CN108726358A - A kind of towering concrete structure main reinforcement batch hanging apparatus and method - Google Patents
A kind of towering concrete structure main reinforcement batch hanging apparatus and method Download PDFInfo
- Publication number
- CN108726358A CN108726358A CN201810751490.7A CN201810751490A CN108726358A CN 108726358 A CN108726358 A CN 108726358A CN 201810751490 A CN201810751490 A CN 201810751490A CN 108726358 A CN108726358 A CN 108726358A
- Authority
- CN
- China
- Prior art keywords
- hanging
- steel bar
- hanging platform
- concrete structure
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/22—Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
- B66C1/28—Duplicate, e.g. pivoted, members engaging the loads from two sides
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/42—Gripping members engaging only the external or internal surfaces of the articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/62—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种高耸混凝土结构主筋批量吊装装置及方法,其中,一种高耸混凝土结构主筋批量吊装装置,包括主构架、吊具和钢筋定位架,主构架的中部设有挂台板,挂台板设置为两个,并以内侧边缘相对设置,挂台板上设有挂台耳板,挂台耳板与主构架铰接,吊具包括吊臂,吊臂设置为两组,分别用于带动两个挂台板转动,使两个挂台板的内侧边缘相互靠近或相互远离,钢筋定位架位于钢筋的待安装位置,其包括限位板,限位板的前后两侧分别设有定位板和定位架,定位板的之间形成定位槽。本发明,通过主构架和挂台板的自重实现对钢筋组的夹紧和松脱,解决了钢筋吊装过程中难定位、功效低的问题,吊装方法简单,使用灵活、有效,还具有节能减耗的优点。
The invention discloses a batch hoisting device and method for the main bars of a towering concrete structure, wherein the batch hoisting device for the main bars of a towering concrete structure includes a main frame, a hanger and a steel bar positioning frame, and a hanging platform is provided in the middle of the main frame, and a hanging There are two table boards, which are set opposite to each other on the inner edge. There are hanging table lugs on the hanging table, which are hinged with the main frame. The hanger includes booms. Drive the rotation of the two hanging table boards, so that the inner edges of the two hanging table boards are close to each other or far away from each other. The steel bar positioning frame is located at the position where the steel bar is to be installed, and it includes a limit plate. A positioning slot is formed between the positioning plate and the positioning frame. The present invention realizes the clamping and loosening of the steel bar group through the self-weight of the main frame and the hanging platform, which solves the problems of difficult positioning and low efficiency in the hoisting process of the steel bar. advantage of consumption.
Description
技术领域technical field
本发明涉及桥梁施工领域,具体涉及一种高耸混凝土结构主筋批量吊装装置及方法。The invention relates to the field of bridge construction, in particular to a batch hoisting device and method for the main bars of a towering concrete structure.
背景技术Background technique
随着桥梁建设大力发展,桥梁跨越能力越来越大,承载能力越来越大,桥塔等高耸混凝土结构越来越广泛使用于桥梁工程中;而高空混凝土施工主筋一般采用大直径直螺纹套筒连接,随着施工高度增加以及高空爬模施工工艺以及现场控制技术日渐成熟,大直径钢筋长度6m、9m越来越常见。With the vigorous development of bridge construction, the spanning capacity of bridges is getting bigger and bigger, and the bearing capacity is getting bigger and bigger. High-rise concrete structures such as bridge towers are more and more widely used in bridge engineering; and the main reinforcement of high-altitude concrete construction generally adopts large-diameter straight thread sleeves. With the increase of construction height and the maturity of high-altitude climbing formwork construction technology and on-site control technology, large-diameter steel bars with lengths of 6m and 9m are becoming more and more common.
大直径超长钢筋安装方法主要有:一是采用起重设备成捆吊装至施工平台上,再由双人甚至三人逐根安装由人工在施工平台逐根安装,该施工效率低下,且需大量劳动力;再一就是就地在地面将柱体整节混凝土钢筋拼装成整体,再由汽车吊或履带等大型起重机整体安装,该施工方法仅适宜高度较低的墩柱施工,而高空作业塔吊起重荷载一般在10吨左右,无法满足动辄上百吨的柱体标准节钢筋整体吊装。The installation methods of large-diameter and super-long steel bars mainly include: first, use hoisting equipment to hoist them in bundles on the construction platform, and then install them one by one by two or even three people, and manually install them on the construction platform one by one. The other is to assemble the whole section of concrete steel bars of the column on the ground into a whole, and then install it as a whole by a large crane such as a truck crane or a crawler. The heavy load is generally about 10 tons, which cannot meet the overall hoisting of the steel bars in the standard section of the column with hundreds of tons.
为提高钢筋吊装效率,充分发挥塔式起重机优点,特研究发明一种高耸混凝土结构用大直径钢筋批量吊装方法,工序简捷,施工快捷、安全等特点,是高耸混凝土结构大直径钢筋吊装高效、安全可行的施工方法之一。In order to improve the hoisting efficiency of steel bars and give full play to the advantages of tower cranes, a batch hoisting method of large-diameter steel bars for high-rise concrete structures is specially researched and invented. The process is simple, the construction is fast, and safe. One of the feasible construction methods.
本发明要解决的是提高高耸混凝土结构大直径钢筋的安装功效的技术问题,并提供了一种施工方法。The invention aims to solve the technical problem of improving the installation efficiency of large-diameter steel bars in towering concrete structures, and provides a construction method.
发明内容Contents of the invention
本发明所要解决的技术问题是针对高耸混凝土结构钢筋吊装功效的问题。The technical problem to be solved by the present invention is aimed at the problem of hoisting efficiency of steel bars in towering concrete structures.
为了解决上述技术问题,本发明所采用的技术方案是提供一种高耸混凝土结构主筋批量吊装装置,包括:In order to solve the above technical problems, the technical solution adopted by the present invention is to provide a batch hoisting device for the main reinforcement of a towering concrete structure, including:
主构架,其中部设有挂台板,所述挂台板设置为两个,并以内侧边缘相对设置,所述挂台板上设有挂台耳板,所述挂台耳板与所述主构架铰接;The main frame is provided with a hanging platform in the middle, and the hanging platform is set to two, and is arranged opposite to the inner edge. Main frame hinge;
吊具,包括吊臂,所述吊臂设置为两组,分别用于带动两个所述挂台板转动,使两个所述挂台板的内侧边缘相互靠近或相互远离;The spreader includes booms, and the booms are arranged in two groups, which are respectively used to drive the rotation of the two hanging platforms, so that the inner edges of the two hanging platforms are close to each other or far away from each other;
钢筋定位架,位于钢筋的待安装位置,其包括限位板,所述限位板的前后两侧分别设有定位板和定位架,所述定位板的之间形成定位槽。The reinforcing bar positioning frame is located at the position to be installed of the reinforcing bar, and it includes a limiting plate. The front and rear sides of the limiting plate are respectively provided with a positioning plate and a positioning frame, and a positioning groove is formed between the positioning plates.
在上述方案中,所述主构架为中部中空的矩形框架,所述挂台耳板设置在所述挂台板的外侧边缘,所述挂台板与所述主构架之间形成间隙。In the above solution, the main frame is a rectangular frame with a hollow center, the hanging table lugs are arranged on the outer edge of the hanging table, and a gap is formed between the hanging table and the main frame.
在上述方案中,所述吊臂通过托架带动所述挂台板转动,所述托架与所述吊臂的下端铰接,所述主构架上设有托架座,所述托架的一端与所述托架座铰接,所述托架的另一端设有用于承接所述挂台板的承托。In the above scheme, the boom drives the hanging platform to rotate through a bracket, the bracket is hinged to the lower end of the boom, the main frame is provided with a bracket seat, and one end of the bracket Hinged with the bracket seat, the other end of the bracket is provided with a support for receiving the hanging platform.
在上述方案中,所述托架的中部设有凹槽,所述吊臂的下端位于所述凹槽内。In the above solution, a groove is provided in the middle of the bracket, and the lower end of the boom is located in the groove.
在上述方案中,所述托架座上设有托架止轨,所述托架上设有与所述托架止轨适配的承托止轨。In the above solution, the bracket seat is provided with a bracket stop rail, and the bracket is provided with a support stop rail adapted to the bracket stop rail.
在上述方案中,所述挂台板的内侧边缘设有用于夹紧钢筋的凹口。In the above solution, the inner edge of the hanging platform is provided with a notch for clamping steel bars.
