging exterior finish, the quantity of described connecting bolt 8 is four, described upper junction plate 6b is corresponding with the four of lower connecting plate 7a Angle Position offers the bolt hole passed through for described connecting bolt 8, or, the quantity of described connecting bolt 8 is one, described upper junction plate 6b and lower connecting plate 7a middle part corresponding offer the bolt hole passed through for described connecting bolt 8.
In order to improve the intensity of suspension scaffold further, thus further connection reliability between suspension scaffold and floor 4, it is preferred that in the above-mentioned fixing device of the climbing frame being used for preventing damaging exterior finish, described suspension scaffold is " �� " type, and on described Cantilever Beams 1, interval arranges two described montants 2.
Preferably, in the above-mentioned fixing device of the climbing frame being used for preventing damaging exterior finish, junction between described Cantilever Beams 1 and described montant 2 arranges stiffener (not shown), thus, the bonding strength between Cantilever Beams 1 and montant 2 can be improved, and then improve the intensity of the fixing device of whole climbing frame.
Please continue to refer to Fig. 1 to Fig. 5, the construction method of the fixing device of climbing frame for preventing damage exterior finish of the present embodiment, comprise the following steps that
Step one: providing implemented the fixing device of climbing frame for preventing damage exterior finish as described in, be reserved for the through hole that described connecting bolt 8 passes through on floor 4, described suspension scaffold, described upper bed-plate 6 and lower bottom base 7 are prefabrication. Floor 4 is reserved for the through hole that described connecting bolt 8 passes through, it is possible to facilitate follow-up being fixed on by suspension scaffold on floor 4, also allows for the fixing device of dismounting climbing frame, it is achieved recycling of parts simultaneously. And the parts such as prefabricated suspension scaffold, described upper bed-plate 6 and lower bottom base 7, it is possible to increase the accuracy of manufacture of parts, improves on-the-spot efficiency of construction, and contributes to energy-saving and emission-reduction.
Step 2: utilize described connecting bolt 8 and nut 9 by logical with lower bottom base 7 for described upper bed-plate 6 upper and lower being individually fixed in described floor 4. Described upper bed-plate 6 is fixed on floor 4 with lower bottom base 7 by connecting bolt 8, not only can realize being reliably connected, and easy accessibility, it is possible to realize cycling and reutilization, save construction cost.
Step 3: described montant 2 is inserted in described sleeve 6a. In the present embodiment, described suspension scaffold is " �� " type, on every described Cantilever Beams 1, interval arranges two described montants 2, that is to say in the sleeve 6a that two montants 2 are inserted in correspondence respectively, to improve the intensity of suspension scaffold further, thus the connection reliability improved further between suspension scaffold and floor 4.
Step 4: will be connected away from one end of described montant 2 and climbing frame are fixing on Cantilever Beams 1, thus realizing being fixed on floor 4 by climbing frame 3 by suspension scaffold and fixed mechanism 5, without climbing frame 3 being fixed on wall face as prior art, thus avoiding the later stage risk of leakage that causing occurs in wall face (have especially and instead break stone material or instead beat the wall face of the exterior finish such as face brick) because fixing climbing frame 3 is damaged.
Preferably, in the above-mentioned climbing frame fixing means being used for preventing damaging exterior finish, described sleeve 6a is corresponding in advance with on described montant 2 offers the through hole passed through for pitman 10, after described step 3, pitman 10 is arranged in described sleeve 6a with in the corresponding through hole of described montant 2. By arranging pitman 10, it is possible to prevent montant 2 from occurring rocking in sleeve 6a, it is possible to say montant 2 more firm be fixed in described sleeve 6a so that the secure more of the connection between suspension scaffold and upper fixed mechanism 5.
Foregoing description is only the description to this utility model preferred embodiment; the not any restriction to this utility model scope; any change that the those of ordinary skill in this utility model field does according to the disclosure above content, modification, belong to the protection domain of claims.

Claims (8)

