CN105587115B - A kind of climbing frame fixing device and method for preventing damage exterior finish - Google Patents

A kind of climbing frame fixing device and method for preventing damage exterior finish Download PDF

Info

Publication number
CN105587115B
CN105587115B CN201510954053.1A CN201510954053A CN105587115B CN 105587115 B CN105587115 B CN 105587115B CN 201510954053 A CN201510954053 A CN 201510954053A CN 105587115 B CN105587115 B CN 105587115B
Authority
CN
China
Prior art keywords
climbing frame
montant
exterior finish
fixing device
frame fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510954053.1A
Other languages
Chinese (zh)
Other versions
CN105587115A (en
Inventor
程美涛
邱迪
罗心枫
朱磊
翁佳飞
王威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Priority to CN201510954053.1A priority Critical patent/CN105587115B/en
Publication of CN105587115A publication Critical patent/CN105587115A/en
Application granted granted Critical
Publication of CN105587115B publication Critical patent/CN105587115B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machine Tool Units (AREA)
  • Finishing Walls (AREA)

Abstract

For climbing frame in the prior art be fixed on wall face destroy exterior finish increase the later stage leakage risk the problem of, the present invention provide it is a kind of for prevent damage exterior finish climbing frame fixing device and method, the climbing frame fixing device, including:Suspension scaffold, the suspension scaffold include Cantilever Beams and montant, and the montant is vertically connected at the lower section of the Cantilever Beams, and one end far from the montant is fixedly connected with climbing frame on the Cantilever Beams;And the fixed mechanism for being fixed on montant on floor, the fixed mechanism includes upper bed-plate, lower bottom base, connection bolt and nut, the through-hole that the connection bolt passes through is reserved on the floor, the upper bed-plate leads to the connection bolt with lower bottom base and nut is individually fixed in the upper and lower of the floor, and the upper bed-plate includes a sleeve for housing the montant.Climbing frame is fixed on floor by the present invention by suspension and fixed mechanism, not only convenient for disassembly and assembly under the premise of avoiding damage to wall face, and safe and reliable.

