CN106049672B - A kind of assembled energy-saving builds bridging arrangement - Google Patents

A kind of assembled energy-saving builds bridging arrangement Download PDF

Info

Publication number
CN106049672B
CN106049672B CN201610634295.7A CN201610634295A CN106049672B CN 106049672 B CN106049672 B CN 106049672B CN 201610634295 A CN201610634295 A CN 201610634295A CN 106049672 B CN106049672 B CN 106049672B
Authority
CN
China
Prior art keywords
house
floor
house beam
groove
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610634295.7A
Other languages
Chinese (zh)
Other versions
CN106049672A (en
Inventor
王进
蒋星宇
袁帅
皮子臻
戴晨思
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing bozhichuan Technology Service Co.,Ltd.
Original Assignee
Yangcheng Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangcheng Institute of Technology filed Critical Yangcheng Institute of Technology
Priority to CN201610634295.7A priority Critical patent/CN106049672B/en
Publication of CN106049672A publication Critical patent/CN106049672A/en
Application granted granted Critical
Publication of CN106049672B publication Critical patent/CN106049672B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B1/1903Connecting nodes specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B2001/199Details of roofs, floors or walls supported by the framework

Abstract

The invention discloses a kind of assembled energy-savings to build bridging arrangement, including the pillars of a house, house beam and floor, the pillars of a house side is equipped with the bracket integrally extended, the bracket upper surface is equipped with the first groove, the end of the house beam is installed on above bracket, the lower surface of house beam end is equipped with the first protrusion being adapted to the first groove, and first groove, the first protrusion are perpendicular with house beam length direction;The house beam upper surface is equipped with second groove identical with house beam length direction, and the floor is installed on above house beam, and the lower surface of floor is equipped with the second protrusion being adapted to the second groove.The lower surface of the bracket obliquely, side surface it is vertical, intersecting lens between the two is concordant with the lower surface of house beam.Assembled energy-saving provided by the present invention builds bridging arrangement, and bracket is integrally formed with the pillars of a house, is overlapped by groove, the fixed way of male cooperation+bolt and house beam, has good structural soundness and vertical bearing capacity.

Description

A kind of assembled energy-saving builds bridging arrangement
Technical field
The present invention relates to building subassembly, more particularly to a kind of assembled energy-saving building bridging arrangement.
Background technology
Generally use bracket between the pillars of a house and house beam is connected, and transfers the load from house beam, which builds as top Weak part in building structure in addition, bracket needs larger space, influences architectural appearance.It is tackled herein in design Construction gives enough attention, particularly with assembled architecture.
The content of the invention
The present invention seeks to:There is provided a kind of stabilized structure, appearance is simplified, the assembled energy-saving building overlap joint knot of energy-saving heat preserving Structure.
The technical scheme is that:
A kind of assembled energy-saving builds bridging arrangement, and including the pillars of a house, house beam and floor, the pillars of a house side, which is equipped with, integrally prolongs The bracket of stretching, the bracket upper surface are equipped with the first groove, and the end of the house beam is installed on above bracket, house beam end Lower surface is equipped with the first protrusion being adapted to the first groove, and first groove, the first protrusion are mutually hung down with house beam length direction Directly;The house beam upper surface is equipped with second groove identical with house beam length direction, and the floor is installed on above house beam, floor To be equipped with second be adapted to the second groove raised for lower surface.
Preferably, the lower surface of the bracket obliquely, side surface it is vertical, intersecting lens between the two and the following table of house beam Face is concordant.
Preferably, it is lined with elastic insert in the seam between the pillars of a house and its bracket, house beam, floor.
Preferably, the elastic insert is insulation elastic bed course.
Preferably, the pillars of a house outer surface is equipped with adiabator layer.
Preferably, the corner that the pillars of a house connects with floor is equipped with L-type backing plate, the bottom plate of the L-type backing plate and floor, House beam and bracket pass sequentially through the first bolt and fix;The side plate of L-type backing plate is fixed with the pillars of a house by the second bolt.
Preferably, the floor is also fixed with house beam by several 3rd bolts, the 3rd bolt from the upper surface of floor according to Below secondary second raised, house beam the second groove through floor.
Preferably, the floor is also fixed with house beam by several 4th bolts, the 4th bolt cross the side of house beam with And the second protrusion of floor.
It is an advantage of the invention that:
1. assembled energy-saving provided by the present invention builds bridging arrangement, bracket is integrally formed with the pillars of a house, by groove, convex It plays the fixed way of cooperation+bolt to be overlapped with house beam, there is good structural soundness and vertical bearing capacity;
2. the present invention bracket lower surface obliquely, side surface it is vertical, intersecting lens between the two and the following table of house beam Face is concordant, the shortcomings that reducing bracket outside, influence appearance;
3. it is lined with elastic insert, good damping effect in the seam between the pillars of a house of the present invention and its bracket, house beam, floor; The elastic insert is insulation elastic bed course, and the heat bridge of building has been blocked to act on, and has energy-saving heat preserving effect.
Description of the drawings
The invention will be further described with reference to the accompanying drawings and embodiments:
Fig. 1 is the schematic diagram of the assembled energy-saving building bridging arrangement in embodiment 1;
Fig. 2 is the schematic diagram of the house beam and floor overlap joint in embodiment 1;
Fig. 3 is the schematic diagram of the assembled energy-saving building bridging arrangement in embodiment 2;
Fig. 4 is the schematic diagram of the house beam and floor overlap joint in embodiment 2.
Specific embodiment
Embodiment 1
As illustrated in fig. 1 and 2, disclosed a kind of assembled energy-saving building bridging arrangement, including the pillars of a house 1, house beam 2 With floor 3,1 side of the pillars of a house is equipped with the bracket 11 integrally extended, and 11 upper surface of bracket is equipped with the first groove 12, institute The end for stating house beam 2 is installed on 11 top of bracket, and the lower surface of 2 end of house beam is equipped with the first protrusion being adapted to the first groove 12 21, first groove 12, the first protrusion 21 are perpendicular with 2 length direction of house beam.
2 upper surface of house beam is equipped with second groove 22 identical with 2 length direction of house beam.The floor 3 is installed on room 2 top of beam, the lower surface of floor 3 are equipped with the second protrusion 31 being adapted to the second groove 22.The floor 3 also passes through with house beam 2 Several 3rd bolts 73 are fixed, and the 3rd bolt 73 sequentially passes through the second protrusion 31 of floor 3, house beam 2 from the upper surface of floor 3 Second groove, 22 lower section.
The lower surface of the bracket 11 obliquely, side surface it is vertical, the lower surface of intersecting lens and house beam 2 between the two is put down Together, the shortcomings that bracket is outside, influence appearance is reduced.
Elastic insert 4 is lined in seam between the pillars of a house 1 and its bracket 11, house beam 2, floor 3.Outside the pillars of a house 1 Side surface is equipped with adiabator layer 5.The corner that the pillars of a house 1 connects with floor 3 is equipped with L-type backing plate 6, the L-type backing plate Bottom plate passes sequentially through the first bolt 71 with floor 3, house beam 2 and bracket 11 and fixes;The side plate of L-type backing plate 6 and the pillars of a house 1, thermal insulating material The bed of material 5 is fixed by the second bolt 72.
Embodiment 2
As shown in Figures 3 and 4, disclosed a kind of assembled energy-saving building bridging arrangement, including the pillars of a house 1, house beam 2 With floor 3,1 side of the pillars of a house is equipped with the bracket 11 integrally extended, and 11 upper surface of bracket is equipped with the first groove 12, institute The end for stating house beam 2 is installed on 11 top of bracket, and the lower surface of 2 end of house beam is equipped with the first protrusion being adapted to the first groove 12 21, first groove 12, the first protrusion 21 are perpendicular with 2 length direction of house beam.
2 upper surface of house beam is equipped with second groove 22 identical with 2 length direction of house beam, and the floor 3 is installed on room 2 top of beam, the lower surface of floor 3 are equipped with the second protrusion 31 being adapted to the second groove 22.The floor 3 also passes through with house beam 2 Several 4th bolts 74 are fixed, and the 4th bolt 74 crosses 3 second protrusion 31 of side and floor of house beam 2.
The lower surface of the bracket 11 obliquely, side surface it is vertical, the lower surface of intersecting lens and house beam 2 between the two is put down Together.
Elastic insert 4, the elastic insert are lined in seam between the pillars of a house 1 and its bracket 11, house beam 2, floor 3 4 be insulation elastic bed course.The corner that the pillars of a house 1 connects with floor 3 be equipped with L-type backing plate 6, the bottom plate of the L-type backing plate with Floor 3, house beam 2 and bracket 11 pass sequentially through the first bolt 71 and fix;The side plate of L-type backing plate passes through the second bolt 72 with the pillars of a house 1 It is fixed.
The above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow person skilled in the art Present disclosure can be understood and implemented according to this, it is not intended to limit the scope of the present invention.It is all to lead according to the present invention The modification that the Spirit Essence of technical solution is wanted to be done, should be covered by the protection scope of the present invention.

Claims (6)

1. a kind of assembled energy-saving builds bridging arrangement, it is characterised in that:Including the pillars of a house(1), house beam(2)And floor(3), it is described The pillars of a house(1)Side is equipped with the bracket integrally extended(11), the bracket(11)Upper surface is equipped with the first groove(12), the room Beam(2)End be installed on bracket(11)Top, house beam(2)The lower surface of end is equipped with and the first groove(12)The first of adaptation Protrusion(21), first groove(12), first protrusion(21)And house beam(2)Length direction is perpendicular;The house beam(2)On Surface is equipped with and house beam(2)The second identical groove of length direction(22), the floor(3)It is installed on house beam(2)Top, floor (3)Lower surface be equipped with and the second groove(22)Second protrusion of adaptation(31);
The pillars of a house(1)With floor(3)The corner to connect is equipped with L-type backing plate(6), the bottom plate and floor of the L-type backing plate (3), house beam(2)And bracket(11)Pass sequentially through the first bolt(71)It is fixed;The side plate and the pillars of a house of L-type backing plate(1)Pass through second Bolt(72)It is fixed;
The floor(3)With house beam(2)Also pass through several 3rd bolts(73)It is fixed, the 3rd bolt(73)From floor(3)It is upper Surface sequentially passes through floor(3)Second protrusion(31), house beam(2)The second groove(22)Lower section.
2. assembled energy-saving according to claim 1 builds bridging arrangement, it is characterised in that:The bracket(11)Following table Face obliquely, side surface it is vertical, intersecting lens and house beam between the two(2)Lower surface it is concordant.
3. assembled energy-saving according to claim 2 builds bridging arrangement, it is characterised in that:The pillars of a house(1)And its ox Leg(11), house beam(2), floor(3)Between seam in be lined with elastic insert(4).
4. assembled energy-saving according to claim 3 builds bridging arrangement, it is characterised in that:The elastic insert(4)For Insulation elastic bed course.
5. assembled energy-saving according to claim 3 builds bridging arrangement, it is characterised in that:The pillars of a house(1)Outside table Face is equipped with adiabator layer(5).
6. assembled energy-saving according to claim 1 builds bridging arrangement, it is characterised in that:The floor(3)With house beam (2)Also pass through several 4th bolts(74)It is fixed, the 4th bolt(74)Cross house beam(2)Side and floor(3)Second is convex It rises(31).
CN201610634295.7A 2016-08-05 2016-08-05 A kind of assembled energy-saving builds bridging arrangement Active CN106049672B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610634295.7A CN106049672B (en) 2016-08-05 2016-08-05 A kind of assembled energy-saving builds bridging arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610634295.7A CN106049672B (en) 2016-08-05 2016-08-05 A kind of assembled energy-saving builds bridging arrangement

Publications (2)

Publication Number Publication Date
CN106049672A CN106049672A (en) 2016-10-26
CN106049672B true CN106049672B (en) 2018-05-18

Family

ID=57480298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610634295.7A Active CN106049672B (en) 2016-08-05 2016-08-05 A kind of assembled energy-saving builds bridging arrangement

Country Status (1)

Country Link
CN (1) CN106049672B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395513B (en) * 2020-03-25 2021-06-08 广东现代建筑设计与顾问有限公司 Assembled super high-rise core tube structure
CN111705796B (en) * 2020-05-27 2022-07-22 中犇建设有限公司 Prefabricated part for assembly type building construction
CN114607037B (en) * 2022-01-21 2023-03-17 大连理工大学 Assembled cable concrete building structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06117019A (en) * 1992-10-07 1994-04-26 Kajima Corp Construction method for locating and connecting steel beam
CN103104039A (en) * 2013-03-08 2013-05-15 郑州大学 Assembled framework beam-column joint adopting cover plate connection and construction method thereof
CN103104040A (en) * 2013-03-08 2013-05-15 郑州大学 Assembled framework beam-column joint adopting vertical connection and construction method thereof
CN202969586U (en) * 2012-12-10 2013-06-05 谌丹 Prefabricated concrete beam-column anchor welding combined structure
CN204983171U (en) * 2015-09-01 2016-01-20 中国十七冶集团有限公司 Prefabricated post connecting device
CN205276501U (en) * 2015-12-23 2016-06-01 青海大学 Assembled concrete frame ductility node structure
CN205875390U (en) * 2016-08-05 2017-01-11 盐城工学院 Assembled energy saving building overlap joint structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06117019A (en) * 1992-10-07 1994-04-26 Kajima Corp Construction method for locating and connecting steel beam
CN202969586U (en) * 2012-12-10 2013-06-05 谌丹 Prefabricated concrete beam-column anchor welding combined structure
CN103104039A (en) * 2013-03-08 2013-05-15 郑州大学 Assembled framework beam-column joint adopting cover plate connection and construction method thereof
CN103104040A (en) * 2013-03-08 2013-05-15 郑州大学 Assembled framework beam-column joint adopting vertical connection and construction method thereof
CN204983171U (en) * 2015-09-01 2016-01-20 中国十七冶集团有限公司 Prefabricated post connecting device
CN205276501U (en) * 2015-12-23 2016-06-01 青海大学 Assembled concrete frame ductility node structure
CN205875390U (en) * 2016-08-05 2017-01-11 盐城工学院 Assembled energy saving building overlap joint structure

Also Published As

Publication number Publication date
CN106049672A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN106049672B (en) A kind of assembled energy-saving builds bridging arrangement
CN207646931U (en) A kind of combined mild steel energy dissipation damper and shear wall structure
CN206625390U (en) A kind of double-layer fireproof dividing plate
CN205314301U (en) Corner connection structure of light gauge steel building
CN208088647U (en) A kind of overall assembled wall
CN211817178U (en) Assembled building heat preservation bearing wall
JP5978150B2 (en) Thermal insulation structure of building
CN209975837U (en) Suspended ceiling mounting structure
CN205875390U (en) Assembled energy saving building overlap joint structure
CN205329980U (en) Assembled wallboard
KR101616500B1 (en) Self-assembly and waterproof structure for roof slab
CN203532992U (en) Novel air pipe mounting connecting structure
CN205189267U (en) It shakes novel multilayer roof boarding of dampproofing integration to subtract acoustic reactance
CN205276704U (en) Roofing system and weld roofing layer structure in succession
CN106245843B (en) A kind of open-type building bottom plate for being applicable lifting suspension member
TWM613201U (en) High-performance wind-resistant building system device
CN205134576U (en) Built on stilts board heat preservation system
CN205604493U (en) A insulation construction for building outer wall
CN205557895U (en) Heat preservation resistance to compression outer wall
CN206800661U (en) Wood structure floor is incubated edge sealing structure
CN217630799U (en) Waterproof board with thermal-insulated function
CN105484362B (en) A kind of shock isolating pedestal suitable for super earthquake intensity geological process
CN206769274U (en) A kind of fire-proof and thermal-insulation type aluminum veneer
CN208803560U (en) A kind of steel construction container house buckle structure
CN208363362U (en) A kind of composite house wallboard

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 224000 Yancheng City, Century Avenue, Jiangsu research and development building, No. 1166

Applicant after: Yangcheng Institute of Technology

Address before: 224051 Yancheng City hope road, Yancheng Institute Of Technology, Jiangsu, 9

Applicant before: Yangcheng Institute of Technology

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211228

Address after: 101300 1206, 12 / F, building 5, courtyard 14, Shunyi District, Beijing

Patentee after: Beijing bozhichuan Technology Service Co.,Ltd.

Address before: Yanchuang building, 1166 Century Avenue, Yancheng City

Patentee before: YANCHENG INSTITUTE OF TECHNOLOGY

TR01 Transfer of patent right