CN103982038A - Construction method for solar separate house modular rapid assembly - Google Patents

Construction method for solar separate house modular rapid assembly Download PDF

Info

Publication number
CN103982038A
CN103982038A CN201410134793.6A CN201410134793A CN103982038A CN 103982038 A CN103982038 A CN 103982038A CN 201410134793 A CN201410134793 A CN 201410134793A CN 103982038 A CN103982038 A CN 103982038A
Authority
CN
China
Prior art keywords
construction
steel
house
solar energy
outdoor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410134793.6A
Other languages
Chinese (zh)
Other versions
CN103982038B (en
Inventor
程群
蒋韶鑫
黎光军
魏鹏
王理
李刚
姚守涛
管聪聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201410134793.6A priority Critical patent/CN103982038B/en
Publication of CN103982038A publication Critical patent/CN103982038A/en
Application granted granted Critical
Publication of CN103982038B publication Critical patent/CN103982038B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Photovoltaic Devices (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a construction method for solar separate house modular rapid assembly. The method comprises the steps that a house housing is hoisted after field paying off is accomplished; pipeline connection in spliced positions and decorative material construction in joint positions are performed after hoisting is accomplished; simultaneously outdoor supporting frame and passage platform construction are performed, the supporting frame forms a house rack to perform integral erection, and a passage plate panel and main and minor keels are integrally erected; solar house rack steel columns, steel beams and photovoltaic panels are installed at the same time; debugging of the whole system is accomplished. The method has the advantages that component modularity is adopted for installation, the field installation efficiency is high, the quality is reliable, the construction period is short, the labor force quantity demanded is low, after the housing hoisting is accomplished, indoor construction and outdoor construction can be performed at the same time, both materials and components can be prefabricated or machined in factories, field splicing operation is only performed directly, the construction period is saved, and the production cost is greatly reduced.

Description

A kind of for solar energy separate house modularization rapid-assembling construction method
Technical field
The present invention relates to assemble fast construction field in construction work, specifically belong to a kind of for solar energy separate house modularization rapid-assembling construction method.
Background technology
In construction engineering, because of duration reason, cost reason, it is a long-term subject under discussion of inquiring into that building is carried out to rapid construction always.Solar house house because of its member many, the complexity of Mechatronic Systems and photovoltaic system, ornament materials variation, in the raising of speed of application especially difficulty.A large amount of on-the-spot structure manufactures and processing have consumed the time of house building, improving on solar house speed of application, study very few at present.
Summary of the invention
The object of the present invention is to provide one for solar energy separate house modularization rapid-assembling construction method, significantly improve efficiency of construction, greatly reduce construction cost.
Technical scheme of the present invention:
A kind of for solar energy separate house modularization rapid-assembling construction method, the method is pressed following implementation step:
1), whole house forms integrated cabinet module, use large-scale crane to lift, whole house forms stress system by three steel structure frames, each framework is of a size of: 12m × 2.4m × 3.45m composition, and space enclosing structure, heat insulating material, ornament materials, pipeline etc. are all integrated in casing;
2), solar energy roof truss and steel structure column are made into module and install, and use bolt to connect solar energy photovoltaic panel, steel structure column and concrete foundation pier use bolt to connect into entirety and install, and solar energy roof truss uses H shaped steel or work shaped steel and angle steel to use bolt to connect to form;
3), outdoor aisle platform support scaffolding becomes Pin to install;
4), deck, outdoor aisle and rough ground are integrated into the module of 2m × 2m left and right, carry out monoblock installation, deck, outdoor aisle is made by bamboo wooden boards, secondary joist wood a tree, used in making timber for boats, main joist wood a tree, used in making timber for boats, when installation, panel, secondary joist, main joist is fixed into entirety, and entirety is installed to docking.
Platform below, described outdoor aisle is provided with scaffold as support system, and scaffold is installed taking Pin as unit.
Described steel structure column is made up of square steel pipe and angle steel welding, leaves 12 hangers at each steel structure frame top simultaneously.
Compared with existing construction technology, the present invention, without construction method and Experience in the situation that, adopts the method for integral moduleization construction, has well solved the type and has built a difficult problem of carrying out rapid construction, and it is artificial to be used in conjunction with big machinery replacement, economic benefit is fairly obvious.The technology of the present invention is simple, and on-the-spot installation effectiveness is high, and amount of labour demanded is little, can arrange labour to carry out indoor and outdoor construction simultaneously; Material all can carry out prefabrication, and assembled work can directly be carried out in scene, has saved the duration.
Brief description of the drawings
Fig. 1 is steel structure column schematic diagram of the present invention.
Fig. 2 is construction schematic diagram of the present invention.
Label in figure is: 1-steel structure column, 2-square steel pipe, the outdoor aisle of 3-platform railing, the outdoor aisle of 4-platform bamboo wooden boards, the outdoor aisle of 5-platform rough ground, the outdoor aisle of 6-platform supporting frame.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in further detail, but not as any limitation of the invention.
A kind of for solar energy separate house modularization rapid-assembling construction method, the method is pressed following implementation step:
1), whole house forms integrated cabinet module, use large-scale crane to lift, whole house forms stress system by three steel structure frames, each framework is of a size of: 12m × 2.4m × 3.45m composition, and space enclosing structure, heat insulating material, ornament materials, pipeline etc. are all integrated in casing;
2), solar energy roof truss and steel structure column are made into module and install, and use bolt to connect solar energy photovoltaic panel, steel structure column and concrete foundation pier use bolt to connect into entirety and install, and solar energy roof truss uses H shaped steel or work shaped steel and angle steel to use bolt to connect to form;
3), outdoor aisle platform support scaffolding becomes Pin to install;
4), deck, outdoor aisle and rough ground are integrated into the module of 2m × 2m left and right, carry out monoblock installation, deck, outdoor aisle is made by bamboo wooden boards, secondary joist wood a tree, used in making timber for boats, main joist wood a tree, used in making timber for boats, when installation, panel, secondary joist, main joist is fixed into entirety, and entirety is installed to docking.
The fixing bolt that adopts of described edge joint position is fixed, and uses foamed glue to carry out the sealing of casing butt joint, with the heat-insulating property that ensures that house is good.Described outdoor aisle platform is that panel, main joist, secondary joist are fixed into integral module, and the about 2m of size × 2m left and right, carries out the installation of whole module; Solar energy roof truss steel column and foundation pier connect into monoblock and carry out integral hoisting leveling.Solar energy roof truss is mainly made up of section steel beam and angle steel, with bolts, and solar energy photovoltaic panel also uses bolt to be connected on roof truss.In described construction, carry out outdoor and indoor construction work after house casing has lifted, dynamo-electric construction interts and carries out with box body splicing place decoration construction simultaneously.
According to aforementioned light-duty steel construction house framework, as shown in Figure 1.Comprise the column 1 that square steel pipe forms, the girder steel 2 that square steel pipe forms.As shown in Figure 2, all ornament materials, pipeline, heat insulating material etc. are all integrated in casing described house casing.Described outdoor walkway board platform as shown in Figure 2, comprises outdoor railing 3, composite bamboo wood material walkway board panel 4, panel support keel (comprising primary and secondary keel) 5, supporting frame 6.Wherein 6 is whole Pin cellular installation, and 4 and 5 are fixed into 2m × 2m left and right module carries out integral installation.
Embodiment
1, measure unwrapping wire location
On compacting soil or hardening of concrete ground, emit base position axis.
2, basis leveling are installed
Basis is fixed as to entirety, carries or machinery assembling.After basis is in place, carry out leveling.
3, lifting house casing
By three house casing hoisted in position, adopt Large-scale Hoisting equipment to lift successively.When lifting, should carry out position adjustment, ensure between casing in stitching error ± 5mm.
4, the casing seam crossing pipeline construction of plugging into
House heat-insulating material, space enclosing structure, pipeline etc. are all integrated in casing, carry out the construction of plugging into of seam crossing pipeline after casing has lifted.Interspersed seam crossing decoration construction simultaneously.
5, outdoor section construction
After house casing has lifted, carry out outdoor section construction, the aisle whole Pin of platform support scaffolding installs, and aisle platform panel, primary and secondary skeletal frame are fixed into entirety and carry out modular installation.
6, solar energy roof truss construction
Solar energy roof truss steel column and foundation pier are fixed into entirety and install, and roof truss girder steel, steel column all use bolt to be connected to reach the requirement of rapid construction with solar energy photovoltaic panel.

Claims (3)

1. for a solar energy separate house modularization rapid-assembling construction method, it is characterized in that: the method is by following implementation step:
1), whole house forms integrated cabinet module, use large-scale crane to lift, whole house forms stress system by three steel structure frames, each framework is of a size of: 12m × 2.4m × 3.45m composition, and space enclosing structure, heat insulating material, ornament materials, pipeline etc. are all integrated in casing;
2), solar energy roof truss and steel structure column are made into module and install, and use bolt to connect solar energy photovoltaic panel, steel structure column and concrete foundation pier use bolt to connect into entirety and install, and solar energy roof truss uses H shaped steel or work shaped steel and angle steel to use bolt to connect to form;
3), outdoor aisle platform support scaffolding becomes Pin to install;
4), deck, outdoor aisle and rough ground are integrated into the module of 2m × 2m left and right, carry out monoblock installation, deck, outdoor aisle is made by bamboo wooden boards, secondary joist wood a tree, used in making timber for boats, main joist wood a tree, used in making timber for boats, when installation, panel, secondary joist, main joist is fixed into entirety, and entirety is installed to docking.
2. method according to claim 1, is characterized in that: platform below in described outdoor aisle is provided with scaffold as support system, and scaffold is installed taking Pin as unit.
3. method according to claim 2, is characterized in that: described steel structure column is made up of square steel pipe and angle steel welding, leaves 12 hangers at each steel structure frame top simultaneously.
CN201410134793.6A 2014-04-03 2014-04-03 A kind of for solar energy separate house modularization rapid-assembling construction method Active CN103982038B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410134793.6A CN103982038B (en) 2014-04-03 2014-04-03 A kind of for solar energy separate house modularization rapid-assembling construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410134793.6A CN103982038B (en) 2014-04-03 2014-04-03 A kind of for solar energy separate house modularization rapid-assembling construction method

Publications (2)

Publication Number Publication Date
CN103982038A true CN103982038A (en) 2014-08-13
CN103982038B CN103982038B (en) 2016-03-23

Family

ID=51274185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410134793.6A Active CN103982038B (en) 2014-04-03 2014-04-03 A kind of for solar energy separate house modularization rapid-assembling construction method

Country Status (1)

Country Link
CN (1) CN103982038B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104967392A (en) * 2015-06-09 2015-10-07 中电投电力工程有限公司 Photovoltaic power station built on fly ash field
CN105298157A (en) * 2015-10-14 2016-02-03 中建钢构有限公司 Ocean green human settlements system and modular construction method thereof
CN105298158A (en) * 2015-10-14 2016-02-03 中建钢构有限公司 Ocean green human settlements system and modular construction method thereof
CN106869305A (en) * 2017-02-24 2017-06-20 中国有色金属工业第六冶金建设有限公司 Modularized house builds construction technology
CN107659257A (en) * 2017-09-25 2018-02-02 何成祥 Matrix photovoltaic generation platform
CN112502285A (en) * 2020-08-31 2021-03-16 天津泰明加德低碳住宅科技发展有限公司 DNA module fast-assembling room
CN114541670A (en) * 2022-03-02 2022-05-27 河南长合幕墙设计院有限公司 Construction process of assembled automobile ramp

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070163205A1 (en) * 2006-01-17 2007-07-19 Johns Bradley W Method for constructing decks
CN102425234A (en) * 2011-12-08 2012-04-25 宋锦琳 Movable board house
CN202644722U (en) * 2012-05-29 2013-01-02 白一帆 Portable easy-to-assemble module board room
CN203347278U (en) * 2013-06-09 2013-12-18 华中科技大学 Barrier-free multifunctional room
CN203347035U (en) * 2013-05-20 2013-12-18 潍坊华宏钢结构工程有限公司 Fully-spliced internally-connected thermal insulation board room
CN203504475U (en) * 2013-05-17 2014-03-26 招维果 Modular combined type mobile solar power station

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070163205A1 (en) * 2006-01-17 2007-07-19 Johns Bradley W Method for constructing decks
CN102425234A (en) * 2011-12-08 2012-04-25 宋锦琳 Movable board house
CN202644722U (en) * 2012-05-29 2013-01-02 白一帆 Portable easy-to-assemble module board room
CN203504475U (en) * 2013-05-17 2014-03-26 招维果 Modular combined type mobile solar power station
CN203347035U (en) * 2013-05-20 2013-12-18 潍坊华宏钢结构工程有限公司 Fully-spliced internally-connected thermal insulation board room
CN203347278U (en) * 2013-06-09 2013-12-18 华中科技大学 Barrier-free multifunctional room

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104967392A (en) * 2015-06-09 2015-10-07 中电投电力工程有限公司 Photovoltaic power station built on fly ash field
CN105298157A (en) * 2015-10-14 2016-02-03 中建钢构有限公司 Ocean green human settlements system and modular construction method thereof
CN105298158A (en) * 2015-10-14 2016-02-03 中建钢构有限公司 Ocean green human settlements system and modular construction method thereof
WO2017063416A1 (en) * 2015-10-14 2017-04-20 中建钢构有限公司 Maritime green human settlement system and modularized construction method therefor
US10415232B2 (en) 2015-10-14 2019-09-17 China Construction Steel Structure Corp. Ltd. Maritime green human settlement system and modularized construction method therefor
CN106869305A (en) * 2017-02-24 2017-06-20 中国有色金属工业第六冶金建设有限公司 Modularized house builds construction technology
CN107659257A (en) * 2017-09-25 2018-02-02 何成祥 Matrix photovoltaic generation platform
CN112502285A (en) * 2020-08-31 2021-03-16 天津泰明加德低碳住宅科技发展有限公司 DNA module fast-assembling room
CN114541670A (en) * 2022-03-02 2022-05-27 河南长合幕墙设计院有限公司 Construction process of assembled automobile ramp

Also Published As

Publication number Publication date
CN103982038B (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN103982038A (en) Construction method for solar separate house modular rapid assembly
CN103184762B (en) Multi-story/high-rise fabricated steel structural prestressed supporting system capable of realizing rigid connection of joints
CN102979176B (en) Industrialized multi-story high-rise assembled steel structure system
CN202131835U (en) Prefabricated assembly type glass fence
CN101418592A (en) Combined light steel structure house and mounting method thereof
CN205421547U (en) Module building system is assembled to low layer
CN105863067A (en) Modular low-layer assembling type house system of special-shaped column steel structure
CN101440635A (en) One layer combined type light steel structure house and installation method thereof
CN205153114U (en) Lightweight steel structure modularized residential building
CN201401027Y (en) Assembly archaizing four-corner pavilion
CN103334488A (en) Assembled steel structure deformed column framework support system
CN104878867A (en) Integrated structure of ceiling keel and double-layer construction platform and manufacturing method thereof
CN104060853A (en) Lightweight steel structure modularized residential building
CN102912972A (en) Multifunctional lifting steel platform switching jig and construction method
CN105332417A (en) Method for constructing prefabricated steel frame composite structure with concrete wrapped outside
CN107762161B (en) A kind of energy-saving assembled system of steel residential structure and installation method
CN203247868U (en) Large-span steel structure construction temporary supporting frame
CN204475921U (en) The dismountable firm structural construction factory building of a kind of safety
CN203808237U (en) Tall building structure system with prefabricated assembled type buckling-restrained steel plate shear walls
CN103485538B (en) A kind of energy-saving heat preserving Waterproof wood truss Roof system construction method
CN103276839B (en) The how high-rise assembled steel framework-eccentrical braces of a kind of hollow irregular column
CN103290922B (en) A kind of industrialization assembling post through beam steel flanged beam steel structure frame system
CN102392493A (en) Vertical reinforcing plate type square steel pipe column and H-shaped steel beam node
CN108590025A (en) A kind of bamboo matter green prefabricated buildings and its method of construction
CN202865996U (en) Room modular structure for nuclear power plant

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 230000 building 3, 262 Heping Road, Yaohai District, Hefei City, Anhui Province

Patentee after: No 6 Construction Co.,Ltd. of China Construction Fourth Engineering Bureau

Address before: 230011 science and Technology Department of No.6 company of China Construction Fourth Bureau, Dongfang Building, intersection of Changjiang East Street and Mingguang Road, Yaohai District, Hefei City, Anhui Province

Patentee before: CHINA CONSTRUCTION 4TH ENGINEERING BUREAU, 6TH Co.,Ltd.

CP03 Change of name, title or address
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A modular rapid assembly construction method for solar independent residential buildings

Granted publication date: 20160323

Pledgee: China Construction Bank Co.,Ltd. Hefei Chengdong sub branch

Pledgor: No 6 Construction Co.,Ltd. of China Construction Fourth Engineering Bureau

Registration number: Y2024980042474