CN103556773A - Novel spliced wallboard for building - Google Patents
Novel spliced wallboard for building Download PDFInfo
- Publication number
- CN103556773A CN103556773A CN201310544669.2A CN201310544669A CN103556773A CN 103556773 A CN103556773 A CN 103556773A CN 201310544669 A CN201310544669 A CN 201310544669A CN 103556773 A CN103556773 A CN 103556773A
- Authority
- CN
- China
- Prior art keywords
- wallboard
- heated board
- fireproof heated
- shingle nail
- amalgamation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses a novel spliced wallboard for a building. The novel spliced wallboard comprises a fireproof insulation board, wherein the fireproof insulation board is provided with pouring penetration holes; wall surface boards are respectively adhered to two sides of the fireproof insulation board and form an integral structure through the pouring penetration holes; a wallboard expanding and splicing device is arranged at the periphery of the two wall surface boards. Fillers can be poured into the wall surface boards on the two sides of the fireproof insulation board through the pouring penetration holes, so that the integral structure is formed between the two wall surface boards, and the fireproof insulation board in the middle is encircled and fixed. Therefore, the connection between the two wall surface boards and the fireproof insulation board is tight and firm, so that the wall is good in sound insulation, heat insulation and fire resistance effects, a separation, drop or deformation phenomenon difficultly occurs even if the wallboard is used for a long time, and the use is safe and stable. Moreover, the connection between two wallboard layers is rapid and firm, and the construction efficiency is improved.
Description
Technical field
The present invention relates to a kind of technical field of building construction apparatus, relate in particular to a kind of novel building amalgamation wallboard.
Background technology
The body of wall of modern architecture is generally all provided with fireprotection layer, insulation layer and puigging, complete executing three construction stages of man-hour requirement, and require very strict for the time interval of constructing between adjacent two durations, body of wall humidity etc., if construction reference is undesirable, can have a strong impact on quality and the application life of building, so construction period is longer; And just rely on and be simply adhesively fixed between adjacent two flaggies, between adjacent two layers, not permeating deep layer fixes, and the end of flaggy is more straight, therefore fastness is poor, long-term use easily produces the fall phenomenon of separation or distortion of body of wall pull-up, therefore use is very dangerous, and the effect of fire prevention, insulation and sound insulation also significantly declines.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of easy construction, lightweight, little, body of wall novel building amalgamation wallboard firmly takes up room.
For solving the problems of the technologies described above, technical scheme of the present invention is: novel building amalgamation wallboard, comprise fireproof heated board, described fireproof heated board is provided with cast through hole, described fireproof heated board both sides are fitted with respectively shingle nail, described shingle nail forms integral structure by described cast through hole, and described in two, the periphery of shingle nail is provided with wallboard expansion splicing apparatus.
As preferred technical scheme, described wallboard expansion splicing apparatus comprises the wallboard tongue-and-groove that shingle nail described in two forms respectively at the adjacent dual-side of described fireproof heated board, the wallboard tenon that described in two, shingle nail forms respectively at the other adjacent dual-side of described fireproof heated board, the size relative set of described wallboard tenon and described wallboard tongue-and-groove.
As preferred technical scheme, described wallboard expansion splicing apparatus comprises the cast link slot that is arranged on described fireproof heated board outer periphery.
As preferred technical scheme, the sidewall of described cast link slot is provided with plug hole.
As preferred technical scheme, described shingle nail is gypsum plank or cement board.
As preferred technical scheme, described fireproof heated board is rock cotton board or mineral wool board.
Owing to having adopted technique scheme, novel building amalgamation wallboard, comprise fireproof heated board, described fireproof heated board is provided with cast through hole, described fireproof heated board both sides are fitted with respectively shingle nail, described shingle nail forms integral structure by described cast through hole, and described in two, the periphery of shingle nail is provided with wallboard expansion splicing apparatus; The invention has the beneficial effects as follows: the shingle nail of fireproof heated board both sides can be built filler by cast through hole makes both form integral structure, surround fixing middle fireproof heated board, make connection between three close and firm more, make body of wall sound insulation, insulation and fireproof better effects if, long-term use is also not easy to produce that separation comes off or metaboly, uses safety and stability more; And the connection between wallboard layer fast, firmly, contributes to improve efficiency of construction.
Accompanying drawing explanation
The following drawings is only intended to the present invention to schematically illustrate and explain, not delimit the scope of the invention.Wherein:
Fig. 1 is the structural representation of the embodiment of the present invention one;
Fig. 2 is the generalized section of the embodiment of the present invention one;
Fig. 3 is the use view of the embodiment of the present invention one;
Fig. 4 is the structural representation of the embodiment of the present invention two;
Fig. 5 is the generalized section of the embodiment of the present invention two;
Fig. 6 is the use view of the embodiment of the present invention two;
In figure: 1-fireproof heated board; 11-pours into a mould link slot; 2-pours into a mould through hole; 3-shingle nail; 4-wallboard tongue-and-groove; 5-wallboard tenon; 6-plug hole.
