Construction method for solar separate house modular rapid assembly Download PDFInfo
- Publication number
- CN103982038A CN103982038A CN201410134793.6A CN201410134793A CN103982038A CN 103982038 A CN103982038 A CN 103982038A CN 201410134793 A CN201410134793 A CN 201410134793A CN 103982038 A CN103982038 A CN 103982038A
- Authority
- CN
- China
- Prior art keywords
- construction
- steel
- house
- solar energy
- outdoor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Photovoltaic Devices (AREA)
Abstract
The invention discloses a construction method for solar separate house modular rapid assembly. The method comprises the steps that a house housing is hoisted after field paying off is accomplished; pipeline connection in spliced positions and decorative material construction in joint positions are performed after hoisting is accomplished; simultaneously outdoor supporting frame and passage platform construction are performed, the supporting frame forms a house rack to perform integral erection, and a passage plate panel and main and minor keels are integrally erected; solar house rack steel columns, steel beams and photovoltaic panels are installed at the same time; debugging of the whole system is accomplished. The method has the advantages that component modularity is adopted for installation, the field installation efficiency is high, the quality is reliable, the construction period is short, the labor force quantity demanded is low, after the housing hoisting is accomplished, indoor construction and outdoor construction can be performed at the same time, both materials and components can be prefabricated or machined in factories, field splicing operation is only performed directly, the construction period is saved, and the production cost is greatly reduced.
Description
Technical field
The present invention relates to assemble fast construction field in construction work, specifically belong to a kind of for solar energy separate house modularization rapid-assembling construction method.
Background technology
In construction engineering, because of duration reason, cost reason, it is a long-term subject under discussion of inquiring into that building is carried out to rapid construction always.Solar house house because of its member many, the complexity of Mechatronic Systems and photovoltaic system, ornament materials variation, in the raising of speed of application especially difficulty.A large amount of on-the-spot structure manufactures and processing have consumed the time of house building, improving on solar house speed of application, study very few at present.
Summary of the invention
The object of the present invention is to provide one for solar energy separate house modularization rapid-assembling construction method, significantly improve efficiency of construction, greatly reduce construction cost.
Technical scheme of the present invention:
A kind of for solar energy separate house modularization rapid-assembling construction method, the method is pressed following implementation step:
1), whole house forms integrated cabinet module, use large-scale crane to lift, whole house forms stress system by three steel structure frames, each framework is of a size of: 12m × 2.4m × 3.45m composition, and space enclosing structure, heat insulating material, ornament materials, pipeline etc. are all integrated in casing;
2), solar energy roof truss and steel structure column are made into module and install, and use bolt to connect solar energy photovoltaic panel, steel structure column and concrete foundation pier use bolt to connect into entirety and install, and solar energy roof truss uses H shaped steel or work shaped steel and angle steel to use bolt to connect to form;
3), outdoor aisle platform support scaffolding becomes Pin to install;
4), deck, outdoor aisle and rough ground are integrated into the module of 2m × 2m left and right, carry out monoblock installation, deck, outdoor aisle is made by bamboo wooden boards, secondary joist wood a tree, used in making timber for boats, main joist wood a tree, used in making timber for boats, when installation, panel, secondary joist, main joist is fixed into entirety, and entirety is installed to docking.
Platform below, described outdoor aisle is provided with scaffold as support system, and scaffold is installed taking Pin as unit.
Described steel structure column is made up of square steel pipe and angle steel welding, leaves 12 hangers at each steel structure frame top simultaneously.
Compared with existing construction technology, the present invention, without construction method and Experience in the situation that, adopts the method for integral moduleization construction, has well solved the type and has built a difficult problem of carrying out rapid construction, and it is artificial to be used in conjunction with big machinery replacement, economic benefit is fairly obvious.The technology of the present invention is simple, and on-the-spot installation effectiveness is high, and amount of labour demanded is little, can arrange labour to carry out indoor and outdoor construction simultaneously; Material all can carry out prefabrication, and assembled work can directly be carried out in scene, has saved the duration.
Brief description of the drawings
Fig. 1 is steel structure column schematic diagram of the present invention.
Fig. 2 is construction schematic diagram of the present invention.
Label in figure is: 1-steel structure column, 2-square steel pipe, the outdoor aisle of 3-platform railing, the outdoor aisle of 4-platform bamboo wooden boards, the outdoor aisle of 5-platform rough ground, the outdoor aisle of 6-platform supporting frame.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in further detail, but not as any limitation of the invention.
A kind of for solar energy separate house modularization rapid-assembling construction method, the method is pressed following implementation step:
1), whole house forms integrated cabinet module, use large-scale crane to lift, whole house forms stress system by three steel structure frames, each framework is of a size of: 12m × 2.4m × 3.45m composition, and space enclosing structure, heat insulating material, ornament materials, pipeline etc. are all integrated in casing;
2), solar energy roof truss and steel structure column are made into module and install, and use bolt to connect solar energy photovoltaic panel, steel structure column and concrete foundation pier use bolt to connect into entirety and install, and solar energy roof truss uses H shaped steel or work shaped steel and angle steel to use bolt to connect to form;
3), outdoor aisle platform support scaffolding becomes Pin to install;
4), deck, outdoor aisle and rough ground are integrated into the module of 2m × 2m left and right, carry out monoblock installation, deck, outdoor aisle is made by bamboo wooden boards, secondary joist wood a tree, used in making timber for boats, main joist wood a tree, used in making timber for boats, when installation, panel, secondary joist, main joist is fixed into entirety, and entirety is installed to docking.
The fixing bolt that adopts of described edge joint position is fixed, and uses foamed glue to carry out the sealing of casing butt joint, with the heat-insulating property that ensures that house is good.Described outdoor aisle platform is that panel, main joist, secondary joist are fixed into integral module, and the about 2m of size × 2m left and right, carries out the installation of whole module; Solar energy roof truss steel column and foundation pier connect into monoblock and carry out integral hoisting leveling.Solar energy roof truss is mainly made up of section steel beam and angle steel, with bolts, and solar energy photovoltaic panel also uses bolt to be connected on roof truss.In described construction, carry out outdoor and indoor construction work after house casing has lifted, dynamo-electric construction interts and carries out with box body splicing place decoration construction simultaneously.
According to aforementioned light-duty steel construction house framework, as shown in Figure 1.Comprise the column 1 that square steel pipe forms, the girder steel 2 that square steel pipe forms.As shown in Figure 2, all ornament materials, pipeline, heat insulating material etc. are all integrated in casing described house casing.Described outdoor walkway board platform as shown in Figure 2, comprises outdoor railing 3, composite bamboo wood material walkway board panel 4, panel support keel (comprising primary and secondary keel) 5, supporting frame 6.Wherein 6 is whole Pin cellular installation, and 4 and 5 are fixed into 2m × 2m left and right module carries out integral installation.
Embodiment
1, measure unwrapping wire location
On compacting soil or hardening of concrete ground, emit base position axis.
2, basis leveling are installed
Basis is fixed as to entirety, carries or machinery assembling.After basis is in place, carry out leveling.
3, lifting house casing
By three house casing hoisted in position, adopt Large-scale Hoisting equipment to lift successively.When lifting, should carry out position adjustment, ensure between casing in stitching error ± 5mm.
4, the casing seam crossing pipeline construction of plugging into
House heat-insulating material, space enclosing structure, pipeline etc. are all integrated in casing, carry out the construction of plugging into of seam crossing pipeline after casing has lifted.Interspersed seam crossing decoration construction simultaneously.
5, outdoor section construction
After house casing has lifted, carry out outdoor section construction, the aisle whole Pin of platform support scaffolding installs, and aisle platform panel, primary and secondary skeletal frame are fixed into entirety and carry out modular installation.
6, solar energy roof truss construction
Solar energy roof truss steel column and foundation pier are fixed into entirety and install, and roof truss girder steel, steel column all use bolt to be connected to reach the requirement of rapid construction with solar energy photovoltaic panel.
Claims (3)
1. for a solar energy separate house modularization rapid-assembling construction method, it is characterized in that: the method is by following implementation step:
1), whole house forms integrated cabinet module, use large-scale crane to lift, whole house forms stress system by three steel structure frames, each framework is of a size of: 12m × 2.4m × 3.45m composition, and space enclosing structure, heat insulating material, ornament materials, pipeline etc. are all integrated in casing;
2), solar energy roof truss and steel structure column are made into module and install, and use bolt to connect solar energy photovoltaic panel, steel structure column and concrete foundation pier use bolt to connect into entirety and install, and solar energy roof truss uses H shaped steel or work shaped steel and angle steel to use bolt to connect to form;
3), outdoor aisle platform support scaffolding becomes Pin to install;
4), deck, outdoor aisle and rough ground are integrated into the module of 2m × 2m left and right, carry out monoblock installation, deck, outdoor aisle is made by bamboo wooden boards, secondary joist wood a tree, used in making timber for boats, main joist wood a tree, used in making timber for boats, when installation, panel, secondary joist, main joist is fixed into entirety, and entirety is installed to docking.
2. method according to claim 1, is characterized in that: platform below in described outdoor aisle is provided with scaffold as support system, and scaffold is installed taking Pin as unit.
3. method according to claim 2, is characterized in that: described steel structure column is made up of square steel pipe and angle steel welding, leaves 12 hangers at each steel structure frame top simultaneously.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410134793.6A CN103982038B (en) | 2014-04-03 | 2014-04-03 | A kind of for solar energy separate house modularization rapid-assembling construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410134793.6A CN103982038B (en) | 2014-04-03 | 2014-04-03 | A kind of for solar energy separate house modularization rapid-assembling construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103982038A true CN103982038A (en) | 2014-08-13 |
CN103982038B CN103982038B (en) | 2016-03-23 |
Family
ID=51274185
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410134793.6A Active CN103982038B (en) | 2014-04-03 | 2014-04-03 | A kind of for solar energy separate house modularization rapid-assembling construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103982038B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104967392A (en) * | 2015-06-09 | 2015-10-07 | 中电投电力工程有限公司 | Photovoltaic power station built on fly ash field |
CN105298158A (en) * | 2015-10-14 | 2016-02-03 | 中建钢构有限公司 | Ocean green human settlements system and modular construction method thereof |
CN105298157A (en) * | 2015-10-14 | 2016-02-03 | 中建钢构有限公司 | Ocean green human settlements system and modular construction method thereof |
CN106869305A (en) * | 2017-02-24 | 2017-06-20 | 中国有色金属工业第六冶金建设有限公司 | Modularized house builds construction technology |
CN107659257A (en) * | 2017-09-25 | 2018-02-02 | 何成祥 | Matrix photovoltaic generation platform |
CN112502285A (en) * | 2020-08-31 | 2021-03-16 | 天津泰明加德低碳住宅科技发展有限公司 | DNA module fast-assembling room |
CN114541670A (en) * | 2022-03-02 | 2022-05-27 | 河南长合幕墙设计院有限公司 | Construction process of assembled automobile ramp |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070163205A1 (en) * | 2006-01-17 | 2007-07-19 | Johns Bradley W | Method for constructing decks |
CN102425234A (en) * | 2011-12-08 | 2012-04-25 | 宋锦琳 | Movable board house |
CN202644722U (en) * | 2012-05-29 | 2013-01-02 | 白一帆 | Portable easy-to-assemble module board room |
CN203347278U (en) * | 2013-06-09 | 2013-12-18 | 华中科技大学 | Barrier-free multifunctional room |
CN203347035U (en) * | 2013-05-20 | 2013-12-18 | 潍坊华宏钢结构工程有限公司 | Fully-spliced internally-connected thermal insulation board room |
CN203504475U (en) * | 2013-05-17 | 2014-03-26 | 招维果 | Modular combined type mobile solar power station |
-
2014
- 2014-04-03 CN CN201410134793.6A patent/CN103982038B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070163205A1 (en) * | 2006-01-17 | 2007-07-19 | Johns Bradley W | Method for constructing decks |
CN102425234A (en) * | 2011-12-08 | 2012-04-25 | 宋锦琳 | Movable board house |
CN202644722U (en) * | 2012-05-29 | 2013-01-02 | 白一帆 | Portable easy-to-assemble module board room |
CN203504475U (en) * | 2013-05-17 | 2014-03-26 | 招维果 | Modular combined type mobile solar power station |
CN203347035U (en) * | 2013-05-20 | 2013-12-18 | 潍坊华宏钢结构工程有限公司 | Fully-spliced internally-connected thermal insulation board room |
CN203347278U (en) * | 2013-06-09 | 2013-12-18 | 华中科技大学 | Barrier-free multifunctional room |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104967392A (en) * | 2015-06-09 | 2015-10-07 | 中电投电力工程有限公司 | Photovoltaic power station built on fly ash field |
CN105298158A (en) * | 2015-10-14 | 2016-02-03 | 中建钢构有限公司 | Ocean green human settlements system and modular construction method thereof |
CN105298157A (en) * | 2015-10-14 | 2016-02-03 | 中建钢构有限公司 | Ocean green human settlements system and modular construction method thereof |
WO2017063416A1 (en) * | 2015-10-14 | 2017-04-20 | 中建钢构有限公司 | Maritime green human settlement system and modularized construction method therefor |
US10415232B2 (en) | 2015-10-14 | 2019-09-17 | China Construction Steel Structure Corp. Ltd. | Maritime green human settlement system and modularized construction method therefor |
CN106869305A (en) * | 2017-02-24 | 2017-06-20 | 中国有色金属工业第六冶金建设有限公司 | Modularized house builds construction technology |
CN107659257A (en) * | 2017-09-25 | 2018-02-02 | 何成祥 | Matrix photovoltaic generation platform |
CN112502285A (en) * | 2020-08-31 | 2021-03-16 | 天津泰明加德低碳住宅科技发展有限公司 | DNA module fast-assembling room |
CN114541670A (en) * | 2022-03-02 | 2022-05-27 | 河南长合幕墙设计院有限公司 | Construction process of assembled automobile ramp |
Also Published As
Publication number | Publication date |
---|---|
CN103982038B (en) | 2016-03-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103982038A (en) | Construction method for solar separate house modular rapid assembly | |
CN103184762B (en) | Multi-story/high-rise fabricated steel structural prestressed supporting system capable of realizing rigid connection of joints | |
CN202176123U (en) | Assembled box-type integrated house with industrial production | |
CN202131835U (en) | Prefabricated assembly type glass fence | |
CN101418592A (en) | Combined light steel structure house and mounting method thereof | |
CN205421547U (en) | Module building system is assembled to low layer | |
CN101440635A (en) | One layer combined type light steel structure house and installation method thereof | |
CN103334490A (en) | Multi-story high-rise fabricated steel structure framework supporting system | |
CN205153114U (en) | Lightweight steel structure modularized residential building | |
CN103334488A (en) | Assembled steel structure deformed column framework support system | |
CN104060853A (en) | Lightweight steel structure modularized residential building | |
CN102912972A (en) | Multifunctional lifting steel platform switching jig and construction method | |
CN105332417A (en) | Method for constructing prefabricated steel frame composite structure with concrete wrapped outside | |
CN107762161B (en) | A kind of energy-saving assembled system of steel residential structure and installation method | |
CN201401027Y (en) | Assembly archaizing four-corner pavilion | |
CN104878867A (en) | Integrated structure of ceiling keel and double-layer construction platform and manufacturing method thereof | |
CN203247868U (en) | Large-span steel structure construction temporary supporting frame | |
CN204475921U (en) | The dismountable firm structural construction factory building of a kind of safety | |
CN203808237U (en) | Tall building structure system with prefabricated assembled type buckling-restrained steel plate shear walls | |
CN103485538B (en) | A kind of energy-saving heat preserving Waterproof wood truss Roof system construction method | |
CN103276839B (en) | The how high-rise assembled steel framework-eccentrical braces of a kind of hollow irregular column | |
CN103290922B (en) | A kind of industrialization assembling post through beam steel flanged beam steel structure frame system | |
CN102392493A (en) | Vertical reinforcing plate type square steel pipe column and H-shaped steel beam node | |
CN108590025A (en) | A kind of bamboo matter green prefabricated buildings and its method of construction | |
CN202865996U (en) | Room modular structure for nuclear power plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 230000 building 3, 262 Heping Road, Yaohai District, Hefei City, Anhui Province Patentee after: No 6 Construction Co.,Ltd. of China Construction Fourth Engineering Bureau Address before: 230011 science and Technology Department of No.6 company of China Construction Fourth Bureau, Dongfang Building, intersection of Changjiang East Street and Mingguang Road, Yaohai District, Hefei City, Anhui Province Patentee before: CHINA CONSTRUCTION 4TH ENGINEERING BUREAU, 6TH Co.,Ltd. |
|
CP03 | Change of name, title or address |