1. the fixing device of climbing frame for preventing damage exterior finish, it is characterised in that including some spaced mechanisms of encorbelmenting up and down, each mechanism of encorbelmenting includes:
Suspension scaffold, described suspension scaffold includes Cantilever Beams and montant, and described montant is vertically connected at the lower section of described Cantilever Beams, and described Cantilever Beams is connected away from one end of described montant and climbing frame are fixing;
And for montant being fixed on the fixed mechanism on floor, described fixed mechanism includes upper bed-plate, lower bottom base, connecting bolt and nut, described floor is reserved for the through hole that described connecting bolt passes through, described upper bed-plate and lower bottom base lead to described connecting bolt and nut is individually fixed in the upper and lower of described floor, and described upper bed-plate includes one for housing the sleeve of described montant.
2. according to claim 1 for preventing the fixing device of climbing frame damaging exterior finish, it is characterised in that: also including at least one pitman, described sleeve is corresponding with on described montant offers the through hole passed through for described pitman.
3. according to claim 2 for preventing the fixing device of climbing frame damaging exterior finish, it is characterised in that: the quantity of described pitman is more than two, and horizontal spaced set.
4. according to claim 1 for preventing the fixing device of climbing frame damaging exterior finish, it is characterized in that: described upper bed-plate also includes upper junction plate, described sleeve is fixedly connected on described upper junction plate, and the through hole passed through for described connecting bolt is offered at the middle part of described upper junction plate.
5. according to claim 4 for preventing the fixing device of climbing frame damaging exterior finish, it is characterized in that: described upper bed-plate also includes some epiplastrons, described epiplastron is distributed in the surrounding of described sleeve, and fixing with described sleeve and upper junction plate is respectively connected.
6. according to claim 5 for preventing the fixing device of climbing frame damaging exterior finish, it is characterized in that: described lower bottom base includes lower connecting plate and some bottom webs, described bottom web and described bottom web are correspondingly arranged up and down, and the fixing connection of described lower connecting plate respectively of described bottom web, the through hole passed through for described connecting bolt is offered at the middle part of described lower connecting plate.
7. according to claim 6 for preventing the fixing device of climbing frame damaging exterior finish, it is characterized in that: the quantity of described connecting bolt is four, described upper junction plate is corresponding with the four of lower connecting plate Angle Position offers the bolt hole passed through for described connecting bolt, or, the quantity of described connecting bolt is one, and described upper junction plate is corresponding with the middle part of lower connecting plate offers the bolt hole passed through for described connecting bolt.
8. according to claim 1 for preventing the fixing device of climbing frame damaging exterior finish, it is characterised in that: described suspension scaffold is " �� " type, and on every described Cantilever Beams, interval arranges two described montants.
CN201521062400.1U 2015-12-17 2015-12-17 A a fixing device climbs for avoid damage exterior finish Withdrawn - After Issue CN205276849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521062400.1U CN205276849U (en) 2015-12-17 2015-12-17 A a fixing device climbs for avoid damage exterior finish

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521062400.1U CN205276849U (en) 2015-12-17 2015-12-17 A a fixing device climbs for avoid damage exterior finish

Publications (1)

Publication Number Publication Date
CN205276849U true CN205276849U (en) 2016-06-01

Family

ID=56061433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521062400.1U Withdrawn - After Issue CN205276849U (en) 2015-12-17 2015-12-17 A a fixing device climbs for avoid damage exterior finish

Country Status (1)

Country Link
CN (1) CN205276849U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105587115A (en) * 2015-12-17 2016-05-18 上海建工五建集团有限公司 Climbing frame fixing device and method for preventing exterior finish from being damaged

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105587115A (en) * 2015-12-17 2016-05-18 上海建工五建集团有限公司 Climbing frame fixing device and method for preventing exterior finish from being damaged
CN105587115B (en) * 2015-12-17 2018-09-21 上海建工五建集团有限公司 A kind of climbing frame fixing device and method for preventing damage exterior finish

Similar Documents

Publication Publication Date Title
CN102661054B (en) Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method
CN110528950B (en) Assembled hidden bracket type beam-column joint connecting device
CN109184189B (en) Construction method for conical shell silo top structure of large-diameter silo
CN106759947A (en) Assembly concrete-filled steel tube post post connected mode
CN201128881Y (en) Preformed supporting structure in bent cap construction
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN107476583A (en) A kind of concrete assembled building builds construction method
CN208792737U (en) For hanging the detachable connecting part of external platform hanging girder steel
CN203487664U (en) Suspension type flexible connection for precast concrete infilled wall
CN108240037A (en) Transverse joint connecting node between a kind of prefabricated board wall layers
CN102337782A (en) Lift system for constructing truss platform on top of tall and large space and construction method for lift system
CN210084736U (en) A portable lifting hook for installation of people's air defense door
CN205276849U (en) A a fixing device climbs for avoid damage exterior finish
CN208701698U (en) A kind of foundation pit recoverable concrete support
CN207003673U (en) A kind of connecting node of beam and wallboard
CN105926925A (en) Joist steel cantilever beam of suspended scaffold and construction method thereof
CN212000585U (en) Be used for assembled bridge pier column and bent cap connection structure
CN105587115A (en) Climbing frame fixing device and method for preventing exterior finish from being damaged
CN204040437U (en) Cantilever tripod and single-row cantilever protection frame system
CN113860189B (en) Pin shaft type overturn-free climbing system of internal climbing tower crane
CN204850068U (en) Connection structure of side column and crane beam tip in steel construction
CN204662933U (en) A kind of hoistway operation frame lift-type steel platform
CN208918020U (en) A kind of detachable assembling type beam column of steel structure connection structure
CN204040471U (en) A kind of Novel direct piece cap template
CN207847078U (en) Core Walls Structure shear wall converts boom device without wall without creeping formwork seat in the plane at beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160601

Effective date of abandoning: 20180921

AV01 Patent right actively abandoned