CN207749908U - A kind of enclosure wall of full assembly lightweight steel construction - Google Patents

A kind of enclosure wall of full assembly lightweight steel construction Download PDF

Info

Publication number
CN207749908U
CN207749908U CN201721339317.3U CN201721339317U CN207749908U CN 207749908 U CN207749908 U CN 207749908U CN 201721339317 U CN201721339317 U CN 201721339317U CN 207749908 U CN207749908 U CN 207749908U
Authority
CN
China
Prior art keywords
prefabricated
wall
foundation
column
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721339317.3U
Other languages
Chinese (zh)
Inventor
杨松
杨晓
杨超
卢安清
罗红旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Guangshengda Construction Co Ltd
Original Assignee
Shenzhen Guangshengda Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Guangshengda Construction Co Ltd filed Critical Shenzhen Guangshengda Construction Co Ltd
Application granted granted Critical
Publication of CN207749908U publication Critical patent/CN207749908U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/16Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • E04H17/22Anchoring means therefor, e.g. specially-shaped parts entering the ground; Struts or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Fencing (AREA)

Abstract

The utility model discloses a kind of enclosure walls of full assembly lightweight steel construction;The enclosure wall is made of the interconnection of multiple repetitive units, and each repetitive unit includes prefabricated column foundation, prefabricated foundation of wall, prefabricated post, prefabricated panel, prefabricated bolumn cap and dry wall eaves;Prefabricated foundation of wall longitudinal middle part is equipped with card slot;One end face of prefabricated post is equipped with vertical card slot;Prefabricated column foundation and dry wall basis instrument are on smooth good foundation pit bottom surface;Prefabricated foundation of wall both ends are connected with prefabricated column foundation respectively;Prefabricated post is connect with prefabricated column foundation;The column of prefabricated panel both sides is stuck in the card slot of two prefabricated posts, and prefabricated panel is stuck in the card slot of prefabricated foundation of wall.The utility model can substitute the bounding wall system of current situ wet operation method construction, and intensity and toughness can be compared with current well accepted stone brick wall fence or enclosure of concrete, and the utility model effectively shortens the construction period under the premise of ensureing that safety is beautiful, reduces waste.

Description

A kind of enclosure wall of full assembly lightweight steel construction
Technical field
The utility model is related to a kind of enclosure walls to belong to building work more particularly to a kind of enclosure wall of full assembly lightweight steel construction Journey field.
Background technology
Enclosure wall refers to a kind of vertical space partition constructure, general to use for enclosing, being isolated or protecting a certain region The materials such as timber, stone brick, concrete, metal are constructed.Well accepted at present is stone brick wall fence and enclosure of concrete.
Bounding wall system further includes the gatekeeper etc. of basic enclosure wall opening in addition to including vertical wall body structure.
General bounding wall system is made of column foundation, foundation of wall, column, wall, bolumn cap, wall eaves etc., in different bounding wall systems Occur with different types, it is also possible to not have:Such as in provisional light-duty bounding wall system, can there is no foundation of wall;It is certain to enclose In wall system, without wall eaves or without bolumn cap etc..
In Practical Project, bounding wall system generally uses the materials such as timber, stone brick, concrete, metal to construct.Current There are the following problems for bounding wall system:
The reasons such as 1, timber enclosure wall is low by the strength of materials, raw material supply is less are influenced, it is difficult to large-scale popularization.Easily by The area of typhoon influence, wooden enclosure wall are easy to be destroyed by disaster caused by a windstorm.Reduce the influence of wind if punched, and affects conduct The screening effect of enclosure wall, so the application of timber enclosure wall is limited.
2, it is slower to build speed by laying bricks or stones for stone brick wall fence.In order to reduce the differential settlement that building mortar layer is generated by compression, stone brick encloses Wall cannot disposably be built by laying bricks or stones to top, need often to build 1m high or so just pauses by laying bricks or stones, ability is upward after waiting mortar joints are stiff to have intensity Continue to build by laying bricks or stones.This just makes stone brick wall fence build speed by laying bricks or stones significantly to slow down, and needs to expend a large amount of artificial.Stone brick wall fence can produce when removing Raw many building wastes can also expend largely manually when clearing, also handle the pressure of building waste.
3, enclosure of concrete speed of application is slow because be related to formwork supporting plate, assembling reinforcement, casting concrete, concrete support The a series of activities such as shield.So the speed of application using enclosure of concrete is slower, and expend a large amount of artificial and materials.Concrete Enclosure wall will produce many building wastes when removing, and can also be expended when clearing largely manually, also handle the pressure of building waste.
4, metal enclosure wall is typically used as interim, small-sized enclosure wall at present, using poured in place concrete basis, metal component Between connected using the modes such as site welding or bolt, metal component can be realized partly and be recycled.Existing metal enclosure wall base This is all that the wall of enclosure wall is formed by polylith metal board material splice using single sheet metal as wall, in addition to basis is scene It pours, except speed of application is relatively slow, installation speed of the current metal enclosure wall on basis is also than faster.But due to structure Smaller at the single metal component section of wall, current metal enclosure wall is generally made more frivolous, usually on sheet metal Open up multiple ventilation holes, make it is penetrating inside and outside metal enclosure wall, and height it is smaller, otherwise enclosure wall becomes in the case where wind load is larger Shape is apparent;Therefore, existing metal enclosure wall can only be used as interim, small-sized enclosure wall and use, cannot be widely accepted Stone brick wall fence, enclosure of concrete are compared.
Utility model content
The purpose of this utility model be exactly to overcome the shortcomings of the existing bounding wall system of the prior art, provide a kind of wall with it is existing Some enclosure of concrete height is identical, not penetrating, it can be achieved that material all recycles, the big full assembly lightweight steel construction of strength of wall body Enclosure wall and assemble method effectively reduce the construction period, reduce waste of material.
The purpose of this utility model is realized by following methods:
A kind of enclosure wall of full assembly lightweight steel construction, which is characterized in that be made of the interconnection of multiple repetitive units, Mei Gechong Multiple unit includes prefabricated column foundation, prefabricated foundation of wall, prefabricated post, prefabricated panel, prefabricated bolumn cap and dry wall eaves;Prefabricated foundation of wall Longitudinal middle part is equipped with card slot;One end face of prefabricated post is equipped with vertical card slot;Prefabricated panel includes column, crossbeam, diagonal brace knead dough Plate;Column has more, and two root posts are respectively provided at both sides, and at least a root post is arranged among the column of both sides, and crossbeam has More, two crossbeams are separately positioned on both sides up and down, and an at least crossbeam is arranged between upper and lower both sides crossbeam;Crossbeam and column Connection;Diagonal brace is arranged between the vertical angles of the quadrangle in two crossbeams and two root posts formation;Prefabricated column foundation and dry wall Basis instrument is on smooth good foundation pit bottom surface;Prefabricated foundation of wall both ends are connected with prefabricated column foundation respectively;Prefabricated post with it is prefabricated Column foundation connects;The column of prefabricated panel both sides is stuck in the card slot of two prefabricated posts, and prefabricated panel is stuck in the card of prefabricated foundation of wall In slot, the top of prefabricated panel is equipped with dry wall eaves, is equipped with prefabricated bolumn cap at the top of prefabricated post, dry wall eaves both ends respectively with it is prefabricated Bolumn cap connects;Column, crossbeam and diagonal brace be light gauge cold-formed steel shape component, and panel is arranged to be constituted in column, crossbeam and diagonal brace Plane both sides.
To further realize the utility model aim, it is preferable that a height of 2.5m~3m of the prefabricated panel 4, length are 3m~4m.
Preferably, the prefabricated column foundation and prefabricated foundation of wall for concrete formation or use metal material;It is prefabricated post, pre- Bolumn cap processed, dry wall eaves are cladded with decoration panel using lightweight steel component as keel.
Preferably, the prefabricated panel includes four columns, three crossbeams and four diagonal braces;Two root posts are separately positioned on Both sides, two root posts are uniformly arranged among the column of both sides;Two crossbeams are separately positioned on both sides up and down, a crossbeam setting Among upper and lower both sides crossbeam;On the quadrangle that four diagonal braces are separately positioned on two crossbeams and two root posts are formed.
Preferably, the prefabricated panel includes 7 root posts, 4 crossbeams and 16 diagonal braces;Two root posts are separately positioned on two Side, 5 root posts are arranged among the column of both sides, and the positive middle part of column in both sides is arranged in an intermediate root post, and middle standing pillar is left The right side respectively sets two root posts;Two crossbeams are separately positioned on both sides up and down, and in addition two crossbeams are arranged among upper and lower both sides crossbeam, It is spaced between intermediate two crossbeams larger;Middle standing pillar is disconnected with intermediate two crossbeam junctions;16 diagonal braces are separately positioned on Arbitrary two crossbeams and two root posts are formed in the vertical angles of square.
Preferably, it is bolted at the top of the bottom of the prefabricated post and prefabricated column foundation.
Preferably, the bottom edge of the prefabricated panel and the top surface of prefabricated foundation of wall are bolted.
Preferably, the dry wall eaves is connected by the top of bolt and prefabricated panel;The both ends of dry wall eaves pass through spiral shell Bolt is connect with prefabricated post.
Preferably, the prefabricated bolumn cap is connected by the top of bolt and prefabricated post.
The prefabricated column foundation, prefabricated foundation of wall use prefabricated components, non-at-scene to pour.
Compared with the existing technology, the utility model has the following advantages that and advantageous effect:
1) the utility model speed of application is fast.Enclosure wall excavation of foundation pit and it is smooth it is good after, by prefabricated column foundation and the prefabricated wall base Plinth is set on smooth good foundation pit bottom surface, is bolted at the top of prefabricated column bottom and prefabricated column foundation, using lifting Prefabricated panel both sides are inserted into the card slot of prefabricated post by means from top to bottom, and prefabricated panel bottom edge and the top surface of prefabricated foundation of wall are logical It crosses and is bolted.Prefabricated bolumn cap is connected by the top of bolt and prefabricated post, and dry wall eaves passes through bolt and prefabricated panel top Connection, the both ends of dry wall eaves are connect by bolt with prefabricated post.Prefabricated column foundation, prefabricated foundation of wall, pre- is installed repeatedly Column processed, prefabricated panel, prefabricated bolumn cap, dry wall eaves.All modules are prefabricated, only need to use spiral shell at the scene between module It tethers and connects, so installation speed is fast.
2) the utility model has the advantages of convenient installation.Due to using lightweight steel construction, so prefabricated post, prefabricated panel do not weigh.By normal Enclosure wall 2.5m~the 3m high seen, the wide 3m~4m of every wallboard are calculated, monolithic wallboard weight about 120kg~150kg, two, three behaviour Making personnel can easily utilize mini-plant to carry, install and dismounting.In addition to prefabricated panel be embedded in prefabricated post card slot it Outside, other connection types, which are all made of, is bolted, therefore installs and dismantle all convenient and efficient.
3) the utility model is fabricated to prefabricated post, prefabricated panel and prefabricated column foundation, dry wall using light gauge cold-formed steel shape Basic, prefabricated bolumn cap, dry wall eaves form the larger structure of intensity and toughness, although being significantly less weight than stone brick wall fence and coagulation fortifield village Wall, but strength and stiffness are at all no less than both rear.So the utility model can by surfaces of wall cover decoration panel, Well accepted stone brick wall fence or enclosure of concrete are simulated in terms of perception;
4) the utility model makes all modules of bounding wall system can be recycled, and avoids wasting.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of a repetitive unit of the enclosure wall of full assembly lightweight steel construction of the utility model.
Fig. 2 is the structural schematic diagram of prefabricated column foundation in Fig. 1.
Fig. 3 is the structural schematic diagram of prefabricated foundation of wall in Fig. 1.
Fig. 4 is the structural schematic diagram of prefabricated post in Fig. 1.
Fig. 5 is the structural representation of the first way of realization of prefabricated panel in Fig. 1.
Fig. 6 is the structural representation of second of way of realization of prefabricated panel in Fig. 1.
Fig. 7 is prefabricated bolumn cap and dry wall eaves scheme of installation in Fig. 1.
It is shown in figure, prefabricated column foundation 1, prefabricated foundation of wall 2, prefabricated post 3, prefabricated panel 4, prefabricated bolumn cap 5, dry wall eaves 6, column 4-1, crossbeam 4-2, diagonal brace 4-3.
Specific implementation mode
Preferably to support the utility model, the utility model will be further described below with reference to the accompanying drawings, but this reality It is unlimited so with novel embodiment.
As shown in figs. 1-7, a kind of enclosure wall of full assembly lightweight steel construction, is made of, each the interconnection of multiple repetitive units Repetitive unit includes prefabricated column foundation 1, prefabricated foundation of wall 2, prefabricated post 3, prefabricated panel 4, prefabricated bolumn cap 5 and dry wall eaves 6; Prefabricated column foundation 1 and the preferably concrete formation of prefabricated foundation of wall 2 use metal material;2 longitudinal middle part of prefabricated foundation of wall is set There is card slot;One end face of prefabricated post 3 is equipped with vertical card slot;Prefabricated panel 4 includes column 4-1, crossbeam 4-2, diagonal brace 4-3 knead doughs Plate;Column 4-1 has more, and two root posts are respectively provided at both sides, and at least a root post is arranged among the column of both sides, crossbeam 4-2 has more, and two crossbeams are separately positioned on both sides up and down, and an at least crossbeam is arranged between upper and lower both sides crossbeam;Crossbeam 4-2 is connected with column 4-1;Diagonal brace 4-3 is arranged between the vertical angles of the quadrangle in two crossbeams and two root posts formation;It is preferred that A height of 2.5m~3m of prefabricated panel 4, length are 3m~4m;Prefabricated column foundation 1 and prefabricated foundation of wall 2 are set to smooth good base It cheats on bottom surface;2 both ends of prefabricated foundation of wall are connected with prefabricated column foundation 1 respectively;Prefabricated post 3 is connect with prefabricated column foundation 1;It is prefabricated The column of 4 both sides of wallboard is stuck in the card slot of two prefabricated posts 3, and prefabricated panel 4 is stuck in the card slot of prefabricated foundation of wall 2, dry wall The top of plate 4 is equipped with dry wall eaves 6, and the top of prefabricated post 3 is equipped with prefabricated bolumn cap 5,6 both ends of dry wall eaves respectively with prefabricated bolumn cap 5 Connection.Column 4-1, crossbeam 4-2 and diagonal brace 4-3 are light gauge cold-formed steel shape component, panel setting in column 4-1, crossbeam 4-2 and The plane both sides that diagonal brace 4-3 is constituted.
Preferably, as shown in figure 5, the first way of realization of prefabricated panel 4 include four columns 4-1, three crossbeam 4-2 and Four diagonal brace 4-3;Two root posts are respectively provided at both sides, and two root posts are uniformly arranged among the column of both sides;Two crossbeams Both sides up and down are separately positioned on, a crossbeam is arranged among upper and lower both sides crossbeam;Four diagonal brace 4-3 are separately positioned on two cross On the quadrangle that beam and two root posts are formed.
Preferably, as shown in fig. 6, second of the way of realization of prefabricated panel 4 include 7 root post 4-1, four crossbeam 4-2 and 16 diagonal brace 4-3;Two root posts are respectively provided at both sides, and 5 root posts are arranged among the column of both sides, and an intermediate root post is set The positive middle part of column in both sides is set, middle standing pillar or so respectively sets two root posts;Two crossbeams are separately positioned on both sides up and down, in addition Two crossbeams are arranged among upper and lower both sides crossbeam, are spaced between intermediate two crossbeams larger;Middle standing pillar and intermediate two cross Beam junction disconnects;16 diagonal brace 4-3 are separately positioned on arbitrary two crossbeams and two root posts are formed in the vertical angles of square.
Preferably, the bottom of prefabricated post 3 and the top of prefabricated column foundation 1 are bolted;The bottom edge of prefabricated panel 4 with The top surface of prefabricated foundation of wall 2 is bolted;Dry wall eaves 6 is connect by bolt with the top of prefabricated panel 4;Dry wall eaves 6 both ends are connect by bolt with prefabricated post 3.Prefabricated bolumn cap 5 is connected by the top of bolt and prefabricated post.
Prefabricated post 3, prefabricated panel 4, prefabricated bolumn cap 5, dry wall eaves 6 are cladded with decoration panel using lightweight steel component as keel.
A kind of assemble method of full assembly lightweight steel construction enclosure wall, prefabricated column foundation and the prefabricated wall base in each repetitive unit Plinth is set on smooth good foundation pit bottom surface, and prefabricated post surface is equipped with vertical card slot, the top of prefabricated column bottom and prefabricated column foundation Portion connects, and 4 both sides of prefabricated panel is inserted into from top to bottom in the card slot of prefabricated post 3 using lifting mode or other modes, in advance 4 bottom of wallboard processed is connect with the top of prefabricated foundation of wall;Prefabricated bolumn cap 5 is connect with the top of prefabricated post, dry wall eaves 6 with it is prefabricated 4 top connection of wallboard, the both ends of dry wall eaves are connect with prefabricated post;Two neighboring repetitive unit repeat to install prefabricated column foundation, Prefabricated foundation of wall, prefabricated post, prefabricated panel, prefabricated bolumn cap, dry wall eaves form full assembly lightweight steel construction enclosure wall.
To further realize the utility model aim, the prefabricated column foundation and prefabricated foundation of wall using concrete material, Metal material.
The utility model speed of application is fast.Enclosure wall excavation of foundation pit and it is smooth it is good after, by prefabricated column foundation and prefabricated foundation of wall It is set on smooth good foundation pit bottom surface, is bolted at the top of prefabricated column bottom and prefabricated column foundation, using lifting hand Prefabricated panel both sides are inserted into the card slot of prefabricated post by section from top to bottom, and prefabricated panel bottom edge and the top surface of prefabricated foundation of wall pass through It is bolted.Prefabricated bolumn cap is connected by the top of bolt and prefabricated post, and dry wall eaves at the top of bolt and prefabricated panel by connecting It connects, the both ends of dry wall eaves are connect by bolt with prefabricated post.Prefabricated column foundation, prefabricated foundation of wall, prefabricated is installed repeatedly Column, prefabricated panel, prefabricated bolumn cap, dry wall eaves.All modules are prefabricated, only need to use bolt at the scene between module Connection, so installation speed is fast.
The utility model has the advantages of convenient installation.Due to using lightweight steel construction, so prefabricated post, prefabricated panel do not weigh.By common Enclosure wall 2.5m~3m high, the wide 3m~4m of every wallboard calculates, monolithic wallboard weight about 120kg~150kg, two, three operations Personnel can easily utilize mini-plant to carry, install and dismounting.Other than prefabricated panel is embedded in the card slot of prefabricated post, Other connection types, which are all made of, to be bolted, therefore is installed and dismantled all convenient and efficient.
The utility model is fabricated to prefabricated post, prefabricated panel and prefabricated column foundation, the prefabricated wall base using light gauge cold-formed steel shape Plinth, prefabricated bolumn cap, dry wall eaves form the larger structure of intensity and toughness, although being significantly less weight than stone brick wall fence and coagulation fortifield village Wall, but strength and stiffness are at all no less than both rear.So the utility model can by surfaces of wall cover decoration panel, Well accepted stone brick wall fence or enclosure of concrete are simulated in terms of perception;
The utility model makes all modules of bounding wall system can be recycled, and avoids wasting.
The utility model can substitute the bounding wall system of current situ wet operation method construction, intensity and toughness can at present widely The stone brick wall fence or enclosure of concrete of receiving are compared;The utility model can simulate stone brick by covering decoration panel in surfaces of wall The appearance of enclosure wall or enclosure of concrete;The utility model can effectively shorten the construction period under the premise of ensureing that safety is beautiful, subtract Little waste.

Claims (9)

1. a kind of enclosure wall of full assembly lightweight steel construction, which is characterized in that it is made of the interconnection of multiple repetitive units, it is each to repeat Unit includes prefabricated column foundation, prefabricated foundation of wall, prefabricated post, prefabricated panel, prefabricated bolumn cap and dry wall eaves;Prefabricated foundation of wall is vertical It is equipped with card slot to middle part;One end face of prefabricated post is equipped with vertical card slot;Prefabricated panel includes column, crossbeam, diagonal brace and panel; Column has more, and two root posts are respectively provided at both sides, and at least a root post is arranged among the column of both sides, and crossbeam has more Root, two crossbeams are separately positioned on both sides up and down, and an at least crossbeam is arranged between upper and lower both sides crossbeam;Crossbeam and column connect It connects;Diagonal brace is arranged between the vertical angles of the quadrangle in two crossbeams and two root posts formation;Prefabricated column foundation and the prefabricated wall base Plinth is set on smooth good foundation pit bottom surface;Prefabricated foundation of wall both ends are connected with prefabricated column foundation respectively;Prefabricated post and prefabricated post Basis connection;The column of prefabricated panel both sides is stuck in the card slot of two prefabricated posts, and prefabricated panel is stuck in the card slot of prefabricated foundation of wall Interior, the top of prefabricated panel is equipped with dry wall eaves, is equipped with prefabricated bolumn cap at the top of prefabricated post, dry wall eaves both ends respectively with prefabricated post Cap connects;Column, crossbeam and diagonal brace are light gauge cold-formed steel shape component, and panel is arranged puts down what column, crossbeam and diagonal brace were constituted Face both sides.
2. it is according to claim 1 it is full assembly lightweight steel construction enclosure wall, which is characterized in that the prefabricated panel 4 it is a height of 2.5m~3m, length are 3m~4m.
3. the enclosure wall of full assembly lightweight steel construction according to claim 1, which is characterized in that the prefabricated column foundation and prefabricated Foundation of wall is concrete formation or uses metal material;Prefabricated post, prefabricated bolumn cap, dry wall eaves are using lightweight steel component as dragon Bone is cladded with decoration panel.
4. the enclosure wall of full assembly lightweight steel construction according to claim 1, which is characterized in that the prefabricated panel includes four Column, three crossbeams and four diagonal braces;Two root posts are respectively provided at both sides, and two root posts are uniformly arranged in the column of both sides Between;Two crossbeams are separately positioned on both sides up and down, and a crossbeam is arranged among upper and lower both sides crossbeam;Four diagonal braces are respectively set On the quadrangle that two crossbeams and two root posts are formed.
5. the enclosure wall of full assembly lightweight steel construction according to claim 1, which is characterized in that the prefabricated panel includes 7 Column, 4 crossbeams and 16 diagonal braces;Two root posts are respectively provided at both sides, and 5 root posts are arranged among the column of both sides, in Between a root post the positive middle part of column in both sides is set, middle standing pillar or so respectively sets two root posts;Two crossbeams are separately positioned on Upper and lower both sides, in addition two crossbeams settings are spaced larger among upper and lower both sides crossbeam between intermediate two crossbeams;Middle standing pillar It is disconnected with intermediate two crossbeam junctions;16 diagonal braces are separately positioned on arbitrary two crossbeams and two root posts form square In vertical angles.
6. the enclosure wall of full assembly lightweight steel construction according to claim 1, which is characterized in that the bottom of the prefabricated post with it is pre- It is bolted at the top of column foundation processed.
7. it is according to claim 1 it is full assembly lightweight steel construction enclosure wall, which is characterized in that the bottom edge of the prefabricated panel with The top surface of prefabricated foundation of wall is bolted.
8. the enclosure wall of full assembly lightweight steel construction according to claim 1, which is characterized in that the dry wall eaves passes through bolt It is connect with the top of prefabricated panel;The both ends of dry wall eaves are connect by bolt with prefabricated post.
9. the enclosure wall of full assembly lightweight steel construction according to claim 1, which is characterized in that the prefabricated bolumn cap passes through bolt It is connect with the top of prefabricated post.
CN201721339317.3U 2017-10-17 2017-10-18 A kind of enclosure wall of full assembly lightweight steel construction Active CN207749908U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710964191 2017-10-17
CN2017109641917 2017-10-17

Publications (1)

Publication Number Publication Date
CN207749908U true CN207749908U (en) 2018-08-21

Family

ID=61697380

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201721339317.3U Active CN207749908U (en) 2017-10-17 2017-10-18 A kind of enclosure wall of full assembly lightweight steel construction
CN201710969356.XA Withdrawn CN107859435A (en) 2017-10-17 2017-10-18 A kind of full assembling lightweight steel construction bounding wall system and assemble method

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201710969356.XA Withdrawn CN107859435A (en) 2017-10-17 2017-10-18 A kind of full assembling lightweight steel construction bounding wall system and assemble method

Country Status (1)

Country Link
CN (2) CN207749908U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725613A (en) * 2019-10-28 2020-01-24 泸州市丹山建材科技有限公司 Building engineering enclosure

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439360A (en) * 2018-05-02 2019-11-12 深圳市前海胜德建筑科技有限公司 A kind of light steel enclosure wall of assembled and its installation method
CN108729542A (en) * 2018-07-18 2018-11-02 北京玖新创世科技有限公司 A kind of prefabrication main body and construction method
CN109339235B (en) * 2018-12-10 2024-03-19 辰信重工(江苏)有限公司 High-rise building thin-wall steel structure convenient to improve stability
CN110630088A (en) * 2019-08-29 2019-12-31 廊坊卓锐建材有限公司 Assembled antique artistic enclosing wall and construction method thereof
CN111387096B (en) * 2020-04-30 2021-09-28 浙江东一海洋集团有限公司 Be applied to large-scale rail facility in marine ranch

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725613A (en) * 2019-10-28 2020-01-24 泸州市丹山建材科技有限公司 Building engineering enclosure

Also Published As

Publication number Publication date
CN107859435A (en) 2018-03-30

Similar Documents

Publication Publication Date Title
CN207749908U (en) A kind of enclosure wall of full assembly lightweight steel construction
CN106013454B (en) Building and method of construction based on large spatial structure body and free-standing peripheral structure
CN105143570B (en) Building structure and construction method for same
CN206053131U (en) Precast floor slab steel reinforcement cage component and floor
CN206052964U (en) Prefabricated composite steel reinforcement cage component and structure
CN2931627Y (en) Frame and wall plate combined building
CN109944324A (en) Steel concrete combo box trestle and the combination assembled structural system of reinforced concrete frame column
CN108316469A (en) A kind of prefabrication system and its construction technology
CN208219844U (en) A kind of prefabrication system
CN205875520U (en) Precast beam steel reinforcement cage component and reinforced concrete roof beam
CN217975378U (en) Cast-in-place board template strutting arrangement of simple beam assembled
CN207794401U (en) A kind of composite floor
CN110230414A (en) A kind of assembled platform canopy and its installation method
CN210529916U (en) Low-rise assembled steel concrete structure building
CN111719578B (en) Archaized building and construction process
CN208056319U (en) The connection structure of non-corner brace steel post and outer enclosure wall in portal-rigid frames light house
CN208294238U (en) A kind of parapeted prefabricated assembled Assembled surrounding wall of tool
CN207892338U (en) Combined self-stabilization fast-assembling communication tower
CN205875402U (en) Building based on big spatial structure body and free -standing outer protective structure
CN104631910B (en) Prefabricated enclosure wall
KR200426155Y1 (en) Mold for construction of a mud-plastered house's wall
CN213927853U (en) Prefabricated enclosure
CN208363286U (en) The connection structure of the brace steel post of portal-rigid frames light house and outer enclosure wall
CN109944391A (en) Steel concrete combo box trestle
CN203048459U (en) Mechanism suitable for mounting arm attachment rods in standard section center of tower crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant