CN205607722U - 混凝土试件现场成型装置 - Google Patents
混凝土试件现场成型装置 Download PDFInfo
- Publication number
- CN205607722U CN205607722U CN201620341055.3U CN201620341055U CN205607722U CN 205607722 U CN205607722 U CN 205607722U CN 201620341055 U CN201620341055 U CN 201620341055U CN 205607722 U CN205607722 U CN 205607722U
- Authority
- CN
- China
- Prior art keywords
- die trial
- forming device
- adjustment barrel
- concrete
- support tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
本实用新型提供一种混凝土试件现场成型装置,包括支撑筒、调节筒和试模,所述调节筒与支撑筒通过调节螺栓连接,通过调节所述调节螺栓可以调整所述调节筒的高度。所述调节筒和试模之间充填油泥,以防止水泥浆流入。利用该装置可以在浇筑混凝土时同时成型试件,然后将试件和混凝土构件一起养护。试验时,取出试件进行抗压强度试验。该装置的特点是结构简单,操作方便,能够准确测定现场混凝土构件的强度。
Description
技术领域
本实用新型涉及混凝土施工领域,尤其是涉及一种混凝土试件现场成型装置。
背景技术
在混凝土构件施工过程中,有时为了满足拆模或实际荷载的需求,需要测定现场混凝土强度。通常的做法是在构件上钻孔,取得芯样进行抗压强度试验。取芯的缺点是有时取样时会遇到钢筋,不仅影响混凝土试验强度,而且还影响构件安全。
实用新型内容
本实用新型提供一种混凝土试件现场成型装置,利用该装置可以在浇筑混凝土时同时成型试件,然后将试件和混凝土构件一起养护。试验时,取出试件进行抗压强度试验。其技术方案如下所述:
一种混凝土试件现场成型装置,包括支撑筒、调节筒和试模,所述调节筒与支撑筒通过调节螺栓进行连接,通过调节所述调节螺栓进行调整所述调节筒的高度,所述试模放置在所述调节筒上部。
所述支撑筒下方设置为模板,所述支撑筒下部的翼缘上设置有固定孔,通过螺钉固定在模板上。
所述试模与混凝土面齐平,所述调节筒和试模之间充填油泥,以防止水泥浆流入。
所述试模的翼缘设置有提拉孔和相配套的提拉把手,所述提拉把手下部设置有丝口。
本实用新型的目的是这样实现的:在混凝土构件模板安装完毕之后,将所述支撑筒通过其翼缘上的固定孔用螺钉固定在所述模板上。然后将所述试模内部涂刷脱模剂,并放置在所述调节筒上部;在所述调节筒和试模之间充填油泥,以防止水泥浆流入。调节所述调节螺栓调整所述调节筒的高度,使试模与混凝土面齐平。最后将所述试模上的所述提拉孔用棉纱充填。浇筑混凝土时,同时装填所述试模,并在用振捣棒在所述试模外侧振实混凝土试件。最后和混凝土构件一起养护。试验时,拿出所述所述提拉孔里的棉纱,旋入所述提拉把手,将所述试模取出,运回试验室进行脱模以及试验。
该装置的特点是结构简单,操作方便,能够准确测定现场混凝土构件的强度。
附图说明
图1是所述混凝土试件现场成型装置的结构示意图;
图2是所述支撑筒的俯视图;
图3是所述试模的俯视图;
图4是所述提拉把手的示意图;
图中1-混凝土;2-油泥;3-试模;4-调节筒;5-调节螺栓;6-固定螺钉;7-支撑筒;8-模板;9-支撑筒翼缘;10-固定孔;11-提拉孔;12-提拉把手;13-丝口。
具体实施方式
如图1所示,所述混凝土试件现场成型装置包括支撑筒7、调节筒4和试模3,所述调节筒4与支撑筒7通过调节螺栓5连接,通过调节所述调节螺栓5可以调整所述调节筒4的高度。
所述试模3放置在所述调节筒4上部,并与混凝土1面齐平;所述调节筒4和试模3之间充填油泥,以防止水泥浆流入。
如图2所示,所述支撑筒7通过其翼缘9上的固定孔10用螺钉固定在模板8上。
如图3和图4所示,所述试模3翼缘设置两个提拉孔11,两个提拉把手12与上述提拉孔11相配套,所述提拉把手12下部设置有丝口13。
在混凝土构件模板8安装完毕之后,将所述支撑筒7通过其翼缘9上的固定孔10用螺钉6固定在所述模板8上。然后将所述试模8内部涂刷脱模剂,并放置在所述调节筒4上部;在所述调节筒4和试模8之间充填油泥,以防止水泥浆流入。
调节所述调节螺栓5调整所述调节筒4的高度,使所述试模3与混凝土1面齐平。最后将所述试模3上的所述提拉孔11用棉纱充填。浇筑混凝土时,同时装填所述试模3,并在用振捣棒在所述试模3外侧振实混凝土试件,最后和混凝土构件一起养护。
试验时,拿出所述所述提拉孔11里的棉纱,旋入所述提拉把手12,将所述试模3取出,运回试验室进行脱模以及试验。
Claims (4)
1.一种混凝土试件现场成型装置,其特征在于:包括支撑筒、调节筒和试模,所述调节筒与支撑筒通过调节螺栓进行连接,通过调节所述调节螺栓进行调整所述调节筒的高度,所述试模放置在所述调节筒上部。
2.根据权利要求1所述的混凝土试件现场成型装置,其特征在于:所述支撑筒下方设置为模板,所述支撑筒下部的翼缘上设置有固定孔,通过螺钉固定在模板上。
3.根据权利要求1所述的混凝土试件现场成型装置,其特征在于:所述试模与混凝土面齐平,所述调节筒和试模之间充填油泥,以防止水泥浆流入。
4.根据权利要求1所述的混凝土试件现场成型装置,其特征在于:所述试模的翼缘设置有提拉孔和相配套的提拉把手,所述提拉把手下部设置有丝口。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620341055.3U CN205607722U (zh) | 2016-04-21 | 2016-04-21 | 混凝土试件现场成型装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620341055.3U CN205607722U (zh) | 2016-04-21 | 2016-04-21 | 混凝土试件现场成型装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205607722U true CN205607722U (zh) | 2016-09-28 |
Family
ID=56970008
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620341055.3U Expired - Fee Related CN205607722U (zh) | 2016-04-21 | 2016-04-21 | 混凝土试件现场成型装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205607722U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115401774A (zh) * | 2022-08-24 | 2022-11-29 | 浙江交工金筑交通建设有限公司 | 一种同体成型混凝土试件的方法 |
-
2016
- 2016-04-21 CN CN201620341055.3U patent/CN205607722U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115401774A (zh) * | 2022-08-24 | 2022-11-29 | 浙江交工金筑交通建设有限公司 | 一种同体成型混凝土试件的方法 |
CN115401774B (zh) * | 2022-08-24 | 2023-12-01 | 浙江交工金筑交通建设有限公司 | 一种同体成型混凝土试件的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Lloret-Fritschi et al. | Smart dynamic casting: slipforming with flexible formwork-inline measurement and control | |
CN106121145B (zh) | 一种分片式装配楼梯及其制作方法与装配方法 | |
CN109208487A (zh) | 铁路超高性能混凝土箱梁模板及施工方法 | |
CN205607722U (zh) | 混凝土试件现场成型装置 | |
CN110259139A (zh) | 一种控制现浇钢筋混凝土楼板厚度的插钎装置及使用方法 | |
CN110328742A (zh) | 一种预制柱生产模具及生产方法 | |
CN106639305B (zh) | 可滑移提升式构造柱钢模板及其施工方法 | |
CN209194995U (zh) | 一种便捷可调式现浇墙柱模板加固支撑结构 | |
CN201406834Y (zh) | 顶板预留洞口模具 | |
CN202744907U (zh) | 一种底座板混凝土整平提浆控制标高一体设备 | |
CN209178831U (zh) | 一种铁路超高性能混凝土箱梁模板 | |
CN109676749A (zh) | 隧道轨下结构预制块模具及其预制隧道轨下结构的方法 | |
CN207512541U (zh) | 一种滑轨式拉杆定位支架 | |
CN212764016U (zh) | 防止内模上浮的预制箱梁模板 | |
CN206220500U (zh) | 剪力墙给水管槽预埋装置 | |
CN206281700U (zh) | 一种可调平翻盖式水泥胶砂试模 | |
CN211647364U (zh) | 大截面现浇钢筋混凝土斜柱振捣体系 | |
CN208884998U (zh) | 外墙模板固定装置 | |
CN203755682U (zh) | 一种混凝土结构楼板小洞口二次浇筑模板施工结构 | |
CN109372264A (zh) | 一种工业厂房室内污水池池壁浇筑系统及其施工方法 | |
CN105965681A (zh) | Pccp管芯立式浇筑快速均料装置及方法 | |
CN202330420U (zh) | 一种塌落度测试桶 | |
CN220752132U (zh) | 一种自密实混凝土水平方向抗离析特性快速测量辅助装置 | |
CN208280584U (zh) | 一种小范围混凝土浇筑模板组件 | |
CN206753074U (zh) | 一种可调节高度的混凝土柱灌装模具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160928 |
|
CF01 | Termination of patent right due to non-payment of annual fee |