CN205276845U - Multilayer construction hanging flower basket - Google Patents

Multilayer construction hanging flower basket Download PDF

Info

Publication number
CN205276845U
CN205276845U CN201620027335.7U CN201620027335U CN205276845U CN 205276845 U CN205276845 U CN 205276845U CN 201620027335 U CN201620027335 U CN 201620027335U CN 205276845 U CN205276845 U CN 205276845U
Authority
CN
China
Prior art keywords
hanging basket
workplatform
support
wireline
multilayer construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620027335.7U
Other languages
Chinese (zh)
Inventor
李新明
李银焜
李艳阳
郭艳召
曾庆平
刘二虎
张慧
熊建武
胡方华
黎学皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 1 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 1 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 1 Engineering Co Ltd filed Critical China Gezhouba Group No 1 Engineering Co Ltd
Priority to CN201620027335.7U priority Critical patent/CN205276845U/en
Application granted granted Critical
Publication of CN205276845U publication Critical patent/CN205276845U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a multilayer construction hanging flower basket, including the support, be equipped with at least two -layer work platform on the support, be equipped with the working stand between the work platform, be equipped with at the back of support and be used for along founing the depended wheel that the thing slideed. Work platform's both ends are equipped with the flexible work platform with work platform swing joint for be under construction in stretching into the gate slot. Having multilayer work platform's hanging basket structure through the setting, having replaced setting up the multistage builder's jack among the prior art and as work platform's construction method, reduced builder's jack construction manual work and material cost in the accident gate slot, overlapping jobs potential safety hazard about eliminating has improved gate slot technical pattern and civil engineering efficiency to make the dam concrete pour in advance and reach the summit, saved dam major project construction period.

Description

Multilayer construction hanging basket
Technical field
The utility model relates to Hydraulic and Hydro-Power Engineering construction field, particularly a kind of water power, the multilayer construction hanging basket of second stage concrete and built-in fitting construction field in oblique door groove in building operation.
Background technology
Construction hanging basket is generally used for building trade, especially the working aloft such as multilayer external decoration of high-rise building finishing, curtain wall installation, this kind of exterior wall hanging basket mainly utilizes hanging basket as operation platform, replace tradition out-mould scaffold frame, scaffolding can be reduced and pacify artificial, the Master Cost torn open, increase work efficiency, thus greatly reduce construction cost. Some hydropower station double curvature arch dam dam section is furnished with 4 low-leveled outlet, the vertical discrepancy in elevation 86m of low-leveled outlet emergency gate slot, and emergency gate slot is the oblique door groove of slope than 1:0.15, and door groove domestic demand carries out door track built-in fitting and Concrete Construction of Powerhouse thereof. Former scheme, with reference to similar engineering construction experience, adopts and sets up multistage scaffolding of encorbelmenting and carry out embedded parts and Concrete Construction of Powerhouse as operation platform, and the construction of door groove carries out with dam concrete construction simultaneously, and the delayed dam concrete construction of scaffold building is about 20m. Problems existing is:
1, single door groove sets up scaffolding needs the steel such as steel pipe, cantilever tripod to be about 35t, and materials consumption is bigger;
2, scaffolding difficulty of construction is big, and the construction structure such as passage, safety precaution is not easily arranged;
3, door track installation of embedded parts and second stage concrete are built segmentation and are constructed, and construction quality is difficult to control;
4, in door groove, construction and dam concrete carry out simultaneously, and upper and lower cross-operation, exists potential safety hazard;
5, door groove segmentation operation metal construction and second stage concrete pouring construction efficiency are lower, and mutually disturb with dam construction, mutually restrict, and affect engineering integral construction progress.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of multilayer construction hanging basket, it is possible to as the job platform of dam flood-discharge deep hole emergency gate slot door track embedded part and Concrete Construction of Powerhouse, be adapted at the requirement that at least upper and lower two working faces are constructed simultaneously. In preferred scheme, it is possible to meet the installation needs in the door groove of oblique door groove, and security can be guaranteed.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of multilayer construction hanging basket, comprises support, and support is provided with at least two layers of workplatform, is provided with work ladder between workplatform;
It is provided with the roller for sliding along construction at the back side of support.
The two ends of workplatform are provided with the flexible workplatform being flexibly connected with workplatform, construct for stretching in a groove.
The location wheel pointing to both sides it is provided with at support or workplatform.
The base plate of workplatform is for being horizontally disposed with.
Being installed with volume on support and raise device, volume is raised device and is connected with suspension by wireline.
Described volume is raised in device, and the volume being installed on support is raised motor and is connected with worm gear reducer, and the output shaft of worm gear reducer is connected with wireline roller, and wire rope roll is around on wireline roller.
Described steel wire penetrating is installed in the limit for tonnage safety lock on support.
In described limit for tonnage safety lock, the first round, the 2nd takes turns and straining pulley staggered arrangement from top to bottom, wherein straining pulley is between the first round and the 2nd take turns, wireline into a bent shape state walk around the first round successively, straining pulley and the 2nd take turns, straining pulley is provided with force transducer.
The structure of force transducer is: the wheel shaft of straining pulley is positioned at groove hole, and wheel shaft side is provided with spring, so that straining pulley presses to wireline, is provided with pressure transmitter on wheel shaft, or wheel shaft is connected with the pulling force sensor admittedly established.
The structure of force transducer is: the wheel shaft of straining pulley is positioned at groove hole, and wheel shaft side is provided with spring, so that straining pulley presses to wireline, is also provided with the travel switch triggered by straining pulley or wheel shaft, and travel switch makes volume raise motor power-off after triggering.
A kind of multilayer construction hanging basket that the utility model provides, the barrel structure that there is multilayer working platform by arranging, instead of and prior art is set up multistage in emergency gate slot encorbelment the arrangement and method for construction of scaffolding as job platform, reduce scaffolding of encorbelmenting to construct manually and material cost, eliminate top-bottom cross job safety hidden danger, improve groove technology structure and civil engineering efficiency, and make dam concrete be poured into top in advance, save the dam main construction construction duration. Job platform can be extend in a groove by the flexible workplatform arranged constructs. Volume is raised device to be arranged on hanging basket, is convenient to execute-in-place control. The limit for tonnage safety lock arranged, it is possible to guarantee the construction safety of barrel structure.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail:
Fig. 1 is main TV structure schematic diagram of the present utility model.
Fig. 2 is side-looking structural representation of the present utility model.
Fig. 3 is the main TV structure schematic diagram of flexible workplatform in the utility model.
Fig. 4 is the plan structure schematic diagram of flexible workplatform in the utility model.
Fig. 5 is the plan structure schematic diagram of the utility model workplatform at the middle and upper levels.
Fig. 6 is the plan structure schematic diagram of lower floor's workplatform in the utility model.
Fig. 7 is the side-looking structural representation of suspension in the utility model.
Fig. 8 is the main TV structure schematic diagram of suspension in the utility model.
Fig. 9 is the structural representation of limit for tonnage safety lock in the utility model.
In figure: support 1, work ladder 2, upper strata workplatform 3, work ladder import 31, lower floor's workplatform 4, flexible workplatform 5, volume raises motor 6, limit for tonnage safety lock 7, seat body 71, the first round 72, force transducer 73, the 2nd takes turns 74, straining pulley 75, groove hole 76, spring 77, wheel shaft 78, wireline 8, guardrail 9, base plate 10, worm gear reducer 11, scalable roller 12, location wheel 13, suspension 14.
Embodiment
As, in Fig. 1,2, a kind of multilayer construction hanging basket, comprises support 1, and support 1 is provided with at least two layers of workplatform, is provided with work ladder 2 between workplatform; Upper strata workplatform 3 is provided with work ladder import 31, is convenient to personnel and enters, as shown in Fig. 5,6.
It is provided with the roller for sliding along construction at the back side of support 1, construction in this example has a cell wall tilted, the roller arranged makes whole hanging basket slide along cell wall in lifting process, roller in this example adopts scalable roller, can by flexible roller, adjusting the inclined degree of whole hanging basket, be beneficial to make workplatform keep horizontality, constructability operation is put with equipment. By above-mentioned structure, it is achieved construct in multiple benches face simultaneously.
The two ends of workplatform are provided with the flexible workplatform 5 being flexibly connected with workplatform, construct for stretching in a groove. As shown in Fig. 1,3,4, the left side in figure is the structure of flexible workplatform 5 when not stretching out, and the right side in figure is the structure of flexible workplatform 5 when stretching out.
The location wheel 13 pointing to both sides it is provided with at support 1 or workplatform. Thus structure, limits the right position of hanging basket, avoids whole hanging basket to swing in construction.
Emergency gate slot is the oblique door groove of slope than 1:0.15, door groove domestic demand carries out door track built-in fitting construction, for ease of construction, the base plate 10 of the workplatform in this example is for being horizontally disposed with, namely the base plate 10 of the workplatform in this example is relative to support non-vertical, but there is corresponding inclination angle at the angle of inclination according to oblique door groove, so that the base plate 10 of workplatform is level, it is convenient to personnel's walking, constructs and put equipment.
As, in Fig. 1,2,7,8, being installed with volume and raise device on support 1, volume is raised device and is connected with suspension 14 by wireline 8. Thus structure, it is achieved the descending operation of whole hanging basket, raises device by volume and is arranged on support 1 to be more convenient for on-the-spot operation.
As, in Fig. 1,2, described volume is raised in device, the volume being installed on support 1 is raised motor 6 and is connected with worm gear reducer 11, and the output shaft of worm gear reducer 11 is connected with wireline roller, and wireline 8 is wound on wireline roller. The worm gear reducer 11 arranged is convenient to realize self-locking, it is to increase security.
As, in Fig. 1,2, described wireline 8 is through the limit for tonnage safety lock 7 being installed on support 1. Thus structure, when whole hanging basket exceedes the safe load of setting, limit for tonnage safety lock 7 can pin volume and raise device, and reports to the police, so that it is guaranteed that construction safety.
As in Fig. 9, in described limit for tonnage safety lock 7, the first round 72, the 2nd takes turns 74 and straining pulley 75 staggered arrangement from top to bottom, wherein straining pulley 75 is taken turns between 74 in the first round 72 and the 2nd, wireline 8 into a bent shape state walk around the first round 72 successively, straining pulley 75 and the 2nd take turns 74, straining pulley 75 is provided with force transducer 73. Thus structure, the pulling force received when wireline 8 strengthens, then the bending degree of wireline 8 reduces, and obtains this kind of change by force transducer 73, reaches set(ting)value, can disconnect the power supply that volume raises device, in preferred scheme and Locking Steel Wire rope.
The structure of force transducer 73 is: the wheel shaft 78 of straining pulley 75 is positioned at groove hole 76, and wheel shaft 78 side is provided with spring 77, so that straining pulley 75 presses to wireline 8, is provided with pressure transmitter on wheel shaft 78, or wheel shaft 78 is connected with the pulling force sensor admittedly established. The control device that force transducer 73 raises device with volume is connected, such as PLC, when PLC receives the data of force transducer 73 acquisition, comparing with default data, when exceeding preset value, then PLC disconnects the power supply that volume raises motor 6, worm gear reducer 11 self-locking, reports to the police, it is ensured that construction safety simultaneously.
In another optional scheme, the structure of force transducer 73 is: the wheel shaft 78 of straining pulley 75 is positioned at groove hole 76, wheel shaft 78 side is provided with spring 77, so that straining pulley 75 presses to wireline 8, is also provided with the travel switch triggered by straining pulley 75 or wheel shaft 78, travel switch makes volume raise motor 6 power-off after triggering, the position being such as arranged in Fig. 9 by travel switch spring 77, reaches to a certain degree when wireline 8 stretches, then triggers travel switch, volume is made to raise motor 6 power-off, and it is electric that warning horn is obtained. Adopt this structure, then without the need to using PLC to realize, be conducive to reducing use cost.
Embodiment:
The using method of construction hanging basket of the present utility model is specifically described for the construction of certain arch dam deep hole emergency gate slot embedded part:
Some hydropower station is double curvature arch dam, is furnished with 4 low-leveled outlet, the vertical discrepancy in elevation 86m of low-leveled outlet emergency gate slot, and emergency gate slot is the oblique door groove of slope than 1:0.15, and door groove domestic demand carries out door track built-in fitting construction. Adopt scheme of the present utility model as follows:
Hanging basket is bilayer structure, high 7.5 meters, wide about 5.5 meters, arranges upper strata workplatform 3 and lower floor's workplatform 4, and upper strata workplatform 3 is all fixedly connected with support 1 with the two ends of lower floor workplatform 4, and designing specified weight-carrying capacity is 1000KG. the hanging basket back side arranges that 6 scalable rollers 12 make hanging basket can slide up and down in for 1:0.15 oblique door groove on slope, arranges 4 adjustable location wheels 13 see both sides, Fig. 4 hanging basket front end spacing for hanging basket, prevents hanging basket left and right in oblique door groove from swinging. the pulling speed of hanging basket is 9.3 �� 0.5m/min, hanging basket adopts mobile crane to install above emergency gate slot and puts into a groove, fix with the suspension 14 of soldered triangle support frame and joist steel crossbeam composition again after putting into, the base plate 10 of suspension work platform and plane-parallel, 81.5 degree of angles are become with big dam facing, the support of hanging basket and workplatform are designed to multiple standard joint composition, so that recycling, and arrange limit for tonnage safety lock 7. the left and right two ends of hanging basket are working face, and base plate 10 surrounding of workplatform is provided with height 150mm baffle plate, and baffle plate and base plate gap are not more than 5mm. before workplatform, rear the fixed safe guardrail of 1.2m height is set, left, the right side is provided with flexible workplatform 5, upper strata workplatform 3 and lower floor's workplatform 4 adopt dismountable mode of connection, it is convenient to the construction needs that other position only needs one layer of workplatform, more multi-layered operation platform can also be increased according to operating mode, volume raises Plant arrangement at upper strata workplatform 3, it is highly 2 meters, work ladder 2 is set in the centre of upper strata workplatform 3 and lower floor's workplatform 4, it is with protective grating outside work ladder 2, for needs of constructing later, work ladder 2 to be convenient to remove, the construction of the right and left personnel can not be affected. have through experiment the utility model draw materials easily, equipment is simple, cost is low, the advantage of work efficiency height, construction safety.
The above embodiments are only optimal technical scheme of the present utility model; and should not be considered as restriction of the present utility model; the technology feature recorded in the utility model; under the prerequisite do not conflicted; can combinationally use mutually; the technical scheme that protection domain of the present utility model should be recorded with claim, the equivalent alternative comprising technology feature in the technical scheme of claim record is protection domain. Namely the equivalent replacement within the scope of this improves, also within protection domain of the present utility model.

Claims (10)

1. a multilayer construction hanging basket, comprises support (1), it is characterized in that: support (1) is provided with at least two layers of workplatform, be provided with work ladder (2) between workplatform;
It is provided with the roller for sliding along construction at the back side of support (1).
2. a kind of multilayer construction hanging basket according to claim 1, is characterized in that: the two ends of workplatform are provided with the flexible workplatform (5) being flexibly connected with workplatform, constructs for stretching in a groove.
3. a kind of multilayer construction hanging basket according to claim 1, is characterized in that: be provided with location wheel (13) pointing to both sides at support (1) or workplatform.
4. a kind of multilayer construction hanging basket according to claim 1, is characterized in that: the base plate (10) of workplatform is for being horizontally disposed with.
5. a kind of multilayer construction hanging basket according to claim 1, is characterized in that: be installed with volume on support (1) and raise device, and volume is raised device and is connected with suspension (14) by wireline (8).
6. a kind of multilayer construction hanging basket according to claim 5, it is characterized in that: described volume is raised in device, the volume being installed on support (1) is raised motor (6) and is connected with worm gear reducer (11), the output shaft of worm gear reducer (11) is connected with wireline roller, and wireline (8) is wound on wireline roller.
7. a kind of multilayer construction hanging basket according to claim 5, is characterized in that: described wireline (8) is through the limit for tonnage safety lock (7) being installed on support (1).
8. a kind of multilayer construction hanging basket according to claim 7, it is characterized in that: in described limit for tonnage safety lock (7), the first round (72), the 2nd takes turns (74) and straining pulley (75) staggered arrangement from top to bottom, wherein straining pulley (75) is positioned at the first round (72) and the 2nd and takes turns between (74), wireline (8) into a bent shape state walk around the first round (72) successively, straining pulley (75) and the 2nd take turns (74), straining pulley (75) is provided with force transducer (73).
9. a kind of multilayer construction hanging basket according to claim 8, it is characterized in that: the structure of force transducer (73) is: the wheel shaft (78) of straining pulley (75) is positioned at groove hole (76), wheel shaft (78) side is provided with spring (77), so that straining pulley (75) presses to wireline (8), wheel shaft (78) is provided with pressure transmitter, or wheel shaft (78) is connected with the pulling force sensor admittedly established.
10. a kind of multilayer construction hanging basket according to claim 8, it is characterized in that: the structure of force transducer (73) is: the wheel shaft (78) of straining pulley (75) is positioned at groove hole (76), wheel shaft (78) side is provided with spring (77), so that straining pulley (75) presses to wireline (8), also being provided with the travel switch triggered by straining pulley (75) or wheel shaft (78), travel switch makes volume raise motor (6) power-off after triggering.
CN201620027335.7U 2016-01-13 2016-01-13 Multilayer construction hanging flower basket Expired - Fee Related CN205276845U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620027335.7U CN205276845U (en) 2016-01-13 2016-01-13 Multilayer construction hanging flower basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620027335.7U CN205276845U (en) 2016-01-13 2016-01-13 Multilayer construction hanging flower basket

Publications (1)

Publication Number Publication Date
CN205276845U true CN205276845U (en) 2016-06-01

Family

ID=56061429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620027335.7U Expired - Fee Related CN205276845U (en) 2016-01-13 2016-01-13 Multilayer construction hanging flower basket

Country Status (1)

Country Link
CN (1) CN205276845U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464358A (en) * 2016-01-13 2016-04-06 中国葛洲坝集团第一工程有限公司 Multi-layer construction basket
CN110397260A (en) * 2019-08-07 2019-11-01 上海市机械施工集团有限公司 A kind of high-altitude is filled a vacancy device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464358A (en) * 2016-01-13 2016-04-06 中国葛洲坝集团第一工程有限公司 Multi-layer construction basket
CN110397260A (en) * 2019-08-07 2019-11-01 上海市机械施工集团有限公司 A kind of high-altitude is filled a vacancy device

Similar Documents

Publication Publication Date Title
CN105464358A (en) Multi-layer construction basket
CN202359506U (en) Double hoop supporting system for pier column capping beam
CN205189392U (en) Lift scaffold is adhered to to guide bracket formula
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN205276845U (en) Multilayer construction hanging flower basket
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN103074871B (en) Arc-shaped slope concrete sliding and lifting template
CN103924653B (en) A kind of frame type catch pit and construction method thereof
CN102975278B (en) Mold system of building prefabricated member and prefabricating method thereof
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
CN205224561U (en) Rail mounted removes scaffold
CN203782863U (en) Frame type draining well
CN203730011U (en) Formwork limiting device
CN202913679U (en) Double-function construction operation protection derrick in elevator shaft way
CN205445621U (en) Vault steel mould trolley
CN214615622U (en) Reinforcing support for house building
CN204715784U (en) A kind of suspension type foundation ditch People's Bank of China's steel ladder cage
CN210194435U (en) Movable trolley for transverse prestress construction of continuous beam
CN204276583U (en) A kind of veneer reeling machine and safe operation platform thereof
CN203382337U (en) Electric hanging basket for drainage vertical well of large-scale ship lock
CN210766416U (en) Bridge cylinder mound construction platform
CN201991144U (en) Hanging stool for thickness-quality control of cast-in-place concrete floor upper-layer plate-rib protecting layer and concrete plate
CN202324433U (en) Spiral-type ladder compartment with pulling/pressing structure for mine
CN202370540U (en) Grotto bridge type construction trolley of large-span underground powerhouse
CN207647285U (en) A kind of civil engineering building guardrail

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160601

Termination date: 20190113