在上述方案中,所述吊具还包括吊梁,所述吊梁与所述吊臂的上端铰接,所述吊梁的中部设有吊耳。In the above solution, the hanger further includes a hanging beam, the hanging beam is hinged to the upper end of the boom, and the middle part of the hanging beam is provided with lifting lugs.
在上述方案中,所述限位板的左右两侧分别设有支撑座,所述支撑座上倾斜设有导向板。In the above solution, the left and right sides of the limiting plate are respectively provided with support bases, and guide plates are obliquely provided on the support bases.
在上述方案中,所述定位板呈向上弯折的曲状,所述定位架的顶面高于所述限位板的上表面。In the above solution, the positioning plate is curved upwards, and the top surface of the positioning frame is higher than the upper surface of the limiting plate.
本发明还提供了一种高耸混凝土结构主筋批量吊装方法,包括以下步骤:The present invention also provides a batch hoisting method for the main bars of a towering concrete structure, which includes the following steps:
S1、通过吊具起吊主构架,使主构架位于放置钢筋组的钢筋支架上方,下放主构架,通过钢筋支架上的导向装置完成主构架的水平定位;S1. Lift the main frame with the sling so that the main frame is located above the steel bar bracket where the steel bar group is placed, lower the main frame, and complete the horizontal positioning of the main frame through the guide device on the steel bar bracket;
S2、在主构架下放过的程中,使钢筋支架上的钢筋组将两个挂台板顶开;并穿过两个挂台板之间的空隙,继续下放,使两个挂台板在自重的作用下闭合;S2. In the process of lowering the main frame, make the steel bar group on the steel bar support push away the two hanging platforms; closed under its own weight;
S3、缓慢起升主构架,使两个挂台板卡紧钢筋组;S3. Slowly lift the main frame, so that the two hanging boards clamp the steel bar group;
S4、将钢筋组移至钢筋定位架的上方,缓慢下放主构架,使钢筋组的每根钢筋分别穿过定位板上的定位槽,继续下放主构架,使托架带动两个挂台板打开,使挂台板放弃支承,将钢筋组置换至钢筋定位架上;S4. Move the steel bar group to the top of the steel bar positioning frame, slowly lower the main frame so that each steel bar of the steel bar group passes through the positioning groove on the positioning plate, and continue to lower the main frame so that the bracket drives the two hanging platforms to open , so that the hanging platform gives up the support, and the steel bar group is replaced on the steel bar positioning frame;
S5、提升主构架,使主构架脱离钢筋组。S5. Lifting the main frame so that the main frame is separated from the reinforcement group.
与现有技术相比,本发明,通过主构架和挂台板的自重及实现对钢筋组的夹紧和松脱,可使带套筒大直径钢筋自动进槽、脱槽,可有效加快大直径超长钢筋的吊装速度,减少大直径钢筋的吊装工序,解决了钢筋吊装过程中难定位、功效低的问题,本发明,吊装方法简单,使用灵活、有效,还具有节能减耗的优点。Compared with the prior art, the present invention realizes the clamping and loosening of the reinforcement group through the self-weight of the main frame and the hanging platform, so that the large-diameter steel bars with sleeves can be automatically grooved and de-grooved, which can effectively speed up the large-scale The hoisting speed of super-long steel bars reduces the hoisting process of large-diameter steel bars, and solves the problems of difficult positioning and low efficiency in the hoisting process of steel bars. The invention has a simple hoisting method, flexible and effective use, and has the advantages of energy saving and consumption reduction.
附图说明Description of drawings
图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;
图2为本发明中主构架的结构示意图;Fig. 2 is the structural representation of main framework among the present invention;
图3为本发明中挂台板的结构示意图;Fig. 3 is a schematic structural view of the hanging platform in the present invention;
图4为本发明中吊臂与托架连接的示意图;Fig. 4 is the schematic diagram that boom is connected with bracket among the present invention;
图5为本发明中托架的结构示意图;Fig. 5 is the structural representation of bracket among the present invention;
图6为本发明中吊具的结构示意图;Fig. 6 is the structural representation of hanger among the present invention;
图7为本发明中钢筋定位架的结构示意图;Fig. 7 is the structural representation of reinforcing bar positioning frame among the present invention;
图8为本发明吊装钢筋组的示意图;Fig. 8 is the schematic diagram of hoisting reinforcing bar group of the present invention;
图9为本发明将钢筋组放置到钢筋定位架上的示意图。Fig. 9 is a schematic diagram of placing the reinforcing bar group on the reinforcing bar positioning frame according to the present invention.
具体实施方式Detailed ways
本发明针对目前吊装系统存在的问题,解决其在使用中需反复拆装,施工繁琐,功效较低,无法对大长度的钢筋实现批量、快速的吊装的缺陷。下面结合说明书附图和具体实施方式对本发明做出详细说明。The invention aims at the problems existing in the current hoisting system, and solves the defects that it needs to be repeatedly disassembled and assembled during use, the construction is cumbersome, the efficiency is low, and the large-length steel bars cannot be hoisted in batches and quickly. The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
如图1~7所示,本发明提供了一种高耸混凝土结构主筋批量吊装装置,包括主构架1、吊具4和钢筋定位架5。主构架1的中部设有挂台板2。本发明通过吊具4带动主构架1和挂台板2吊装钢筋组,并通过钢筋定位架5将钢筋组安放到指定位置,可实现对钢筋组高效、快速的吊装。As shown in FIGS. 1 to 7 , the present invention provides a batch hoisting device for main bars of a towering concrete structure, which includes a main frame 1 , a hanger 4 and a steel bar positioning frame 5 . The middle part of the main frame 1 is provided with a hanging platform 2 . The present invention drives the main frame 1 and the hanging platform 2 to hoist the steel bar group through the hanger 4, and places the steel bar group at a designated position through the steel bar positioning frame 5, so that efficient and fast hoisting of the steel bar group can be realized.
主构架1包括主构架主体1-1,主构架主体1-1为矩形框架,包括边框,边框的内侧竖直设有竖板,竖板和边框之间设有加强肋1-5。The main frame 1 includes a main frame body 1-1. The main frame body 1-1 is a rectangular frame including a frame. Risers are vertically arranged on the inside of the frame, and reinforcing ribs 1-5 are arranged between the risers and the frame.
挂台板2设置为两个,并以内侧边缘相对设置,挂台板2包括挂台板主体2-1,挂台板主体2-1呈矩形,挂台板主体2-1上设有挂台耳板2-2,挂台耳板2-2设置在挂台板主体2-1的外侧边缘。主构架1上设有耳板1-2,挂台耳板2-2与耳板1-2铰接,挂台板主体2-1的内侧边缘设有用于夹紧钢筋的凹口2-3。两个挂台板主体2-1通过绕铰接点转动改变两挂台板主体2-1上凹口2-3的正对距离,由此实现对钢筋的夹紧和松脱。The hanging table board 2 is set to two, and is arranged relatively with the inner edge, the hanging table board 2 comprises the hanging table board main body 2-1, and the hanging table board main body 2-1 is rectangular, and the hanging table board main body 2-1 is provided with a hanging table board main body 2-1. The table ear plate 2-2, the hanging table ear plate 2-2 is arranged on the outer edge of the hanging table main body 2-1. The main frame 1 is provided with an ear plate 1-2, the hanging platform ear plate 2-2 is hinged with the ear plate 1-2, and the inner edge of the hanging platform main body 2-1 is provided with a notch 2-3 for clamping steel bars. The two hanging platform main bodies 2-1 change the facing distance of the notches 2-3 on the two hanging platform main bodies 2-1 by rotating around the hinge point, thereby realizing the clamping and loosening of the reinforcing bars.
吊具4包括吊臂4-1,吊臂4-1设置为两组,分别用于带动两个挂台板2转动,使两个挂台板2的内侧边缘相互靠近或相互远离,由此实现对钢筋的夹紧和松脱。主构架1为中部中空的矩形框架,挂台耳板2-2与主构架1之间形成间隙,该间隙用于穿过吊臂4-1,使吊臂4-1自由活动。吊臂4-1通过托架3带动挂台板主体2-1转动,托架3与吊臂4-1的下端铰接,主构架1上设有托架座1-3,托架3的一端与托架座1-3铰接,托架3的另一端设有用于承接挂台板主体2-1的承托3-1。优选的托架3上的一端和中部分别设有第一销孔3-4和第二销孔3-5,第一销孔3-4和第二销孔3-5分别配合销柱与托架座1-3和吊臂4-1的下端铰接。托架3的中部设有开口朝上的凹槽3-3,吊臂4-1的下端位于该凹槽3-3内。优选的,托架座1-3上设有托架止轨1-4,托架3上设有与托架止轨1-4适配的承托止轨3-2,起到限位的作用,防止托架3旋转过度,造成不必要的碰伤。The spreader 4 includes a boom 4-1, and the boom 4-1 is arranged in two groups, which are respectively used to drive the two hanging platform boards 2 to rotate, so that the inner edges of the two hanging platform boards 2 are close to or far away from each other, thereby Realize the clamping and loosening of steel bars. The main frame 1 is a hollow rectangular frame in the middle, and a gap is formed between the hanger lug 2-2 and the main frame 1, and the gap is used to pass the boom 4-1 so that the boom 4-1 can move freely. The boom 4-1 drives the main body 2-1 of the hanging platform to rotate through the bracket 3, the bracket 3 is hinged with the lower end of the boom 4-1, the main frame 1 is provided with a bracket seat 1-3, and one end of the bracket 3 It is hinged with the bracket seat 1-3, and the other end of the bracket 3 is provided with a support 3-1 for receiving the main body 2-1 of the hanging platform. One end and the middle part on the preferred bracket 3 are respectively provided with a first pin hole 3-4 and a second pin hole 3-5, and the first pin hole 3-4 and the second pin hole 3-5 cooperate with the pin and the bracket respectively. The lower ends of the mount 1-3 and the boom 4-1 are hinged. The middle part of the bracket 3 is provided with an upwardly facing groove 3-3, and the lower end of the boom 4-1 is located in the groove 3-3. Preferably, the bracket seat 1-3 is provided with a bracket stop rail 1-4, and the bracket 3 is provided with a support stop rail 3-2 adapted to the bracket stop rail 1-4, which acts as a limiter. function, preventing the bracket 3 from over-rotating and causing unnecessary bumps.
吊具4还包括吊梁4-2,吊梁4-2与吊臂4-1的上端铰接,吊梁4-2的中部设有吊耳4-3。优选的,吊梁4-2呈条状,吊臂4-1设置为4条,分别设置在吊梁4-2的四角边缘,并通过销柱与吊梁4-2铰接。The spreader 4 also includes a suspension beam 4-2, the suspension beam 4-2 is hinged with the upper end of the suspension arm 4-1, and the middle part of the suspension beam 4-2 is provided with a suspension lug 4-3. Preferably, the suspension beam 4-2 is strip-shaped, and the number of suspension arms 4-1 is set to four, which are respectively arranged on the four corner edges of the suspension beam 4-2, and are hinged to the suspension beam 4-2 through pins.
钢筋定位架5位于钢筋的待安装位置,用于配合主构架1、挂台板2、托架3和吊具4实现自动卸载钢筋,并将钢筋放置到指定位置,钢筋定位架5包括限位板,限位板的前后两侧分别设有定位板5-4和定位架5-1,定位板5-4的之间形成定位槽5-5,定位槽5-5用于定位单根钢筋。The steel bar positioning frame 5 is located at the position to be installed of the steel bar, and is used to cooperate with the main frame 1, the hanging plate 2, the bracket 3 and the spreader 4 to realize automatic unloading of the steel bar, and place the steel bar at a designated position. The steel bar positioning frame 5 includes a limit The front and rear sides of the limiting plate are respectively provided with a positioning plate 5-4 and a positioning frame 5-1, and a positioning groove 5-5 is formed between the positioning plates 5-4, and the positioning groove 5-5 is used for positioning a single steel bar .
限位板的左右两侧分别设有支撑座5-3,支撑座5-3上倾斜设有导向板5-2,导向板5-2用于为主构架1的下放导向,实现快速到位。定位板5-4呈向上弯折的曲状,定位架5-1的顶面高于限位板的上表面。当主构架1置于钢筋定位架5上后,可支承托架3,使挂台板2在托架3、吊具4以及钢筋组的重力作用下向下翻折,使挂台板2打开,释放钢筋组。The left and right sides of the limiting plate are respectively provided with a support seat 5-3, and the support seat 5-3 is inclined to be provided with a guide plate 5-2, and the guide plate 5-2 is used for lowering and guiding of the main frame 1 to realize quick arrival. The positioning plate 5-4 is curved upwards, and the top surface of the positioning frame 5-1 is higher than the upper surface of the limiting plate. After the main frame 1 is placed on the steel bar positioning frame 5, it can support the bracket 3, so that the hanging platform 2 is folded downward under the gravity of the bracket 3, the hanger 4 and the steel bar group, so that the hanging platform 2 is opened. Release the rebar group.
本发明的工作原理为:Working principle of the present invention is:
钢筋组起吊:当吊机将主构架1吊起,并位于钢筋支架正上方时,缓慢下放主构架1,同时,通过钢筋支架上的导向装置定位,使钢筋组将挂台板2顶开并穿入,待主构架1下放到一定位置,使钢筋顶部的套筒穿过挂台板2后,挂台板2在自重的作用下恢复原位,此时,钢筋已被挂台板2上的凹口2-3卡紧,提升吊架主构架1,将钢筋组吊离钢筋支架;Reinforcement group lifting: When the crane lifts the main frame 1 and is located directly above the steel support, slowly lower the main frame 1, and at the same time, through the positioning of the guide device on the reinforcement support, the reinforcement group pushes the hanging platform 2 back and After the main frame 1 is lowered to a certain position, the sleeve on the top of the steel bar passes through the hanging platform 2, and the hanging platform 2 returns to its original position under the action of its own weight. At this time, the steel bar has been placed on the hanging platform 2 Lock the notch 2-3 of the hanger, lift the main frame 1 of the hanger, and lift the steel bar group away from the steel bar support;
钢筋组落架:通过吊具4将钢筋组置于钢筋定位架5的上方,缓慢下放主构架1,在导向板5-2和定位架5-1的作用下,将钢筋组的每根钢筋嵌入到定位槽5-5内,当主构架1下放到支撑座5-3上时,通过吊具4继续下放主构架1,直至无法下放,此时,托架3受到定位板5-4和定位架5-1的支承,使挂台板2悬空,在钢筋和挂台板2重力的作用下,挂台板2向下翻折,使挂台板2打开,释放钢筋,向上起吊主构架1即可将钢筋组整体置换至定位板5-4上,并使主构架1脱离钢筋组,以备下次起吊。Reinforcement group fall: Place the reinforcement group above the reinforcement positioning frame 5 through the spreader 4, slowly lower the main frame 1, and under the action of the guide plate 5-2 and the positioning frame 5-1, embed each reinforcement in the reinforcement group In the positioning groove 5-5, when the main frame 1 is lowered on the support seat 5-3, the main frame 1 is continuously lowered through the spreader 4 until it cannot be lowered. At this time, the bracket 3 is supported by the positioning plate 5-4 and the positioning frame. The support of 5-1 makes the hanging platform 2 suspended in the air. Under the action of the steel bar and the gravity of the hanging platform 2, the hanging platform 2 is folded downward, so that the hanging platform 2 is opened, the steel bar is released, and the main frame 1 is lifted upwards. The whole reinforcement group can be replaced on the positioning plate 5-4, and the main frame 1 is separated from the reinforcement group, so as to prepare for the next lifting.
如图8~9所示,本发明还一种高耸混凝土结构主筋批量吊装方法,用于实现钢筋的批量、吊装,包括以下步骤:As shown in Figures 8 to 9, the present invention also provides a batch hoisting method for the main bars of towering concrete structures, which is used to realize batch hoisting of steel bars, including the following steps:
S1、通过吊具起吊主构架,使主构架位于放置钢筋组的钢筋支架上方,下放主构架,通过钢筋支架上的导向装置完成主构架的水平定位;S1. Lift the main frame with the sling so that the main frame is located above the steel bar bracket where the steel bar group is placed, lower the main frame, and complete the horizontal positioning of the main frame through the guide device on the steel bar bracket;
S2、在主构架下放过的程中,使钢筋支架上的钢筋组将两个挂台板顶开;并穿过两个挂台板之间的空隙,继续下放,使两个挂台板在自重的作用下闭合;S2. In the process of lowering the main frame, make the steel bar group on the steel bar support push away the two hanging platforms; closed under its own weight;
S3、缓慢起升主构架,使两个挂台板卡紧钢筋组;S3. Slowly lift the main frame, so that the two hanging boards clamp the steel bar group;
S4、将钢筋组移至钢筋定位架的上方,缓慢下放主构架,使钢筋组的每根钢筋分别穿过定位板上的定位槽,继续下放主构架,使托架带动两个挂台板打开,使挂台板放弃支承,将钢筋组置换至钢筋定位架上;S4. Move the steel bar group to the top of the steel bar positioning frame, slowly lower the main frame so that each steel bar of the steel bar group passes through the positioning groove on the positioning plate, and continue to lower the main frame so that the bracket drives the two hanging platforms to open , so that the hanging platform gives up the support, and the steel bar group is replaced on the steel bar positioning frame;
S5、提升主构架,使主构架脱离钢筋组。S5. Lifting the main frame so that the main frame is separated from the reinforcement group.