Description

A kind of climbing frame fixing device and method for preventing damage exterior finish
Technical field
The present invention relates to the technical field of auxiliary equipment of building structure, more particularly to are used to prevent the climbing frame of damage exterior finish Fixing device and method.
Background technology
It is attached on cast-in-place structural currently, being required suitable for prefabricated concrete structure system climbing frame.And it will be suitable for Prefabricated concrete structure system climbing frame is attached on exterior wall, just must on precast facade component reserved opening, not only waste Material and duration, and exterior finish (especially instead break stone material or instead beat the exterior finish such as face brick) can be destroyed, once destroy exterior finish meeting The risk for increasing later stage leakage, reduces construction quality and the service life of building.
Therefore, how providing one kind can ensure that prefabricated outer wall panel exterior finish is not damaged, avoid punching in precast facade, The climbing frame fixing device and method for reducing wall face later stage risk of leakage are this field technical problems urgently to be resolved hurrily.
Invention content
It is fixed on wall face for climbing frame in the prior art and destroys the problem of exterior finish increases the risk of later stage leakage, this hair It is bright that a kind of climbing frame fixing device and method for preventing damage exterior finish is provided, climbing frame is consolidated by suspension and fixed mechanism It is not only convenient for disassembly and assembly due on floor, avoiding damage to wall face, and the safe and reliable fixation of climbing frame may be implemented.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of climbing frame fixing device for preventing damage exterior finish, including several spaced overhanging mechanisms up and down, Each overhanging mechanism includes:
Suspension scaffold, the suspension scaffold include Cantilever Beams and montant, and the montant is vertically connected at the lower section of the Cantilever Beams, One end far from the montant is fixedly connected with climbing frame on the Cantilever Beams;
And for montant to be fixed on the fixed mechanism on floor, the fixed mechanism includes upper bed-plate, lower bottom base, company Connecting bolt and nut, the through-hole that the connection bolt passes through is reserved on the floor, and the upper bed-plate leads to institute with lower bottom base It states connection bolt and nut is individually fixed in the upper and lower of the floor, the upper bed-plate includes one described perpendicular for housing The sleeve of bar.
Preferably, further include at least one connection in the above-mentioned climbing frame fixing device for preventing damage exterior finish Stick, the sleeve is corresponding on the montant to open up the through-hole passed through for the pitman.
Preferably, in the above-mentioned climbing frame fixing device for preventing damage exterior finish, the quantity of the pitman is Two or more, and horizontal spaced set.
Preferably, in the climbing frame fixing device above-mentioned for preventing damage exterior finish, on the upper bed-plate further includes Connecting plate, the sleeve are fixedly connected on the upper junction plate, are opened up in the middle part of the upper junction plate for the connection bolt The through-hole passed through.
Preferably, in the above-mentioned climbing frame fixing device for preventing damage exterior finish, if the upper bed-plate further includes Dry epiplastron, the epiplastron is distributed in the surrounding of the sleeve, and is fixedly connected respectively with upper junction plate with the sleeve, institute State the through-hole for opening up in the middle part of lower connecting plate and being passed through for the connection bolt.
Preferably, in the above-mentioned climbing frame fixing device for preventing damage exterior finish, the lower bottom base includes lower company Fishplate bar and several bottom webs, the bottom web is correspondingly arranged up and down with the bottom web, and the bottom web distinguishes the lower company Fishplate bar is fixedly connected.
Preferably, in the above-mentioned climbing frame fixing device for preventing damage exterior finish, the quantity of the connection bolt It is four, the upper junction plate is corresponding with four Angle Positions of lower connecting plate to open up the bolt hole passed through for the connection bolt, Alternatively, the quantity of the connection bolt is one, the upper junction plate is corresponding with the middle part of lower connecting plate to be opened up for the connection The bolt hole that bolt passes through.
Preferably, in the above-mentioned climbing frame fixing device for preventing damage exterior finish, the suspension scaffold is in " π " type, Setting two montants in interval on the every Cantilever Beams.
The invention also discloses a kind of climbing frame fixing means for preventing damage exterior finish, including steps are as follows:
Step 1:Climbing frame fixing device as described above for preventing damage exterior finish is provided, is reserved on floor The through-hole that the connection bolt passes through, the suspension scaffold, the upper bed-plate and lower bottom base are prefabrication;
Step 2:The upper bed-plate and lower bottom base are led to using the connection bolt and nut and are individually fixed in the building The upper and lower of plate;
Step 3:The montant is inserted in the sleeve;
Step 4:One end far from the montant on Cantilever Beams is fixedly connected with climbing frame.
Preferably, in the above-mentioned climbing frame fixing means for preventing damage exterior finish, the sleeve and the montant Upper correspondence in advance opens up the through-hole passed through for pitman, and after the step 3, pitman is arranged in the sleeve and institute It states in the correspondence through-hole of montant.
Compared with prior art, the beneficial effects of the present invention are:
Climbing frame fixing device and method for preventing damage exterior finish of the invention includes Cantilever Beams by setting and is erected The suspension scaffold of bar, one end far from the montant is fixedly connected with climbing frame on the Cantilever Beams;And use fixed mechanism will The montant of suspension scaffold is fixed on floor, it is not necessary that climbing frame is fixed on wall face as the prior art, so as to avoid outer Metope (especially having the anti-wall face for breaking stone material or instead beat the exterior finish such as face brick) is led to the later stage due to fixed climbing frame by destruction Risk of leakage occurs.It is pre- on the floor since the fixed mechanism includes upper bed-plate, lower bottom base, connects bolt and nut The through-hole passed through for the connection bolt is stayed, the upper bed-plate leads to the connection bolt with lower bottom base and nut is individually fixed in The montant of suspension scaffold is inserted in the upper bed-plate by the upper and lower of the floor after upper bed-plate is fixed on floor In sleeve, to just complete being effectively reliably fixed to suspension scaffold, have the advantages that construction is simple, safe and reliable.More preferably It is that should be conducive to repetitive cycling use, can effectively reduce work due to convenient for disassembly and assembly between the fixed mechanism and suspension scaffold Journey cost.
In addition, upper bed-plate, lower bottom base and suspension scaffold are prefabricated components, so as to part building element by scene It pours and is transferred to factory's batch production, greatly improve building industrialization level, significantly lifting construction quality and efficiency, and have Help energy-saving and emission-reduction.
Description of the drawings
Fig. 1 is the structural schematic diagram of the climbing frame fixing device for preventing damage exterior finish of one embodiment of the invention;
Fig. 2 is the structural schematic diagram that montant is fixed on floor by fixed mechanism in one embodiment of the invention.
Fig. 3 is the A-A schematic diagrames of Fig. 2.
Fig. 4 is the B-B schematic diagrames of Fig. 2.
Fig. 5 is the C-C schematic diagrames of Fig. 2.
In figure:1- Cantilever Beams, 2- montants, 3- climbing frames, 4- floors, 5- fixed mechanisms, 6- upper bed-plates, 6a- sleeves, on 6b- Connecting plate, 6c- epiplastrons, 7- lower bottom bases, 7a- lower connecting plates, 7b- bottom webs, 8- connections bolt, 9- nuts, 10- pitmans.
Specific implementation mode
Below in conjunction with the drawings and specific embodiments to the utility model proposes a kind of framed bent template system make further it is detailed It describes in detail bright.According to following explanation and claims, will be become apparent from feature the advantages of the utility model.It below will be by listed For embodiment combination attached drawing, the technology contents and feature of the utility model are described in detail.Need in addition it illustrate, attached drawing is adopted Non-accurate ratio is used with very simplified form and, only to convenient, lucidly aid illustration the utility model is implemented The purpose of example.For sake of convenience, "upper" described below, "lower" are consistent with the upper and lower direction of attached drawing, but this can't be The limitation of technical solutions of the utility model.
Embodiment one
It please refers to Fig.1 to Fig. 5, present embodiments provides a kind of climbing frame fixing device for preventing damage exterior finish, if Dry spaced overhanging mechanism up and down, each overhanging mechanism include:
Suspension scaffold, the suspension scaffold include Cantilever Beams 1 and montant 2, and the montant 2 is vertically connected at the Cantilever Beams 1 Lower section, one end far from the montant 2 on the Cantilever Beams 1 are fixedly connected with climbing frame 3;
And the fixed mechanism 5 for being fixed on montant 2 on floor 4, the fixed mechanism 5 include upper bed-plate 6, bottom Seat 7 connects bolt 8 and nut 9, and the through-hole (not shown) that the connection bolt 8 passes through is reserved on the floor 4, described Upper bed-plate 6 leads to the connection bolt 8 with lower bottom base 7 and nut 9 is individually fixed in the upper and lower of the floor 4, the upper bottom Seat 6 includes a sleeve 6a for housing the montant 2.
The present embodiment is by using the suspension scaffold including Cantilever Beams 1 Yu montant 2, far from described on the Cantilever Beams 1 One end of montant 2 is fixedly connected with climbing frame 3, the montant 2 of suspension scaffold is fixed on floor 4 using fixed mechanism 5 so that climbing frame 3 are fixed on by suspension scaffold and fixed mechanism 5 on floor 4, it is not necessary that climbing frame 3 is fixed on wall face as the prior art, So as to avoid wall face (especially have anti-beat stone material or the anti-wall face for beating the exterior finish such as face brick) appearance because fix climbing frame by Later stage risk of leakage caused by destruction.Furthermore since the fixed mechanism 5 includes upper bed-plate 6, lower bottom base 7, connection bolt 8 and nut 9, the through-hole that the connection bolt 8 passes through is reserved on the floor 4, and the upper bed-plate 6 leads to institute with lower bottom base 7 It states connection bolt 8 and nut 9 is individually fixed in the upper and lower of the floor 4, when the upper bed-plate 6 is fixed on floor 4 Afterwards, the montant of suspension scaffold 2 is inserted in the sleeve 6a of the upper bed-plate 6, can be completed to suspension scaffold to very convenient It is effective, be reliably fixed, therefore, 3 fixed form of climbing frame have the advantages that construction it is simple, safe and reliable.It more optimizedly, should be by It is convenient for disassembly and assembly between the fixed mechanism 5 and suspension scaffold, therefore be conducive to the use of component repetitive cycling, it effectively reduces engineering and makes Valence.In addition, in order to improve site operation efficiency, the upper bed-plate 6, lower bottom base 7 and suspension scaffold are preferably prefabrication.
Preferably, further include at least one connection in the above-mentioned climbing frame fixing device for preventing damage exterior finish Stick 10, the sleeve 6a is corresponding on the montant 2 to open up the through-hole (not shown) passed through for the pitman 10.Pass through setting Pitman 10 can prevent montant 2 from being shaken in sleeve 6a, can say montant 2 it is more firm be fixed on the sleeve In 6a so that the connection more secure between suspension scaffold and upper fixed mechanism 5.
In order to further increase, the connection reliability between montant 2 and sleeve 6a improves the whole of entire climbing frame fixing device Body intensity, it is preferred that in the above-mentioned climbing frame fixing device for preventing damage exterior finish, the quantity of the pitman 10 is extremely It is two or more less, and horizontal spaced set.In the present embodiment, the quantity of the pitman 10 is three, and level etc. Spacing is arranged.
For the ease of by sleeve 6a securely and be easily fixed on floor 4, it is preferred that in the present embodiment, it is described on Pedestal 6 further includes upper junction plate 6b, and the sleeve 6a is fixedly connected on by being fixedly welded on the upper junction plate 6b, described The through-hole passed through for the connection bolt 8 is opened up in the middle part of upper junction plate 6b.
In order to improve the intensity of upper bed-plate 6, and then improve the intensity and reliability of entire climbing frame fixing device, it is preferred that In the above-mentioned climbing frame fixing device for preventing damage exterior finish, the upper bed-plate 6 further includes several epiplastron 6c, described Epiplastron 6c is distributed in the surrounding of the sleeve 6a, and is fixedly connected respectively with upper junction plate 6b with the sleeve 6a.
Preferably, in the above-mentioned climbing frame fixing device for preventing damage exterior finish, the lower bottom base 7 includes lower company Fishplate bar 7a and several bottom web 7b, the bottom web 7b are correspondingly arranged with the bottom web 7b or more, and the bottom web 7b points The not described lower connecting plate 7a is fixedly connected, and the through-hole passed through for the connection bolt 8 is opened up in the middle part of the lower connecting plate 7a.It is logical Setting lower connecting plate 7a is crossed, is matched with upper junction plate 6b, can facilitate and sleeve 6a is fixed on floor 4.In addition, passing through increasing Web 7b is set, the intensity of lower bottom base 7 can be improved, and then improve the intensity and reliability of entire climbing frame fixing device.
Preferably, in the above-mentioned climbing frame fixing device for preventing damage exterior finish, the quantity of the connection bolt 8 It it is four, the upper junction plate 6b is corresponding with four Angle Positions of lower connecting plate 7a to open up the spiral shell passed through for the connection bolt 8 Keyhole, alternatively, the quantity of the connection bolt 8 is one, the upper junction plate 6b is corresponding with the middle part of lower connecting plate 7a to be opened up The bolt hole passed through for the connection bolt 8.
It is excellent to the connection reliability between further suspension scaffold and floor 4 in order to further increase the intensity of suspension scaffold Choosing, in the above-mentioned climbing frame fixing device for preventing damage exterior finish, the suspension scaffold is in " π " type, the Cantilever Beams 1 Two montants 2 are arranged in upper interval.
Preferably, in the above-mentioned climbing frame fixing device for preventing damage exterior finish, the Cantilever Beams 1 are erected with described Junction setting stiffener (not shown) between bar 2, it is thus possible to the bonding strength between Cantilever Beams 1 and montant 2 is improved, And then improve the intensity of entire climbing frame fixing device.
Embodiment two
Please continue to refer to Fig. 1 to Fig. 5, present embodiment discloses a kind of climbing frame fixation sides for preventing damage exterior finish Method, including steps are as follows:
Step 1:The climbing frame fixing device for preventing damage exterior finish as described in implementing one is provided, it is pre- on floor 4 It is prefabrication to stay the through-hole passed through for the connection bolt 8, the suspension scaffold, the upper bed-plate 6 and lower bottom base 7.In building It is reserved for the through-hole that the connection bolt 8 passes through on plate 4, conveniently subsequently suspension scaffold can be fixed on floor 4, while also just In dismounting climbing frame fixing device, recycling for component is realized.And the portions such as prefabricated suspension scaffold, the upper bed-plate 6 and lower bottom base 7 Part can improve the accuracy of manufacture of component, the construction efficiency at the scene of improving, and contribute to energy-saving and emission-reduction.
Step 2:The upper bed-plate 6 and lower bottom base 7 are led to using the connection bolt 8 and nut 9 and are individually fixed in institute State the upper and lower of floor 4.The upper bed-plate 6 is fixed on by connecting bolt 8 on floor 4 with lower bottom base 7, not only may be implemented It is reliably connected, and convenient for disassembly and assembly, can realize cycling and reutilization, save construction cost.
Step 3:The montant 2 is inserted in the sleeve 6a.In the present embodiment, the suspension scaffold is in " π " type, often Setting two montants 2 in interval on Cantilever Beams 1 described in root, that is to say, that say that two montants 2 are inserted in corresponding set respectively In cylinder 6a, to further increase the intensity of suspension scaffold, to further increase the connection reliability between suspension scaffold and floor 4.
Step 4:One end far from the montant 2 on Cantilever Beams 1 is fixedly connected with climbing frame, leads to climbing frame 3 to realize Suspension scaffold is crossed to be fixed on floor 4 with fixed mechanism 5, it is not necessary that climbing frame 3 is fixed on wall face as the prior art, to Wall face (especially there is the anti-wall face for breaking stone material or instead beat the exterior finish such as face brick) is avoided to occur because fixed climbing frame 3 is by broken Later stage risk of leakage caused by bad.
Preferably, in the above-mentioned climbing frame fixing means for preventing damage exterior finish, the sleeve 6a is erected with described Correspondence opens up the through-hole passed through for pitman 10 in advance on bar 2, and after the step 3, pitman 10 is arranged in the set Cylinder 6a in the corresponding through-hole of the montant 2.By setting pitman 10, it can prevent montant 2 from being shaken in sleeve 6a, It can say that montant 2 is more firm to be fixed in the sleeve 6a so that the connection between suspension scaffold and upper fixed mechanism 5 is more Secure.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (10)

1. a kind of climbing frame fixing device for preventing damage exterior finish, which is characterized in that including several spaced up and down Overhang mechanism, each overhanging mechanism includes:
Suspension scaffold, the suspension scaffold include Cantilever Beams and montant, and the montant is vertically connected at the lower section of the Cantilever Beams, described One end far from the montant is crossed above wall face and is fixedly connected with climbing frame on Cantilever Beams;
And for montant to be fixed on the fixed mechanism on floor, the fixed mechanism includes upper bed-plate, lower bottom base, connection spiral shell Bolt and nut are reserved for the through-hole that the connection bolt passes through on the floor, and the upper bed-plate passes through described with lower bottom base Connection bolt and nut are individually fixed in the upper and lower of the floor, and the upper bed-plate includes one for housing the montant Sleeve.
2. the climbing frame fixing device according to claim 1 for preventing damage exterior finish, it is characterised in that:Further include to A few pitman, the sleeve is corresponding on the montant to open up the through-hole passed through for the pitman.
3. the climbing frame fixing device according to claim 2 for preventing damage exterior finish, it is characterised in that:The connection The quantity of stick is two or more, and horizontal spaced set.
4. the climbing frame fixing device according to claim 1 for preventing damage exterior finish, it is characterised in that:The upper bottom Seat further includes upper junction plate, and the sleeve is fixedly connected on the upper junction plate, is opened up in the middle part of the upper junction plate for institute State the through-hole that connection bolt passes through.
5. the climbing frame fixing device according to claim 4 for preventing damage exterior finish, it is characterised in that:The upper bottom Seat further includes several epiplastrons, and the epiplastron is distributed in the surrounding of the sleeve, and respectively with the sleeve and upper junction plate It is fixedly connected.
6. the climbing frame fixing device according to claim 5 for preventing damage exterior finish, it is characterised in that:The bottom Seat includes lower connecting plate and several bottom webs, and the bottom web is correspondingly arranged up and down with the bottom web, and the bottom web point It is not fixedly connected with the lower connecting plate, the through-hole passed through for the connection bolt is opened up in the middle part of the lower connecting plate.
7. the climbing frame fixing device according to claim 6 for preventing damage exterior finish, it is characterised in that:The connection The quantity of bolt is four, and open up corresponding with four Angle Positions of lower connecting plate of the upper junction plate is passed through for the connection bolt Bolt hole, alternatively, it is described connection bolt quantity be one, the upper junction plate is corresponding with the middle part of lower connecting plate to open up confession The bolt hole that the connection bolt passes through.
8. the climbing frame fixing device according to claim 1 for preventing damage exterior finish, it is characterised in that:The overhanging Frame is in " π " type, and two montants of setting are spaced on the every Cantilever Beams.
9. a kind of climbing frame fixing means for preventing damage exterior finish, it is characterised in that:Including steps are as follows:Step 1:It carries For the climbing frame fixing device for preventing damage exterior finish as described in any one of claim 1-8, reserved on floor For the through-hole that the connection bolt passes through, the suspension scaffold, the upper bed-plate and lower bottom base are prefabrication;
Step 2:The upper bed-plate and lower bottom base are led to using the connection bolt and nut and are individually fixed in the floor Upper and lower;
Step 3:The montant is inserted in the sleeve;
Step 4:One end far from the montant on Cantilever Beams is fixedly connected with climbing frame.
10. the climbing frame fixing means according to claim 9 for preventing damage exterior finish, it is characterised in that:The set Cylinder opens up the through-hole passed through for pitman with corresponding in advance on the montant, and after the step 3, pitman is arranged in The sleeve in the corresponding through-hole of the montant.
CN201510954053.1A 2015-12-17 2015-12-17 A kind of climbing frame fixing device and method for preventing damage exterior finish Active CN105587115B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510954053.1A CN105587115B (en) 2015-12-17 2015-12-17 A kind of climbing frame fixing device and method for preventing damage exterior finish

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510954053.1A CN105587115B (en) 2015-12-17 2015-12-17 A kind of climbing frame fixing device and method for preventing damage exterior finish

Publications (2)

Publication Number Publication Date
CN105587115A CN105587115A (en) 2016-05-18
CN105587115B true CN105587115B (en) 2018-09-21

Family

ID=55926996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510954053.1A Active CN105587115B (en) 2015-12-17 2015-12-17 A kind of climbing frame fixing device and method for preventing damage exterior finish

Country Status (1)

Country Link
CN (1) CN105587115B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268972A (en) * 2017-08-08 2017-10-20 吉林建筑大学 External hanging type scaffold and its installation method are climbed in one kind
CN110670868A (en) * 2019-11-06 2020-01-10 中国建筑第四工程局有限公司 PC (personal computer) bay window climbing frame wall-attaching device and installation method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205276849U (en) * 2015-12-17 2016-06-01 上海建工五建集团有限公司 A a fixing device climbs for avoid damage exterior finish

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2494860Y (en) * 2001-09-07 2002-06-12 成军 Outrigger supporting type lifting scaffold
CN101839070B (en) * 2010-04-07 2011-12-28 南通建工集团股份有限公司 Construction method for temporarily supporting and strengthening reinforced concrete structured beam by using steel column
CN204492134U (en) * 2014-12-31 2015-07-22 河北建设集团有限公司 Be convenient to the height scaffolding installed
CN204850402U (en) * 2015-07-24 2015-12-09 中建四局第一建筑工程有限公司 Outer facade super high -rise building structure of bamboo joint shape is adhered to formula and is climbed frame

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205276849U (en) * 2015-12-17 2016-06-01 上海建工五建集团有限公司 A a fixing device climbs for avoid damage exterior finish

Also Published As

Publication number Publication date
CN105587115A (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN108193782A (en) Prefabricated modular frame node and assembling method thereof
CN206815520U (en) A kind of connecting node of prefabricated post and precast beam
CN207959600U (en) A kind of precast shear wall horizontal joint connection structure with I-steel
CN207846687U (en) Prefabricated assembled modularization frame node
CN207003643U (en) A kind of assembled beam-column node
CN208137146U (en) Replaceable assembly concrete beam-column connection based on Damage Coutrol
CN108360901A (en) Novel low layer assembled wallboard structure energy dissipating bolt joint
CN105587115B (en) A kind of climbing frame fixing device and method for preventing damage exterior finish
CN109853802A (en) It is a kind of whole across precast prestressed flute profile floor, building cover structure and its assembly method
CN108589914A (en) A kind of Self-resetting frame structure and construction method
CN110080418A (en) A kind of detachable assembling type shear wall structure of bolt splicing
CN108374493A (en) Novel low layer assembled wallboard structure energy dissipating steel plate welding node
CN207003673U (en) A kind of connecting node of beam and wallboard
CN209293474U (en) A kind of support device that cantilevered structure falsework is shared with external scaffolding
CN208701698U (en) A kind of foundation pit recoverable concrete support
CN207003672U (en) A kind of connecting node of precast beam and prefabricated panel
CN205976087U (en) Can dismantle shear force wall assembly structure system
CN210530358U (en) Device for hoisting and temporarily fixing H-shaped steel beam
CN210619969U (en) Prefabricated staircase hoist and mount subassembly
CN209039975U (en) One kind can temporarily turn permanent superstructure
CN208899660U (en) A kind of full precast shear wall connection structure
CN209369402U (en) A kind of basement roof ruggedized construction
CN205276849U (en) A a fixing device climbs for avoid damage exterior finish
CN217870942U (en) Beam column connecting structure
CN206815519U (en) A kind of connecting node of prefabricated post and precast beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant