CN106013434B - Bean column node fixed structure and installation method among a kind of prefabricated construction - Google Patents

Bean column node fixed structure and installation method among a kind of prefabricated construction Download PDF

Info

Publication number
CN106013434B
CN106013434B CN201610562404.9A CN201610562404A CN106013434B CN 106013434 B CN106013434 B CN 106013434B CN 201610562404 A CN201610562404 A CN 201610562404A CN 106013434 B CN106013434 B CN 106013434B
Authority
CN
China
Prior art keywords
precast beam
steel
support frame
prefabricated post
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610562404.9A
Other languages
Chinese (zh)
Other versions
CN106013434A (en
Inventor
高路恒
徐卫星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Huazheng Innovation Technology Research Institute Co ltd
Original Assignee
Nantong Textile Vocational Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Textile Vocational Technology College filed Critical Nantong Textile Vocational Technology College
Priority to CN201610562404.9A priority Critical patent/CN106013434B/en
Publication of CN106013434A publication Critical patent/CN106013434A/en
Application granted granted Critical
Publication of CN106013434B publication Critical patent/CN106013434B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses bean column node fixed structure and installation methods among a kind of prefabricated construction, including prefabricated post and precast beam, the longitudinal prefabricated post muscle with outward extension of the prefabricated post, the precast beam is transversely provided with precast beam muscle, bilateral tie support frame is additionally provided at the node of the handover of the prefabricated post and precast beam, the bilateral tie support frame includes the steel angle brace and steel column hoop being connected as one, the steel angle brace is two and is separately positioned on the two sides of the steel column hoop, the steel angle brace is respectively used to the support in place when support precast beam lifting, steel column hoop is mounted in prefabricated post, carrying fulcrum as support frame.Structure of the invention is reasonable, and precast beam installation precision in place is high, and construction hoisting speed is fast, and tie support frame can be used in turn, and beam bottom support use compares, and traditional hanging method is many less, and saving Construction Cost has good economic benefit.

Description

Bean column node fixed structure and installation method among a kind of prefabricated construction
Technical field
The present invention relates to a kind of bean column node fixed setting methods, and in particular to a kind of prefabricated construction centre beam column Node fixed setting method.
Background technique
In recent years, prefabricated assembled continuous development and progress with new building technology and material, prefabrication It is widely used.In the country of many building industrialization prosperities, prefabrication experienced long-term experiment and Using, the prefabrication product of modernization can highly integrated building various functions, and the form built It is very exquisite with component.China's construction demand amount is big, construction speed is fast, it is necessary to develop prefabrication, then right Prefabricated construction joint structure requires and hoisting is also higher and higher.Traditional prefabricated construction hoisting cost compared with Height, lifting speed is low with precision, this brings very big difficulty to construction, and the adjustment of hoisting process error occupies largely Duration of a project, therefore, prefabrication lifting also need hanging method further to innovate and grind to realize industry modernization Study carefully.
Summary of the invention
Goal of the invention: the purpose of the present invention is to solve deficiency in the prior art, provide it is a kind of reasonable in design, Precast beam installs precision height in place, and construction hoisting speed is fast, and tie support frame can be used in turn, and beam bottom support use compares Traditional hanging method is many less, save among a kind of prefabricated construction of Construction Cost beam-column node structure and its Fixed setting method.
Technical solution: a kind of prefabricated construction centre bean column node fixed structure of the present invention, including it is prefabricated Column and precast beam, longitudinally prefabricated post muscle with outward extension, the precast beam are transversely provided with precast beam muscle, institute to the prefabricated post It states and is additionally provided with bilateral tie support frame at the node of the handover of prefabricated post and precast beam, the bilateral tie support frame includes connection The steel angle brace and steel column hoop being structure as a whole, the steel angle brace is two and is separately positioned on the two sides of the steel column hoop, described Steel angle brace is respectively used to the support in place when support precast beam lifting, and steel column hoop is mounted in prefabricated post, as holding for support frame Carry fulcrum.
Further, the closed triangular prism that the steel angle brace is made of 5 blocks of steel plates, steel column hoop are by 4 pieces of steel plate groups At upper and lower opening quadrangular, and steel angle brace and steel column hoop share two blocks of steel plates.
Further, the thickness of the steel plate is not less than 40mm.
Further, in a pre-installation, bullet has got well installation control line to the bilateral tie support frame on shaft.
Further, the bilateral tie support frame can be torn open when node strength reaches the 50% of concrete design strength It removes.
The invention also discloses a kind of installation method of above-mentioned prefabricated construction centre bean column node fixed structure, packets Include following steps:
(1) prefabricated post lifts: prefabricated post lifting answers strict control column to lift quality, and Horizontal position errors are no more than 5mm, hangs down Straight error is no more than 3mm;
(2) play precast beam and lift absolute altitude control line: prefabricated post lifting fixation finishes, and lifts absolute altitude in shaft pop-up precast beam Control line, under special circumstances it is also contemplated that error transfer factor value;
(3) tie support frame and the installation of beam bottom bracket: precast beam is carried out according to shaft control line, error transfer factor value size and is hung Dress work in place;
(4) precast beam lifts, is fixed;
(5) precast beam Hoisting Position is reviewed, is adjusted;
(6) bean column node formwork erection;
(7) bean column node concreting, maintenance;
(8) tie support frame is removed, is had enough to meet the need.
The utility model has the advantages that structure of the invention is reasonable, precast beam installs precision height in place, and construction hoisting speed is fast, tie support Frame can be used in turn, and beam bottom support use traditional hanging method that compares is many less, save Construction Cost, with compared with Good economic benefit.
Detailed description of the invention
Fig. 1 is the overall schematic of node structure of the present invention;
Fig. 2 is the bilateral tie support frame structure diagram of the present invention.
Specific embodiment
Bean column node fixed structure among a kind of prefabricated construction as depicted in figs. 1 and 2, including 5 He of prefabricated post Precast beam 3, the longitudinal prefabricated post muscle 6 with outward extension of the prefabricated post 5, the precast beam 3 are transversely provided with precast beam muscle 4, Bilateral tie support frame is additionally provided at the node of the handover of the prefabricated post 5 and precast beam 3, the bilateral tie support frame includes The steel angle brace 1 and steel column hoop 2 being connected as one, the steel angle brace 1 are two and are separately positioned on the two of the steel column hoop 2 Side, the steel angle brace 1 are respectively used to the support in place when support precast beam 3 lifts, and steel column hoop 2 is mounted in prefabricated post 5, as The carrying fulcrum of support frame.
The closed triangular prism that the steel angle brace 1 is made of 5 blocks of steel plates, steel column hoop 2 are made of upper and lower 4 blocks of steel plates The quadrangular of opening, two arms of angle can freely be unfolded, and steel angle brace 1 and steel column hoop 2 share two blocks of steel plates.
In a pre-installation, bullet has got well installation control line to the bilateral tie support frame on shaft, after guaranteeing beam lifting Precision in place.
The bilateral tie support frame rigidity is larger, and installation error adjusted value is easy to control, installation error general control Within 5mm.
The bilateral tie support frame turnaround speed is fast, (generally takes Concrete Design when node strength reaches preset value The 50% of intensity), it can first retain part conventional steel bracket, bilateral tie support frame, that is, dismountable realizes early removing system mesh Mark.
The invention also discloses a kind of installation method of above-mentioned prefabricated construction centre bean column node fixed structure, packets Include following steps:
(1) prefabricated post lifts: prefabricated post lifting answers strict control column to lift quality, and Horizontal position errors are no more than 5mm, hangs down Straight error is no more than 3mm;
(2) play precast beam and lift absolute altitude control line: prefabricated post lifting fixation finishes, and lifts absolute altitude in shaft pop-up precast beam Control line, under special circumstances it is also contemplated that error transfer factor value;
(3) tie support frame and the installation of beam bottom bracket: precast beam is carried out according to shaft control line, error transfer factor value size and is hung Dress work in place;
(4) precast beam lifts, is fixed;
(5) precast beam Hoisting Position is reviewed, is adjusted;
(6) bean column node formwork erection;
(7) bean column node concreting, maintenance;
(8) tie support frame is removed, is had enough to meet the need.
Structure of the invention is reasonable, and precast beam installs precision height in place, and construction hoisting speed is fast, and tie support frame can have enough to meet the need It uses, beam bottom support use compares, and traditional hanging method is many less, and saving Construction Cost has good economic effect Benefit.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, though So the present invention has been disclosed as a preferred embodiment, and however, it is not intended to limit the invention, any technology people for being familiar with this profession Member, without departing from the scope of the present invention, when the technology contents using the disclosure above make a little change or modification For the equivalent embodiment of equivalent variations, but anything that does not depart from the technical scheme of the invention content, according to the technical essence of the invention Any simple modification, equivalent change and modification to the above embodiments, all of which are still within the scope of the technical scheme of the invention.

Claims (4)

1. bean column node fixed structure among a kind of prefabricated construction, it is characterised in that: including prefabricated post (5) and precast beam (3), the longitudinal prefabricated post muscle (6) with outward extension of the prefabricated post (5), the precast beam (3) are transversely provided with precast beam muscle (4), bilateral tie support frame, the bilateral tie branch are additionally provided at the node of the handover of the prefabricated post (5) and precast beam (3) Support includes the steel angle brace (1) and steel column hoop (2) being connected as one, and the steel angle brace (1) is two and is separately positioned on The two sides of the steel column hoop (2), the steel angle brace (1) are respectively used to the support in place when support precast beam (3) lifting, steel column hoop (2) it is mounted on prefabricated post (5), the carrying fulcrum as support frame;
The closed triangular prism that the steel angle brace (1) is made of 5 blocks of steel plates, steel column hoop (2) are made of upper and lower 4 blocks of steel plates The quadrangular of opening, and steel angle brace (1) and steel column hoop (2) share two blocks of steel plates;
The installation method of bean column node fixed structure, includes the following steps: among a kind of prefabricated construction
(1) prefabricated post lifts: prefabricated post lifting answers strict control column to lift quality, and Horizontal position errors are no more than 5mm, vertically accidentally Difference is no more than 3mm;
(2) play precast beam and lift absolute altitude control line: prefabricated post lifting fixation finishes, in shaft pop-up precast beam lifting absolute altitude control Line;
(3) precast beam lifting tie support frame and the installation of beam bottom bracket: is carried out just according to shaft control line, error transfer factor value size Position work;
(4) precast beam lifts, is fixed;
(5) precast beam Hoisting Position is reviewed, is adjusted;
(6) bean column node formwork erection;
(7) bean column node concreting, maintenance;
(8) tie support frame is removed, is had enough to meet the need.
2. bean column node fixed structure among a kind of prefabricated construction according to claim 1, it is characterised in that: institute The thickness of steel plate is stated not less than 40mm.
3. bean column node fixed structure among a kind of prefabricated construction according to claim 1, it is characterised in that: institute In a pre-installation, bullet has got well installation control line to the bilateral tie support frame stated on shaft.
4. bean column node fixed structure among a kind of prefabricated construction according to claim 1 or 3, feature exist In: the bilateral tie support frame can be removed when node strength reaches the 50% of concrete design strength.
CN201610562404.9A 2016-07-18 2016-07-18 Bean column node fixed structure and installation method among a kind of prefabricated construction Active CN106013434B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610562404.9A CN106013434B (en) 2016-07-18 2016-07-18 Bean column node fixed structure and installation method among a kind of prefabricated construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610562404.9A CN106013434B (en) 2016-07-18 2016-07-18 Bean column node fixed structure and installation method among a kind of prefabricated construction

Publications (2)

Publication Number Publication Date
CN106013434A CN106013434A (en) 2016-10-12
CN106013434B true CN106013434B (en) 2019-01-08

Family

ID=57119242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610562404.9A Active CN106013434B (en) 2016-07-18 2016-07-18 Bean column node fixed structure and installation method among a kind of prefabricated construction

Country Status (1)

Country Link
CN (1) CN106013434B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760571B (en) * 2016-12-29 2022-07-19 上海建工五建集团有限公司 Tool and method for quickly positioning and adjusting precast beam component
CN106812213B (en) * 2017-03-07 2019-06-14 南通华新建工集团有限公司 The quick construction method in place of column muscle at PC Structure Beam-column node
CN106958348A (en) * 2017-04-14 2017-07-18 青岛建集团有限公司 A kind of prefabricated post bean column node is constructed using plastic formwork
CN109518948B (en) * 2018-12-28 2023-09-01 云南建投第二建设有限公司 Supporting and positioning template device for construction of assembled building beam column joints and application thereof
CN112921796B (en) * 2021-04-02 2022-07-12 湖北交投建设集团有限公司 Reinforced steel structure bridge prefabricated assembly

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691412A (en) * 2012-06-05 2012-09-26 中国十七冶集团有限公司 Prefabricated frame structure connection supporting template with adjustable vertical height
CN104727440A (en) * 2014-11-17 2015-06-24 马恒忠 Novel industrialized production efficiently-assembled type building frame column beam and manufacturing method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100526573C (en) * 2008-08-28 2009-08-12 温州建设集团公司 Construction method of structure conversion layer concrete girder steel bracket formwork support
JP2010242390A (en) * 2009-04-07 2010-10-28 Toda Constr Co Ltd Joining method and structure of column-beam joint part having steel brace
CN202969586U (en) * 2012-12-10 2013-06-05 谌丹 Prefabricated concrete beam-column anchor welding combined structure
CN203603253U (en) * 2013-11-15 2014-05-21 华汇建设集团有限公司 Detachable steel corbel structure on reinforced concrete column
CN205894293U (en) * 2016-07-18 2017-01-18 江苏工程职业技术学院 Beam column node fixed knot constructs in middle of prefabricated assembly structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691412A (en) * 2012-06-05 2012-09-26 中国十七冶集团有限公司 Prefabricated frame structure connection supporting template with adjustable vertical height
CN104727440A (en) * 2014-11-17 2015-06-24 马恒忠 Novel industrialized production efficiently-assembled type building frame column beam and manufacturing method

Also Published As

Publication number Publication date
CN106013434A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN106013435B (en) A kind of prefabricated construction end bean column node fixed structure and installation method
CN106013434B (en) Bean column node fixed structure and installation method among a kind of prefabricated construction
CN208087078U (en) A kind of boom hoisting of large span steel reinforced concrete combination beam Bridge Erector
CN101619630A (en) Mounting method of steel chimney and implementary jacking device
CN208618274U (en) A kind of assembled steel reinforced binding moulding bed group suitable for different size Precast T-Beams
CN105317205B (en) The construction method and equipment therefor of a kind of elevator
CN203878965U (en) Device for construction of elevator shaft
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN108708394A (en) A kind of tunneling boring exempts from the overlapping assembled comprehensive pipe gallery structure and construction method of support
CN206467991U (en) The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated
CN205894292U (en) Prefabricated assembly structure tip beam column node fixed knot constructs
CN206784172U (en) Overpass anti-collision wall formwork hoisting conveyance
CN102425140A (en) Special mobile support frame for high-altitude arch closing and construction method thereof
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN201232353Y (en) High pier lifting type turnover formwork platform hanger
CN103758343A (en) Hanging type construction method and hanging device for reinforced concrete floor
CN206233120U (en) Folding shape steel web continuous box girder jenny mould bases cantilever structure
CN205894293U (en) Beam column node fixed knot constructs in middle of prefabricated assembly structure
CN202401753U (en) Sliding die device
CN201972099U (en) Through type hanging basket in bridge construction
CN201400997Y (en) Stepping type alternate supporting platform device
CN108726358A (en) A kind of towering concrete structure main reinforcement batch hanging apparatus and method
CN208777171U (en) A kind of bridge construction platform
CN204645350U (en) Be inverted two-way abdomen gusset Prestressed Concrete Superimposed Sheet Of Steel Bar Truss
CN207538506U (en) The independent supporting rack of efficient construction of precast floorslab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191224

Address after: 030000 No. 3, No. 24, 2nd floor, 15 Yam Shi Street, Xinghualing District, Taiyuan City, Shanxi Province

Patentee after: Ye Ling

Address before: 226000 Jiangsu Province, Nantong City Chongchuan District Youth Road No. 105

Patentee before: JIANGSU College OF ENGINEERING AND TECHNOLOGY

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221110

Address after: 030000 Room 415, Comprehensive Office Building, Phase II, Small and Micro Enterprise Park, Jinxiu Street, Taiyuan Yangqu Park, Taiyuan Demonstration Area, Shanxi Province

Patentee after: Shanxi Huazheng Innovation Technology Research Institute Co.,Ltd.

Address before: 030000 No. 3, No. 24, 2nd floor, 15 Yam Shi Street, Xinghualing District, Taiyuan City, Shanxi Province

Patentee before: Ye Ling

TR01 Transfer of patent right