CN206888535U - A kind of moulding bed - Google Patents
A kind of moulding bed Download PDFInfo
- Publication number
- CN206888535U CN206888535U CN201720535624.2U CN201720535624U CN206888535U CN 206888535 U CN206888535 U CN 206888535U CN 201720535624 U CN201720535624 U CN 201720535624U CN 206888535 U CN206888535 U CN 206888535U
- Authority
- CN
- China
- Prior art keywords
- moulding bed
- main body
- chassis
- bar
- connection end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The purpose of this utility model is to provide a kind of moulding bed, including moulding bed main body and chassis, and moulding bed main body includes the more support columns extended downwardly, and support column is connected with chassis;Framework of steel reinforcement is suspended in moulding bed main body;Support column includes the first connection end, and the first connection end is connected with the connected mode of the separable shaft hole matching of vertical direction with chassis;Moulding bed main body is used to be lifted by crane, to cause the shaft hole matching between the first connection end and chassis to separate, to enable framework of steel reinforcement to follow moulding bed main body away from chassis.Because the connected mode between moulding bed main body and chassis is the axis hole connection on vertical direction, so during lifting, moulding bed main body and framework of steel reinforcement can be separated with chassis so that framework of steel reinforcement can be removed from the direction where chassis so that the taking-up process of framework of steel reinforcement becomes easy.
Description
Technical field
Building field is the utility model is related to, more particularly, to a kind of moulding bed.
Background technology
In recent years, all kinds of bridge construction quantity in China are increasing year by year, most engine request short time limits, in addition by bridge
The condition such as framework of steel reinforcement section weight and appearance and size limits, and the framework of steel reinforcement for making bridge can not be all complete in building-site
Into the framework of steel reinforcement of bridge needs to be easy near engineering bridge site to complete in the beta site of framework of steel reinforcement transport, framework of steel reinforcement
Production quality be construction quality key, the accurate control of particularly bar spacing is the most important thing of construction quality.
In the prior art, the design comparison of moulding bed is inflexible, after the completion of a tie with reinforcing bar, can not easily by
The framework of steel reinforcement that colligation is completed is removed from moulding bed, so as to delay the colligation of next framework of steel reinforcement work.
This area needs a kind of framework of steel reinforcement that can complete colligation to hold easily detachable moulding bed.
Utility model content
The purpose of this utility model is to provide a kind of moulding bed, and the framework of steel reinforcement being formed in described moulding bed can be held
Easily take out.
To realize the moulding bed of the purpose, for forming framework of steel reinforcement, the moulding bed includes moulding bed main body and chassis, described
Moulding bed main body includes the more support columns extended downwardly, and the support column is connected with the chassis;The framework of steel reinforcement includes side
Face cage bar, top surface cage bar, bottom surface cage bar and stirrup, the moulding bed main body are used to place the side cage bar and the top surface master
Muscle, the chassis are used to place the bottom surface cage bar;The stirrup is used for the side cage bar, the top surface cage bar and described
Bottom surface cage bar banding is to form the framework of steel reinforcement;The framework of steel reinforcement is suspended in the moulding bed main body;
The support column includes the first connection end, and first connection end is with the separable shaft hole matching of vertical direction
Connected mode is connected with the chassis;
The moulding bed main body is used to be lifted by crane, to cause the axis hole between first connection end and the chassis to match somebody with somebody
Separation is closed, to enable the framework of steel reinforcement to follow the moulding bed main body away from the chassis, so as to easily be removed.
Described moulding bed, its further feature are that first connection end includes the connecting shaft being vertically arranged, the bottom
Frame includes the branch sleeve being vertically arranged, and the connecting shaft is used to extend into the branch sleeve, to cause described first to connect
End and the chassis shaft hole matching are connect, the connecting shaft is additionally operable to when the moulding bed main body is lifted by crane from the branch sleeve
Exit, to cause the shaft hole matching to separate.
Described moulding bed, its further feature are that first connection end includes the connecting shaft being vertically arranged, the bottom
Frame includes the branch sleeve being vertically arranged, and the connecting shaft is used to extend into the branch sleeve, to cause described first to connect
End and the chassis shaft hole matching are connect, the connecting shaft is additionally operable to when the moulding bed main body is lifted by crane from the branch sleeve
Exit, to cause the shaft hole matching to separate.
Described moulding bed, its further feature are that the support column also includes support column main body, the support column main body
On be provided with more horizontally disposed locating rods, the locating rod extends to the same side from the support column main body and protrudes from institute
State support column main body;The more locating rods are spaced apart up and down along the support column main body;
The upper surface of the locating rod is used to place the side cage bar, to cause the side cage bar by the stirrup hoop
It is close to when connecing and keeps stable, and position is accurate.
Described moulding bed, its further feature are that the moulding bed main body also includes upper frame, and the upper frame includes support
Bar, the support column also include second connection end, and the second connection end is separably connected with the support bar;
The upper surface of the support bar is used to place the top surface cage bar, so that the framework of steel reinforcement is suspended on the support
On bar;The support bar is used to be lifted by crane, so that the framework of steel reinforcement can follow the moulding bed main body to rise and away from described
Chassis.
Described moulding bed, its further feature are that the second connection end includes connection ring, and the connection ring is set in
On the support bar, to cause the second connection end to be separably connected with the support bar.
Described moulding bed, its further feature are that the second connection end includes the groove of opening upwards, the support
Bar is placed in the groove from top to bottom, to cause the second connection end to be separably connected with the support bar;
The locating rod includes the first locating rod and the second locating rod of neighbouring setting, and first locating rod is located at
Above second locating rod;The upper surface of second locating rod is used to place the side cage bar;First locating rod
Lower surface can be hung over when the support bar is lifted by crane in the side cage bar so that the support column can be risen
Hang.
Described moulding bed, its further feature are that the groove is formed by semicircle bar dowel.
Described moulding bed, its further feature are that the chassis includes chassis main body and support frame, and support frame as described above is set
Put above the chassis main body, support frame as described above is used to place the bottom surface cage bar.
Described moulding bed, its further feature are that the branch sleeve is arranged in the chassis main body and quantity
For two, the quantity of the connecting shaft is two.
Described moulding bed, its further feature are that the chassis is horizontal positioned, and the support column extends simultaneously straight down
It is connected with the chassis.
Positive effect of the present utility model is:Moulding bed provided by the utility model, including moulding bed main body and chassis,
Moulding bed main body includes the more support columns extended downwardly, and support column is connected with chassis;Framework of steel reinforcement is suspended in moulding bed main body;Branch
Dagger includes the first connection end, and the first connection end is connected with the connected mode of the separable shaft hole matching of vertical direction and chassis
Connect;Moulding bed main body is used to be lifted by crane, to cause the shaft hole matching between the first connection end and chassis to separate, to cause framework of steel reinforcement
Moulding bed main body can be followed away from chassis.Because the connected mode between moulding bed main body and chassis is the axis hole company on vertical direction
Connect, so during lifting, moulding bed main body and framework of steel reinforcement can separate with chassis so that framework of steel reinforcement can be the bottom of from
Direction where frame is removed so that the taking-up process of framework of steel reinforcement becomes easy.
Brief description of the drawings
The above and other feature, property and advantage of the present utility model will be by with reference to the accompanying drawings and examples
Description and become readily apparent from, wherein:
Fig. 1 is the schematic diagram of the framework of steel reinforcement in the utility model;
Fig. 2 is schematic diagram of the framework of steel reinforcement in banding on moulding bed in the utility model;
Fig. 3 is schematic diagram when moulding bed main body is lifted by crane in the utility model;
Fig. 4 is schematic diagram when support column separates from upper frame in the utility model;
Fig. 5 is the schematic diagram at the moulding bed back side in the utility model;
Fig. 6 is the positive schematic diagram of moulding bed in the utility model;
Fig. 7 is the enlarged drawing at A in Fig. 6;
Fig. 8 is the schematic diagram of moulding bed side in the utility model;
Fig. 9 is the enlarged drawing at B in Fig. 8.
Embodiment
With reference to specific embodiments and the drawings, the utility model is described in further detail, elaborates in the following description
More details are in order to fully understand the utility model, but the utility model obviously can be different from what this was described with a variety of
Other manner is implemented, and those skilled in the art can be in the case of without prejudice to the utility model connotation according to practical application feelings
Condition is made similar popularization, deduced, therefore should not limit the scope of protection of the utility model with the content of this specific embodiment.
It should be noted that Fig. 1 to Fig. 9 is not only as an example, it is drawn according to the condition of equal proportion, and not
It should be construed as limiting in this, as the protection domain to the utility model actual requirement.
Fig. 1 shows a kind of framework of steel reinforcement 1, and framework of steel reinforcement 1 is generally embedded in the cement components such as post, beam, can be notable
Increase the structural strength of cement components, be widely used in building engineering field.As shown in figure 1, framework of steel reinforcement 1 includes side cage bar
11st, top surface cage bar 12, bottom surface cage bar 13 and stirrup 14.Side cage bar 11, top surface cage bar 12 and bottom surface cage bar 13 be arranged in parallel, hoop
Muscle 14 is set around cage bar.Screw-thread steel can be selected in side cage bar 11, top surface cage bar 12 and bottom surface cage bar 13, and the diameter of stirrup 14 is small
In cage bar.Stirrup 14 will form framework of steel reinforcement 1 after side cage bar 11, top surface cage bar 12 and the banding of bottom surface cage bar 13.
Fig. 2 shows the scene that framework of steel reinforcement 1 is formed on moulding bed 2.Moulding bed 2 includes moulding bed main body 20 and chassis 21, its
In, moulding bed main body 20 includes the more support columns 201 and upper frame 202 extended downwardly, and chassis 21 is horizontal positioned, including chassis main body
212 and support frame 211, support frame 211 is arranged on the top of chassis main body 212, and support frame 211 is used to place bottom surface cage bar 13.Top
Frame 202 includes support bar 202a, and support bar 202a upper surface is used to place top surface cage bar 12, so that framework of steel reinforcement 1 is suspended on
On support bar 202a.Alternatively, support bar 202a is steel pipe.
Support column 201 includes the first connection end 201a, support column main body 201b and second connection end 201c.First connection end
201a and chassis 21 are separably attached, and second connection end 201c and upper frame 202 support bar 202a are separably attached.
First connection end 201a and the separable axis hole that the separably attached connected mode of chassis 21 is vertical direction
Coordinate.Specifically, with reference to figure 3,4,6,7, the first connection end 201a includes the connecting shaft 201a-1 being vertically arranged, and chassis 21 includes
The branch sleeve 212a being vertically arranged, connecting shaft 201a-1 are used to extend into branch sleeve 212a, to cause the first connection end
201a and the shaft hole matching of chassis 21, connecting shaft 201a-1 are additionally operable to when moulding bed main body 20 is lifted by crane by lifting rope 3 from branch sleeve
Exited in 212a, to cause shaft hole matching to separate.In addition, in another embodiment of the present utility model, connecting shaft is located at bottom
On frame 21, the branch sleeve that shaft hole matching is formed with connecting shaft is arranged on support column 201.
Support bar 202a is lifted by crane so that the first connection end 201a separates with the shaft hole matching between chassis 21, to cause
Framework of steel reinforcement 1 can follow moulding bed main body 20 away from chassis 21, so as to easily be removed.
Alternatively, support column main body 201b is channel-section steel, and connecting shaft 201a-1 is steel pipe, and is welded on the interior of channel-section steel web
On side.Chassis main body 212 is I-steel, and branch sleeve 212a is the steel pipe that internal diameter is more than connecting shaft 201a-1, and is welded
On a side of I-steel web.Branch sleeve 212a lower end is directly rested on the bottom wing listrium of I-steel, connection
Sleeve 212a upper end passes through the top flange plate of I-steel, and the upper surface of branch sleeve 212a upper end and I-steel is upper
The upper surface of flange plate is equal.Connecting shaft 201a-1 quantity can be two, and correspondingly, branch sleeve 212a quantity is two
It is individual.
More horizontally disposed locating rod 201b-1, locating rod 201b-1 self-supporting posts are provided with support column main body 201b
Main body 201b extends to the same side and protrudes from support column main body 201b;More locating rod 201b-1 are along support column main body 201b
Under be spaced apart;Locating rod 201b-1 upper surface is used to place side cage bar 11, to cause side cage bar 11 to be bound round by stirrup 14
It is close to when connecing and keeps stable, and position is accurate.Locating rod 201b-1 can be bar dowel.Side cage bar 11 is placed on locating rod
201b-1 is in support column main body 201b angle.The distance between adjacent two locating rod 201b-1 are equal, and should
The distance between distance and adjacent two side cage bars 11, therefore ensure adjacent two positioning in the manufacturing process of moulding bed 2
The distance between bar 201b-1 accurately ensures that the distance between adjacent two side cage bars 11 are accurate.
The separably attached modes of support bar 202a of second connection end 201c and upper frame 202 include it is a variety of, such as:Second
Connection end 201c includes connection ring (accompanying drawing is not shown), and connection ring is set on support bar 202a, and after lifting, connection ring can be from branch
Removed on strut 202a.
As shown in Fig. 2,3,4,8, second connection end 201c includes the groove 201c-1 of opening upwards, and support bar 202a is from upper
It is placed under and in groove 201c-1, to cause second connection end 201c to be separably connected with support bar 202a, groove 201c-
1 is formed by semicircle bar dowel.Locating rod 201b-1 includes the first locating rod and the second locating rod of neighbouring setting, and first
Locating rod is located above the second locating rod;The upper surface of second locating rod is used to place side cage bar 11;Under first locating rod
Surface can be hung in side cage bar 11 when support bar 202a is lifted by crane, although so that support column 201 and support bar
202a is separated, but in the presence of side cage bar 11, is still able to follow support bar 202a upward motion and is lifted by crane.Support
, can be by manually support column 201 be removed from side cage bar 11 after post 201 separates with support bar 202a.
In one embodiment of the present utility model, the process of lifting is as follows:
A. the original state of moulding bed 2 is as shown in Figure 2.Connecting shaft 201a-1 is located in branch sleeve 212a, side cage bar 11
In on the upper surface of the second locating rod, support bar 202a is supported by the second connection end 201c of support column 201.
B. after the shaping of the banding of framework of steel reinforcement 1, as shown in figure 3, lifting support bar 202a, support bar 202a and support column 201
Second connection end 201c separation, framework of steel reinforcement 1 follows support bar 202a to move upwards;Side cage bar 11 moves up to first
The lower surface of locating rod, and drive support column 201 to move upwards, cause connecting shaft 201a-1 and branch sleeve 212a axis hole to be matched somebody with somebody
Close separation.
C. as shown in figure 4, being removed from side cage bar 11 support column 201 by artificial or other modes, and will connection
Axle 201a-1 turns back to corresponding branch sleeve 212a.
Positive effect of the present utility model is:Moulding bed provided by the utility model, including moulding bed main body and chassis,
Moulding bed main body includes the more support columns extended downwardly, and support column is connected with chassis;Framework of steel reinforcement is suspended in moulding bed main body;Branch
Dagger includes the first connection end, and the first connection end is connected with the connected mode of the separable shaft hole matching of vertical direction and chassis
Connect;Moulding bed main body is used to be lifted by crane, to cause the shaft hole matching between the first connection end and chassis to separate, to cause framework of steel reinforcement
Moulding bed main body can be followed away from chassis.Because the connected mode between moulding bed main body and chassis is the axis hole company on vertical direction
Connect, so during lifting, moulding bed main body and framework of steel reinforcement can separate with chassis so that framework of steel reinforcement can be the bottom of from
Direction where frame is removed so that the taking-up process of framework of steel reinforcement becomes easy.
Although the utility model is disclosed as above with preferred embodiment, its be not for limiting the utility model, it is any
Those skilled in the art are not being departed from spirit and scope of the present utility model, can make possible variation and modification, all
It is the content without departing from technical solutions of the utility model, appoints according to what the technical essence of the utility model was made to above example
What modification, equivalent variations and modification, each falls within the protection domain that the utility model claims are defined.
Claims (10)
1. a kind of moulding bed, for forming framework of steel reinforcement (1), the moulding bed (2) includes moulding bed main body (20) and chassis (21), described
Moulding bed main body (20) includes the more support columns (201) extended downwardly, and the support column (201) is connected with the chassis (21);
The framework of steel reinforcement (1) includes side cage bar (11), top surface cage bar (12), bottom surface cage bar (13) and stirrup (14), the moulding bed
Main body (20) is used to place the side cage bar (11) and the top surface cage bar (12), and the chassis (21) is used to place the bottom
Face cage bar (13);The stirrup (14) is used for the side cage bar (11), the top surface cage bar (12) and the bottom surface cage bar
(13) banding is to form the framework of steel reinforcement (1);The framework of steel reinforcement (1) is suspended on the moulding bed main body (20);
Characterized in that, the support column (201) includes the first connection end (201a), first connection end (201a) is with vertical
The connected mode of the separable shaft hole matching in direction is connected with the chassis (21);
The moulding bed main body (20) is used to be lifted by crane, to cause between first connection end (201a) and the chassis (21)
The shaft hole matching separation, to cause the framework of steel reinforcement (1) that the moulding bed main body (20) can be followed away from the chassis
(21), so as to easily be removed.
2. moulding bed as claimed in claim 1, it is characterised in that first connection end (201a) includes the connection being vertically arranged
Axle (201a-1), the chassis (21) include the branch sleeve (212a) being vertically arranged, and the connecting shaft (201a-1) is used to stretch
Enter into the branch sleeve (212a), to cause first connection end (201a) and the chassis (21) shaft hole matching, institute
Connecting shaft (201a-1) is stated to be additionally operable to exit from the branch sleeve (212a) when the moulding bed main body (20) is lifted by crane, with
So that the shaft hole matching separation.
3. moulding bed as claimed in claim 1, it is characterised in that the support column (201) also includes support column main body (201b),
More horizontally disposed locating rods (201b-1) are provided with the support column main body (201b), the locating rod (201b-1) is certainly
The support column main body (201b) extends to the same side and protrudes from the support column main body (201b);The more locating rods
(201b-1) is spaced apart up and down along the support column main body (201b);
The upper surface of the locating rod (201b-1) is used to place the side cage bar (11), to cause the side cage bar (11)
Keep stable when being connected by the stirrup (14) banding, and position is accurate.
4. moulding bed as claimed in claim 3, it is characterised in that the moulding bed main body (20) also includes upper frame (202), the top
Frame (202) includes support bar (202a), and the support column (201) also includes second connection end (201c), the second connection end
(201c) is separably connected with the support bar (202a);
The upper surface of the support bar (202a) is used to place the top surface cage bar (12), so that the framework of steel reinforcement (1) is hung
On the support bar (202a);The support bar (202a) is used to be lifted by crane, so that the framework of steel reinforcement (1) can follow institute
Moulding bed main body (20) is stated to rise and away from the chassis (21).
5. moulding bed as claimed in claim 4, it is characterised in that the second connection end (201c) includes connection ring, the company
Ring set is connect to be located on the support bar (202a), with cause the second connection end (201c) separably with the support bar
(202a) is connected.
6. moulding bed as claimed in claim 4, it is characterised in that the second connection end (201c) includes the groove of opening upwards
(201c-1), the support bar (202a) are placed in the groove (201c-1) from top to bottom, to cause second connection
End (201c) is separably connected with the support bar (202a);
The locating rod (201b-1) includes the first locating rod and the second locating rod of neighbouring setting, first locating rod
Above second locating rod;The upper surface of second locating rod is used to place the side cage bar (11);Described
The lower surface of a positioning rod can be hung over when the support bar (202a) is lifted by crane on the side cage bar (11), so that
The support column (201) can be lifted by crane.
