CN204850068U - Connection structure of side column and crane beam tip in steel construction - Google Patents
Connection structure of side column and crane beam tip in steel construction Download PDFInfo
- Publication number
- CN204850068U CN204850068U CN201520551260.8U CN201520551260U CN204850068U CN 204850068 U CN204850068 U CN 204850068U CN 201520551260 U CN201520551260 U CN 201520551260U CN 204850068 U CN204850068 U CN 204850068U
- Authority
- CN
- China
- Prior art keywords
- crane beam
- steel
- column
- wing listrium
- side column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a connection structure of side column and crane beam tip in steel construction, characterized by: to upright steel column, weld steel corbel on the inboard flange plate of steel column, crane beam's tip is established on steel corbel with its lower flange grillage, in order to be horizontally connecting plate fixed connection between the inboard flange plate of crane beam's upper limb listrium and steel column. The utility model discloses the structure is firm reliable.
Description
Technical field
The utility model relates to the syndeton of side column and crane beam end in steel work.
Background technology
Factory building crane beam crane has become the indispensable extraordinary lifting appliance of modern factories enterprise, prior art middle rolling car beam and post syndeton comparatively complicated, be adopt pull bar directly weld with column, destroy the performance of crane beam and post mother metal; Meanwhile, crane beam crane has live load, and vibrating load is frequent, and butt welded seam quality influence is very large, and its safety and practicality are firm all not, and support performance is not high enough.
Utility model content
The utility model is the weak point for avoiding above-mentioned prior art to exist, and provides the syndeton of side column and crane beam end in a kind of steel work, to simplify work progress, increase its support performance, to improve reliability.
The utility model is that technical solution problem adopts following technical scheme:
In the utility model steel work, the feature of the syndeton of side column and crane beam end is: for upright steel column, weldable steel bracket on the inboard wing listrium of described steel column, the end of crane beam is located on described steel corbel with its bottom flange grillage, is fixedly connected with between the top flange plate and the inboard wing listrium of steel column of described crane beam with the junction plate in level.
In the utility model steel work, side column is also with the feature of the syndeton of crane beam end: on described inboard wing listrium, fixedly weld set square, the side that described junction plate is in inboard wing listrium is set up and is fixedly connected on set square with bolt, and described junction plate and the top flange plate of crane beam are fixedly connected with bolt.
In the utility model steel work, the feature of the syndeton of side column and crane beam end is also: on the cross section of described steel column, arrange stiffener, on the same elevation location of top flange plate and set square place of described stiffener and crane beam.
Compared with the prior art, the utility model beneficial effect is embodied in:
1, the utility model vibrational power flow is more simple, on-site construction operations is convenient;
2, the utility model saves the erection procedure between job site crane beam and steel column, reduces constructor's labour intensity;
3, the utility model structural stability performance and supporting rod performance high, use more reliable;
Accompanying drawing explanation
Fig. 1 is the utility model facade structures schematic diagram;
Fig. 2 is the utility model plan structure schematic diagram;
Number in the figure: 2 crane beams, 2a bottom wing listrium, 2b top flange plate, 3 steel columns, 3a inboard wing listrium, 4 set squares, 5 steel corbels, 6 junction plates, 7 stiffeners.
Detailed description of the invention:
See Fig. 1 and Fig. 2, in the present embodiment, in steel work, the syndeton of side column and crane beam end is: for upright steel column 3, weldable steel bracket 5 on the inboard wing listrium 3a of described steel column 3, the end of crane beam 2 is erected on described steel corbel 5 with its bottom wing listrium 2a, is fixedly connected with between the top flange plate 2b and the inboard wing listrium 3a of steel column 3 of described crane beam 2 with the junction plate 6 in level.
In concrete enforcement, fixing welding set square 4 on described inboard wing listrium 3a, the side that described junction plate 7 is in inboard wing listrium 3a is set up and is fixedly connected on set square 4 with bolt, and described junction plate 6 is fixedly connected with bolt with the top flange plate 2b of crane beam 2.The cross section of described steel column 3 arranges stiffener 7, and described stiffener 8 is with on the same elevation location of top flange plate 2b and set square 4 place of crane beam 2.
In installation process: first crane beam 2 is hung at steel corbel 5, junction plate 6 is placed between crane beam top flange plate 2b and set square 4, bolt is utilized to be fastenedly connected by the preformed hole on junction plate 6, set square 4 and crane beam top flange plate 2b, crane beam 2 and steel column 3 are linked together, stiffener 8 makes overall structure more stable, and support performance is stronger.
Claims (3)
1. the syndeton of side column and crane beam end in a steel work, it is characterized in that: for upright steel column (3), at the upper weldable steel bracket (5) of the inboard wing listrium (3a) of described steel column (3), the end of crane beam (2) is erected on described steel corbel (5) with its bottom wing listrium (2a), is fixedly connected with between the top flange plate (2b) and the inboard wing listrium (3a) of steel column (3) of described crane beam (2) with the junction plate (6) in level.
2. the syndeton of side column and crane beam end in steel work according to claim 1, it is characterized in that: upper fixing welding set square (4) of described inboard wing listrium (3a), the side that described junction plate (7) is in inboard wing listrium (3a) is set up and is fixedly connected on set square (4) with bolt, and described junction plate (6) is be fixedly connected with bolt with the top flange plate (2b) of crane beam (2).
3. the syndeton of side column and crane beam end in steel work according to claim 1, it is characterized in that: on the cross section of described steel column (3), arrange stiffener (7), described stiffener (8) is with on the same elevation location of top flange plate (2b) and set square (4) place of crane beam (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520551260.8U CN204850068U (en) | 2015-07-24 | 2015-07-24 | Connection structure of side column and crane beam tip in steel construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520551260.8U CN204850068U (en) | 2015-07-24 | 2015-07-24 | Connection structure of side column and crane beam tip in steel construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204850068U true CN204850068U (en) | 2015-12-09 |
Family
ID=54740634
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520551260.8U Active CN204850068U (en) | 2015-07-24 | 2015-07-24 | Connection structure of side column and crane beam tip in steel construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204850068U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088335A (en) * | 2016-08-12 | 2016-11-09 | 安徽富煌钢构股份有限公司 | Side column angle brace and end crane beam attachment structure |
CN108439203A (en) * | 2018-04-25 | 2018-08-24 | 中国核电工程有限公司 | A kind of crane girder mounting structure |
-
2015
- 2015-07-24 CN CN201520551260.8U patent/CN204850068U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088335A (en) * | 2016-08-12 | 2016-11-09 | 安徽富煌钢构股份有限公司 | Side column angle brace and end crane beam attachment structure |
CN108439203A (en) * | 2018-04-25 | 2018-08-24 | 中国核电工程有限公司 | A kind of crane girder mounting structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105604187B (en) | A kind of assembling type steel structure beam column node connection device | |
CN205369542U (en) | Concrete beam longitudinal reinforcement and steel column connection structure | |
CN104652617B (en) | A kind of beam column node connection device of many high-rise assembling type steel structure systems | |
CN104264792B (en) | A kind of bean column node of layered assembling type steel structure | |
CN204850068U (en) | Connection structure of side column and crane beam tip in steel construction | |
CN204826714U (en) | Novel steel constructs a tire supporting frame | |
CN203420477U (en) | Steel structure set-up platform for concrete pouring | |
CN202706508U (en) | Overhanging strength bearing steel beam construction member of scaffold | |
CN209482483U (en) | A kind of assembled quadrate steel pipe column channel steel connection bean column node | |
CN203569485U (en) | Steel truss beam elevation adjusting device | |
CN218292929U (en) | Support frame of hoop on civil engineering structure beam | |
CN201485976U (en) | Node connecting structure of steel structural frame girder and structural pole | |
CN204850047U (en) | Two davits of both shoulders and crane beam connection structure | |
CN206800653U (en) | A kind of concrete filled steel tube pole steel beam end plate type bolt connection node | |
CN205531410U (en) | A simply can dismantle construction canopy for steel construction job site | |
CN210342237U (en) | Steel construction post roof beam connecting elements convenient to installation | |
CN204850046U (en) | Many davits of both shoulders and crane beam connection structure | |
CN204139334U (en) | Girder steel and steel column weld temporary connecting structure entirely | |
CN207032671U (en) | Steel and concrete post and the attachment structure of steel and concrete post and Vierendeel girder | |
CN203924484U (en) | A kind of precast beam and there is the reinforced concrete structure of tenon anchor system | |
CN201605583U (en) | Connecting node of steel structure trussed beam and prestressed concrete tubular pile | |
CN207959911U (en) | A kind of builder's jack gusseted | |
CN206846097U (en) | A kind of Men Gangyu frameworks separately-loaded pipeline support structure | |
CN207392715U (en) | A kind of overhanging inclined support structure | |
CN203867155U (en) | Steel-structure operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |