CN202969586U - Prefabricated concrete beam-column anchor welding combined structure - Google Patents

Prefabricated concrete beam-column anchor welding combined structure Download PDF

Info

Publication number
CN202969586U
CN202969586U CN 201220676192 CN201220676192U CN202969586U CN 202969586 U CN202969586 U CN 202969586U CN 201220676192 CN201220676192 CN 201220676192 CN 201220676192 U CN201220676192 U CN 201220676192U CN 202969586 U CN202969586 U CN 202969586U
Authority
CN
China
Prior art keywords
column
crossbeam
embedded
cross beam
embedded bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220676192
Other languages
Chinese (zh)
Inventor
谌丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220676192 priority Critical patent/CN202969586U/en
Application granted granted Critical
Publication of CN202969586U publication Critical patent/CN202969586U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a prefabricated concrete beam-column anchor welding combined structure which comprises a vertical post and a cross beam connected with the vertical post. A connecting plate is arranged between the vertical post and the cross beam. Embedded reinforcing steel bars and a first embedded bolt are arranged on the inner side of the vertical post. Through holes corresponding to the embedded reinforcing steel bars and the first embedded bolt in positions are formed in the connecting plate. The embedded reinforcing steel bars penetrate through the through holes to be correspondingly fixed in the cross beam. The first embedded bolt penetrates through one through hole to be fixed on the connecting plate through a first nut. Compared with the prior art, the prefabricated concrete beam-column anchor welding combined structure improves the shear-bearing capability of the cross beam, and the bending resistance capability at the connecting position of the cross beam, and effectively resists the support bending moment produced at the two ends of the cross beam by horizontal seismic force. The prefabricated concrete beam-column anchor welding combined structure has the advantages of being small in operating amount, good in integrity and aseismicity, rapid to install, convenient to detach, short in construction period, capable of being reused and the like.

Description

Preset beam column built from concrete anchor weldering composite construction
Technical field:
The utility model belongs to building field, and what be specifically related to is a kind of beam column built from concrete anchor weldering composite construction that presets.
Background technology:
At present building concrete structural system commonly used mainly contains three kinds of cast-in-place integral formula, prefabricated assembled and assembled integrals.Wherein the cast-in-place integral formula refers to that all members adopt on-the-spot formwork supporting plate, and poured in place concrete and job-cured construction method are fit to highrise building.It has good integrity, and rigidity is large, and anti-knock shock resistance is good, good waterproof performance and to the strong adaptability of concave plane, and easy advantage punches; But this mode needs a large amount of templates, and on-the-spot workload is large, and the duration is also longer.
Prefabricated assembledly refer to that member first makes in factory or precasting yard, the construction method of then installing at the construction field (site) is fit to low story dwelling, as movable plank house.It can save template, improves the execution conditions when making, raise labour productivity, and accelerating construction progress, but this mode globality, rigidity and anti-seismic performance are relatively poor.
Assembled integral is again assembling, refer to the lifting components such as precast plate, beam is in place after, thereon or build steel concrete with other joints, position and connect to integral body, this mode need not on-the-spot formwork supporting plate, workload is less, and its globality and shock resistance better than prefabricated assembled, but therefore the connecting portion of its crossbeam and column needs concreting, has long problem of duration.
Summary of the invention:
For this reason, the purpose of this utility model is to provide a kind of beam column built from concrete anchor weldering composite construction that presets, and needs concreting with the connecting portion that solves the existing crossbeam of present assembled integral construction method and column, and causes long problem of duration.
For achieving the above object, the utility model is mainly by the following technical solutions:
A kind of beam column built from concrete anchor weldering composite construction that presets comprises column and the crossbeam that is connected with column, is provided with a plate between described column and crossbeam, and described column inboard is provided with embedded bar and the first pre-embedded bolt; Be provided with the through hole corresponding with above-mentioned embedded bar and the first pre-embedded bolt position on described junction plate, described embedded bar passes this through hole correspondence and is fixed in crossbeam, and described the first pre-embedded bolt passes this through hole and is fixed on junction plate by the first nut.
Preferably, the lower end of described column and crossbeam junction also is equipped with steel corbel, and described steel corbel upper end is fixedly connected with the crossbeam bottom; Side is fixedly connected with the column inboard.
Preferably, be provided with the second pre-embedded bolt in described crossbeam, described steel corbel upper end is fixedly connected with by the second nut with the second pre-embedded bolt.
Preferably, described steel corbel and the moulding of column formed by integrally casting.
The utility model is embedded with reinforcing bar and bolt in column inboard and position, crossbeam junction, be provided with junction plate between crossbeam and column, the pre-buried reinforcing bar correspondence of column is passed junction plate, enter in crossbeam, the pre-buried bolt of column passes junction plate, fix by nut, and bolt and embedded bar all weld together with junction plate.This connected mode has effectively improved the bending resistance of crossbeam in the junction, and the acting in conjunction of bolt and welding can effectively be resisted horizontal seismic force at the larger support moment of crossbeam two ends generation.
The utility model column and the moulding of steel corbel formed by integrally casting, the crossbeam correspondence is positioned on steel corbel, forms effective support by steel corbel, and the Shear force within the beam end that crossbeam is produced passes to column by steel corbel, has effectively improved the shear resistance of crossbeam.
The utility model need not on-the-spot formwork supporting plate, and workload is less, and its globality and shock resistance are better, especially the connecting portion of crossbeam and column only needs to fix by bolt embedment and nut and gets final product, and has and installs comparatively fast, the advantage that the duration is shorter, and the utility model is reusable, convenient disassembly.
Description of drawings:
Fig. 1 is the syndeton schematic diagram of the utility model column and a crossbeam.
Fig. 2 is the right view of Fig. 1.
Fig. 3 is the syndeton schematic diagram of the utility model column and four crossbeams.
Identifier declaration in figure: column 1, embedded bar 101, the first pre-embedded bolt 102, the first nut 103, crossbeam 2, the second pre-embedded bolt 201, the second nut 202, junction plate 3, steel corbel 4.
The specific embodiment:
For setting forth thought of the present utility model and purpose, below in conjunction with the drawings and specific embodiments, the utility model is described further.
See also Fig. 1, shown in Figure 2, Fig. 1 is the syndeton schematic diagram of the utility model column and a crossbeam; Fig. 2 is the right view of Fig. 1.
The utility model exists on-the-spot form erecting operation amount large for present cast-in-place integral formula construction method, the shortcoming that duration is long provides a kind of beam column built from concrete anchor weldering composite construction that presets, to realize need not on-the-spot formwork, rapid-assembling, the precast concrete integral installation formula formula that the duration is shorter.
Also there is the relatively poor shortcoming of globality, rigidity and anti-seismic performance in the utility model for present prefabrication mode, provide a kind of beam column built from concrete anchor weldering composite construction that presets, with the shear resistance that improves crossbeam and the crossbeam bending resistance in the junction.
The utility model also needs concreting for the connecting portion of present assembled integral crossbeam and column, and has long defective of duration, proposes a kind of beam column built from concrete anchor weldering composite construction that presets, and connects to realize rapid-assembling.
Wherein the utility model include column 1, with column 1 crossbeam 2 connected vertically and build the steel corbel 4 that is integrated with column 1, described column 1 is with crossbeam 2 reinforced concrete member of making in advance.
Be provided with a junction plate 3 between column 1 and crossbeam 2, this junction plate 3 can be steel plate, also can be other sheet alloys, it can be embedded in crossbeam 2 ends or column 1, also can use separately, be provided with a plurality of through holes on this junction plate 3, described column 1 is inboard is provided with the embedded bar parallel with crossbeam 2 101 and the first pre-embedded bolt 102 with crossbeam 2 junctions; The through hole correspondence that embedded bar 101 passes on junction plate 3 enters into crossbeam 2, and that the first pre-embedded bolt 102 passes after through hole on junction plate 3 is outside exposed, is fixed on junction plate 3 by the first nut 103.
When junction plate used separately, the end that it can corresponding be embedded in crossbeam 2 was connected with the inside reinforcing bar of crossbeam 2; And correspondence position also can pre-buried junction plate on column 1, and make itself and the corresponding connection of the inner reinforcing bar of column 1; During installation, need to make junction plate corresponding matching pre-buried on junction plate pre-buried on crossbeam and column, be bolted to connection, and be welded and fixed.
Steel corbel 4 can be built with column 1 and is integral, also can separately steel corbel 4 be arranged on column 1 one sides, steel corbel 4 correspondences are positioned at the inboard downside with crossbeam 2 junctions of column 1, be provided with second pre-embedded bolt 201 parallel with column 1 in crossbeam 2, described steel corbel 4 upper ends are fixedly connected with by the second nut 202 with the second pre-embedded bolt 201.
As shown in Figure 3, Fig. 3 is the syndeton schematic diagram of the utility model column and four crossbeams.Wherein the surrounding of the utility model column 1 all can correspondingly be installed four crossbeams 2, and it adopts structure same as described above, and corresponding downside at every crossbeam is provided with steel corbel 4, and this steel corbel 4 can be one-body molded with column 1, also can be installed separately.
When the utility model crossbeam was connected with column, crossbeam can directly be bolted on steel corbel, and the Shear force within the beam end that can allow earthquake produce passes to column by bracket, has effectively avoided the problem of crossbeam shear resistance deficiency under geological process.In addition, at crossbeam end pre-buried steel structural member, the form of welding by bolt and junction plate can fully improve crossbeam in the bending resistance of junction, and bolt and weld seam acting in conjunction can be resisted the larger support moment that in geological process, horizontal seismic force produces at two ends.By the processing of above two kinds of measures, the whole fabricated dwelling house of the utility model can be realized under the common seismic effect, the normal use of main structure body; And when dismounting, the utility model structure is also more convenient, and the member after dismounting can also reclaim use again.
Need to prove, described in the present embodiment is the mode that column one side is connected with crossbeam, and it adopts same way as also can same crossbeam be installed in any side of the surrounding of column, and as both sides or three sides, it all belongs to protection domain of the present utility model.
More than that a kind of beam column built from concrete anchor weldering composite construction that presets provided by the utility model is described in detail, used specific case herein structural principle of the present utility model and embodiment are set forth, above embodiment just is used for helping to understand method of the present utility model and core concept thereof; Simultaneously, for one of ordinary skill in the art, according to thought of the present utility model, all will change in specific embodiments and applications, in sum, this description should not be construed as restriction of the present utility model.

Claims (4)

1. one kind is preset beam column built from concrete anchor weldering composite construction, comprise column (1) and the crossbeam (2) that is connected with column (1), it is characterized in that being provided with a plate (3) between described column (1) and crossbeam (2), described column (1) inboard is provided with embedded bar (101) and the first pre-embedded bolt (102); Be provided with the through hole corresponding with above-mentioned embedded bar (101) and the first pre-embedded bolt (102) position on described junction plate (3), described embedded bar (101) passes this through hole correspondence and is fixed in crossbeam (2), and described the first pre-embedded bolt (102) passes this through hole and is fixed on junction plate (3) by the first nut (103).
2. the beam column built from concrete anchor weldering composite construction that presets according to claim 1 is characterized in that the lower end of described column (1) and crossbeam (2) junction also is provided with steel corbel (4), and described steel corbel (4) upper end is fixedly connected with bottom crossbeam (2).
3. the beam column built from concrete anchor that presets according to claim 2 welds composite construction, it is characterized in that being provided with in described crossbeam (2) the second pre-embedded bolt (201), described steel corbel (4) upper end is fixedly connected with by the second nut (202) with the second pre-embedded bolt (201).
4. the beam column built from concrete anchor weldering composite construction that presets according to claim 2, is characterized in that described steel corbel (4) and column (1) formed by integrally casting moulding.
CN 201220676192 2012-12-10 2012-12-10 Prefabricated concrete beam-column anchor welding combined structure Expired - Fee Related CN202969586U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220676192 CN202969586U (en) 2012-12-10 2012-12-10 Prefabricated concrete beam-column anchor welding combined structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220676192 CN202969586U (en) 2012-12-10 2012-12-10 Prefabricated concrete beam-column anchor welding combined structure

Publications (1)

Publication Number Publication Date
CN202969586U true CN202969586U (en) 2013-06-05

Family

ID=48510680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220676192 Expired - Fee Related CN202969586U (en) 2012-12-10 2012-12-10 Prefabricated concrete beam-column anchor welding combined structure

Country Status (1)

Country Link
CN (1) CN202969586U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104405044A (en) * 2014-11-25 2015-03-11 中国建筑第八工程局有限公司 Connecting structure and connecting method for steel pipe column and concrete frame
CN104895196A (en) * 2015-05-27 2015-09-09 常州市规划设计院 Hidden steel corbel type beam column hinged node and construction method thereof
CN105113626A (en) * 2015-08-19 2015-12-02 广西矿建集团有限公司 Construction method of cast-in-place column precast beam and plate structure
CN106013435A (en) * 2016-07-18 2016-10-12 江苏工程职业技术学院 Node fixing structure for prefabricated structure type end beam column and mounting method
CN106013434A (en) * 2016-07-18 2016-10-12 江苏工程职业技术学院 Prefabricated assembled structural intermediate beam column node fixing structure and installation method
CN106049672A (en) * 2016-08-05 2016-10-26 盐城工学院 Assembled energy-saving building lap joint structure
CN109183986A (en) * 2018-11-08 2019-01-11 安徽建筑大学 A kind of assembling frame Structure Beam-column connecting node and construction method
CN111255065A (en) * 2020-01-21 2020-06-09 安徽建筑大学 Connection node of assembled beam column of pre-buried connecting element

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104405044A (en) * 2014-11-25 2015-03-11 中国建筑第八工程局有限公司 Connecting structure and connecting method for steel pipe column and concrete frame
CN104895196A (en) * 2015-05-27 2015-09-09 常州市规划设计院 Hidden steel corbel type beam column hinged node and construction method thereof
CN105113626A (en) * 2015-08-19 2015-12-02 广西矿建集团有限公司 Construction method of cast-in-place column precast beam and plate structure
CN106013435A (en) * 2016-07-18 2016-10-12 江苏工程职业技术学院 Node fixing structure for prefabricated structure type end beam column and mounting method
CN106013434A (en) * 2016-07-18 2016-10-12 江苏工程职业技术学院 Prefabricated assembled structural intermediate beam column node fixing structure and installation method
CN106049672A (en) * 2016-08-05 2016-10-26 盐城工学院 Assembled energy-saving building lap joint structure
CN106049672B (en) * 2016-08-05 2018-05-18 盐城工学院 A kind of assembled energy-saving builds bridging arrangement
CN109183986A (en) * 2018-11-08 2019-01-11 安徽建筑大学 A kind of assembling frame Structure Beam-column connecting node and construction method
CN111255065A (en) * 2020-01-21 2020-06-09 安徽建筑大学 Connection node of assembled beam column of pre-buried connecting element
CN111255065B (en) * 2020-01-21 2021-05-14 安徽建筑大学 Connection node of assembled beam column of pre-buried connecting element

Similar Documents

Publication Publication Date Title
CN202969586U (en) Prefabricated concrete beam-column anchor welding combined structure
CN103195170B (en) Prefabricated reinforced concrete frame structure system
CN103243817B (en) A kind of assembled beam-column attachment means
CN201339250Y (en) Stiffness structure framework beam preformed steel reinforcement framework structure
CN103572873B (en) Assembled integral floor and construction method thereof
CN203174770U (en) Connection structure of prefabricated column and construction site base and building
CN203213282U (en) Fabricated reinforced concrete frame structure system
CN102251699B (en) Residential building system with cast-in-situ beam columns and prefabricated sandwich concrete wall panels and construction method
CN103266660B (en) A kind of industrialization assembling post through beam steel flanged beam steel structure frame prestressing force eccentrical braces
CN213233788U (en) Bolted assembled concrete frame top corner joint trunk connection structure
KR101617221B1 (en) Joint structure of remodeling modular unit for seismic retrofitting and joint method of using it
CN105297886A (en) Lightweight steel structure building frame system
CN205024833U (en) Reinforcing bar concrete combination prefabricated component
CN112323985A (en) Prefabricated reinforced concrete column and composite board node and construction process
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN103397700A (en) Connection structure of building composite floor slab and steel tube shear wall
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
JP4235079B2 (en) Structure of joint between reinforced concrete column and steel beam
CN107447873B (en) Device for connecting prefabricated laminated connecting beam and prefabricated shear wall and installation method
CN206956979U (en) A kind of Linear shear wall with fore-set
CN202925730U (en) Assembling integrated type floor
CN203475609U (en) Connecting structure of composite floor slab and steel tube shear wall of building
CN110820976A (en) Assembly structure and method of damping damper, prefabricated pier joist and assembly type building
CN212506733U (en) Assembled concrete structure beam column connected node
CN214739012U (en) Assembled double-connecting-beam combined shear wall component and connecting structure thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130605

Termination date: 20141210

EXPY Termination of patent right or utility model