CN105464358A - Multi-layer construction basket - Google Patents

Multi-layer construction basket Download PDF

Info

Publication number
CN105464358A
CN105464358A CN201610019015.1A CN201610019015A CN105464358A CN 105464358 A CN105464358 A CN 105464358A CN 201610019015 A CN201610019015 A CN 201610019015A CN 105464358 A CN105464358 A CN 105464358A
Authority
CN
China
Prior art keywords
hanging basket
working platform
support
wire rope
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610019015.1A
Other languages
Chinese (zh)
Other versions
CN105464358B (en
Inventor
李新明
李银焜
李艳阳
郭艳召
曾庆平
刘二虎
张慧
熊建武
胡方华
黎学皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No1 Engineering Co Ltd
Original Assignee
China Gezhouba Group No1 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No1 Engineering Co Ltd filed Critical China Gezhouba Group No1 Engineering Co Ltd
Priority to CN201610019015.1A priority Critical patent/CN105464358B/en
Publication of CN105464358A publication Critical patent/CN105464358A/en
Application granted granted Critical
Publication of CN105464358B publication Critical patent/CN105464358B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables

Abstract

The invention provides a multi-layer construction basket. The multi-layer construction basket comprises a support, at least two layers of work platforms are arranged on the support, a work ladder is arranged between the work platforms, and abutting-against wheels used for sliding along a building are arranged on the back face of the support. Telescopic work platforms movably connected with the work platforms are arranged at the two ends of the work platforms and used for stretching into gate slots to conduct construction. The construction scheme that multiple overhanging scaffolds are set up in the construction gate slots to serve as an operation platform in the prior art is replaced by the basket structure provided with the multiple layers of work platforms, labor and material cost for constructing the overhanging scaffolds is reduced, potential safety hazards caused by vertical cross operation are eliminated, the construction efficiency of a gate slot technical structure and civil engineering is improved, dam concrete is poured to the top in advance, and the construction period of the dam major engineering is shortened.

Description

Multilayer construction hanging basket
Technical field
The present invention relates to Construction for Hydroelectric Project field, particularly the multilayer construction hanging basket of second stage concrete and built-in fitting construction field in oblique door groove in a kind of water power, building operations.
Background technology
Construction hanging basket is generally used for building trade, especially the work high above the ground such as multilayer external decoration of high-rise building finishing, curtain wall installation, this kind of exterior wall hanging basket mainly utilizes hanging basket as operation platform, replace traditional external scaffolding, scaffold can be reduced and pacify artificial, the Master Cost torn open, increase work efficiency, thus greatly reduce construction cost.Some hydropower station dome dam monolith is furnished with 4 low-leveled outlet, the vertical discrepancy in elevation 86m of low-leveled outlet emergency gate slot, and emergency gate slot is the oblique door groove of slope than 1:0.15, and gate slot domestic demand carries out door track built-in fitting and Concrete Construction of Powerhouse thereof.Former scheme reference class is like engineering construction experience, and employing is set up multistage builder's jack and carried out embedded parts and Concrete Construction of Powerhouse as operation platform, and gate slot construction is carried out with dam concrete construction simultaneously, and the delayed dam concrete construction of scaffold building is about 20m.Problems existing is:
1, single gate slot sets up scaffold needs the steel such as steel pipe, cantilever tripod to be about 35t, and material consumption is larger;
2, scaffold construction difficulty is large, and structure such as construction passage, security protection etc. is not easily arranged;
3, door track installation of embedded parts and second stage concrete are built segmentation and are constructed, and construction quality is difficult to control;
4, in gate slot, construction and dam concrete carry out simultaneously, and upper and lower cross-operation, exists potential safety hazard;
5, gate slot segmentation operation metal construction and second stage concrete pouring construction efficiency lower, and mutually to disturb with dam construction, mutually restrict, affect engineering integral construction progress.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of multilayer construction hanging basket, as the job platform of dam flood-discharge deep hole emergency gate slot door track embedded part and Concrete Construction of Powerhouse, can be adapted at the requirement that at least upper and lower two work planes are constructed simultaneously.In preferred scheme, the installation needs in the gate slot of oblique door groove can be met, and can safety be guaranteed.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of multilayer construction hanging basket, comprises support, and support is provided with at least two-layer working platform, is provided with working stand between working platform;
The roller for sliding along construction is provided with at the back side of support.
The two ends of working platform are provided with the flexible working platform be flexibly connected with working platform, construct for stretching in gate slot.
The locating wheel pointing to both sides is provided with at support or working platform.
The base plate of working platform is for being horizontally disposed with.
Support is installed with winding plant, and winding plant is connected with suspension by wire rope.
In described winding plant, the elevator motor be installed on support is connected with worm gear reducer, and the output shaft of worm gear reducer is connected with wire rope roller, and wire rope roll is around on wire rope roller.
Described steel wire penetrating is installed in the limit for tonnage safety lock on support.
In described limit for tonnage safety lock, the first round, second takes turns and straining pulley interlaced arrangement from top to bottom, wherein straining pulley is between the first round and second take turns, and state walks around the first round to wire rope successively into a bent shape, straining pulley and second is taken turns, and straining pulley is provided with force snesor.
The structure of force snesor is: the wheel shaft of straining pulley is positioned at slotted eye, and wheel shaft side is provided with spring, to make straining pulley press to wire rope, wheel shaft is provided with pressure sensor, or wheel shaft is connected with the pulling force sensor set firmly.
The structure of force snesor is: the wheel shaft of straining pulley is positioned at slotted eye, and wheel shaft side is provided with spring, and to make straining pulley press to wire rope, be also provided with the travel switch triggered by straining pulley or wheel shaft, travel switch makes the power-off of elevator motor after triggering.
A kind of multilayer construction hanging basket provided by the invention, by arranging the barrel structure with multilayer working platform, instead of in prior art in emergency gate slot, set up the constructure scheme of multistage builder's jack as job platform, reduce builder's jack to construct manually and material cost, eliminate top-bottom cross job safety hidden danger, improve gate slot technical pattern and civil engineering efficiency, and make dam concrete be poured into top in advance, save the dam major project construction period.Job platform can extend in gate slot by the flexible working platform arranged constructs.Winding plant is arranged on hanging basket, is convenient to execute-in-place and controls.The limit for tonnage safety lock arranged, can guarantee the construction safety of barrel structure.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is main TV structure schematic diagram of the present invention.
Fig. 2 is side-looking structural representation of the present invention.
Fig. 3 is the main TV structure schematic diagram of flexible working platform in the present invention.
Fig. 4 is the plan structure schematic diagram of flexible working platform in the present invention.
Fig. 5 is the plan structure schematic diagram of the present invention's working platform at the middle and upper levels.
Fig. 6 is the plan structure schematic diagram of lower floor's working platform in the present invention.
Fig. 7 is the side-looking structural representation of suspension in the present invention.
Fig. 8 is the main TV structure schematic diagram of suspension in the present invention.
Fig. 9 is the structural representation of limit for tonnage safety lock in the present invention.
In figure: support 1, working stand 2, upper strata working platform 3, working stand import 31, lower floor's working platform 4, flexible working platform 5, elevator motor 6, limit for tonnage safety lock 7, pedestal 71, the first round 72, force snesor 73, second takes turns 74, straining pulley 75, slotted eye 76, spring 77, wheel shaft 78, wire rope 8, guardrail 9, base plate 10, worm gear reducer 11, scalable roller 12, locating wheel 13, suspension 14.
Detailed description of the invention
As in Fig. 1,2, a kind of multilayer construction hanging basket, comprises support 1, and support 1 is provided with at least two-layer working platform, is provided with working stand 2 between working platform; Upper strata working platform 3 is provided with working stand import 31, is convenient to personnel and enters, as shown in Fig. 5,6.
The roller for sliding along construction is provided with at the back side of support 1, construction in this example has a cell wall tilted, the roller arranged makes whole hanging basket slide along cell wall in lifting process, roller in this example adopts telescopic roller, can by flexible roller, adjust the inclined degree of whole hanging basket, be beneficial to make working platform to keep level, putting of constructability operation and equipment.By above-mentioned structure, realize multiple benches face and construct simultaneously.
The two ends of working platform are provided with the flexible working platform 5 be flexibly connected with working platform, construct for stretching in gate slot.As shown in Fig. 1,3,4, the left side in figure is the structure of flexible working platform 5 when not stretching out, and the right side in figure is the structure of flexible working platform 5 when stretching out.
The locating wheel 13 pointing to both sides is provided with at support 1 or working platform.Structure thus, limits the right position of hanging basket, avoids whole hanging basket to swing in construction.
Emergency gate slot is the oblique door groove of slope than 1:0.15, gate slot domestic demand carries out the construction of door track built-in fitting, for ease of construction, the base plate 10 of the working platform in this example is for being horizontally disposed with, the base plate 10 of the working platform namely in this example is relative to support out of plumb, but have corresponding inclination angle according to the angle of inclination of oblique door groove, to make the base plate 10 of working platform for level, be convenient to personnel's walking, construction and putting equipment.
As in Fig. 1,2,7,8, support 1 is installed with winding plant, and winding plant is connected with suspension 14 by wire rope 8.Structure thus, realizes the descending operation of whole hanging basket, winding plant is arranged on the operation at the scene of being more convenient on support 1.
As in Fig. 1,2, in described winding plant, the elevator motor 6 be installed on support 1 is connected with worm gear reducer 11, and the output shaft of worm gear reducer 11 is connected with wire rope roller, and wire rope 8 is wound on wire rope roller.The worm gear reducer 11 arranged is convenient to realize self-locking, improves safety.
As in Fig. 1,2, described wire rope 8 is through the limit for tonnage safety lock 7 be installed on support 1.Structure thus, when whole hanging basket exceedes the safe bearing load of setting, limit for tonnage safety lock 7 can pin winding plant, and reports to the police, thus guarantees construction safety.
As in Fig. 9, in described limit for tonnage safety lock 7, the first round 72, second takes turns 74 and straining pulley 75 interlaced arrangement from top to bottom, wherein straining pulley 75 is taken turns between 74 in the first round 72 and second, state walks around the first round 72 to wire rope 8 successively into a bent shape, straining pulley 75 and second takes turns 74, and straining pulley 75 is provided with force snesor 73.Structure thus, the pulling force received when wire rope 8 strengthens, then the bending degree of wire rope 8 reduces, and obtains this change, reaches setting value, can disconnect the power supply of winding plant by force snesor 73, in preferred scheme and locking steel wire rope.
The structure of force snesor 73 is: the wheel shaft 78 of straining pulley 75 is positioned at slotted eye 76, and wheel shaft 78 side is provided with spring 77, to make straining pulley 75 press to wire rope 8, wheel shaft 78 is provided with pressure sensor, or wheel shaft 78 is connected with the pulling force sensor set firmly.Force snesor 73 is connected with the control device of winding plant, such as PLC, when PLC receives the data of force snesor 73 acquisition, compare with the data preset, when exceeding preset value, then PLC disconnects the power supply of elevator motor 6, worm gear reducer 11 self-locking, same to alarm, guarantees construction safety.
In another optional scheme, the structure of force snesor 73 is: the wheel shaft 78 of straining pulley 75 is positioned at slotted eye 76, wheel shaft 78 side is provided with spring 77, to make straining pulley 75 press to wire rope 8, is also provided with the travel switch triggered by straining pulley 75 or wheel shaft 78, travel switch makes elevator motor 6 power-off after triggering, such as travel switch is arranged on the position of spring 77 in Fig. 9, acquires a certain degree when wire rope 8 stretches, then trigger travel switch, make elevator motor 6 power-off, and it is electric that alarm buzzer is obtained.Adopt this structure, then without the need to using PLC to realize, be conducive to reducing use cost.
Embodiment:
The using method of construction hanging basket of the present invention is specifically described for the construction of certain arch dam deep hole emergency gate slot embedded part:
Some hydropower station is dome dam, is furnished with 4 low-leveled outlet, the vertical discrepancy in elevation 86m of low-leveled outlet emergency gate slot, and emergency gate slot is the oblique door groove of slope than 1:0.15, and gate slot domestic demand carries out the construction of door track built-in fitting.Employing the solution of the present invention is as follows:
Hanging basket is double-decker, high 7.5 meters, wide about 5.5 meters, arranges upper strata working platform 3 and lower floor's working platform 4, and upper strata working platform 3 is all fixedly connected with support 1 with the two ends of lower floor working platform 4, and design nominal load capacity is 1000KG.The hanging basket back side arranges that 6 scalable rollers 12 make hanging basket on slope than for sliding up and down in 1:0.15 oblique door groove, can arrange 4 adjustable locating wheels 13 spacing for hanging basket, prevent hanging basket from swinging in oblique door groove see both sides, Fig. 4 hanging basket front end.The hoisting velocity of hanging basket is 9.3 ± 0.5m/min, hanging basket adopts mobile crane to install above emergency gate slot and puts into gate slot, fix with the suspension 14 of soldered triangle support frame and i iron crossbeam composition again after putting into, the base plate 10 of suspension work platform and plane-parallel, 81.5 degree of angles are become with large dam facing, the support of hanging basket and working platform are designed to multiple standard knot composition, so that recycle, and arrange limit for tonnage safety lock 7.The left and right two ends of hanging basket are work plane, and base plate 10 surrounding of working platform is provided with height 150mm baffle plate, and baffle plate and base plate gap are not more than 5mm.Before working platform, after fixed 1.2m height safety barrier is set, left, the right side is provided with flexible working platform 5, upper strata working platform 3 and lower floor's working platform 4 adopt dismountable connected mode, be convenient to the construction needs that other position only needs one deck working platform, also more multi-layered operation platform can be increased according to operating mode, winding plant is arranged in upper strata working platform 3, be highly 2 meters, in the centre of upper strata working platform 3 and lower floor's working platform 4, working stand 2 is set, protective guard is with outside working stand 2, for needs of constructing later, working stand 2 will be convenient to remove, the construction of the right and left personnel can not be affected.Have through experiment the present invention draw materials easily, equipment is simple, cost is low, work efficiency is high, the advantage of construction safety.
The above embodiments are only the preferred technical solution of the present invention; and should not be considered as restriction of the present invention; the technical characteristic recorded in the present invention; under the prerequisite of not conflicting; can combinationally use mutually; the technical scheme that protection scope of the present invention should be recorded with claim, the equivalents comprising technical characteristic in the technical scheme of claim record is protection domain.Namely the equivalent replacement within the scope of this improves, also within protection scope of the present invention.

Claims (10)

1. a multilayer construction hanging basket, comprises support (1), it is characterized in that: support (1) is provided with at least two-layer working platform, is provided with working stand (2) between working platform;
The roller for sliding along construction is provided with at the back side of support (1).
2. a kind of multilayer construction hanging basket according to claim 1, is characterized in that: the two ends of working platform are provided with the flexible working platform (5) be flexibly connected with working platform, construct for stretching in gate slot.
3. a kind of multilayer construction hanging basket according to claim 1, is characterized in that: be provided with the locating wheel (13) pointing to both sides at support (1) or working platform.
4. a kind of multilayer construction hanging basket according to claim 1, is characterized in that: the base plate (10) of working platform is for being horizontally disposed with.
5. a kind of multilayer construction hanging basket according to claim 1, is characterized in that: on support (1), be installed with winding plant, and winding plant is connected with suspension (14) by wire rope (8).
6. a kind of multilayer construction hanging basket according to claim 5, it is characterized in that: in described winding plant, the elevator motor (6) be installed on support (1) is connected with worm gear reducer (11), the output shaft of worm gear reducer (11) is connected with wire rope roller, and wire rope (8) is wound on wire rope roller.
7. a kind of multilayer construction hanging basket according to claim 5, is characterized in that: described wire rope (8) is through the limit for tonnage safety lock (7) be installed on support (1).
8. a kind of multilayer construction hanging basket according to claim 7, it is characterized in that: in described limit for tonnage safety lock (7), the first round (72), second takes turns (74) and straining pulley (75) interlaced arrangement from top to bottom, wherein straining pulley (75) is positioned at the first round (72) and second and takes turns between (74), state walks around the first round (72) to wire rope (8) successively into a bent shape, straining pulley (75) and second is taken turns (74), and straining pulley (75) is provided with force snesor (73).
9. a kind of multilayer construction hanging basket according to claim 8, it is characterized in that: the structure of force snesor (73) is: the wheel shaft (78) of straining pulley (75) is positioned at slotted eye (76), wheel shaft (78) side is provided with spring (77), wire rope (8) is pressed to make straining pulley (75), wheel shaft (78) is provided with pressure sensor, or wheel shaft (78) is connected with the pulling force sensor set firmly.
10. a kind of multilayer construction hanging basket according to claim 8, it is characterized in that: the structure of force snesor (73) is: the wheel shaft (78) of straining pulley (75) is positioned at slotted eye (76), wheel shaft (78) side is provided with spring (77), wire rope (8) is pressed to make straining pulley (75), also be provided with the travel switch triggered by straining pulley (75) or wheel shaft (78), travel switch makes elevator motor (6) power-off after triggering.
CN201610019015.1A 2016-01-13 2016-01-13 Multilayer construction hanging basket Active CN105464358B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610019015.1A CN105464358B (en) 2016-01-13 2016-01-13 Multilayer construction hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610019015.1A CN105464358B (en) 2016-01-13 2016-01-13 Multilayer construction hanging basket

Publications (2)

Publication Number Publication Date
CN105464358A true CN105464358A (en) 2016-04-06
CN105464358B CN105464358B (en) 2018-02-27

Family

ID=55602473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610019015.1A Active CN105464358B (en) 2016-01-13 2016-01-13 Multilayer construction hanging basket

Country Status (1)

Country Link
CN (1) CN105464358B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105776093A (en) * 2016-05-09 2016-07-20 艾和美 Double-layer safety temporarily installed suspended access equipment for detection working at height for special equipment
CN106430008A (en) * 2016-08-24 2017-02-22 无锡科通工程机械制造有限公司 Double-layer hanging basket
CN109025234A (en) * 2018-07-28 2018-12-18 北京建工集团有限责任公司 A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200430674Y1 (en) * 2006-08-21 2006-11-10 (주)조은곤도라 High place working gondola in building
CN201268937Y (en) * 2008-09-05 2009-07-08 高智鹏 Double-layer hanging cradle for working aloft
CN201593300U (en) * 2009-12-08 2010-09-29 无锡华科机械设备有限公司 Overload protecting device
CN203514754U (en) * 2013-08-16 2014-04-02 中建七局第四建筑有限公司 Cradle for large-slope decoration construction
CN205276845U (en) * 2016-01-13 2016-06-01 中国葛洲坝集团第一工程有限公司 Multilayer construction hanging flower basket

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200430674Y1 (en) * 2006-08-21 2006-11-10 (주)조은곤도라 High place working gondola in building
CN201268937Y (en) * 2008-09-05 2009-07-08 高智鹏 Double-layer hanging cradle for working aloft
CN201593300U (en) * 2009-12-08 2010-09-29 无锡华科机械设备有限公司 Overload protecting device
CN203514754U (en) * 2013-08-16 2014-04-02 中建七局第四建筑有限公司 Cradle for large-slope decoration construction
CN205276845U (en) * 2016-01-13 2016-06-01 中国葛洲坝集团第一工程有限公司 Multilayer construction hanging flower basket

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105776093A (en) * 2016-05-09 2016-07-20 艾和美 Double-layer safety temporarily installed suspended access equipment for detection working at height for special equipment
CN106430008A (en) * 2016-08-24 2017-02-22 无锡科通工程机械制造有限公司 Double-layer hanging basket
CN109025234A (en) * 2018-07-28 2018-12-18 北京建工集团有限责任公司 A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk

Also Published As

Publication number Publication date
CN105464358B (en) 2018-02-27

Similar Documents

Publication Publication Date Title
CN102677889B (en) System for alternatively supporting whole lifting steel platform formwork by steel column casing rack and construction method
KR20130105536A (en) Motorized height access device for tower cranes
CN102587645B (en) Climbing supporting mechanism having expansion and automatic meshing functions, and construction method thereof
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN104453231B (en) Gantry type building construction lifting device as well as manufacturing method and construction method thereof
CN101435276B (en) Cabin top steel beam hydraulic hoisting and positioning apparatus of cylinder cabin structure building and construction method thereof
CN206408952U (en) A kind of construction adhesion type lifts discharging platform
CN201635379U (en) Safety platform for installation and construction of roof contour plate hang ceiling
CN105800482A (en) Tower crane with climbing ladder and elevator
CN103806644B (en) For electrical lift shaft form hydraulic telescopic device and operation method thereof
CN104074349B (en) A kind of new-type protection type attachment type raise scaffold
CN203514754U (en) Cradle for large-slope decoration construction
CN201785162U (en) Pull pole hoist for arc gird
CN202751338U (en) Rail type suspension basket
CN202785176U (en) Novel construction hoist
CN106400951B (en) A kind of level and vertical structure method for synchronously constructing of super high-rise building
CN107435438A (en) A kind of chimney turnover formwork construction device
CN205804190U (en) A kind of travelling bridge for the guardrail construction that builds a bridge
CN206220464U (en) A kind of raise scaffold
CN208518310U (en) All steel type attachment type raise scaffold
CN106677509A (en) Design finalization external protective frame system used for assembly type building construction
CN102561744B (en) Integrated base station capable of realizing one-click maintenance without ascending height
US20180170716A1 (en) Hydraulic elevating platform having no guide rails and elevating method
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN205077885U (en) Building core section of thick bamboo hydraulic pressure intelligence protection platform that climbs

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Xinming

Inventor after: Hu Fanghua

Inventor after: Li Xuehao

Inventor after: Cai Yongfa

Inventor after: Li Yanyang

Inventor after: Guo Yanzhao

Inventor after: Li Yinkun

Inventor after: Zeng Qingping

Inventor after: Liu Erhu

Inventor after: Zhang Hui

Inventor after: Xiong Jianwu

Inventor before: Li Xinming

Inventor before: Li Xuehao

Inventor before: Li Yinkun

Inventor before: Li Yanyang

Inventor before: Guo Yanzhao

Inventor before: Zeng Qingping

Inventor before: Liu Erhu

Inventor before: Zhang Hui

Inventor before: Xiong Jianwu

Inventor before: Hu Fanghua

CB03 Change of inventor or designer information
GR01 Patent grant