Summary of the invention
The object of the present invention is to provide one for solar energy separate house modularization rapid-assembling construction method, significantly improve efficiency of construction, greatly reduce construction cost.
Technical scheme of the present invention:
A kind of for solar energy separate house modularization rapid-assembling construction method, the method is pressed following implementation step:
1), whole house forms integrated cabinet module, use large-scale crane to lift, whole house forms stress system by three steel structure frames, each framework is of a size of: 12m × 2.4m × 3.45m composition, and space enclosing structure, heat insulating material, ornament materials, pipeline etc. are all integrated in casing;
2), solar energy roof truss and steel structure column are made into module and install, and use bolt to connect solar energy photovoltaic panel, steel structure column and concrete foundation pier use bolt to connect into entirety and install, and solar energy roof truss uses H shaped steel or work shaped steel and angle steel to use bolt to connect to form;
3), outdoor aisle platform support scaffolding becomes Pin to install;
4), deck, outdoor aisle and rough ground are integrated into the module of 2m × 2m left and right, carry out monoblock installation, deck, outdoor aisle is made by bamboo wooden boards, secondary joist wood a tree, used in making timber for boats, main joist wood a tree, used in making timber for boats, when installation, panel, secondary joist, main joist is fixed into entirety, and entirety is installed to docking.
Platform below, described outdoor aisle is provided with scaffold as support system, and scaffold is installed taking Pin as unit.
Described steel structure column is made up of square steel pipe and angle steel welding, leaves 12 hangers at each steel structure frame top simultaneously.
Compared with existing construction technology, the present invention, without construction method and Experience in the situation that, adopts the method for integral moduleization construction, has well solved the type and has built a difficult problem of carrying out rapid construction, and it is artificial to be used in conjunction with big machinery replacement, economic benefit is fairly obvious.The technology of the present invention is simple, and on-the-spot installation effectiveness is high, and amount of labour demanded is little, can arrange labour to carry out indoor and outdoor construction simultaneously; Material all can carry out prefabrication, and assembled work can directly be carried out in scene, has saved the duration.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in further detail, but not as any limitation of the invention.
A kind of for solar energy separate house modularization rapid-assembling construction method, the method is pressed following implementation step:
1), whole house forms integrated cabinet module, use large-scale crane to lift, whole house forms stress system by three steel structure frames, each framework is of a size of: 12m × 2.4m × 3.45m composition, and space enclosing structure, heat insulating material, ornament materials, pipeline etc. are all integrated in casing;
2), solar energy roof truss and steel structure column are made into module and install, and use bolt to connect solar energy photovoltaic panel, steel structure column and concrete foundation pier use bolt to connect into entirety and install, and solar energy roof truss uses H shaped steel or work shaped steel and angle steel to use bolt to connect to form;
3), outdoor aisle platform support scaffolding becomes Pin to install;
4), deck, outdoor aisle and rough ground are integrated into the module of 2m × 2m left and right, carry out monoblock installation, deck, outdoor aisle is made by bamboo wooden boards, secondary joist wood a tree, used in making timber for boats, main joist wood a tree, used in making timber for boats, when installation, panel, secondary joist, main joist is fixed into entirety, and entirety is installed to docking.
The fixing bolt that adopts of described edge joint position is fixed, and uses foamed glue to carry out the sealing of casing butt joint, with the heat-insulating property that ensures that house is good.Described outdoor aisle platform is that panel, main joist, secondary joist are fixed into integral module, and the about 2m of size × 2m left and right, carries out the installation of whole module; Solar energy roof truss steel column and foundation pier connect into monoblock and carry out integral hoisting leveling.Solar energy roof truss is mainly made up of section steel beam and angle steel, with bolts, and solar energy photovoltaic panel also uses bolt to be connected on roof truss.In described construction, carry out outdoor and indoor construction work after house casing has lifted, dynamo-electric construction interts and carries out with box body splicing place decoration construction simultaneously.
According to aforementioned light-duty steel construction house framework, as shown in Figure 1.Comprise the column 1 that square steel pipe forms, the girder steel 2 that square steel pipe forms.As shown in Figure 2, all ornament materials, pipeline, heat insulating material etc. are all integrated in casing described house casing.Described outdoor walkway board platform as shown in Figure 2, comprises outdoor railing 3, composite bamboo wood material walkway board panel 4, panel support keel (comprising primary and secondary keel) 5, supporting frame 6.Wherein 6 is whole Pin cellular installation, and 4 and 5 are fixed into 2m × 2m left and right module carries out integral installation.
Embodiment
1, measure unwrapping wire location
On compacting soil or hardening of concrete ground, emit base position axis.
2, basis leveling are installed
Basis is fixed as to entirety, carries or machinery assembling.After basis is in place, carry out leveling.
3, lifting house casing
By three house casing hoisted in position, adopt Large-scale Hoisting equipment to lift successively.When lifting, should carry out position adjustment, ensure between casing in stitching error ± 5mm.
4, the casing seam crossing pipeline construction of plugging into
House heat-insulating material, space enclosing structure, pipeline etc. are all integrated in casing, carry out the construction of plugging into of seam crossing pipeline after casing has lifted.Interspersed seam crossing decoration construction simultaneously.
5, outdoor section construction
After house casing has lifted, carry out outdoor section construction, the aisle whole Pin of platform support scaffolding installs, and aisle platform panel, primary and secondary skeletal frame are fixed into entirety and carry out modular installation.
6, solar energy roof truss construction
Solar energy roof truss steel column and foundation pier are fixed into entirety and install, and roof truss girder steel, steel column all use bolt to be connected to reach the requirement of rapid construction with solar energy photovoltaic panel.