The specific embodiment
Below in conjunction with drawings and Examples, further set forth the present invention.In the following detailed description, only by the mode of explanation, some one exemplary embodiment of the present invention has been described.Undoubtedly, those of ordinary skill in the art can recognize, without departing from the spirit and scope of the present invention in the situation that, can to described embodiment, revise by various mode.Therefore, accompanying drawing is illustrative with being described in essence, rather than for limiting the protection domain of claim.
Embodiment mono-:
As shown in Figure 1, Figure 2 and Figure 3, novel building amalgamation wallboard, comprise fireproof heated board 1, described fireproof heated board 1 is provided with cast through hole 2, described fireproof heated board 1 both sides are fitted with respectively shingle nail 3, described shingle nail 3 forms integral structure by described cast through hole 2, and described in two, the periphery of shingle nail 3 is provided with wallboard expansion splicing apparatus.
The described wallboard expansion splicing apparatus of the present embodiment comprises the wallboard tongue-and-groove 4 that shingle nail 3 described in two forms respectively at the adjacent dual-side of described fireproof heated board 1, the wallboard tenon 5 that described in two, shingle nail 3 forms respectively at the other adjacent dual-side of described fireproof heated board 1, the size relative set of described wallboard tenon 5 and described wallboard tongue-and-groove 4.When splicing wallboard, wallboard tenon 5 and wallboard tongue-and-groove 4 are pegged graft mutually, the expansion that realizes wallboard area connects, and wall construction is processed more convenient, and the wallboard more straight than periphery in prior art connects more firm.
Described shingle nail 3 is gypsum plank or concrete slab, and described fireproof heated board 1 is set to rock cotton board, high insulating effect, and quality is firm, contributes to guarantee its application life.
Embodiment bis-:
As shown in Figure 4, Figure 5 and Figure 6, the difference of the present embodiment and embodiment mono-is: the structure of described wallboard expansion splicing apparatus changes to some extent, concrete is that described wallboard expansion splicing apparatus comprises the cast link slot 11 that is arranged on described fireproof heated board 1 outer periphery, and the sidewall of described cast link slot 11 is provided with plug hole 6.
By plug hole 6, can both be coupled together closely to the interior filler plaster of spliced cast link slot 11 or the concrete of adjacent two blocks of amalgamation wallboards, connect better effects if, use more firm.
The shingle nail of fireproof heated board of the present invention both sides can be built filler by cast through hole makes both form integral structure, surround fixing middle fireproof heated board, make connection between three close and firm more, make body of wall sound insulation, insulation and fireproof better effects if, long-term use is also not easy to produce separated obscission, uses safety and stability more; And the connection between wallboard layer fast, firmly, contributes to improve efficiency of construction.
More than show and described basic principle of the present invention, principal character and advantage of the present invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; that in above-described embodiment and manual, describes just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.The claimed scope of the present invention is defined by appending claims and equivalent thereof.
Claims (6)
1. novel building amalgamation wallboard, it is characterized in that: comprise fireproof heated board, described fireproof heated board is provided with cast through hole, described fireproof heated board both sides are fitted with respectively shingle nail, described shingle nail forms integral structure by described cast through hole, and described in two, the periphery of shingle nail is provided with wallboard expansion splicing apparatus.
2. novel building amalgamation wallboard as claimed in claim 1, it is characterized in that: described wallboard expansion splicing apparatus comprises the wallboard tongue-and-groove that shingle nail described in two forms respectively at the adjacent dual-side of described fireproof heated board, the wallboard tenon that described in two, shingle nail forms respectively at the other adjacent dual-side of described fireproof heated board, the size relative set of described wallboard tenon and described wallboard tongue-and-groove.
3. novel building amalgamation wallboard as claimed in claim 1, is characterized in that: described wallboard expansion splicing apparatus comprises the cast link slot that is arranged on described fireproof heated board outer periphery.
4. novel building amalgamation wallboard as claimed in claim 3, is characterized in that: the sidewall of described cast link slot is provided with plug hole.
5. the novel building amalgamation wallboard as described in claim 1,2,3 or 4, is characterized in that: described shingle nail is gypsum plank or cement board.
6. novel building amalgamation wallboard as claimed in claim 5, is characterized in that: described fireproof heated board is rock cotton board or mineral wool board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310544669.2A CN103556773A (en) | 2013-11-06 | 2013-11-06 | Novel spliced wallboard for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310544669.2A CN103556773A (en) | 2013-11-06 | 2013-11-06 | Novel spliced wallboard for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103556773A true CN103556773A (en) | 2014-02-05 |
Family
ID=50011110
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310544669.2A Pending CN103556773A (en) | 2013-11-06 | 2013-11-06 | Novel spliced wallboard for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103556773A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104213656A (en) * | 2014-08-07 | 2014-12-17 | 叶君华 | Construction method of denoising and fireproof plate |
CN110424561A (en) * | 2019-07-24 | 2019-11-08 | 李纪用 | A kind of nonmetallic fire-resistive construction material flame-retardant board |
CN114603943A (en) * | 2021-11-30 | 2022-06-10 | 中国电力科学研究院有限公司 | Heat-preservation sound-absorption and sound-insulation enclosure wall for transformer substation |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH073935A (en) * | 1991-10-11 | 1995-01-06 | Toho Kenzai:Kk | Fire resisting/sound insulating construction ceiling board |
CN2835415Y (en) * | 2005-11-07 | 2006-11-08 | 张卫东 | Light fireproof thermal-insulation composite wall board for inner wall |
CN201649429U (en) * | 2009-06-26 | 2010-11-24 | 沈阳北方建设股份有限公司 | Thermal-insulation sound-proof wall plate |
CN102433958A (en) * | 2011-12-12 | 2012-05-02 | 中冶建工集团有限公司 | Prefabricated wall board construction member |
CN202899426U (en) * | 2012-11-22 | 2013-04-24 | 四川鸥克建材科技有限公司 | Heat-insulating, soundproof and fireproof integrated wallboard |
CN203531218U (en) * | 2013-11-06 | 2014-04-09 | 陈浩 | Novel built-up wall board for building |
-
2013
- 2013-11-06 CN CN201310544669.2A patent/CN103556773A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH073935A (en) * | 1991-10-11 | 1995-01-06 | Toho Kenzai:Kk | Fire resisting/sound insulating construction ceiling board |
CN2835415Y (en) * | 2005-11-07 | 2006-11-08 | 张卫东 | Light fireproof thermal-insulation composite wall board for inner wall |
CN201649429U (en) * | 2009-06-26 | 2010-11-24 | 沈阳北方建设股份有限公司 | Thermal-insulation sound-proof wall plate |
CN102433958A (en) * | 2011-12-12 | 2012-05-02 | 中冶建工集团有限公司 | Prefabricated wall board construction member |
CN202899426U (en) * | 2012-11-22 | 2013-04-24 | 四川鸥克建材科技有限公司 | Heat-insulating, soundproof and fireproof integrated wallboard |
CN203531218U (en) * | 2013-11-06 | 2014-04-09 | 陈浩 | Novel built-up wall board for building |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104213656A (en) * | 2014-08-07 | 2014-12-17 | 叶君华 | Construction method of denoising and fireproof plate |
CN104213656B (en) * | 2014-08-07 | 2016-05-11 | 叶君华 | Noise reduction, fire-proof board construction method |
CN110424561A (en) * | 2019-07-24 | 2019-11-08 | 李纪用 | A kind of nonmetallic fire-resistive construction material flame-retardant board |
CN114603943A (en) * | 2021-11-30 | 2022-06-10 | 中国电力科学研究院有限公司 | Heat-preservation sound-absorption and sound-insulation enclosure wall for transformer substation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CL2014003521A1 (en) | Acoustic panel for the formation of a ceiling or wall, where the panel extends through a rectangular area with a nominal thickness and with a core made mainly of plaster; acoustic ceiling | |
WO2014144394A3 (en) | Insulated concrete masonry system | |
CA2499971A1 (en) | Multi-storey insulated concrete foam building | |
WO2007070848A3 (en) | Adobe building construction system and associated methods | |
GB2567341A8 (en) | Pre-cast concrete formwork, wall system and method of construction | |
CN103556773A (en) | Novel spliced wallboard for building | |
KR101413089B1 (en) | Outdoor wall finishing structure and construction method | |
CN104264871B (en) | Splicing seams construction method between a kind of precast wall panel | |
CN203531218U (en) | Novel built-up wall board for building | |
CN201474110U (en) | Heat insulation system in compound heat insulation keel | |
CN203334306U (en) | Self-embedding type retaining wall | |
KR100701497B1 (en) | Architectural brick Without mortar | |
CN204753865U (en) | Coincide formula foamed ceramic sound insulation slat | |
CN104179293A (en) | Single-connection light energy-saving wallboard | |
CN108661206A (en) | Secondary structure masonry panel is constructed from tolerant noise-insulating warm-keeping and its construction method | |
KR101156568B1 (en) | Method of Constructing Wall | |
CN204662713U (en) | A kind of body of wall of building | |
CN201817964U (en) | Building energy-saving wall body structure board | |
CN204753931U (en) | Concrete precast slab | |
CN204590400U (en) | A kind of building wall board | |
CN105649266A (en) | Large wood-plastic sound insulation partition wallboard profile | |
CN108071191A (en) | A kind of building wall board | |
CN109424087A (en) | A kind of construction wall | |
CN203769103U (en) | Building insulation board | |
CN204401826U (en) | A kind of foamed ceramic steel construction wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140205 |