与现有技术相比,本发明,通过主构架和挂台板的自重及实现对钢筋组的夹紧和松脱,可使带套筒大直径钢筋自动进槽、脱槽,可有效加快大直径超长钢筋的吊装速度,减少大直径钢筋的吊装工序,解决了钢筋吊装过程中难定位、功效低的问题,本发明,吊装方法简单,使用灵活、有效,还具有节能减耗的优点。Compared with the prior art, the present invention realizes the clamping and loosening of the reinforcement group through the self-weight of the main frame and the hanging platform, so that the large-diameter steel bars with sleeves can be automatically grooved and de-grooved, which can effectively speed up the large-scale The hoisting speed of super-long steel bars reduces the hoisting process of large-diameter steel bars, and solves the problems of difficult positioning and low efficiency in the hoisting process of steel bars. The invention has a simple hoisting method, flexible and effective use, and has the advantages of energy saving and consumption reduction.
本发明并不局限于上述最佳实施方式,任何人应该得知在本发明的启示下做出的结构变化,凡是与本发明具有相同或相近的技术方案,均落入本发明的保护范围之内。The present invention is not limited to the above-mentioned best implementation mode, and anyone should know that the structural changes made under the inspiration of the present invention, all technical solutions that are identical or similar to the present invention, all fall within the scope of protection of the present invention Inside.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810751490.7A CN108726358B (en) | 2018-07-10 | 2018-07-10 | A batch hoisting device and method for main bars of a towering concrete structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810751490.7A CN108726358B (en) | 2018-07-10 | 2018-07-10 | A batch hoisting device and method for main bars of a towering concrete structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN108726358A true CN108726358A (en) | 2018-11-02 |
| CN108726358B CN108726358B (en) | 2020-01-07 |
Family
ID=63926572
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810751490.7A Active CN108726358B (en) | 2018-07-10 | 2018-07-10 | A batch hoisting device and method for main bars of a towering concrete structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108726358B (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110329896A (en) * | 2019-08-14 | 2019-10-15 | 四川路桥华东建设有限责任公司 | The curtain hoisting structure and lift-on/lift-off system that square concrete pier stud main reinforcement quickly positions, installs |
| CN113235826A (en) * | 2021-05-19 | 2021-08-10 | 中建桥梁有限公司 | Steel bar wire connection installation positioning method |
| CN117306412A (en) * | 2023-11-07 | 2023-12-29 | 中铁十一局集团有限公司 | A construction method for integral hoisting and adjustable positioning of the main bars of high piers without stirrups |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU925839A1 (en) * | 1980-08-25 | 1982-05-07 | Государственный Всесоюзный научно-исследовательский институт строительных материалов и конструкций им.П.П.Будникова | Gripper for piece loads |
| CN2537692Y (en) * | 2002-04-22 | 2003-02-26 | 张德生 | Multifunctional hanging tongs |
| CN202643100U (en) * | 2012-06-21 | 2013-01-02 | 中铁隧道装备制造有限公司 | Mechanical self-locking pipe sheet clamp |
| CN203474231U (en) * | 2013-08-08 | 2014-03-12 | 中交第二航务工程局有限公司 | Steel bar tower safety hoisting device |
| CN203545431U (en) * | 2013-11-27 | 2014-04-16 | 葛洲坝集团第五工程有限公司 | Device for vertically hoisting whole large-diameter rebar in high pier construction |
| CN105152006A (en) * | 2015-09-24 | 2015-12-16 | 太原高科锐志物流仓储设备有限公司 | Gravity-controlled opening and closing lifting appliance |
| CN205973440U (en) * | 2016-08-02 | 2017-02-22 | 威海银河风力发电有限公司 | Special lifting device of permanent magnet wind power generator main shaft tapered roller bearing |
-
2018
- 2018-07-10 CN CN201810751490.7A patent/CN108726358B/en active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU925839A1 (en) * | 1980-08-25 | 1982-05-07 | Государственный Всесоюзный научно-исследовательский институт строительных материалов и конструкций им.П.П.Будникова | Gripper for piece loads |
| CN2537692Y (en) * | 2002-04-22 | 2003-02-26 | 张德生 | Multifunctional hanging tongs |
| CN202643100U (en) * | 2012-06-21 | 2013-01-02 | 中铁隧道装备制造有限公司 | Mechanical self-locking pipe sheet clamp |
| CN203474231U (en) * | 2013-08-08 | 2014-03-12 | 中交第二航务工程局有限公司 | Steel bar tower safety hoisting device |
| CN203545431U (en) * | 2013-11-27 | 2014-04-16 | 葛洲坝集团第五工程有限公司 | Device for vertically hoisting whole large-diameter rebar in high pier construction |
| CN105152006A (en) * | 2015-09-24 | 2015-12-16 | 太原高科锐志物流仓储设备有限公司 | Gravity-controlled opening and closing lifting appliance |
| CN205973440U (en) * | 2016-08-02 | 2017-02-22 | 威海银河风力发电有限公司 | Special lifting device of permanent magnet wind power generator main shaft tapered roller bearing |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110329896A (en) * | 2019-08-14 | 2019-10-15 | 四川路桥华东建设有限责任公司 | The curtain hoisting structure and lift-on/lift-off system that square concrete pier stud main reinforcement quickly positions, installs |
| CN113235826A (en) * | 2021-05-19 | 2021-08-10 | 中建桥梁有限公司 | Steel bar wire connection installation positioning method |
| CN117306412A (en) * | 2023-11-07 | 2023-12-29 | 中铁十一局集团有限公司 | A construction method for integral hoisting and adjustable positioning of the main bars of high piers without stirrups |
| CN117306412B (en) * | 2023-11-07 | 2026-03-03 | 中铁十一局集团有限公司 | Integral hoisting alignment adjustable construction method for high pier main reinforcement stirrup-free |
Also Published As
| Publication number | Publication date |
|---|---|
| CN108726358B (en) | 2020-01-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205603040U (en) | Special lifting device and work piece hoisting structure with adjustable nuclear power station focus deviation | |
| CN101357739B (en) | Column crane special for movable arm type group tower | |
| CN218619838U (en) | Steel pipe truss hoist and mount auxiliary device | |
| CN214326960U (en) | Indoor equipment for existing high-rise building hoisting large-scale device | |
| CN108726358A (en) | A kind of towering concrete structure main reinforcement batch hanging apparatus and method | |
| CN206562264U (en) | A kind of hanging device for transport outside high-rise building | |
| CN111776940A (en) | An adjustable arch rib installation and lifting device | |
| CN211034927U (en) | Assembled building hoist and mount frame | |
| CN108408667A (en) | Broken line type girder truss rod piece Quick overturning device and its method for turning | |
| CN212450358U (en) | A kind of lifting machinery and equipment for building construction | |
| CN201678360U (en) | An equipment hoisting device | |
| CN218027231U (en) | Simple device for lowering bottom basket of hanging basket | |
| CN105883645B (en) | Method for dismantling attachment device of tower crane | |
| CN212127255U (en) | A turnaround hoisting tool | |
| CN110723642A (en) | A device and method for translating and hoisting equipment in a closed workshop | |
| CN209635721U (en) | A lifting balance device for fair-faced concrete GRC slab | |
| CN212712384U (en) | Building templates hoist device | |
| CN114835003A (en) | Device and hoisting method suitable for balanced hoisting of large and medium-sized space prefabricated unit parts | |
| CN219384478U (en) | Precast beam template hoist | |
| CN220539250U (en) | Steel pipe removes scaffold | |
| CN105883646B (en) | Tower crane and derrick crane used by same | |
| CN204401619U (en) | precast pile fixing device | |
| CN211772911U (en) | Hang basket collet system and transfer device | |
| CN223893829U (en) | Lifting support frame for binding beam steel bars and auxiliary tool for binding beam steel bars | |
| CN220334504U (en) | Steel pipe truss hoist and mount auxiliary device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |