Technical field
The utility model relates to a kind of building in the style of the ancients, refers to a kind of assembly unit four jiaos of booths modelled after an antique especially.
Background technology
Four jiaos of booth buildings also are one of Ancient Times in China architectural styles, in a lot of scenic spots and historical sites of modern society, all with a hook at the end, four jiaos of booths in past are built and are required selection very strict, its lost labor, time and timber, therefore the ancient building construction is fewer and feweri, and this has influenced the propagation of ancient building to a great extent.
The utility model content
The purpose of this utility model provides a kind of assembly unit four jiaos of booths modelled after an antique, and it is good that it builds saving of labor, laborsaving, province's cycle and overall structure.
To achieve these goals, technical solution of the present utility model is: a kind of assembly unit four jiaos of booths modelled after an antique, it comprises that platform is bright, four seat stool lintels, four peripheral columns, the flower serratd edge, four reversal of the natural order of things lintels, four cantilevered corner beams, the angle cloud, well beam, three of four groups of purlins, suspended column, roof boarding, the brain rafter, flying-rafter, eave-rafter, the top steelframe, tiling, ridge and Bao Ding hang down, described exposed installation places on the ground, described peripheral column bottom be installed on platform bright on, described peripheral column upper end steel column and angle cloud are pegged graft and are installed, welding purlin steelframe above the described peripheral column, three of described purlins are bolted on the purlin steelframe, described well beam is bolted on three of the purlins, the steel column of described cantilevered corner beam one end and peripheral column upper end is pegged graft, the described cantilevered corner beam other end all is fixed on the suspended column, on described cantilevered corner beam and the nine-squares beam roof boarding is installed, grafting brain rafter on the described roof boarding, flying-rafter and eave-rafter, described brain rafter, welding top steelframe on flying-rafter and the eave-rafter, described tiling is bolted on the steelframe of top, described vertical ridge is welded on the roof boarding, described seat stool lintel, reversal of the natural order of things lintel all welds with peripheral column, described colored serratd edge is pegged graft with reversal of the natural order of things lintel, and described Bao Ding is socketed on the suspended column.
The utility model assembly unit four jiaos of booths modelled after an antique, wherein said bright, seat stool lintel, peripheral column, reversal of the natural order of things lintel, cantilevered corner beam, angle cloud, Jing Ziliang, three of purlins, suspended column, roof boarding, brain rafter, flying-rafter, eave-rafter, tiling, hang down ridge and Bao Ding adopt the FRIM material to make.
The utility model assembly unit four jiaos of booths modelled after an antique, wherein said colored serratd edge adopts composite material to make.
The utility model assembly unit four jiaos of booths modelled after an antique, wherein said vertical ridge top are bolted with hang down beast and beast.
The utility model assembly unit four jiaos of booths modelled after an antique, between three of wherein said purlins and the purlin steelframe, be spirally connected by tapping screw between three of described well beam and the purlins fixing.
The utility model assembly unit four jiaos of booths modelled after an antique, mount pad stool plate, described seat stool plate and peripheral column welding on wherein said seat stool lintel.
After adopting such scheme, the utility model assembly unit four jiaos of booths modelled after an antique are each parts to be made in advance to be ready to earlier, splicing fits together again, from the construction angle, save the time and the manpower and materials of four jiaos of booths of integral constructing, be not subjected to the restriction of construction ground simultaneously, can be earlier after other place assembles some parts splicings, be placed in the job site again, and the four jiaos of booth overall structures modelled after an antique after should assembling are good.
Description of drawings
Fig. 1 is the plane structure schematic diagram of the utility model assembly unit four jiaos of booths modelled after an antique;
Fig. 2 is the structural representation of the work progress one of the utility model assembly unit four jiaos of booths modelled after an antique;
Fig. 3 is the structural representation of the work progress two of the utility model assembly unit four jiaos of booths modelled after an antique;
Fig. 4 is the structural representation of the work progress three of the utility model assembly unit four jiaos of booths modelled after an antique.
The specific embodiment
See also the plane structure schematic diagram of the utility model assembly unit shown in Figure 1 four jiaos of booths modelled after an antique, it comprises bright 1, four seat stool lintel of platform 2, four peripheral columns 3, flower serratd edge 4, four reversal of the natural order of things lintels 5, four cantilevered corner beams 6, angle cloud 7, well beam 8, four groups of three 9 of purlins, suspended column 10, roof boarding 11, brain rafter 12, flying-rafter 13, eave-rafter 14, top steelframe 15, tiling 16, the ridge 17 that hangs down, precious tops 18, hang down beastly 19 and beast 20, and beast 20 is respectively lion, phoenix, dragon, celestial being.
In conjunction with shown in Figure 2, platform bright 1 is arranged on the ground, platform bright 1 is provided with step 30, peripheral column 3 bottoms are installed on the platform bright 1, and peripheral column 3 upper end steel columns 31 are pegged graft with angle cloud 7 and installed, welding purlin steelframe 91 above the peripheral column 3, three 9 of purlins are bolted on the purlin steelframe 91 by tapping screw, well beam 8 is bolted on three 9 of the purlins by tapping screw, and the steel column 31 of cantilevered corner beam 6 one ends and peripheral column 3 upper ends is pegged graft, and cantilevered corner beam 6 other ends all are fixed on the suspended column 10.
In conjunction with shown in Figure 3, roof boarding 11, grafting brain rafter 12, flying-rafter 13 and eave-rafter 14 on the roof boarding 11 are installed on cantilevered corner beam 6 and the nine-squares beam 8.
In conjunction with Fig. 1 and shown in Figure 4, welding top steelframe 15 on brain rafter 12, flying-rafter 13 and the eave-rafter 14, tiling 16 is bolted on the top steelframe 15, the ridge 17 that hangs down is welded on the roof boarding 11, seat stool lintel 2, reversal of the natural order of things lintel 5 all weld with peripheral column 3, and flower serratd edge 4 is pegged graft with reversal of the natural order of things lintel 5, mount pad stool plate 40 on stool lintel 2, seat stool plate 40 and peripheral column 3 welding, precious top 18 is socketed on the suspended column 10.Vertical ridge 17 tops are bolted with hang down beast 19 and beast 20.
The utility model assembly unit four jiaos of booths modelled after an antique are made each parts in advance and are ready to, splicing fits together again, from the construction angle, the time and the manpower and materials of four jiaos of booths of integral constructing have been saved, be not subjected to simultaneously the restriction of construction ground, can earlier after other place assembles some parts splicings, be placed in the job site again, and the four jiaos of booth overall structures modelled after an antique after should assembling be good.
The platform of the utility model assembly unit four jiaos of booths modelled after an antique is bright 1, seat stool lintel 2, peripheral column 3, reversal of the natural order of things lintel 5, cantilevered corner beam 6, angle cloud 7, well beam 8, three 9 of purlins, suspended column 10, roof boarding 11, brain rafter 12, flying-rafter 13, eave-rafter 14, tiling 16, hang down ridge 17 and precious top 18 adopt the FRIM materials to make.Flower serratd edge 4 adopts composite material to make.Four jiaos of booths that four jiaos of existing integral body of booth weight ratio of the integral body that its each parts assembly unit is got up are built up are gently a lot, and each modular construction is simply compact, and material uses the overall structure of environmental protection and saving and its each parts splicing assembling good.
The above embodiment is described preferred implementation of the present utility model; be not that scope of the present utility model is limited; under the prerequisite that does not break away from the utility model design spirit; various distortion and improvement that the common engineers and technicians in this area make the technical solution of the utility model all should fall in the definite protection domain of claims of the present utility model.