CN107288240A - One species wood hollow wall structure and preparation method thereof - Google Patents
One species wood hollow wall structure and preparation method thereof Download PDFInfo
- Publication number
- CN107288240A CN107288240A CN201710617997.9A CN201710617997A CN107288240A CN 107288240 A CN107288240 A CN 107288240A CN 201710617997 A CN201710617997 A CN 201710617997A CN 107288240 A CN107288240 A CN 107288240A
- Authority
- CN
- China
- Prior art keywords
- wallboard
- ribbing
- wall
- liang
- keel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002023 wood Substances 0.000 title claims abstract description 31
- 238000002360 preparation method Methods 0.000 title claims abstract description 8
- 239000000463 material Substances 0.000 claims abstract description 13
- 239000002994 raw material Substances 0.000 claims abstract description 12
- 238000004519 manufacturing process Methods 0.000 claims description 5
- 239000002184 metal Substances 0.000 claims description 3
- 229910052751 metal Inorganic materials 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 10
- 238000000034 method Methods 0.000 abstract description 5
- 238000009413 insulation Methods 0.000 abstract description 3
- 239000000126 substance Substances 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 8
- 241000894007 species Species 0.000 description 7
- WSFSSNUMVMOOMR-UHFFFAOYSA-N Formaldehyde Chemical compound O=C WSFSSNUMVMOOMR-UHFFFAOYSA-N 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 241000132536 Cirsium Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000004308 accommodation Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000011819 refractory material Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/7407—Removable non-load-bearing partitions; Partitions with a free upper edge assembled using frames with infill panels or coverings only; made-up of panels and a support structure incorporating posts
- E04B2/7453—Removable non-load-bearing partitions; Partitions with a free upper edge assembled using frames with infill panels or coverings only; made-up of panels and a support structure incorporating posts with panels and support posts, extending from floor to ceiling
- E04B2/7457—Removable non-load-bearing partitions; Partitions with a free upper edge assembled using frames with infill panels or coverings only; made-up of panels and a support structure incorporating posts with panels and support posts, extending from floor to ceiling with wallboards attached to the outer faces of the posts, parallel to the partition
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/80—Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of wood
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2002/7461—Details of connection of sheet panels to frame or posts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2002/7461—Details of connection of sheet panels to frame or posts
- E04B2002/7477—Details of connections using screws or nails
Abstract
The present invention discloses wooden hollow wall structure of a species and preparation method thereof in building timber structural techniques field.Hollow wall structure includes wall top and wall bottom Wo Liang, wallboard with ribbing, and the rib of wallboard with ribbing is the load-bearing keel post of wall body structure.The component of above-mentioned wall is made using similar wood material in factory, and similar wood material is formed using string or wood chip as main raw material(s) by specific physics, chemical technology.Component first installs wall bottom and wall top Wo Liang after factory makes, then order forms the wall body structure with vertical cavity to bolting wallboard with ribbing and Wo Liang to installation wallboard with ribbing, and by special connecting piece.The similar wood material that the present invention is used has the advantages that raw material sources wide, fire insulation performance and defening effect is good, high capacity, stability are good;In addition, can arrange pipeline in wall cavity, using the installation of big wallboard, speed of application is fast.
Description
Technical field
The invention belongs to build timber structural techniques field, and in particular to using string or wood chip as the one of main raw material(s)
Species wood hollow wall structure and preparation method thereof.
Technical background
The materials for wall of existing timber structure is mostly primary timber or the laminated wood made by primary timber, it is necessary to consume big
The forest reserves of amount, the welding ecological balance, and wooden wall surface need to do fire prevention processing with refractory materials such as Thistle boards,
With low intensity, heat-insulated, protection, the shortcoming of sound insulation property difference, wherein laminated wood are surpassed because being more easily caused formaldehyde using structure glue
Mark.
It is existing that there is some strength by the artificial plate of main raw material(s) of string or wood chip, but because rigidity is poor,
It is mainly used in building construction formwork, decorations and furniture industry.The compactness of existing artificial plate is better than primary wood plank,
With preferable fire protecting performance.With good plasticity during pulp after string or wood chip are crushed, therefore can be by it
As main raw material(s), it is used for wall body structure for making cylindrical component, then after being combined with thin plate, this is in Replacing engineering structure
Primary timber so that the environmental protection ecological balance is significant.
The content of the invention
The technical problem to be solved in the present invention is:There is provided a kind of empty by the class wood of former main material of string or wood chip
Heart wall body structure and preparation method thereof, to overcome the shortcomings of existing wooden wall.
