CN102433958A - Prefabricated wall board construction member - Google Patents

Prefabricated wall board construction member Download PDF

Info

Publication number
CN102433958A
CN102433958A CN2011104117472A CN201110411747A CN102433958A CN 102433958 A CN102433958 A CN 102433958A CN 2011104117472 A CN2011104117472 A CN 2011104117472A CN 201110411747 A CN201110411747 A CN 201110411747A CN 102433958 A CN102433958 A CN 102433958A
Authority
CN
China
Prior art keywords
space
wall board
wallboard
wall
construction member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104117472A
Other languages
Chinese (zh)
Inventor
李智能
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN2011104117472A priority Critical patent/CN102433958A/en
Publication of CN102433958A publication Critical patent/CN102433958A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a prefabricated wall board construction member, which comprises two prefabricated wall board shells. Vertical splicing edges are arranged on the two opposite sides of the two wall board shells. A space for holding a corresponding constructional column is reserved between each splicing edge and the end surface of the splicing edge. A space for post-filling heat insulating materials is formed among the two splicing edges and the wall board shells, wherein pouring ports are respectively arranged at the position of one wall board shell corresponding to the space of the construction column and the position of the one wall board shell corresponding to the space of the post-filling heat insulating materials. After a left wall board member and a right wall board member are installed, the heat insulating materials are poured into a space between two wall boards to realize a self heat preserving wall body. The prefabricated wall board construction member has the advantages that the member can be produced in a large scale in a factory and the quality of a wall surface is guaranteed; templates are not required for framework erection and framework release, and the wall boards are firmly and compactly combined with the constructional column; and plaster is not required to be applied onto exterior walls, the construction period is shortened, the self heat preserving wall body can be realized and the construction cost is reduced.

Description

A kind of prefabricated panel construction member
Technical field
The invention belongs to the technical field of building unit, relate in particular to a kind of prefabricated panel construction member.
Background technology
Traditional framework stuffing wall construction mode is generally: at first set up scaffold, build the brick wall body by laying bricks or stones in the position of building a wall, treat that brick wall body intensity meets the demands after, set up scaffold again and plaster.
Because the construction of traditional masonry panel receives the influence of operator's technical level, construction technology etc., is difficult to satisfy the requirement of people to quality; Because of the complexity of traditional wall construction operation,, exist the engineering time long, the shortcoming that construction costs is high again so cause wall construction palpus labor labour; And it is not firm that metope connects, and when disasters such as generation earthquake, hurricane, collapses easily, jeopardizes the property and the personal safety of resident family.
Have scholar's research to point out, to beginning in 2014, China's economic was to be not less than 8% speed increment, and the labour but is negative growth, and this certainly will bring serious labor shortage.And builing industry is as the industry of labour intensive, and labor shortage will seriously restrict the development of builing industry.
Summary of the invention
The technical problem that the present invention will solve provides a kind of prefabricated prefabricated panel construction member, the operation that can save wall construction, thus shorten the engineering time, reduce labour's consumption.
In order to solve the problems of the technologies described above; The present invention provides following technical scheme: a kind of prefabricated panel construction member, comprise two prefabricated wallboard shells, and the relative both sides of said two wallboard shells are provided with vertical splicing eaves; Be reserved with the space that holds the relative configurations post between splicing eaves and its end face; Become the back to fill the space of heat preserving and insulating material with the wallboard hull shape between the two splicing eaves, wherein, the position that a wallboard shell is filled the space of heat preserving and insulating material in the space and the back of corresponding constructional column is provided with the sprue gate.
Compared with prior art, the invention has the advantages that: 1, the wallboard shell constitutes two external surfaces of metope, can be by factory's mass production, reduced the influence that metope receives operator's technical level, construction technology, and guaranteed the quality of metope.2, when construction; Because of having built constructional column and heat preserving and insulating material between two wallboard shells, it is firm that self-heat conserving and the wallboard shell of having realized body of wall is connected with constructional column, when disasters such as generation earthquake, hurricane; Metope is difficult for occurrence of tilting, has reduced the property of resident family and the harm of personal safety.3, do not need template to carry out formwork erection, the demoulding, construction technology is simple.4, metope is the wallboard shell of prefabricated panel construction member, has guaranteed the bright and clean of metope, need not external wall plastering, and that has avoided causing because of plastering wastes time and energy, and has shortened the engineering time, thereby has reduced construction costs.
Further, for the rigidity of Reinfored wallboard shell, the inboard of two wallboard shells is provided with horizontal and vertical floor.
Further, for material and the building that makes metope keeps consistency, said wallboard shell is the concrete composite bed.
Further, pipeline passes in wall for ease, has through wires hole on the said floor, and through wires hole has alleviated the weight of prefabricated panel construction member simultaneously, makes it more be prone to transportation.
Further, in order to make the flowability of packing material in the space of infilled wall better, the floor on the said two wallboard shells is to the mistake setting.
Further, because of the reason of gravity, the material of building from the sprue gate can flow to lower from eminence, so the position at said sprue gate is near the top of wallboard shell.
Description of drawings
Below in conjunction with accompanying drawing and embodiment technical scheme of the present invention is further specified:
Fig. 1 is the structural representation of an a kind of embodiment of wallboard shell in the prefabricated panel construction member of the present invention;
Fig. 2 is the structural representation of a kind of embodiment of prefabricated panel construction member of the present invention;
Fig. 3 is the structural representation after prefabricated panel construction member of the present invention is implemented to be completed.
The specific embodiment
Like Fig. 1, Fig. 2 and shown in Figure 3; A kind of prefabricated panel construction member of the present invention comprises two prefabricated wallboard shells 1, and the relative both sides of said two wallboard shells 1 are provided with vertical splicing eaves 2; Be reserved with the space that holds relative configurations post 3 between splicing eaves 2 and its end face; Form the space of infilled wall between the two splicing eaves 2 with wallboard shell 1, wherein, a wallboard shell 1 is provided with sprue gate 4 in the position in the space of the space of corresponding constructional column 3 and infilled wall.
In the present embodiment, for the rigidity of Reinfored wallboard shell 1, the inboard of two wallboard shells 1 is provided with horizontal and vertical floor 5.For material and the building that makes metope keeps consistency, said wallboard shell 1 is the concrete composite bed.Pipeline passes in wall for ease, has through wires hole 6 on the said floor 5, and through wires hole 6 has alleviated the weight of prefabricated panel construction member simultaneously, makes it more be prone to transportation.In order to make the flowability of packing material in the space of infilled wall better, 5 pairs of mistakes of the floor on the said two wallboard shells 1 are provided with.Because of the reason of gravity, 4 materials of building can flow to lower from eminence from the sprue gate, so the position at said sprue gate 4 is near the top of wallboard shell 1.
The present invention comprises following concrete steps in use:
A makes above-mentioned prefabricated panel construction member in factory;
B will customize good prefabricated panel construction member and be transported to the job site near constructional column 3 reinforcing bar places;
C is with the both sides of wallboard shell 1 location and installation at constructional column 3 reinforcing bars;
D is through sprue gate 4 packing material in the space of the space of constructional column 3 and infilled wall;
After E builds and finishes, unnecessary packing material is removed, again that sprue gate 4 is floating;
F repeats above step, until accomplishing wall construction.
The invention has the advantages that: 1, wallboard shell 1 constitutes two external surfaces of metope, can be by factory's mass production, reduced the influence that metope receives operator's technical level, construction technology, and guaranteed the quality of metope.2, when construction, built constructional column 3 because of 1 on two wallboard shells, it is firm that wallboard shell 1 is connected with constructional column 3, and when disasters such as generation earthquake, hurricane, metope is difficult for occurrence of tilting, has reduced the property of resident family and the harm of personal safety.3, do not need template to carry out formwork erection, the demoulding, construction technology is simple.4, metope is the wallboard shell 1 of prefabricated panel construction member, has guaranteed the bright and clean of metope, need not external wall plastering, and that has avoided causing because of plastering wastes time and energy, and has shortened the engineering time, thereby has reduced construction costs.
For a person skilled in the art, under the prerequisite that does not break away from structure of the present invention, can also make some distortion and improvement, these also should be regarded as protection scope of the present invention, and these can not influence effect and practical applicability that the present invention implements.