7. moulding bed as claimed in claim 6, it is characterised in that the groove (201c-1) is formed by semicircle bar dowel.
8. moulding bed as claimed in claim 2, it is characterised in that the chassis (21) includes chassis main body (212) and support frame
(211), support frame as described above (211) is arranged on above the chassis main body (212), and support frame as described above (211) is described for placing
Bottom surface cage bar (13).
9. moulding bed as claimed in claim 8, it is characterised in that the branch sleeve (212a) is arranged on the chassis main body
(212) on and quantity is two, and the quantity of the connecting shaft (201a-1) is two.
10. moulding bed as claimed in claim 1, it is characterised in that the chassis (21) is horizontal positioned, the support column (201)
Extend straight down and be connected with the chassis (21).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720535624.2U CN206888535U (en) | 2017-05-15 | 2017-05-15 | A kind of moulding bed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720535624.2U CN206888535U (en) | 2017-05-15 | 2017-05-15 | A kind of moulding bed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206888535U true CN206888535U (en) | 2018-01-16 |
Family
ID=61342312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720535624.2U Active CN206888535U (en) | 2017-05-15 | 2017-05-15 | A kind of moulding bed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206888535U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108748650A (en) * | 2018-05-30 | 2018-11-06 | 浙江交工集团股份有限公司 | A kind of pedestal structure for the installation of preform lid beam steel |
CN109024276A (en) * | 2018-07-25 | 2018-12-18 | 重庆交通大学 | Cable-stayed Bridge Pylon framework of steel reinforcement wears system |
-
2017
- 2017-05-15 CN CN201720535624.2U patent/CN206888535U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108748650A (en) * | 2018-05-30 | 2018-11-06 | 浙江交工集团股份有限公司 | A kind of pedestal structure for the installation of preform lid beam steel |
CN109024276A (en) * | 2018-07-25 | 2018-12-18 | 重庆交通大学 | Cable-stayed Bridge Pylon framework of steel reinforcement wears system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103276895B (en) | Die supporting method of reversed-cone-shaped column cap die | |
CN106522372B (en) | A kind of hybrid integrated house and construction method | |
CN106013435B (en) | A kind of prefabricated construction end bean column node fixed structure and installation method | |
CN206888535U (en) | A kind of moulding bed | |
CN106677353A (en) | Double-column and double-beam connection device of assembly type steel structure | |
CN106013434B (en) | Bean column node fixed structure and installation method among a kind of prefabricated construction | |
CN206917087U (en) | A kind of prefabricated assembling type reinforced concrete framework open tubular column and its making mould | |
CN207714310U (en) | A kind of lowering device for reinforcing cage | |
CN206530056U (en) | Construction beam adjustable supporting device | |
CN205314586U (en) | Prefabricated element slings | |
CN208052240U (en) | A kind of concrete prefabricated element integrated production line | |
KR101697360B1 (en) | Connection structure of prefabricated columns | |
CN204456428U (en) | A kind of entirety being installed on composite wallboard is waftd window | |
CN104912322B (en) | Early dismantling supporting system for plastic template and construction method thereof | |
CN201501032U (en) | 900 T box girder elevating type steam-cured shed | |
CN107267165A (en) | A kind of dry coke quenching body of heater is circular layout pre-embedded bolt fixed structure and installation method | |
CN202185966U (en) | Novel hydraulic internal mold for U-shaped beam | |
CN209523294U (en) | A kind of prefabricated assembled concrete frame joint connection structure | |
CN209368658U (en) | A kind of precast beam with locating piece | |
CN107217790A (en) | A kind of prefabricated assembling type reinforced concrete framework open tubular column and its construction method | |
CN104453243B (en) | Cast-in-situ concrete beam steadily enters the erection device and method of mould | |
CN205894292U (en) | Prefabricated assembly structure tip beam column node fixed knot constructs | |
CN209620275U (en) | A kind of prefabricated steel column node connecting structure of assembled architecture | |
CN209179203U (en) | Column and basic connection component and frame structure system | |
CN106088924A (en) | A kind of prefabricated window and installation method of wafing of modified model |