In order to solve the above technical problems, one aspect of the present invention is:One species wood hollow wall structure, profit
Vertical wallboard with ribbing is manufactured in factory for the similar wood material of main raw material(s) to string or wood chip, it is same with using
The wall top Wo Liang and wall bottom Wo Liang of material manufacture are bolted with special connecting piece, so as to form the class with transversely arranged closed cavity
Wooden hollow wall structure.
The wallboard with ribbing includes keel post and thin plate, is integrally manufactured in factory, and plate is wide manually to carry and be installed as
Degree;The special connecting piece is made using sheet metal;The bolt uses bolt.
In order to solve the above technical problems, another technical solution used in the present invention is:One species wood hollow wall structure
Preparation method, mainly comprise the steps of:(1) L-shaped is manufactured using similar wood material in factory and T-shaped wallboard with ribbing, wall top is crouched
Beam and wall bottom Wo Liang;(2) it is wall top Wo Liang and wall bottom Wo Liang is in place, and be reliably connected with supporting structure, by special connecting piece point
It is not stuck on wall top Wo Liang and wall bottom Wo Liang, side horizontal tightens connecting bolt;(3) in order by the keel post of wallboard with ribbing
It is upper and lower to be caught in special connecting piece, keel post and special connecting piece are bolted;(4) in lastblock wallboard with ribbing and next piece of band
The seam crossing of rib wallboard, the keel stud on thin plate and opposite is connect.
In the above method, the supporting structure includes steel construction, concrete structure, masonry structure or timber structure.
Compared with the existing wall body structure made using primary timber or laminated wood, the beneficial effects of the invention are as follows:(1) with
String and wood chip are that main raw material(s) makes wall body construction, and the good compactness of raw material itself ensure that wall of the present invention
Good fire protecting performance;(2) raw material sources are wide, can promote the recycling of wastes of crops, and do not consume the forest reserves,
Beneficial to ecological environmental protection;(3) using close post as the main load-bearing skeleton of wall of the present invention, wall has higher bearing capacity and steady
Qualitative energy;(4) ensure that can in the good heat-proof quality of wall of the present invention and sound insulation property, wall cavity for the sealing cavity of structure
Arrange pipeline, it is to avoid the drawbacks of traditional wooden wall pipeline is exposed;(5) wall of the present invention uses big wallboard prefabricated construction,
Connection process is reduced, installation rate is improved.
Brief description of the drawings
Fig. 1 is the space schematic diagram of the wooden hollow wall structure of a species of the invention;
Fig. 2 is the structure arrangement schematic diagram of wall, wherein B1Plate for wallboard with ribbing is wide, H1For the height of wallboard with ribbing, B
For wall overall width, H is wall total height;
Fig. 3 is the schematic cross-section and space schematic diagram of L-shaped wallboard with ribbing;
Fig. 4 is the schematic cross-section and space schematic diagram of T-shaped wallboard with ribbing;
Fig. 5 is the keel post of T-shaped wallboard with ribbing and Wo Liang connecting structure schematic diagram;
Fig. 6 is the keel post of L-shaped wallboard with ribbing and Wo Liang connecting structure schematic diagram;
Fig. 7 is special connecting piece schematic diagram;
Fig. 8 is the floor map of wall production order, and direction is square in place for the installation of wallboard with ribbing wherein shown in arrow
To;
Fig. 9 is the space schematic diagram of wall production order
Description of reference numerals:1- Wo Liang;2-L shapes wallboard with ribbing;3-T shapes wallboard with ribbing;4- keel posts;The special connections of 5-
Part;6- attaching plate elements;The sleeping beam connecting bolts of 7-;8- keel post connecting bolts;9- screws;It is vertical after 10- wallboard installations with ribbing
Seam.
Embodiment
Present disclosure is further illustrated below in conjunction with the drawings and specific embodiments, but not as to any of the present invention
Limit foundation.
Refering to Fig. 1 and Fig. 2, species wood hollow wall structure, the T-shaped of L-shaped wallboard 2 with ribbing and middle part by two ends is with ribbing
Wallboard 3, the sleeping beam 1 of the sleeping beam 1 in wall top and wall bottom enclose transversely arranged closed cavity.The rib of wallboard 2 and 3 with ribbing is keel post 4,
After wall is installed, keel post 4 is placed in wall cavity.The keel post 4 of wallboard 2 and 3 with ribbing and the sleeping beam 1 on wall top and wall bottom
Bolted by special connecting piece 5 parallel to metope.After wallboard 2 and 3 with ribbing is installed, erected in a face self-assembling formation of keel post 4
To seam 10, then by the nail joint of keel post 4 on the wallboard at vertical abutment joint 10 and opposite.
The sleeping beam 1, L-shaped wallboard 2 with ribbing and T-shaped wallboard 3 with ribbing, keel post 4 use using string or wood chip as
The similar wood material of main raw material(s) makes in factory, and keel post 4 needs to produce with the entirety of wallboard 2,3 with ribbing respectively, keel post 4
Top and bottom need to open up installation bolt hole.
The special connecting piece 5 and attaching plate elements 6 are made using sheet metal.
Specific embodiment:Below in conjunction with the making side of the wooden hollow wall of specific embodiment a present invention is furture elucidated species
Method.
(1) Fig. 2~Fig. 4 and Fig. 7 is referred to, it is with ribbing that crouch beam 1, the L-shaped comprising keel post 4 are made using similar wood material in factory
Wallboard 2 and T-shaped wallboard 3 with ribbing, and make special connecting piece 5 and attaching plate elements 6;
(2) Fig. 1 is referred to, a sleeping beam 1 is respectively installed on the supporting structure at wall top and wall bottom, special connecting piece 5 is stuck in
On Wo Liang, sleeping beam connecting bolt 7 is tightened perpendicular to metope level, the installation of special connecting piece 5 is completed;
(3) Fig. 9 and Fig. 8 (a) is referred to, it is since wall one end, L-shaped wallboard 2 (1.) horizontal sliding with ribbing is in place;Refering to Fig. 8
(b) after, adding attaching plate elements 6 respectively in the top surface at wall end and bottom surface, the connecting bolt of keel post 4 is tightened parallel to metope level
8, that is, complete the installation of L-shaped wallboard 2 (1.) with ribbing;
(4) Fig. 9 and Fig. 8 (b) is referred to, T-shaped wallboard 3 (2.) horizontal sliding with ribbing is in place, its keel post 4 is caught in upper and lower
Between manned special connecting piece 5, refering to Fig. 8 (c), the connecting bolt 8 of keel post 4 is tightened parallel to metope level, i.e., it is complete
The installation of T-shaped wallboard with ribbing 3 (2.);
(5) refering to Fig. 9, Fig. 8 (c) and Fig. 8 (d), so move in circles, until completing the installation of all wallboards with ribbing;
(6) Fig. 1 is referred to, at the vertical abutment joint 10 of wallboard with ribbing, by the nail joint of keel post 4 on wallboard with ribbing and opposite.
In the preparation method, in addition to initial L-shaped wallboard 2 (1.) with ribbing, the keel post 4 of remaining wallboard with ribbing with it is special
Connecting bolt 8 between connector 5, need to pass through special connecting piece 5 and keel before wallboard with ribbing is in place after being tied up with iron wire etc.
The hole of post 4, after wallboard with ribbing is caught in special connecting piece 5, connecting bolt 8 is hauled out, then tighten its nut.
Although the preferred embodiments of the present invention are described above-mentioned combination accompanying drawing, above-mentioned embodiment is only
It is schematical, and is not restricted, one of ordinary skill in the art is not departing under spirit of the invention enlightenment
The accommodation made in the scope of the present invention, within the scope of the present invention.
Claims (6)
1. species wood hollow wall structure, it is characterised in that wall is enclosed by wall bottom Wo Liang, wall top Wo Liang and wallboard with ribbing
Vertical cavity, the rib of the wallboard with ribbing is wall body keel post, and Wo Liang and the keel post is connected using special connecting piece.
2. the wooden hollow wall structure of class according to claim 1, it is characterised in that the Wo Liang and wallboard with ribbing are in work
Factory is made using similar wood material, and this material is using string or wood chip as main raw material(s).
3. wallboard with ribbing according to claim 1, it is characterised in that wallboard is with the keel post in factory's integral manufacturing.
4. special connecting piece according to claim 1, it is characterised in that the flute profile with riser is fabricated to using sheet metal and connected
Fitting, the trough section is bolted with the Wo Liang, and the riser portion connects with the keel stud.
5. the wooden hollow wall structure of class according to claim 1, it is characterised in that after the wallboard with ribbing is installed, two pieces
Seam crossing between wallboard with ribbing, its thin plate is connect with opposite keel stud.
6. the preparation method of the wooden hollow wall structure of class according to claim 1, it is characterised in that mainly comprising following step
Suddenly:
(1) string or wood chip is used to manufacture Wo Liang and wallboard with ribbing for the similar wood material of main raw material(s) in factory;
(2) after wall bottom and wall top Wo Liang are installed, then special connecting piece is installed on Wo Liang;
(3) it is caught in the keel post of wallboard with ribbing is upper and lower in order in special connecting piece, and by keel post and special connecting piece bolt
Connect;
(4) at two pieces of wallboard joints with ribbing of wall the same side, the keel stud of thin plate and opposite wallboard with ribbing is connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710617997.9A CN107288240A (en) | 2017-07-26 | 2017-07-26 | One species wood hollow wall structure and preparation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710617997.9A CN107288240A (en) | 2017-07-26 | 2017-07-26 | One species wood hollow wall structure and preparation method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107288240A true CN107288240A (en) | 2017-10-24 |
Family
ID=60103044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710617997.9A Pending CN107288240A (en) | 2017-07-26 | 2017-07-26 | One species wood hollow wall structure and preparation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107288240A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237462A (en) * | 2017-07-26 | 2017-10-10 | 贵州理工环保新材料研究有限公司 | One species plank formula staircase structure and preparation method thereof |
CN111042387A (en) * | 2020-01-03 | 2020-04-21 | 台州学院 | Wood structure partition wall suitable for steel structure building and construction method thereof |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1532095A (en) * | 1975-05-27 | 1978-11-15 | United States Gypsum Co | Stud for forming fire-rated wall and structure formed therewith |
CN1095130A (en) * | 1993-10-12 | 1994-11-16 | 谭庆稚 | Double splice plate hollow wall |
WO2001051725A1 (en) * | 2000-01-13 | 2001-07-19 | Yhtyneet Sahat Oy | Method of building wall framework, wall framework, and wood profile |
CN2585915Y (en) * | 2002-04-24 | 2003-11-12 | 方承仕 | Fast fabricated gypsum wall plate |
CN101255755A (en) * | 2007-03-03 | 2008-09-03 | 潘旭鹏 | Stagger assemble inorganic keel wall board and technique |
US20100293888A1 (en) * | 2009-05-19 | 2010-11-25 | William Andrews | Vertical deflection extension end member |
CN102433958A (en) * | 2011-12-12 | 2012-05-02 | 中冶建工集团有限公司 | Prefabricated wall board construction member |
CN202706258U (en) * | 2012-07-17 | 2013-01-30 | 徐学东 | Fully-assembled detachable concrete wallboard |
CN203066343U (en) * | 2013-03-06 | 2013-07-17 | 四川东大板业有限公司 | Steel edge frame heat insulation light board/wall board/roof board/LOFT interlayer floor slab |
CN204326304U (en) * | 2014-11-24 | 2015-05-13 | 湖北弘毅建设有限公司 | A kind of grooved wallboard and superposed beam mount syndeton |
CN204590334U (en) * | 2015-04-30 | 2015-08-26 | 威力(烟台)木业技术有限公司 | A kind of wood composite structure wall |
CN105926838A (en) * | 2016-05-26 | 2016-09-07 | 沈阳建筑大学 | Modular wood structure sandwich passive wallboard and wall construction method |
CN205617611U (en) * | 2016-04-26 | 2016-10-05 | 山东星合钢构有限公司 | Confined concrete's steel construction dividing wall component |
CN205976205U (en) * | 2016-05-26 | 2017-02-22 | 沈阳建筑大学 | Modularization heat preservation sound insulation bearing wood wallboard |
CN206554386U (en) * | 2017-01-20 | 2017-10-13 | 楼东浩 | A kind of concrete filled steel tube coupled column |
CN110761447A (en) * | 2019-09-17 | 2020-02-07 | 中建装配式建筑设计研究院有限公司 | Assembly type inner partition wall system and assembly type inner partition wall construction method |
-
2017
- 2017-07-26 CN CN201710617997.9A patent/CN107288240A/en active Pending
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1532095A (en) * | 1975-05-27 | 1978-11-15 | United States Gypsum Co | Stud for forming fire-rated wall and structure formed therewith |
CN1095130A (en) * | 1993-10-12 | 1994-11-16 | 谭庆稚 | Double splice plate hollow wall |
WO2001051725A1 (en) * | 2000-01-13 | 2001-07-19 | Yhtyneet Sahat Oy | Method of building wall framework, wall framework, and wood profile |
CN2585915Y (en) * | 2002-04-24 | 2003-11-12 | 方承仕 | Fast fabricated gypsum wall plate |
CN101255755A (en) * | 2007-03-03 | 2008-09-03 | 潘旭鹏 | Stagger assemble inorganic keel wall board and technique |
US20100293888A1 (en) * | 2009-05-19 | 2010-11-25 | William Andrews | Vertical deflection extension end member |
CN102433958A (en) * | 2011-12-12 | 2012-05-02 | 中冶建工集团有限公司 | Prefabricated wall board construction member |
CN202706258U (en) * | 2012-07-17 | 2013-01-30 | 徐学东 | Fully-assembled detachable concrete wallboard |
CN203066343U (en) * | 2013-03-06 | 2013-07-17 | 四川东大板业有限公司 | Steel edge frame heat insulation light board/wall board/roof board/LOFT interlayer floor slab |
CN204326304U (en) * | 2014-11-24 | 2015-05-13 | 湖北弘毅建设有限公司 | A kind of grooved wallboard and superposed beam mount syndeton |
CN204590334U (en) * | 2015-04-30 | 2015-08-26 | 威力(烟台)木业技术有限公司 | A kind of wood composite structure wall |
CN205617611U (en) * | 2016-04-26 | 2016-10-05 | 山东星合钢构有限公司 | Confined concrete's steel construction dividing wall component |
CN105926838A (en) * | 2016-05-26 | 2016-09-07 | 沈阳建筑大学 | Modular wood structure sandwich passive wallboard and wall construction method |
CN205976205U (en) * | 2016-05-26 | 2017-02-22 | 沈阳建筑大学 | Modularization heat preservation sound insulation bearing wood wallboard |
CN206554386U (en) * | 2017-01-20 | 2017-10-13 | 楼东浩 | A kind of concrete filled steel tube coupled column |
CN110761447A (en) * | 2019-09-17 | 2020-02-07 | 中建装配式建筑设计研究院有限公司 | Assembly type inner partition wall system and assembly type inner partition wall construction method |
Non-Patent Citations (1)
Title |
---|
任平弟主编: "《建筑材料 第2版》", 31 July 2004, 中国铁道出版社 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237462A (en) * | 2017-07-26 | 2017-10-10 | 贵州理工环保新材料研究有限公司 | One species plank formula staircase structure and preparation method thereof |
CN111042387A (en) * | 2020-01-03 | 2020-04-21 | 台州学院 | Wood structure partition wall suitable for steel structure building and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587693A (en) | Two-storey modular villa building and construction method thereof | |
US9366027B2 (en) | Lattice girder structure using innovative multiple joints for roof covering purposes | |
CN106592825A (en) | Assembly type wood frame energy-saving shear wall | |
CN103982038A (en) | Construction method for solar separate house modular rapid assembly | |
CN107905385A (en) | The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure | |
CN107288240A (en) | One species wood hollow wall structure and preparation method thereof | |
CN206873673U (en) | A kind of assembling type steel structure out-hung panel node | |
CN106284644B (en) | A kind of residential architecture structural system and its method of construction suitable for industrialized production | |
CN111549950A (en) | Light assembled steel structure combined floor slab and implementation method thereof | |
CN111021551A (en) | Connecting structure of steel structure beam column and wallboard or floor slab | |
CN201128950Y (en) | Fast-fabricated bamboo house | |
CN103485538B (en) | A kind of energy-saving heat preserving Waterproof wood truss Roof system construction method | |
CN110284725B (en) | Reinforced concrete frame node beam hogging moment assembly steel structure and reinforcing method thereof | |
CN204781309U (en) | Roof beam plate -column structure of green ecological feasibility building system | |
KR20110009882A (en) | Tailor-made manufacturing method for furniture-style buildings and traditional korean-style structure | |
CN103437488B (en) | Slab for buildings | |
CN107447865A (en) | One species Wood construction frame structure and preparation method thereof | |
CN203462631U (en) | Energy-saving and heat-insulating waterproof wooden truss roofing system construction structure | |
CN106836660A (en) | A kind of unidirectional composite roof board mechanism | |
CN106013421B (en) | A kind of method of construction of the compound assembled fiber concrete building of steel wood | |
CN102561731A (en) | Module constructed one-layer villa and construction method thereof | |
CN201981755U (en) | Floor structure of timberwork building | |
WO2021109181A1 (en) | High-strength lightweight composite floor slab and floor slab layer system thereof | |
CN101240664A (en) | Quickly mounted bamboo house | |
CN2778940Y (en) | Multifunctional multi-shaped building board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171024 |