Claims (6)

1. prefabricated panel construction member; It is characterized in that: comprise two prefabricated wallboard shells; The relative both sides of said two wallboard shells are provided with vertical splicing eaves, are reserved with the space that holds the relative configurations post between splicing eaves and its end face, become the back to fill the space of heat preserving and insulating material with the wallboard hull shape between the two splicing eaves; Wherein, a wallboard shell is provided with the sprue gate in the space of corresponding constructional column and the position in the space of back filling heat preserving and insulating material.
2. prefabricated panel construction member as claimed in claim 1 is characterized in that: the inboard of two wallboard shells is provided with horizontal and vertical floor.
3. prefabricated panel construction member as claimed in claim 2 is characterized in that: said wallboard shell is the concrete composite bed.
4. prefabricated panel construction member as claimed in claim 3 is characterized in that: have through wires hole on the said floor.
5. prefabricated panel construction member as claimed in claim 4 is characterized in that: the floor on the said two wallboard shells is to the mistake setting.
6. prefabricated panel construction member as claimed in claim 5 is characterized in that: the position at said sprue gate is near the top of wallboard shell.
CN2011104117472A 2011-12-12 2011-12-12 Prefabricated wall board construction member Pending CN102433958A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104117472A CN102433958A (en) 2011-12-12 2011-12-12 Prefabricated wall board construction member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104117472A CN102433958A (en) 2011-12-12 2011-12-12 Prefabricated wall board construction member

Publications (1)

Publication Number Publication Date
CN102433958A true CN102433958A (en) 2012-05-02

Family

ID=45982286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104117472A Pending CN102433958A (en) 2011-12-12 2011-12-12 Prefabricated wall board construction member

Country Status (1)

Country Link
CN (1) CN102433958A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556773A (en) * 2013-11-06 2014-02-05 陈浩 Novel spliced wallboard for building
CN104631675A (en) * 2015-02-16 2015-05-20 济南轨道交通集团有限公司 Double-face prefabricated superimposed plate
CN106284413A (en) * 2016-10-31 2017-01-04 朱凤起 A kind of piping lane section of jurisdiction
CN106320577A (en) * 2016-10-31 2017-01-11 朱凤起 Internal wall structure
CN106320376A (en) * 2016-10-31 2017-01-11 朱凤起 Pipe gallery
CN107288240A (en) * 2017-07-26 2017-10-24 贵州理工环保新材料研究有限公司 One species wood hollow wall structure and preparation method thereof
CN111441529A (en) * 2020-04-07 2020-07-24 江苏锐鹰机械有限公司 Heat-insulation sound-insulation wall prefabricated part mainly used for non-bearing building wall
CN112061930A (en) * 2020-07-31 2020-12-11 上海智世物流科技有限公司 Storage lift system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0893132A (en) * 1994-09-22 1996-04-09 Ibiden Co Ltd Heat insulating wall panel
CN2443074Y (en) * 2000-10-06 2001-08-15 本溪华厦(集团)有限公司 Thermal insulation precast slab for building wall
CN101012672A (en) * 2007-01-25 2007-08-08 赵建华 Energy-saving heat preservation thermally insulated wall and method of construction
CN101324091A (en) * 2008-08-01 2008-12-17 王炳申 Module construction method having mould-carrying function and building module
CN101333830A (en) * 2008-07-04 2008-12-31 欧阳文皇 Wall possessing heat insulation performance and method of manufacture
CN201292606Y (en) * 2008-11-14 2009-08-19 南京华韵建筑科技发展有限公司 Concrete prefabricated element
CN202370161U (en) * 2011-12-12 2012-08-08 中冶建工集团有限公司 Constructing member of prefabricated wallboard

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0893132A (en) * 1994-09-22 1996-04-09 Ibiden Co Ltd Heat insulating wall panel
CN2443074Y (en) * 2000-10-06 2001-08-15 本溪华厦(集团)有限公司 Thermal insulation precast slab for building wall
CN101012672A (en) * 2007-01-25 2007-08-08 赵建华 Energy-saving heat preservation thermally insulated wall and method of construction
CN101333830A (en) * 2008-07-04 2008-12-31 欧阳文皇 Wall possessing heat insulation performance and method of manufacture
CN101324091A (en) * 2008-08-01 2008-12-17 王炳申 Module construction method having mould-carrying function and building module
CN201292606Y (en) * 2008-11-14 2009-08-19 南京华韵建筑科技发展有限公司 Concrete prefabricated element
CN202370161U (en) * 2011-12-12 2012-08-08 中冶建工集团有限公司 Constructing member of prefabricated wallboard

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556773A (en) * 2013-11-06 2014-02-05 陈浩 Novel spliced wallboard for building
CN104631675A (en) * 2015-02-16 2015-05-20 济南轨道交通集团有限公司 Double-face prefabricated superimposed plate
CN104631675B (en) * 2015-02-16 2017-08-25 济南轨道交通集团有限公司 A kind of two-sided prefabricated superimposed sheet
CN106284413A (en) * 2016-10-31 2017-01-04 朱凤起 A kind of piping lane section of jurisdiction
CN106320577A (en) * 2016-10-31 2017-01-11 朱凤起 Internal wall structure
CN106320376A (en) * 2016-10-31 2017-01-11 朱凤起 Pipe gallery
CN107288240A (en) * 2017-07-26 2017-10-24 贵州理工环保新材料研究有限公司 One species wood hollow wall structure and preparation method thereof
CN111441529A (en) * 2020-04-07 2020-07-24 江苏锐鹰机械有限公司 Heat-insulation sound-insulation wall prefabricated part mainly used for non-bearing building wall
CN112061930A (en) * 2020-07-31 2020-12-11 上海智世物流科技有限公司 Storage lift system

Similar Documents

Publication Publication Date Title
CN102433958A (en) Prefabricated wall board construction member
CN104005502B (en) A kind of precast light building cover board and industrialized building house floor slab structure
CN101967851A (en) Board-mixing structure assembly type house and building method thereof
WO2014094458A1 (en) Fully assembled, fully cast-in-place, composite-type house and construction method thereof
CN102248577B (en) Superlight-foamed-cement-based manufacturing process for thermal-insulation bearing wall panel
CN107288256A (en) Light composite heat insulation outer wall plate, particular manufacturing craft and preparation method thereof
CN103469825A (en) Prefabricated water-resistant post-pouring belt formwork and installation method
CN106930431A (en) A kind of combined type cavity EPS modules
CN102535841A (en) Construction technology of prefabricated wall panel
CN112459291A (en) Prefabricated heat insulation structure integrated wall structure and construction process thereof
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN106351376A (en) Construction method of garage roof
CN105275206A (en) A construction method of an external wall of a building
CN202248392U (en) Cast-in-situ partition wall structure
CN103883022A (en) Earthquake-resistant, sound-insulating and crack-resistant integrated structure for inner wall and outer wall of enclosure structure and construction method thereof
CN206957042U (en) Light composite heat insulation outer wall plate and particular manufacturing craft
CN101624841B (en) Method for constructing one-time casting reinforced concrete building
CN107237448B (en) The prefabricated interior fill concrete wallboard of one kind and its manufacturing method
CN203795650U (en) Integrated building interior and exterior wall structure
CN203256930U (en) Connection structure for concrete wall body and masonry wall face
CN203296209U (en) Self-insulation mortarless block masonry shear wall system
WO2018126950A1 (en) Modular stairway
CN202370161U (en) Constructing member of prefabricated wallboard
CN205502377U (en) Hanging wallboard is partly inlayed to unit -installment light
CN107246106A (en) A kind of surface cuts shaping haydite concrete prefabricated panel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120502