CN205500144U - A integral type steel reinforcement cage transfer chain for pipe pile production line - Google Patents

A integral type steel reinforcement cage transfer chain for pipe pile production line Download PDF

Info

Publication number
CN205500144U
CN205500144U CN201620152386.2U CN201620152386U CN205500144U CN 205500144 U CN205500144 U CN 205500144U CN 201620152386 U CN201620152386 U CN 201620152386U CN 205500144 U CN205500144 U CN 205500144U
Authority
CN
China
Prior art keywords
steel reinforcement
reinforcement cage
pipeline
pipe die
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620152386.2U
Other languages
Chinese (zh)
Inventor
周兆弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620152386.2U priority Critical patent/CN205500144U/en
Application granted granted Critical
Publication of CN205500144U publication Critical patent/CN205500144U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to an integral type steel reinforcement cage transfer chain for pipe pile production line belongs to building technical field. Including the steel reinforcement cage frame, the steel reinforcement cage frame on be equipped with a plurality of the steel reinforcement cage conveyer belts that are parallel to each other, the steel reinforcement cage conveyer belt can transport the steel reinforcement cage from the one end of steel reinforcement cage frame the other end of steel reinforcement cage frame, the both sides of steel reinforcement cage frame be equipped with respectively an ability will compile steel reinforcement cage on the cage machine transport on the steel reinforcement cage conveyer belt steel reinforcement cage receiving means with the pipe die transfer chain carried can carry out the pipe die that the loading has a steel reinforcement cage along the horizontal direction. The utility model discloses can realize that the steel reinforcement cage is accepted from compiling the cage machine, is laid, transport, unloading income pipe die, the serialization operation of carrying the pipe die.

Description

Integral type steel reinforcement cage pipeline for pile tube production line
Technical field
The invention belongs to technical field of buildings, relate to a kind of one for pile tube production line Formula steel reinforcement cage pipeline.
Background technology
The production technology of existing prefabricated pile or pile tube is as follows:
1. the metering of concrete raw material, stirring.According to the match ratio designed, by sand, Stone, cement, water, additive and admixture etc., through accurate measurement, use strong concrete standard The fresh concrete of the low slump of 3cm~5cm made by blender, and design requires concrete Strength grade is not less than C60 or C80.
2. offcenter squared pile end plate makes.Make basically identical with pile end board, but square pile End plate profile is square, and the counterbore of the main muscle of prestressing force uniformly divides along end plate four limit, angle Cloth.Before end plate is installed, the sheet metal that surrounding needs throat thickness to be 1.5mm~2mm is fabricated to Barrette cuff.
3. carcasing.The main muscle of prestressing force uses the steel for prestressed concrete of low relaxation type Rod, needs accurate fixed-length, cut-out, heading;Spiral bar uses the low-carbon (LC) of vertebra 4mm~6mm Cold drawn wire;Designing requirement according to offcenter squared pile structural reinforcement, square framework of steel reinforcement uses Special square pile skeleton automatic welding machining.
4. framework of steel reinforcement is installed.The framework of steel reinforcement made, square endplate have been welded cuff Be positioned in the steel mold of offcenter squared pile, and with deformed bar anchor plate, stretch board, Tension rods etc. connect.
5. concrete distributing.By the consumption requirement of every offcenter squared pile, by fresh concrete Female die is uniformly filled up, at stretch-draw one end some concrete of the most cloth along mould.
6. matched moulds.Offcenter squared pile upper half punching block is winched to above lower half punching block, and uses bolt Upper and lower two halves punching block is fixed, to guarantee that mould does not loosens in high speed centrifugation operation process With concrete not running pulp.
7. prestressed stretch-draw.Use the stretching machine of jack type to the offcenter squared pile after matched moulds Framework of steel reinforcement carries out integral tension, after being stretched to the 70% of reinforced steel bar strength, and will with big nut Tension rod is fixed in steel mold.
8. centrifuging process.Band mould offcenter squared pile after above-mentioned stretch-draw anchor is winched to centrifuge Top, is accelerated step by step by initial velocity, middling speed, high speed, the centrifugal speed of high speed, centrifugal Time is generally 10min~18min.By centrifugal closely knit moulding process, make newly to mix coagulation Soil is the most closely knit along the mould surrounding of offcenter squared pile, and meanwhile, pile tube forms a round cavity. After centrifugal end, stretching end is raised, topple over the useless pulp-water produced in centrifugal process.
9. primary steam curing.Band mould offcenter squared pile after centrifugal forming winches to normal pressure steam In gas curing pool hole, quiet stop 1h~2h, be to slowly warm up to 90 DEG C~100 DEG C, under normal pressure Maintenance 4h~8h, makes concrete strength reach more than 40MPa.
10. the demoulding.Band mould offcenter squared pile after primary steam curing is winched to special stripping station On position, shed stretch-draw bolt and die bolt with pneumatic impact wrench, to pile body Shi Hanzhang, Then hang away upper mold section, stir female die, shed prestressing force and widen screw rod.In cleaning Female die, anchor plate, tension rod, and brushing releasing agent.For concrete design strength Grade is the offcenter squared pile of C60, and the offcenter squared pile after the demoulding is directly hoisted to finished product heap Code heap, natural curing, can dispatch from the factory after the intensity that reaches to dispatch from the factory.
11. high-pressure steaming and cultivating.Design strength grade of concrete is the offcenter squared pile of more than C80, Offcenter squared pile after the demoulding autoclave be need to be entered back into and high-temperature vapour maintenance, the highest temperature carried out Degree is 180 DEG C~200 DEG C, and saturation vapour pressure is 1.0MPa, curing time 8h~12h, Concrete strength is made to reach more than 80MPa.Pile tube after high-pressure curing can directly go out Factory is for stake.
In carcasing, being the most all to make steel reinforcement cage by volume cage mechanism, steel reinforcement cage completes After, to show up with traveling crane and stack on the ground, the place of stacking is according to different steel reinforcement cage specifications Carrying out classification to stack, it is the highest that driving hangs steel reinforcement cage work efficiency, and automaticity is low, When steel reinforcement cage is put in pipe die by needs, need again to be hung by crane or driving Put, cause crane or driving to come and go back and forth.
Summary of the invention
It is an object of the invention to for the problems referred to above, it is provided that a kind of automaticity is high, energy Improve the integral type steel reinforcement cage pipeline for pile tube production line of work efficiency.
For reaching above-mentioned purpose, present invention employs following technical proposal: one is used for managing The integral type steel reinforcement cage pipeline of stake production line, including steel reinforcement cage frame, described reinforcing bar Cage frame is provided with some the steel reinforcement cage conveyer belts being parallel to each other, and described steel reinforcement cage is defeated Send that steel reinforcement cage can be transported to steel reinforcement cage frame by band from one end of steel reinforcement cage frame another End, being respectively provided on two sides with and can compile the reinforcing bar on cage machine of described steel reinforcement cage frame The steel reinforcement cage support structure that cage is transported on steel reinforcement cage conveyer belt and steel reinforcement cage can be will be loaded with Pipe die carry out the pipe die pipeline that carries in the horizontal direction.
In the above-mentioned integral type steel reinforcement cage pipeline for pile tube production line, described Pipe die pipeline is positioned at below steel reinforcement cage frame and described pipe die pipeline at least one end Extend to below the end of steel reinforcement cage frame, when steel reinforcement cage is transported to by steel reinforcement cage conveyer belt During steel reinforcement cage Frame end, described steel reinforcement cage drops from steel reinforcement cage conveyer belt and can fall Enter in the pipe die on pipe die pipeline.
In the above-mentioned integral type steel reinforcement cage pipeline for pile tube production line, described Steel reinforcement cage support structure includes being positioned at steel reinforcement cage frame and compiling being inclined to set in the middle of cage machine Steel reinforcement cage accept pipeline, described steel reinforcement cage is accepted the two ends of pipeline and is laid respectively at Compile below cage machine and above steel reinforcement cage conveyer belt, and accept on pipeline fixing at steel reinforcement cage Some pieces are had to accept pipeline vertically disposed steel reinforcement cage baffle plate with steel reinforcement cage.
In the above-mentioned integral type steel reinforcement cage pipeline for pile tube production line, described Steel reinforcement cage support structure includes accepting support and the undertaking turnover panel hinged with accepting support, institute The turnover panel of accepting stated is also associated with one and has the outfan that can axially move back and forth Turnover panel driver and described turnover panel driver are hinged with undertaking support, and described undertaking is propped up Frame is provided with two pieces of straight corner supporting blocks being parallel to each other, and the described two ends accepting turnover panel are divided It is not hinged with the inner side of straight corner supporting block so that undertaking support can be at two pieces of straight corner supporting blocks Upset.
In the above-mentioned integral type steel reinforcement cage pipeline for pile tube production line, described If steel reinforcement cage frame includes the steel reinforcement cage support that dried layer in the vertical direction be arranged in parallel, often Layer steel reinforcement cage support is provided with some steel reinforcement cage conveyer belts, described steel reinforcement cage support structure Also include being positioned at below undertaking support and fix, with accepting support, the lifting platform being connected, described Lifting platform can drive undertaking support rise or fall so that the undertaking accepting on support is turned over The steel reinforcement cage support of plate correspondence differing heights.
In the above-mentioned integral type steel reinforcement cage pipeline for pile tube production line, described Accepting turnover panel cross section is circular arc, and undertaking turnover panel is positioned at volume cage machine and steel reinforcement cage frame Centre, described lifting platform includes the shears fork hinged with accepting frame bottom and and shears Pitching hinged shears fork driver, described shears fork driver has can be the most past Outfan and this outfan of multiple movement are hinged with shears fork.
In the above-mentioned integral type steel reinforcement cage pipeline for pile tube production line, described Steel reinforcement cage conveyer belt includes sprocket wheel and the chain hinged with sprocket wheel, some steel reinforcement cage conveyer belts The fixing connection of sprocket wheel synchronizing shaft and the synchronizing shaft connection that are positioned at the same side can drive synchronizing shaft The synchronizing shaft driver rotated, in steel reinforcement cage frame and be located close to the side of synchronizing shaft and set There is at least one steel reinforcement cage slide plate cutting agency, when steel reinforcement cage falls from steel reinforcement cage conveyer belt When falling, described steel reinforcement cage can slide into pipe die conveying along steel reinforcement cage slide plate cutting agency In pipe die on line.
In the above-mentioned integral type steel reinforcement cage pipeline for pile tube production line, described Steel reinforcement cage slide plate cutting agency includes the blanking slide plate that one end is hinged with steel reinforcement cage frame, and Two ends respectively with steel reinforcement cage frame and blanking slide plate in the middle part of hinged blanking sled driver, Described blanking sled driver has the outfan that can axially move back and forth and this is defeated Going out end hinged with the middle part of blanking slide plate, described blanking sled driver can drive Blanking slide plate moves toward the direction near pipe die pipeline so that blanking slide plate is formed and water The gradient that plane is at an acute angle, blanking sled driver also stretchy blanking slide plate is toward near steel The bottom direction of muscle cage frame is moved so that blanking slide plate is away from pipe die pipeline.
In the above-mentioned integral type steel reinforcement cage pipeline for pile tube production line, described Blanking sled driver is hinged on bottom steel reinforcement cage frame, and blanking slide plate is hinged on steel reinforcement cage The end of frame, described pipe die pipeline include two that be parallel to each other and be positioned at reinforcing bar Chain conveyor below cage frame, two chain conveyors connect with synchronizing shaft and synchronize Axle connects pipe die driver, and the end of every chain conveyor is extended outside steel reinforcement cage frame Portion.
In the above-mentioned integral type steel reinforcement cage pipeline for pile tube production line, described Evenly spaced on pipe die pipeline be provided with some load mould dollies, described load mould dolly with The dismountable fixing connection of pipe die pipeline and can be along with pipe die pipeline synchronizing moving, institute The mould dolly that carries stated includes that two opposite rollers and roller rotate even with load mould dolly Connect, the load mould dolly one_to_one corresponding on two pipe die pipelines.
Compared with prior art, it is an advantage of the current invention that: steel reinforcement cage can be realized from volume Accept on cage machine, lay, carry, blanking enters pipe die, the continuous operation of conveying pipe die, Thus improve work efficiency and automaticity, it is suitable in automatization's pile tube production line.
Accompanying drawing explanation
Fig. 1 is the structural representation that embodiment 1 provides;
Fig. 2 is another direction structure schematic diagram that embodiment 1 provides;
Fig. 3 is the structural representation of the steel reinforcement cage support structure in embodiment 1;
Fig. 4 is the structural representation in another direction of steel reinforcement cage support structure in embodiment 1 Figure;
Fig. 5 is the fundamental diagram of steel reinforcement cage support structure in embodiment 1;
Fig. 6 is that the structure during lifting platform rising of steel reinforcement cage support structure in embodiment 1 is shown It is intended to;
Fig. 7 is the steel reinforcement cage support structure structural representation of embodiment 2.
In figure: steel reinforcement cage frame 1, steel reinforcement cage conveyer belt 2, steel reinforcement cage support structure 3, Pipe die pipeline 4, steel reinforcement cage accept pipeline 5, steel reinforcement cage baffle plate 6, accept support 7, Accept turnover panel 8, turnover panel driver 9, straight corner supporting block 10, steel reinforcement cage support 11, rise Fall platform 12, shears fork 13, shears fork driver 14, sprocket wheel 15, chain 16, synchronization Axle 17, steel reinforcement cage slide plate cutting agency 18, blanking slide plate 19, blanking sled driver 20, chain conveyor 21, pipe die driver 22, load mould dolly 23, roller 24, steel Muscle cage 100, volume cage machine 101, pipe die 102, blanking slide carriage 103.
Detailed description of the invention
With detailed description of the invention the present invention done further details of theory below in conjunction with the accompanying drawings Bright.
Embodiment 1
As depicted in figs. 1 and 2, a kind of integral type steel reinforcement cage for pile tube production line is defeated Line sending, including steel reinforcement cage frame 1, described steel reinforcement cage frame 1 is provided with some phases The most parallel steel reinforcement cage conveyer belt 2, described steel reinforcement cage conveyer belt 2 can be by steel reinforcement cage 100 The other end of steel reinforcement cage frame 1 it is transported to, in conjunction with Fig. 5 from one end of steel reinforcement cage frame 1 Shown in, described steel reinforcement cage frame 1 be respectively provided on two sides with one can will compile cage machine 101 On steel reinforcement cage support structure 3 He that is transported on steel reinforcement cage conveyer belt 2 of steel reinforcement cage 100 The pipe die that the pipe die 102 of steel reinforcement cage 100 carries out carrying in the horizontal direction can be will be loaded with defeated Line sending 4.
When steel reinforcement cage 100 is placed on steel reinforcement cage conveyer belt 2, steel reinforcement cage conveyer belt 2 is every A mobile station can vacate one for the room placing steel reinforcement cage 100, steel reinforcement cage 100 can be placed sequentially on steel reinforcement cage conveyer belt 2 until steel reinforcement cage conveyer belt 2 piles with, When steel reinforcement cage 100 is positioned at steel reinforcement cage frame 1 end, driving or crane can be used steel Muscle cage 100 hangs in pipe die 102, and pipe die 102 is transported to coagulation by pipe die pipeline 4 Handwoven cloth material district, in this process, it is achieved that steel reinforcement cage stacks, transport, install one Bodyization operates, and work efficiency is significantly improved.Described steel reinforcement cage conveyer belt 2 includes Sprocket wheel 15 and the chain 16 hinged with sprocket wheel 15, it will be appreciated by those skilled in the art that Chain 16 to be made energy smooth rotation, the two ends of chain 16 should connect a sprocket wheel respectively, Some steel reinforcement cage conveyer belts 2 are positioned at the fixing connection of sprocket wheel 15 synchronizing shaft 17 of the same side And synchronizing shaft 17 connects the synchronizing shaft driver that synchronizing shaft 17 can be driven to rotate (in figure not Illustrate), synchronizing shaft driver can be motor or hydraulic motor.
Pipe die pipeline 4 is positioned at below steel reinforcement cage frame 1 and described pipe die pipeline 4 At least one end extends to below the end of steel reinforcement cage frame 1, such that it is able to allow steel reinforcement cage 100 directly tumble and corresponding pipe die 102 from steel reinforcement cage conveyer belt 2, therefore, work as reinforcing bar When steel reinforcement cage is transported to steel reinforcement cage frame 1 end by cage conveyer belt 2, described steel reinforcement cage Drop from steel reinforcement cage conveyer belt 2 and can drop in the pipe die on pipe die pipeline 4.
As it has been described above, steel reinforcement cage 100 can put into pipe die 102 by driving, crane etc. In, in the present embodiment, as it is shown in figure 1, in steel reinforcement cage frame 1 and be located close to The side of step axle 17 is provided with at least one steel reinforcement cage slide plate cutting agency 18, works as steel reinforcement cage 100 when dropping from steel reinforcement cage conveyer belt 2, and described steel reinforcement cage 100 can be along reinforcing bar Cage slide plate cutting agency 18 slides in the pipe die 102 on pipe die pipeline 4, it is achieved steel The steady blanking of muscle cage 100.
Specifically, steel reinforcement cage slide plate cutting agency 18 includes one end and steel reinforcement cage frame 1 Hinged blanking slide plate 19, and two ends respectively with steel reinforcement cage frame 1 and blanking slide plate 19 The blanking sled driver 20 that middle part is hinged, described blanking sled driver 20 has The outfan that can axially move back and forth and this outfan end and blanking slide plate 19 Middle part is hinged, and described blanking sled driver 20 can drive blanking slide plate 19 toward close The direction of pipe die pipeline 4 is moved so that blanking slide plate 19 is formed horizontal by acute angle The gradient, blanking sled driver 20 goes back stretchy blanking slide plate 19 toward near steel reinforcement cage The bottom direction of frame 1 is moved so that blanking slide plate 19 is away from pipe die pipeline 4, also Blanking slide plate 19 can be packed up by i.e. blanking sled driver 20, thus provides one for pipe The space that mould 102 moves.Blanking sled driver 20 can be cylinder or oil cylinder.
Preferred version, blanking sled driver 20 is hinged on bottom steel reinforcement cage frame 1, under Material slide plate 19 is hinged on the end of steel reinforcement cage frame 1.
Steel reinforcement cage support structure 3 can use pipeline, driving, crane etc..In this reality Executing in example, as shown in Figure 3 and Figure 4, steel reinforcement cage support structure 3 includes accepting support 7 And the undertaking turnover panel 8 hinged with undertaking support 7, described undertaking turnover panel 8 is also associated with One turnover panel driver 9 with the outfan that can axially move back and forth and described Turnover panel driver 9 is hinged with undertaking support 7, and described undertaking support 7 is provided with two pieces The straight corner supporting block 10 being parallel to each other, the described two ends accepting turnover panel 8 respectively with right angle The inner side propping up bracer 10 is hinged so that undertaking support 7 can be at two pieces of straight corner supporting blocks 10 Upset.Turnover panel driver 9 can be cylinder or oil cylinder.Steel reinforcement cage support structure 3 is permissible Arrange one or more, can work simultaneously or work independently.
Preferred version, as shown in Figure 5 and Figure 6, if steel reinforcement cage frame 1 includes that dried layer exists The steel reinforcement cage support 11 be arrangeding in parallel on vertical direction, every layer of steel reinforcement cage support 11 sets Some steel reinforcement cage conveyer belts 2, described steel reinforcement cage support structure 3 is had also to include being positioned at holding Connect below support 7 and fix the lifting platform 12 being connected, described lifting with accepting support 7 Platform 12 can drive undertaking support 7 to rise or fall so that the undertaking accepted on support 7 is turned over The steel reinforcement cage support 11 of the corresponding differing heights of plate 8.
Specific works process is, to receive, when accepting turnover panel 8, the reinforcing bar compiled on cage machine 101 During cage 100, turnover panel driver 9 action, make undertaking turnover panel 8 toward near compiling cage machine 101 Direction upset, compile and be provided with blanking chute between cage machine 101 and steel reinforcement cage support structure 3 Plate 103, when accepting turnover panel 8 and overturning, accepts turnover panel 8 relative with blanking slide carriage 103 Should, so that steel reinforcement cage 100 slides in undertaking turnover panel 8 along blanking slide carriage 103, rise Fall platform 12 rises or falls, and makes the steel reinforcement cage support of the corresponding differing heights of undertaking turnover panel 8 11, turnover panel driver 9 action again, make undertaking turnover panel 8 toward near steel reinforcement cage support 11 Direction upset, steel reinforcement cage 100 rolls into the steel reinforcement cage conveyer belt 2 of steel reinforcement cage support 11 On.Lifting platform 12 can use commercially available elevating mechanism, such as chain-type elevator, very heavy Top etc..
Preferred version, accepting turnover panel 8 cross section is circular arc, is affixed with steel reinforcement cage 100 Close, and undertaking turnover panel 8 is positioned in the middle of volume cage machine 101 and steel reinforcement cage frame 1, described Lifting platform 12 includes and accepts shears fork 13 hinged bottom support 7 and pitch 13 with shears Hinged shears fork driver 14, described shears fork driver 14 has can be along axle 13 are pitched hinged to the outfan moved back and forth and this outfan and shears.Shears fork driver 14 can be that cylinder has oil cylinder.
Pipe die pipeline 4 can be the belt pulley conveyer of prior art, at the present embodiment In, pipe die pipeline 4 include two that be parallel to each other and be positioned at below steel reinforcement cage frame 1 Chain conveyor 21, two chain conveyors 21 connect with synchronizing shaft and synchronizing shaft even Adapter mould driver 22, steel reinforcement cage frame 1 is extended in the end of every chain conveyor 21 Outside.
Evenly spaced on pipe die pipeline 4 it is provided with some load mould dollies 23, described load Mould dolly 23 is dismountable with pipe die pipeline 4 fixing to be connected and can be along with pipe die pipeline 4 synchronizing movings, the described mould dolly 23 that carries includes two opposite rollers 24 and rolling Roller 24 is rotationally connected with carrying mould dolly 23, and pipe die 102 is played undertaking by two rollers 24 Positioning action thus prevent pipe die 102 and pipe die pipeline 4 from friction or collision occurring.Two Load mould dolly 23 one_to_one corresponding on bar pipe die pipeline 4, makes the two ends of pipe die 102 all Gentle support can be obtained.
Total work process of the present embodiment is: when steel reinforcement cage 100 is from compiling cage machine 101 During blanking, undertaking turnover panel 8 accepts this steel reinforcement cage and the action by lifting platform 12 makes undertaking The corresponding different lifting platform 12 of turnover panel 8, accepts the turnover panel 8 effect in turnover panel driver 9 Lower generation upset makes steel reinforcement cage put on steel reinforcement cage conveyer belt 2, steel reinforcement cage conveyer belt 2 Work makes steel reinforcement cage be moved, thus vacates room at steel reinforcement cage conveyer belt 2 and carry Steel reinforcement cage moves toward the direction near pipe die 102.
When steel reinforcement cage needs blanking, pipe die pipeline 4 transports pipe die 102 to steel reinforcement cage Below conveyer belt 2 end, blanking sled driver 20 work is opened blanking slide plate 19 and is slipped Plate, the position of pipe die pipeline 4 adjustable pipe die 102 makes pipe die and blanking slide plate 19 Correspondence, steel reinforcement cage conveyer belt 2 action makes steel reinforcement cage slide into pipe die along blanking slide plate 19 In 102, blanking slide plate 19 is packed up in blanking sled driver 20 action again, and pipe die carries Line 4 transports pipe die 102 to cloth district.
Embodiment 2
The present embodiment is essentially identical with the structure of embodiment 1 and operation principle, difference Be, as it is shown in fig. 7, steel reinforcement cage support structure 3 include being positioned at steel reinforcement cage frame 1 and Compile the steel reinforcement cage being inclined to set in the middle of cage machine 101 and accept pipeline 5, described steel Muscle cage is accepted the two ends of pipeline 5 and is laid respectively at below volume cage machine 101 and steel reinforcement cage conveying Above band 2, and accept at steel reinforcement cage and be fixed with some pieces on pipeline 5 and hold with steel reinforcement cage Connect pipeline 5 vertically disposed steel reinforcement cage baffle plate 6.Steel reinforcement cage is accepted pipeline 5 and can be adopted Use prior art pulley conveyer, or use and the steel reinforcement cage conveyer belt in embodiment 1 2 identical structures.
In the present embodiment, steel reinforcement cage 100 directly can roll down to reinforcing bar from volume cage machine 101 Cage is accepted and is blocked by steel reinforcement cage baffle plate 6 on pipeline 5, when steel reinforcement cage accepts pipeline 5 During action, steel reinforcement cage 100 is to moving near steel reinforcement cage conveyer belt 2 and final from steel reinforcement cage Accept pipeline 5 to tumble, drop on steel reinforcement cage conveyer belt 2.
Specific embodiment described herein is only to present invention spirit theory for example Bright.Those skilled in the art can be to described specific embodiment Make various amendment or supplement or use similar mode to substitute, but without departing from The spirit of the present invention or surmount scope defined in appended claims.
Although the most more employing steel reinforcement cage frame 1, steel reinforcement cage conveyer belt 2, reinforcing bar Cage support structure 3, pipe die pipeline 4, steel reinforcement cage accept pipeline 5, steel reinforcement cage baffle plate 6, accept support 7, accept turnover panel 8, turnover panel driver 9, straight corner supporting block 10, steel Muscle cage support 11, lifting platform 12, shears fork 13, shears fork driver 14, sprocket wheel 15, Chain 16, synchronizing shaft 17, steel reinforcement cage slide plate cutting agency 18, blanking slide plate 19, under Material sled driver 20, chain conveyor 21, pipe die driver 22, carry mould dolly 23, The art such as roller 24, steel reinforcement cage 100, volume cage machine 101, pipe die 102, blanking slide carriage 103 Language, but it is not precluded from using the probability of other term.These terms are used to be only Describe and explain the essence of the present invention more easily;It is construed as any attached The restriction added is all contrary with spirit of the present invention.

Claims (10)

1. for an integral type steel reinforcement cage pipeline for pile tube production line, including steel reinforcement cage Frame (1), it is characterised in that described steel reinforcement cage frame (1) is provided with some phases The most parallel steel reinforcement cage conveyer belt (2), described steel reinforcement cage conveyer belt (2) can be by reinforcing bar Cage is transported to the other end of steel reinforcement cage frame (1) from one end of steel reinforcement cage frame (1), Being respectively provided on two sides with one and can compile the reinforcing bar on cage machine of described steel reinforcement cage frame (1) Steel reinforcement cage support structure (3) that cage is transported on steel reinforcement cage conveyer belt (2) and filling It is loaded with the pipe die pipeline (4) that the pipe die of steel reinforcement cage carries out carrying in the horizontal direction.
Integral type steel reinforcement cage for pile tube production line the most according to claim 1 is defeated Line sending, it is characterised in that described pipe die pipeline (4) is positioned at steel reinforcement cage frame (1) Lower section and described pipe die pipeline (4) at least one end extend to steel reinforcement cage frame (1) End below, when steel reinforcement cage is transported to steel reinforcement cage frame (1) by steel reinforcement cage conveyer belt (2) During end, described steel reinforcement cage drops from steel reinforcement cage conveyer belt (2) and can drop into pipe In pipe die on mould pipeline (4).
Integral type steel reinforcement cage for pile tube production line the most according to claim 1 is defeated Line sending, it is characterised in that described steel reinforcement cage support structure (3) includes being positioned at steel reinforcement cage The steel reinforcement cage being inclined to set in the middle of frame (1) and volume cage machine accepts pipeline (5), Described steel reinforcement cage is accepted the two ends of pipeline (5) and is laid respectively at below volume cage machine and reinforcing bar Cage conveyer belt (2) top, and it is fixed with some on steel reinforcement cage undertaking pipeline (5) Block accepts pipeline (5) vertically disposed steel reinforcement cage baffle plate (6) with steel reinforcement cage.
Integral type steel reinforcement cage for pile tube production line the most according to claim 1 is defeated Line sending, it is characterised in that described steel reinforcement cage support structure (3) includes accepting support (7) And the undertaking turnover panel (8) hinged with undertaking support (7), described undertaking turnover panel (8) It is also associated with a turnover panel driver with the outfan that can axially move back and forth (9) and described turnover panel driver (9) is with to accept support (7) hinged, described holds Connecing support (7) and be provided with two pieces of straight corner supporting blocks (10) being parallel to each other, described holds The two ends connecing turnover panel (8) are hinged so that holding with the inner side of straight corner supporting block (10) respectively Connect support (7) to overturn two pieces of straight corner supporting blocks (10).
Integral type steel reinforcement cage for pile tube production line the most according to claim 4 is defeated Line sending, it is characterised in that dried layer is in vertically side if including for described steel reinforcement cage frame (1) The steel reinforcement cage support (11) upwards be arrangeding in parallel, every layer of steel reinforcement cage support (11) is provided with Some steel reinforcement cage conveyer belts (2), described steel reinforcement cage support structure (3) also includes being positioned at Accept support (7) lower section and fix, with accepting support (7), the lifting platform (12) being connected, Described lifting platform (12) can drive undertaking support (7) to rise or fall so that accepting The steel reinforcement cage support (11) of the corresponding differing heights of the undertaking turnover panel (8) on support (7).
Integral type steel reinforcement cage for pile tube production line the most according to claim 5 is defeated Line sending, it is characterised in that described undertaking turnover panel (8) cross section is circular arc, and holds Connect turnover panel (8) and be positioned in the middle of volume cage machine and steel reinforcement cage frame (1), described lifting platform (12) include shears fork (13) hinged with accepting support (7) bottom and pitch with shears (13) hinged shears fork driver (14), described shears fork driver (14) tool There are the outfan that can axially move back and forth and this outfan hinged with shears fork (13).
Integral type steel reinforcement cage for pile tube production line the most according to claim 1 is defeated Line sending, it is characterised in that described steel reinforcement cage conveyer belt (2) include sprocket wheel (15) and The chain (16) hinged with sprocket wheel (15), some steel reinforcement cage conveyer belts (2) are positioned at same The sprocket wheel (15) of side connects and synchronizing shaft (17) connection with synchronizing shaft (17) is fixing The synchronizing shaft driver that synchronizing shaft (17) rotates can be driven, steel reinforcement cage frame (1) upper and The side being located close to synchronizing shaft (17) is provided with at least one steel reinforcement cage slide plate cutting agency (18), when steel reinforcement cage drops from steel reinforcement cage conveyer belt (2), described steel reinforcement cage The pipe on pipe die pipeline (4) can be slided into along steel reinforcement cage slide plate cutting agency (18) In mould.
Integral type steel reinforcement cage for pile tube production line the most according to claim 7 is defeated Line sending, it is characterised in that described steel reinforcement cage slide plate cutting agency (18) includes one end The blanking slide plate (19) hinged with steel reinforcement cage frame (1), and two ends respectively with steel reinforcement cage Blanking sled driver (20) hinged in the middle part of frame (1) and blanking slide plate (19), Described blanking sled driver (20) has the outfan that can axially move back and forth And the blanking slide plate that this outfan end is hinged, described with the middle part of blanking slide plate (19) Driver (20) can drive blanking slide plate (19) toward the side near pipe die pipeline (4) To mobile so that blanking slide plate (19) forms the gradient horizontal by acute angle, blanking Sled driver (20) goes back stretchy blanking slide plate (19) toward near steel reinforcement cage frame (1) Bottom direction move so that blanking slide plate (19) is away from pipe die pipeline (4).
Integral type steel reinforcement cage for pile tube production line the most according to claim 8 is defeated Line sending, it is characterised in that described blanking sled driver (20) is hinged on steel reinforcement cage Frame (1) bottom, blanking slide plate (19) is hinged on the end of steel reinforcement cage frame (1), Described pipe die pipeline (4) include two that be parallel to each other and be positioned at steel reinforcement cage frame (1) The chain conveyor (21) of lower section, two chain conveyors (21) connect with synchronizing shaft and Synchronizing shaft connects pipe die driver (22), and the end of every chain conveyor (21) extends Go out steel reinforcement cage frame (1) outside.
Integral type steel reinforcement cage for pile tube production line the most according to claim 9 Pipeline, it is characterised in that described pipe die pipeline (4) is the most evenly spaced to be provided with Some loads mould dolly (23), described load mould dolly (23) and pipe die pipeline (4) Dismountable fixing connection and can be along with pipe die pipeline (4) synchronizing moving, described load Mould dolly (23) includes two opposite rollers (24) and roller (24) and carries mould Dolly (23) is rotationally connected, load mould dolly (23) on two pipe die pipelines (4) One_to_one corresponding.
CN201620152386.2U 2016-02-29 2016-02-29 A integral type steel reinforcement cage transfer chain for pipe pile production line Withdrawn - After Issue CN205500144U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620152386.2U CN205500144U (en) 2016-02-29 2016-02-29 A integral type steel reinforcement cage transfer chain for pipe pile production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620152386.2U CN205500144U (en) 2016-02-29 2016-02-29 A integral type steel reinforcement cage transfer chain for pipe pile production line

Publications (1)

Publication Number Publication Date
CN205500144U true CN205500144U (en) 2016-08-24

Family

ID=56726973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620152386.2U Withdrawn - After Issue CN205500144U (en) 2016-02-29 2016-02-29 A integral type steel reinforcement cage transfer chain for pipe pile production line

Country Status (1)

Country Link
CN (1) CN205500144U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105668178A (en) * 2016-02-29 2016-06-15 周兆弟 Integrated reinforcement cage conveying line for pipe pile production line
CN106829363A (en) * 2016-12-27 2017-06-13 重庆市永川区益锐机械有限责任公司 Automobile exhaust pipe conveying arrangement
CN108161388A (en) * 2017-12-29 2018-06-15 广州德亚机械制造有限公司 Integrated full-automatic end plate fills cage system
CN110254803A (en) * 2019-07-23 2019-09-20 中国重型机械研究院股份公司 A kind of full-automatic steel plate tail coil packing device and method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105668178A (en) * 2016-02-29 2016-06-15 周兆弟 Integrated reinforcement cage conveying line for pipe pile production line
CN105668178B (en) * 2016-02-29 2018-08-03 周兆弟 Integral type steel reinforcement cage pipeline for pile pile production line
CN106829363A (en) * 2016-12-27 2017-06-13 重庆市永川区益锐机械有限责任公司 Automobile exhaust pipe conveying arrangement
CN108161388A (en) * 2017-12-29 2018-06-15 广州德亚机械制造有限公司 Integrated full-automatic end plate fills cage system
CN108161388B (en) * 2017-12-29 2024-04-05 广州德亚机械制造有限公司 Integrated full-automatic end plate cage loading system
CN110254803A (en) * 2019-07-23 2019-09-20 中国重型机械研究院股份公司 A kind of full-automatic steel plate tail coil packing device and method

Similar Documents

Publication Publication Date Title
CN205500144U (en) A integral type steel reinforcement cage transfer chain for pipe pile production line
CN105583947B (en) It is continuous to compile cage pile pile production line
CN105668178B (en) Integral type steel reinforcement cage pipeline for pile pile production line
CN208788805U (en) A kind of concrete precast pile automatic production line
CN105600335B (en) For the steel reinforcement cage storage of tubular pole production line, conveying device
CN102744779B (en) PHC (prestressed concrete pipe pile) pile streamline conveying production line
CN105599128B (en) Full-automatic pile tube production line
CN205012651U (en) Novel side wall unilateral formwork system of underground space
CN209158614U (en) Prepare concrete precast pile three unite across two linear systems
CN109968516B (en) Comprehensive production system and production method for PC (polycarbonate) components
CN107176405B (en) Building material automatic storage device
CN107379226A (en) A kind of preparation method of multifunctional fabricated precast hollow building block
CN104710155A (en) Production technology of precast reinforced concrete piles
CN102555053A (en) Porous foaming concrete block production line
CN102398305B (en) Method for producing precast concrete piles
CN205394800U (en) Full -automatic pipe pile production line
CN110142862A (en) The production system of concrete precast pile automatic production line workshop and prefabricated pile
CN205394799U (en) Compile cage pipe pile production line in succession
CN107471427A (en) A kind of construction method of prefabricated assembled cassette ceiling
CN205397327U (en) A steel reinforcement cage is deposited, conveyor for pipe pile production line
CN105583948B (en) End plate transport mechanism for tubular pole production line
CN102248601B (en) Method for producing precast concrete piles by transverse running water
CN205497776U (en) A end plate transport mechanism for pipe pile production line
CN105564897B (en) Volume cage reinforcing bar storage shelf and volume cage steel bar conveying device for pile pile production line
CN113183308B (en) Concrete pipe pile production method convenient for demolding

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160824

Effective date of abandoning: 20180803