CN101240569A - In-situ integrated placing construction method for aerated concrete wall - Google Patents

In-situ integrated placing construction method for aerated concrete wall Download PDF

Info

Publication number
CN101240569A
CN101240569A CNA2007101164070A CN200710116407A CN101240569A CN 101240569 A CN101240569 A CN 101240569A CN A2007101164070 A CNA2007101164070 A CN A2007101164070A CN 200710116407 A CN200710116407 A CN 200710116407A CN 101240569 A CN101240569 A CN 101240569A
Authority
CN
China
Prior art keywords
keel
lower keel
wall
template
formworks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101164070A
Other languages
Chinese (zh)
Inventor
毕可洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2007101164070A priority Critical patent/CN101240569A/en
Publication of CN101240569A publication Critical patent/CN101240569A/en
Pending legal-status Critical Current

Links

Images

Abstract

The present invention discloses a construction method which is used for wholly pouring at the air-entrained concrete wall site and belongs to the building filed; the method comprises the following procedures: fixing the upper keel at the fixed position of the roof plate and fixing the lower keel at the corresponding position of the ground; using a plurality of columns between the upper keel and the lower keel; at the external side of the two bottom flanges of the upper keel and the lower keel connecting a plurality of formworks flat to the upper keel and the lower keel and the column; arranging a grouting opening at the appropriate position of the upper edge of the formwork, and injecting the concrete filler to the space between the two formworks through the grouting opening; and detaching the formwork when the wall between the two formworks are solidified primarily. The method of the invention has the advantages of economizing the man power, reducing the material loss, shortening the constructing time and low project cost.

Description

The job practices of the on-the-spot monobloc cast of aerated concrete wall
Technical field
The present invention relates to technical field of buildings, say it is on-the-spot monobloc cast of aerated concrete wall and whole job practices of watering the template installation in detail.
Background technology
At present, the form of structure of construction work is selected the cast-in-situ steel reinforced concrete frame construction in a large number for use, and enclosed structure and inner partition wall adopt pre-formed building block, builds by laying bricks or stones by manually carrying out filling between framework, and its shortcoming is; Waste of manpower, increase spillage of material, the hysteresis of equipment time for competiton, prolongation duration, engineering cost height.
Summary of the invention
In order to overcome the deficiencies in the prior art, the objective of the invention is to solve the technical deficiency of above-mentioned old way, and provide a kind of aerated concrete wall on-the-spot monobloc cast construction technology, but use this method reduction of erection time, reduce engineering cost.
The technical scheme that technical solution problem of the present invention is adopted is: the job practices of the on-the-spot monobloc cast of a kind of aerated concrete wall may further comprise the steps:
(1) will go up keel is fixed on the permanent position of top board and lower keel is fixed on the relevant position on ground;
(2) connect with a plurality of columns between keel and the lower keel on described;
(3) two root edges outsides of keel and lower keel are connected on keel and lower keel and the column some templates are flat respectively on described;
(4) suitable position of described template top edge is established grouting mouthful, mouthful the concrete filler is poured in the space between two templates from grouting;
(5) after the body of wall between two templates tentatively solidifies, template is unloaded.
The invention has the beneficial effects as follows: save manpower, reduce spillage of material, reduction of erection time, engineering cost be low.
Description of drawings
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is a structural representation of the present invention.
Among the figure, 1. top board is 2. gone up keel, 3. lower keel, 4. ground, 5. column, 6. template, 7. template, 8. grouting mouth.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the invention will be further described, to help to understand content of the present invention.
As shown in Figure 1, the on-the-spot monobloc cast construction of a kind of aerated concrete wall, top board and the flooring that need construct and finish.May further comprise the steps:
1. will go up keel 2 is fixed on the permanent position of top board 1 and lower keel 3 is fixed on the relevant position on ground 4;
2. between keel 2 and the lower keel 3, connect on described with a plurality of columns 5;
3. a root edge outside of keel 2 and lower keel 3 connects into the plurality of small blocks template on template 6 flat being connected on keel 2, lower keel 3 and the column 5 on described;
4. another root edge outside of keel 2 and lower keel 3 connects into the plurality of small blocks template on template 7 flat being connected on keel 2, lower keel 3 and the column 5 on described;
5. the suitable position of stating template 6, template 7 top edges is established grouting mouthfuls 8, filler is poured in the space between template 6 and the template 7 from grouting mouthfuls 8;
6. after the body of wall between template 6 and the template 7 tentatively solidifies template is unloaded;
7. the present invention can pre-buried body of wall and the stiffened wire lath at frame construction handing-over interface, removes back nail net operation from and saves duration and corresponding cost.
8. the present invention can be provided with the prefabricated aerating concrete core pipe identical with this way material or the core pipe of other materials according to the thickness of wall body in the actual engineering, intensity, rigidity requirement in body of wall, with reduction of erection time, minimizing site work amount.
9. but tension rib between the present invention's preburied frame shelf structure and the body of wall and windowsill position reinforcing band arrangement of reinforcement.
The present invention can carry out one or many to body of wall according to the concrete condition of engineering and build, to satisfy the coordination requirement between the operation.
Described grouting filler is a concrete, and its prescription mainly contains following material and forms: cement (230-400kg), stone flour (50-150kg), flyash (35-80kg), lime (5-15kg), gypsum (1-3.5kg), water reducing agent (2-6kg), slip stabilizing agent (2-10kg), blowing agent (in right amount), water (in right amount).

Claims (1)

1, the job practices of the on-the-spot monobloc cast of a kind of aerated concrete wall is characterized in that: may further comprise the steps:
(1) will go up keel is fixed on the permanent position of top board and lower keel is fixed on the relevant position on ground;
(2) connect with a plurality of columns between keel and the lower keel on described;
(3) two root edges outsides of keel and lower keel are connected on keel, lower keel and the column some templates are flat respectively on described;
(4) suitable position of described template top edge is established grouting mouthful, mouthful the concrete filler is poured in the space between two templates from grouting;
(5) after the body of wall between two templates tentatively solidifies, template is unloaded.
CNA2007101164070A 2007-12-25 2007-12-25 In-situ integrated placing construction method for aerated concrete wall Pending CN101240569A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101164070A CN101240569A (en) 2007-12-25 2007-12-25 In-situ integrated placing construction method for aerated concrete wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101164070A CN101240569A (en) 2007-12-25 2007-12-25 In-situ integrated placing construction method for aerated concrete wall

Publications (1)

Publication Number Publication Date
CN101240569A true CN101240569A (en) 2008-08-13

Family

ID=39932363

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101164070A Pending CN101240569A (en) 2007-12-25 2007-12-25 In-situ integrated placing construction method for aerated concrete wall

Country Status (1)

Country Link
CN (1) CN101240569A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105523739A (en) * 2015-12-30 2016-04-27 张秋文 Self-fermentation cement mixed mortar for walls and a constructing method thereof
CN109113229A (en) * 2018-09-13 2019-01-01 崔二民 A kind of filling wall and its construction technology
CN115008600A (en) * 2022-06-14 2022-09-06 福建省兴岩建筑科技有限公司 Production method of prefabricated sandwich ALC inner partition wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105523739A (en) * 2015-12-30 2016-04-27 张秋文 Self-fermentation cement mixed mortar for walls and a constructing method thereof
CN109113229A (en) * 2018-09-13 2019-01-01 崔二民 A kind of filling wall and its construction technology
CN115008600A (en) * 2022-06-14 2022-09-06 福建省兴岩建筑科技有限公司 Production method of prefabricated sandwich ALC inner partition wall

Similar Documents

Publication Publication Date Title
CN101041980B (en) Lightweight plaster wall and integral pouring procedure thereof
CN103615053B (en) Monolithic reinforced concrete structure post empiricism engineering method
CN204343459U (en) The parapet node structure of overlaid plate type concrete shear wall system
CN103469825A (en) Prefabricated water-resistant post-pouring belt formwork and installation method
CN205296388U (en) Apron is sealed to garage wall post -cast strip
CN101487293A (en) Concreting method with different intensity grades for beam column nodes
CN102433958A (en) Prefabricated wall board construction member
CN108005118A (en) Underground pipe gallery agent structure integrates construction method
CN104790436A (en) High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN106284653B (en) A kind of construction method that balcony construct capital interspaces in advance
CN206233560U (en) Wall formwork erecting structure
CN102535841A (en) Construction technology of prefabricated wall panel
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN101240569A (en) In-situ integrated placing construction method for aerated concrete wall
CN108035457A (en) A kind of high ductility concrete shear force wall connection structure of assembled and connection method
CN105332386A (en) Structure construction method for tower crane foundation serving as basement bottom plate
CN108130889B (en) Manufacturing method of stepped construction joint between main bottom plate of pump brake and side wall of runner layer
CN103334771A (en) Concrete pouring method of side wall and joint of middle plate and vault by means of underground excavation reverse construction method
CN206319404U (en) A kind of building precast exterior sheathing
CN2239997Y (en) Ring beam capable of making prefabricated floor slab monolithic pure at the support
CN204112586U (en) A kind of building operations precast plate formwork
CN109025301A (en) It floats window side plate construction method
CN106948534A (en) Mesh sheet forms hollow dark contignation and technique with spacer bar cast-in-place concrete
CN212613735U (en) Non-dismantling formwork for caisson cement cover plate
CN218374656U (en) Windowsill coping prefabricated part

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Bi Kezhou

Document name: Notification of Patent Invention Entering into Substantive Examination Stage

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080813