CN205502067U - Prefabricated corridor component and air film ball storehouse shock insulation buffering precast concrete corridor - Google Patents

Prefabricated corridor component and air film ball storehouse shock insulation buffering precast concrete corridor Download PDF

Info

Publication number
CN205502067U
CN205502067U CN201620163089.8U CN201620163089U CN205502067U CN 205502067 U CN205502067 U CN 205502067U CN 201620163089 U CN201620163089 U CN 201620163089U CN 205502067 U CN205502067 U CN 205502067U
Authority
CN
China
Prior art keywords
prefabricated
wall structure
air film
shock insulation
foundation wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620163089.8U
Other languages
Chinese (zh)
Inventor
朱必毅
赵家鹏
曾思慧
闫志敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Building & Installation Engineering Group Co ltd
Original Assignee
China Coal Building & Installation Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Building & Installation Engineering Group Co ltd filed Critical China Coal Building & Installation Engineering Group Co ltd
Priority to CN201620163089.8U priority Critical patent/CN205502067U/en
Application granted granted Critical
Publication of CN205502067U publication Critical patent/CN205502067U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a prefabricated corridor component and have the air film ball storehouse shock insulation buffering precast concrete corridor of this component belongs to the building field. Prefabricated corridor member is including prefabricated basic wall member, prefabricated basic wall member is the shape of falling T, prefabricated basic wall member includes the bottom and sets up the supporting part that upwards extends on the bottom, the one end of bottom is provided with the basis reservation and connects the raft reinforcing bar. The utility model discloses an one end of the bottom of prefabricated basic wall member is provided with the basis reservation and connects the raft reinforcing bar, and the top of prefabricated basic wall member is provided with foretell prefabricated roof member, and prefabricated basic wall member forms the wall body of air film ball storehouse shock insulation buffering precast concrete corridor, this kind of simple structure, and the shock insulation is effectual in addition, has still realized the batch production and has processed production, has reduced in a large number and has set up scaffold, a template, need not set up special transport corridor, convenient construction, reduction of erection time.

Description

Precast Gallery component and air film ball storehouse shock insulation buffer concrete prefabricated gallery
Technical field
The utility model relates to building field, particularly relates to a kind of Precast Gallery component and has this component Air film ball storehouse shock insulation buffer concrete prefabricated gallery.
Background technology
Pneumatic membrane building uses special building film material to do shell, and the architectural characteristic of pneumatic membrane building self makes It has enough securities, have compared with existing common building preferable economy, the feature of environmental protection, Comfortableness and construction convenience, the most increasingly obtain the concern of building field, and by more and more It is applied in building field.
In the flat warehouse in air film ball storehouse or major diameter, underground gallery is that to transport material requisite logical Road, is typically designed to the long box-structure of armored concrete, need to set up in work progress scaffold, Formwork supporting plate, there is provision of special transport channel, and the mode that module and cast-in-situ method carries out constructing is propped up in this employing, Operation is many, long in time limit, expense of taking a lot of work material, is difficult to control the quality of underground gallery.
Utility model content
The utility model provides a kind of convenient construction, the Precast Gallery component of reduction of erection time and has this structure The air film ball storehouse shock insulation of part buffers concrete prefabricated gallery.
For solving above-mentioned technical problem, the utility model provides technical scheme as follows:
On the one hand, the utility model provides a kind of Precast Gallery component, including prefabricated foundation wall structure, Described prefabricated foundation wall structure is inverted T-shaped, and described prefabricated foundation wall structure includes bottom and arranges The most upwardly extending supporting part, one end of described bottom is provided with basic reserving and connects raft steel Muscle.
Further, the side of described prefabricated foundation wall structure is provided with the first groove, and opposite side sets It is equipped with first with described first fit depressions protruding.
Further, the side of described supporting part is provided with the first suspension ring.
Further, described Precast Gallery component also includes prefabricated top plate member, described prefabricated top board structure Part is inverted U-shaped.
Further, the side at the two ends at the top of described prefabricated top plate member is provided with the second groove, It is protruding that opposite side is provided with second with described second fit depressions.
Further, the top of described prefabricated top plate member is provided with the second suspension ring.
On the other hand, the utility model also provides for a kind of air film ball storehouse shock insulation and buffers concrete prefabricated corridor Road, described air film ball storehouse shock insulation buffer the both sides of concrete prefabricated gallery be provided with above-mentioned multipair relatively The prefabricated foundation wall structure arranged, being provided above of described prefabricated foundation wall structure is above-mentioned pre- Top plate member processed, described prefabricated foundation wall structure is built up described air film ball storehouse shock insulation buffering coagulation The body of wall of soil Precast Gallery, it is mixed that described prefabricated top plate member is built up described air film ball storehouse shock insulation buffering The top board of solidifying soil Precast Gallery, is provided with between described prefabricated foundation wall structure and prefabricated top plate member Isolation rubber cushioning support-saddle backing plate.
Further, the adjacent gap between prefabricated foundation wall structure is watered and is provided with cement mortar, The adjacent gap between prefabricated top plate member is also watered and is provided with cement mortar.
Further, between the bottom of relative prefabricated foundation wall structure, it is provided with bottom plate rear pouring tape, The lower section of described prefabricated foundation wall structure and bottom plate rear pouring tape is provided with paves fine-stone concrete.
Further, described top board is provided with cast-in-place bell mouth or prefabricated bell mouth.
The utility model has the advantages that
Compared with prior art, the both sides of air film ball storehouse of the present utility model armored concrete Precast Gallery It is provided with the multipair prefabricated foundation wall structure being oppositely arranged, the one of the bottom of prefabricated foundation wall structure End is provided with that basis is reserved connects raft reinforcing bar, and being provided above of prefabricated foundation wall structure is above-mentioned prefabricated Top plate member, prefabricated foundation wall structure forms air film ball storehouse shock insulation and buffers the wall of concrete prefabricated gallery Body, this simple in construction, and also isolating affection is good, also achieves batch production processing, subtracts in a large number Lack and set up scaffold, formwork supporting plate, be not required to arrange special transport channel, convenient construction, shortening work Phase.
Accompanying drawing explanation
Fig. 1 is the overall structure signal of air film ball storehouse of the present utility model armored concrete Precast Gallery Figure;
Fig. 2 is the amplification at the air film ball storehouse armored concrete Precast Gallery interior joint A shown in Fig. 1 Structural representation;
Fig. 3 is the amplification at the air film ball storehouse armored concrete Precast Gallery interior joint B shown in Fig. 1 Structural representation;
Fig. 4 is the amplification at the air film ball storehouse armored concrete Precast Gallery interior joint C shown in Fig. 1 Structural representation;
Fig. 5 is the amplification at the air film ball storehouse armored concrete Precast Gallery interior joint D shown in Fig. 1 Structural representation.
Detailed description of the invention
For making the technical problems to be solved in the utility model, technical scheme and advantage clearer, below To be described in detail in conjunction with the drawings and the specific embodiments.
On the one hand, the utility model provides a kind of Precast Gallery component, as shown in Figure 1 and Figure 5, bag Include prefabricated foundation wall structure 1, prefabricated foundation wall structure 1 in inverted T-shaped, prefabricated foundation wall structure Part 1 includes bottom 11 and is arranged on upwardly extending supporting part 12 on bottom 11, the one of bottom 11 End is provided with basic reserving and connects raft reinforcing bar 7.
Compared with prior art, one end of the bottom of prefabricated foundation wall structure of the present utility model is arranged Having basis to reserve and connect raft reinforcing bar, this structure is easy to stablizing between multiple prefabricated foundation wall structure and is connected Connect, the utility model simple in construction, it is possible to achieve batch production processes, convenient construction, shorten work Phase.Concrete, one end of bottom can be the length direction of bottom, at the one of the length direction of bottom End is provided with basic reserving and connects raft reinforcing bar.
As a kind of improvement of the present utility model, as shown in Figure 4, the one of prefabricated foundation wall structure 1 Side is preferably provided with the first groove, and opposite side can be provided with convex with the first of the first fit depressions Rise.This structure can improve fastness of the present utility model and isolating affection.
In the utility model, the side of supporting part is preferably provided with the first suspension ring 6.This structure is convenient Prefabricated foundation wall structure hangs block install, convenient construction, improve efficiency of construction, reduction of erection time.
As another kind of improvement of the present utility model, it is also possible to include prefabricated top plate member 2, prefabricated top Board member 2 can be inverted U-shaped.The end on two limits of prefabricated top plate member U-shape structure Can be connected with the supporting part 12 of prefabricated foundation wall structure respectively.
In order to improve fastness of the present utility model and isolating affection further, as it is shown on figure 3, prefabricated The side at the two ends at the top of top plate member can be provided with the second groove, opposite side can be provided with The second of second fit depressions is protruding.
Further, the top of prefabricated top plate member can be provided with the second suspension ring 5.This structure side Prefabricated top plate member is just hung block install, convenient construction, improve efficiency of construction, reduction of erection time.
On the other hand, as Figure 1-Figure 5, the utility model also provides for a kind of air film ball storehouse shock insulation and delays Rushing concrete prefabricated gallery, air film ball storehouse shock insulation buffers the both sides of concrete prefabricated gallery and is provided with above-mentioned The multipair prefabricated foundation wall structure 1 being oppositely arranged, being provided above of prefabricated foundation wall structure 1 Having above-mentioned prefabricated top plate member 2, prefabricated foundation wall structure is built up air film ball storehouse shock insulation buffering The body of wall of concrete prefabricated gallery, prefabricated top plate member is built up air film ball storehouse shock insulation buffering concrete The top board of Precast Gallery, is provided with shock insulation between prefabricated foundation wall structure 1 and prefabricated top plate member 2 Rubber buffer holder base plate 8.
The both sides of air film ball storehouse of the present utility model armored concrete Precast Gallery be provided with multipair relatively The prefabricated foundation wall structure arranged, it is pre-that one end of the bottom of prefabricated foundation wall structure is provided with basis Stay and connect raft reinforcing bar, prefabricated foundation wall structure be provided above above-mentioned prefabricated top plate member, prefabricated Foundation wall component forms air film ball storehouse shock insulation and buffers the body of wall of concrete prefabricated gallery, the letter of this structure Single, and isolating affection is good, also achieves batch production processing, substantially reduce the number set up scaffold, Formwork supporting plate, is not required to arrange special transport channel, convenient construction, reduction of erection time.
Concrete, the supporting part of prefabricated foundation wall structure of the present utility model and prefabricated top plate member End can be connected by mortise and tenon mode, it is also possible to connects by other means.
In the utility model, the adjacent gap between prefabricated foundation wall structure can be watered and be provided with water Cement mortar, can also water in the adjacent gap between prefabricated top plate member and be provided with cement mortar.This reality With novel be aided with at the scene the most cast-in-place, easy and simple to handle, and can reduce to take in a large number and tear scaffold open, Formwork supporting plates etc. bother.
Preferably, water after base plate can being provided with between the bottom of relative prefabricated foundation wall structure 1 Band 3, the lower section of prefabricated foundation wall structure 1 and bottom plate rear pouring tape 3 can be provided with and pave fine-stone concrete 9.This structure can improve fastness of the present utility model, it is also possible to solves differential settlement, reduces temperature Degree effect of contraction.
Further, top board is provided with cast-in-place bell mouth 4 or prefabricated bell mouth.
The above is preferred embodiment of the present utility model, it is noted that for the art Those of ordinary skill for, on the premise of without departing from principle described in the utility model, it is also possible to make Going out some improvements and modifications, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (10)

1. a Precast Gallery component, it is characterised in that include prefabricated foundation wall structure, described Prefabricated foundation wall structure is inverted T-shaped, and described prefabricated foundation wall structure includes bottom and is arranged on institute Stating the upper upwardly extending supporting part in bottom, one end of described bottom is provided with basic reserving and connects raft reinforcing bar.
Precast Gallery component the most according to claim 1, it is characterised in that described prefabricated base The side of plinth wall structure is provided with the first groove, and opposite side is provided with and described first fit depressions First protruding.
Precast Gallery component the most according to claim 1, it is characterised in that described supporting part Side be provided with the first suspension ring.
Precast Gallery component the most according to claim 1, it is characterised in that described prefabricated corridor Road component also includes that prefabricated top plate member, described prefabricated top plate member are inverted U-shaped.
Precast Gallery component the most according to claim 4, it is characterised in that described prefabricated top The side at the two ends at the top of board member is provided with the second groove, and opposite side is provided with second recessed with described The second projection that groove matches.
Precast Gallery component the most according to claim 4, it is characterised in that described prefabricated top The top of board member is provided with the second suspension ring.
7. an air film ball storehouse shock insulation buffers concrete prefabricated gallery, it is characterised in that described air film Ball storehouse shock insulation buffers the both sides of concrete prefabricated gallery and is provided with in claim 1-6 arbitrary described many To the prefabricated foundation wall structure being oppositely arranged, being provided above of described prefabricated foundation wall structure is had the right Profit requires arbitrary described prefabricated top plate member in 4-6, and described prefabricated foundation wall structure is built up Described air film ball storehouse shock insulation buffers the body of wall of concrete prefabricated gallery, described prefabricated top plate member congruent form Described air film ball storehouse shock insulation is become to buffer the top board of concrete prefabricated gallery, described prefabricated foundation wall structure And it is provided with isolation rubber cushioning support-saddle backing plate between prefabricated top plate member.
Air film ball storehouse the most according to claim 7 shock insulation buffers concrete prefabricated gallery, and it is special Levy and be, the adjacent gap between prefabricated foundation wall structure is watered and is provided with cement mortar, adjacent Gap between prefabricated top plate member is also watered and is provided with cement mortar.
Air film ball storehouse the most according to claim 7 shock insulation buffers concrete prefabricated gallery, and it is special Levy and be, between the bottom of relative prefabricated foundation wall structure, be provided with bottom plate rear pouring tape, described pre- The lower section of foundation wall component processed and bottom plate rear pouring tape is provided with paves fine-stone concrete.
10. buffer concrete prefabricated corridor according to described air film ball storehouse shock insulation arbitrary in claim 7-9 Road, it is characterised in that be provided with cast-in-place bell mouth or prefabricated bell mouth on described top board.
CN201620163089.8U 2016-03-03 2016-03-03 Prefabricated corridor component and air film ball storehouse shock insulation buffering precast concrete corridor Expired - Fee Related CN205502067U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620163089.8U CN205502067U (en) 2016-03-03 2016-03-03 Prefabricated corridor component and air film ball storehouse shock insulation buffering precast concrete corridor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620163089.8U CN205502067U (en) 2016-03-03 2016-03-03 Prefabricated corridor component and air film ball storehouse shock insulation buffering precast concrete corridor

Publications (1)

Publication Number Publication Date
CN205502067U true CN205502067U (en) 2016-08-24

Family

ID=56727354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620163089.8U Expired - Fee Related CN205502067U (en) 2016-03-03 2016-03-03 Prefabricated corridor component and air film ball storehouse shock insulation buffering precast concrete corridor

Country Status (1)

Country Link
CN (1) CN205502067U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059917A (en) * 2016-12-30 2017-08-18 中建五局第三建设有限公司 Split component prefabricated comprehensive pipe gallery and construction method thereof
CN108755760A (en) * 2018-08-01 2018-11-06 中冶长天国际工程有限责任公司 A kind of pipe gallery with high intensity interface
CN111593861A (en) * 2020-04-14 2020-08-28 中铁第四勘察设计院集团有限公司 Connecting structure of prefabricated rail top air duct and structural slab and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059917A (en) * 2016-12-30 2017-08-18 中建五局第三建设有限公司 Split component prefabricated comprehensive pipe gallery and construction method thereof
CN107059917B (en) * 2016-12-30 2020-02-04 中建五局第三建设有限公司 Split component prefabricated comprehensive pipe gallery and construction method thereof
CN108755760A (en) * 2018-08-01 2018-11-06 中冶长天国际工程有限责任公司 A kind of pipe gallery with high intensity interface
CN111593861A (en) * 2020-04-14 2020-08-28 中铁第四勘察设计院集团有限公司 Connecting structure of prefabricated rail top air duct and structural slab and construction method thereof

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN207538350U (en) A kind of assembled cantilever stair
CN102116061A (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN205502067U (en) Prefabricated corridor component and air film ball storehouse shock insulation buffering precast concrete corridor
CN104405062A (en) Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment
CN201588207U (en) Concreting device at construction joints
CN105178352B (en) One kind is non-equal across the adjustable T-type girder prefabricated pedestal construction method of different bottom width
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN203270627U (en) Construction joint structure of shear wall
CN107605107A (en) A kind of method for controlling pitched roof concrete construction quality
CN104141358A (en) Mortar-free self-embedded masonry structure system and building comprising system
CN206859272U (en) The interim block structure of outer wall of basement pouring after settlement
CN105019593A (en) Building insulation precast block and modular reinforcement cast-in-place construction method thereof
CN102433894B (en) Construction method for station side wall by covered top-down excavation method
CN208717952U (en) A kind of reserved passage construction device of basement post-pouring zone
CN209277547U (en) Turnover hole hanging die assisting in blocking reserved hole
CN103334771A (en) Concrete pouring method of side wall and joint of middle plate and vault by means of underground excavation reverse construction method
CN206844389U (en) Building blocks wall structure
CN205502217U (en) Prefabricated corridor of prefabricated corridor component and air film ball storehouse reinforced concrete
CN211172565U (en) A ram for argil brick facade
CN209053376U (en) A kind of porous brick external decoration wall cladding system
CN211286317U (en) Ridge wall basic unit structure of roofing is decorated to overhead stone material
CN206916995U (en) A kind of masonry structure of new ribs building block
CN209369106U (en) A kind of integral prefabricated masonry structure
CN101240569A (en) In-situ integrated placing construction method for aerated concrete wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20210303

CF01 Termination of patent right due to non-payment of annual fee