CN203782863U - Frame type draining well - Google Patents

Frame type draining well Download PDF

Info

Publication number
CN203782863U
CN203782863U CN201420182158.0U CN201420182158U CN203782863U CN 203782863 U CN203782863 U CN 203782863U CN 201420182158 U CN201420182158 U CN 201420182158U CN 203782863 U CN203782863 U CN 203782863U
Authority
CN
China
Prior art keywords
well
ring baffle
frame type
catch pit
baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420182158.0U
Other languages
Chinese (zh)
Inventor
陈欢
李启轩
李瑞林
李永进
唐文超
王敬瑞
张强强
贾晔
呼晓慧
崔培
周红坤
郑伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINJIAN ENGINEERING DESIGN Co Ltd
Original Assignee
JINJIAN ENGINEERING DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINJIAN ENGINEERING DESIGN Co Ltd filed Critical JINJIAN ENGINEERING DESIGN Co Ltd
Priority to CN201420182158.0U priority Critical patent/CN203782863U/en
Application granted granted Critical
Publication of CN203782863U publication Critical patent/CN203782863U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a frame type draining well which comprises a well seat. The top of the well seat is provided with a derrick, and the derrick comprises well pillars and ring beams. The well pillars are provided with hinge pin holes in the perpendicular direction, and hinge pins are inserted into the hinge pin holes. The ring beams are arranged between the adjacent well pillars, and the internal space defined by the well pillars and the ring beams is perpendicularly provided with annular baffles in an overlapped mode. The inner walls of the annular baffles are provided with lifting lugs, and the outer walls of the annular baffles are matched with the inner walls of the well pillars and the ring beams. Each annular baffle is supported by the corresponding hinge pin of the same height, and the top end of the well seat is provided with an annular supporting platform. An initial draining channel is arranged between the bottom end of the bottommost annular baffle and the supporting platform. According to the frame type draining well, rear-stage operation is convenient and fast, time and labor are saved, and the frame type draining well is safe, reliable, good in integrity, firm and durable.

Description

A kind of frame type catch pit
Technical field
The utility model relates to catch pit, relates in particular to mill tailings frame type catch pit.
Background technology
Catch pit is one of important structure of mill tailings facility.Drop to sleet water in Tailings Dam catchment area and tailing clearing rinsing mostly by it, discharge outside storehouse through structure such as drainage culvert or tunnels subsequently, pushed up and make tailing clearing rinsing to return to ore dressing plant to reuse by flood is unrestrained to guarantee that tailing dam is unlikely.
The commonplace catch pit of current domestic use has window type catch pit, semicircle baffle-type (twin columns) catch pit, frame baffle formula catch pit, building-brick type catch pit and the stacked catch pit of walling crib.Window type catch pit system once builds up, and in borehole wall different level, place leaves circle or square window, this well construction good integrity, and hole diameter is little, and working service is easy, but bleeder quantity is little.The framework of semicircle baffle-type catch pit is also once to build up, only two well posts, and well post linking beam (crossbeam) is in the middle of well, baffle plate is semicircle, and with adding baffle plate in reservoir level rising successively, hole diameter is generally not more than 2m, bleeder quantity is larger, but baffle plate inconvenience is in use installed.The well post radical of frame baffle formula catch pit is different with hole diameter, is used for the Tailings Dam that catchment area is larger, and feature is that bleeder quantity is large, and construction and installation are cumbersome.The pit shaft of building-brick type catch pit rises and increases gradually with building block with reservoir level, and owing to there is no well post and linking beam, bleeder quantity is than large with diameter frame type, but use inconvenience need be constructed while building by laying bricks or stones on the water.The stacked catch pit of walling crib is to be successively formed by stacking with reservoir level rising Whole curb, and walling crib diameter is unsuitable excessive.
More use frame type catch pit at present Tailings Dam design, as depicted in figs. 1 and 2, this catch pit vent flow is large, and structural stability is better, but the installation of curved baffle bothers, and uses very inconvenient.Such as: as derrick external diameter 2.5m, the high 0.3m of arch bar, when wall thickness 0.1m, the heavily about 145kg of every arc arch bar (90 °).Need be by it from moving to ship on the bank when installation, then install on well post from ship, 2~3 common operations of strong workman just can complete, and still need and there is the delivery vehicle of certain carrying and resistance to capsizing.If adopt lifting machine more complicated.Can reduce every arch bar weight though reduce walling crib height, but increase workload to making, carrying and installation, and joint close increases, increased because engaging and sternly do not produced the Lou possibility of sand.Therefore, available frame formula catch pit in use exists baffle plate that trouble, inconvenient problem with use are installed.
Summary of the invention
The technical problems to be solved in the utility model is: provide a kind of constructability, the frame type catch pit that result of use is good.
Technical solution of the present utility model is:
A kind of frame type catch pit, comprise well seat, well seat top is provided with derrick, derrick comprises well post and collar tie beam, well post vertical direction is provided with pin shaft hole, pin shaft hole is fitted with bearing pin, between adjacent well post, be provided with collar tie beam, the vertical closed assembly in inner space that well post encloses with collar tie beam has ring baffle, the inwall of ring baffle is provided with hanger, the inwall of the outer wall of ring baffle and well post and collar tie beam is suitable, each ring baffle is supported by the bearing pin of sustained height, the top of well seat is provided with annular support platform, it between the bottom of nethermost ring baffle and support platform, is initial drainage channel.
As improvement, the top of well post is provided with suspension bracket and operating platform, and suspension bracket is provided with bottle gouard moved by hands, and bottle gouard moved by hands is fixed with stay cord.
As improvement, embedded steel tube in pin shaft hole,
The pitch of holes of neighbouring pin shaft hole is greater than 5 centimetres of the height of ring baffle, large 3~5 millimeters than pin diameter of pipe diameters.
Technique effect of the present utility model is: the utility model frame type catch pit is suspended on the well post of catch pit prefabricated ring baffle in advance with bearing pin.In use, extract one by one again bearing pin out and transfer ring baffle along with water level raises, making like this drainage channel move on gradually, using the later stage convenient to operation, time saving and energy saving, safe and reliable.Because ring baffle is cylindric, good integrity, sturdy and durable.
The concrete technique effect of the utility model is:
(1) easy to operate.The utility model can solve existing Tailings Dam frame type catch pit in use, and baffle plate is installed trouble, inconvenient problem with use.Owing to also not when ore discharge, in advance ring baffle being suspended on well post by bearing pin in Tailings Dam, when later stage operation, adopt bottle gouard moved by hands to promote ring baffle, pull out bearing pin and manually place ring baffle.The difficulty degree of the installation of the more existing catch pit baffle plate of this generic operation will reduce greatly.
(2) safe and reliable.Use ship work from being transported to catch pit on the bank and installing by baffle plate owing to having evaded, eliminated shipboard and turned over the danger overboard with people.Ring baffle is in well post inner side, and when promoting and transferring ring baffle, personnel are at well post outside and top, even if because falling of unexpected generation ring baffle also can ensure staff's safety.
(3) good integrity.Due to existing curved baffle is improved to tubular ring baffle, and ring baffle is with well post outward and collar tie beam is fixed, compared with available frame formula catch pit good integrity.
Brief description of the drawings
1, Fig. 1 is the front view of available frame formula catch pit.
2, Fig. 2 is the left view of available frame formula catch pit.
3, the C-C that Fig. 3 is Fig. 2 is to sectional view.
4, Fig. 4 is the front view of the utility model frame type catch pit.
5, Fig. 5 is the left view of the utility model frame type catch pit.
6, Fig. 6 is the top view of the utility model frame type catch pit.
7, the A-A that Fig. 7 is Fig. 6 is to sectional view.
8, the B-B that Fig. 8 is Fig. 6 is to sectional view.
9, Fig. 9 is Fig. 7 partial enlarged drawing.
10, Figure 10 is the front view of the utility model ring baffle.
11, Figure 11 is the top view of the utility model ring baffle.
12, Figure 12 is the longitudinal sectional view of the utility model ring baffle.
In figure: 2, well post, 3, curved baffle, 4, cat ladder in existing catch pit, 5, ring baffle, 6, suspension bracket, 7, bottle gouard moved by hands, 8, bearing pin, 9, outer cat ladder, 10, cat ladder in catch pit of the present invention, 11, well seat, 12, outfall, 13, hanger, 14, collar tie beam, 15, drainage channel, 16, stay cord, 17, support platform.
Detailed description of the invention
Describe in detail below in conjunction with drawings and Examples.
As shown in Fig. 4 to Figure 12, a kind of frame type catch pit of the utility model, comprise well seat 11, well seat 11 tops are provided with derrick, derrick comprises well post 2 and collar tie beam 14, well post 2 vertical direction are provided with pin shaft hole, pin shaft hole is fitted with bearing pin 8, between adjacent well post 2, be provided with collar tie beam 14, the vertical closed assembly in inner space that well post 2 encloses with collar tie beam 14 has ring baffle 5, ring baffle 5 is cylindric, the inwall of ring baffle 5 is provided with hanger 13, the inwall of the outer wall of ring baffle 5 and well post 2 and collar tie beam 14 is suitable, each ring baffle 5 is supported by the bearing pin 8 of sustained height, the top of well seat 11 is provided with annular support platform 17, between the bottom of nethermost ring baffle and support platform 17, it is drainage channel 15.
The top of well post 2 is provided with suspension bracket 6 and operating platform, and suspension bracket 6 is provided with bottle gouard moved by hands 7, and bottle gouard moved by hands 7 is fixed with stay cord 16.Embedded steel tube in pin shaft hole, the pitch of holes of neighbouring pin shaft hole is greater than 5 centimetres of the height of ring baffle 5, large 3~5 millimeters than pin diameter of pipe diameters.
The construction method of the utility model the first frame type catch pit, the steps include:
(1) excavation well seat basis: well seat buried depth is not less than 2/3 of well seat height, and bearing capacity of foundation soil is not less than 200kPa;
(2) make well seat: formwork supporting plate, put reinforcing bar, pouring concrete, maintenance;
(3) make well post: formwork supporting plate, put reinforcing bar, pouring concrete, maintenance, wherein at well post vertical direction embedded steel tube, neighbouring steel pipe spacing is for being greater than 5 centimetres of ring baffle height, the initial setting height(from bottom) of steel pipe is determined according to the height of drainage channel, the installation number of plies of steel pipe is identical with the number of plies of ring baffle, and at well capital end fitting operation platform, suspension bracket and bottle gouard moved by hands, bottle gouard moved by hands is installed stay cord;
(4) make ring baffle: after the well post of derrick and collar tie beam have been constructed, in well post and collar tie beam, overlap the prefabricated ring baffle of movable steel template with two, the 1st layer of ring baffle below contiguous built and reached after some strength, on the 1st layer of ring baffle, build the 2nd layer of ring baffle above vicinity by the second cover template, between the 1st layer of ring baffle and contiguous the 2nd layer of ring baffle, separate with malthoid, when the 2nd layer of contiguous ring baffle built and reached after some strength, and then build the 3rd layer of ring baffle layer at the top of the 2nd layer of ring baffle with making the first set template of the 1st layer of ring baffle below, so analogize, prefabricated all ring baffles in well post and collar tie beam,
(5) stack ring baffle and plug-in mounting bearing pin: operative employee stands in operating platform, the bottle gouard moved by hands that manual suspension bracket is provided with, from uppermost ring baffle, lift one by one ring baffle, in contiguous steel pipe below this lifting ring baffle, insert bearing pin, and then the ring baffle having lifted is slowly hung down, the bottom surface of ring baffle is touched on the bearing pin of plug-in mounting, finally support ring baffle by bearing pin, the lifting of other ring baffle and support are so analogized, final all ring baffles are all supported by bearing pin, install before bearing pin, external surface at steel pipe inner wall and bearing pin is smeared anticorrosive paint,
(6) hang ring baffle: in use, along with the rising of tailings face, from nethermost ring baffle, operative employee stands in operating platform, the bottle gouard moved by hands that manual suspension bracket is provided with, first lift the hanger of bottom ring baffle inwall, the ring baffle of slinging, bearing pin in contiguous steel pipe below this lifting ring baffle is extracted, and then the ring baffle having lifted is slowly hung down, the bottom surface of bottom ring baffle is touched in support platform, finally support ring baffle by support platform, the lifting of other ring baffle and support are so analogized, the contiguous end face of ring baffle below of the bottom surface of ring baffle contact above, final all ring baffles stack together, drainage channel moves on gradually like this, on hang lower vicinity before ring baffle, cement mortar is smeared in the top of the vicinity of having put well ring baffle below.
The advantage of the construction method of the first frame type catch pit: the one, the distance that each ring baffle moves in well post is shorter than the method for prefabricated ring baffle outside well post.Therefore, ring baffle is stronger to the compliance of the defects such as well major gene construction Deformation or construction precision deficiency.Advantage two is that the seam between each ring baffle is tighter, because each ring baffle is in the time slinging, between ring baffle, relative position is constant, has exempted because of larger space between the prefabricated rough and uneven in surface ring baffle causing of ring baffle, has reduced the possibility of a large amount of spillages.
The construction method of the utility model the second frame type catch pit, the steps include:
(1) excavation well seat basis: well seat buried depth is not less than 2/3 of well seat height, and foundation bearing is not less than 200kPa;
(2) make well seat: formwork supporting plate, put reinforcing bar, pouring concrete, maintenance;
(3) prefabricated ring baffle: shift to an earlier date prefabricated ring baffle and overlay on the well seat that maintenance is good, at the pre-buried hanger of ring baffle inwall;
(4) make well post and collar tie beam: formwork supporting plate on the good well seat of maintenance, put reinforcing bar, pouring concrete, maintenance, wherein at well post vertical direction embedded steel tube, neighbouring steel pipe spacing is for being greater than 5 centimetres of ring baffle height, large 3~5 millimeters than pin diameter of the internal diameters of steel pipe, the initial setting height(from bottom) of steel pipe is determined according to the height of drainage channel, the installation number of plies of steel pipe is identical with the number of plies of ring baffle, prefabricated well post and collar tie beam enclose the ring baffle stacking therein, at well capital end fitting operation platform, suspension bracket and bottle gouard moved by hands, bottle gouard moved by hands is installed stay cord,
(5) lifting ring baffle and plug-in mounting bearing pin: operative employee stands in operating platform, the bottle gouard moved by hands that manual suspension bracket is provided with, hanging is ring baffle topmost, in contiguous steel pipe below this lifting ring baffle, insert bearing pin, and then the ring baffle having lifted is slowly hung down, the bottom surface of ring baffle is touched on the bearing pin of plug-in mounting, finally support ring baffle by bearing pin, the lifting of other ring baffle and support are so analogized, final all ring baffles are all supported by corresponding bearing pin, install before bearing pin, external surface at steel pipe inner wall and bearing pin is smeared anticorrosive paint,
(6) hang ring baffle: from nethermost ring baffle, operative employee stands in operating platform, the bottle gouard moved by hands that manual suspension bracket is provided with, first lift the hanger of bottom ring baffle inwall, the ring baffle of slinging, bearing pin in contiguous steel pipe below this lifting ring baffle is extracted, and then the ring baffle having lifted is slowly hung down, the bottom surface of ring baffle is touched in support platform, finally support ring baffle by support platform, the lifting of ring baffle above and support are so analogized, final all ring baffles stack together, make like this drainage channel move on gradually, on hang lower vicinity before ring baffle, cement mortar is smeared in the top of the vicinity of having put well ring baffle below.
The construction method of the utility model the second frame type catch pit is first to complete and overlay on well seat prefabricated ring baffle, shuttering is built derrick (well post and collar tie beam) again, using the advantage of the method is that ring baffle can be prefabricated in advance, operate more convenient, and speed of application is very fast, but require relatively high to construction precision.
The construction technology of the well seat of the utility model frame type catch pit, well post, collar tie beam can adopt by reference " metallurgical mine mine tailing facility general drawing album-mine tailing frame type catch pit " of Kuming Coloured Metallurgy design Institute's nineteen eighty-two establishment.The well seat of this catch pit and derrick are cast-in-place forming, and select as required the catch pit of different collar tie beam external diameters, and conventional catch pit collar tie beam external diameter has 2.5m, 3m, 3.5m and 4.5m.
Collar tie beam external diameter 2.5m, derrick high 12m, the mine tailing load 40t/m of the present embodiment to commonly use 2catch pit be that example is specifically described:
The present embodiment frame type catch pit technical data: catch pit well seat internal diameter 1.5m, well seat external diameter 3.2m; Establish collar tie beam one every 3m, collar tie beam external diameter 3.0m, the thick 0.3m of collar tie beam, high 0.35m; Ring baffle is positioned over well post inner side, changes annular tubular into, external diameter 2.36m, and thick 0.1m, high 0.4~0.5m, every heavy 710~888kg, every ring baffle is established 4 hangers, is evenly arranged in ring baffle inwall; Four, well post, well post section configuration is " mouth " font or " fan-shaped ", wide 0.4m, thick 0.3m, well post vertical direction is every 1 of the pre-buried φ 25mm of 0.45~0.5m steel pipe; The water pipe internal diameter 1.2m that runs in of institute.The top of well post is provided with suspension bracket and simple and easy steel operating platform, and suspension bracket is provided with 1 ton of bottle gouard moved by hands, and bottle gouard moved by hands is fixed with stay cord, and catch pit adopts reinforced concrete structure.
After the present embodiment ring baffle is prefabricated, sling with bottle gouard moved by hands one by one, ring baffle is suspended on well post with the bearing pin of 20 millimeters of four φ and long 0.5m (the present embodiment bearing pin adopts outside to have the steel pin of plush copper).For preventing steel pipe and steel pin corrosion, surface is coated with anticorrosive paint, as antirust oil.If the seat number of catch pit is more than two, the catch pit ring baffle not coming into operation can first be folded sieve in well post, hangs up, in order to avoid the corrosion of overlong time steel pin before waiting to reinstate again.In use, transfer one by one with water level rising ring baffle in Tailings Dam.While transferring, first with bottle gouard moved by hands, ring baffle is mentioned to a little and make steel pin not bear pressure, extract steel pin on well post, then ring baffle is transferred slowly.For making to engage tightly between ring baffle, can smear little water cement mortar at front ring baffle top of having put well in advance.Due to light (the about 11kg of bottle gouard moved by hands net weight that lifting capacity is 1 ton) of bottle gouard moved by hands, can in the time of Interim use, bring to scene, in order to avoid be suspended on for a long time on suspension bracket by corrosion or loss.In concrete operations, only need 2~3 people can complete the installation work of transferring of ring baffle with a Simple wood (bamboo) raft, time saving and energy saving, safe and reliable.
Frame type catch pit of the present utility model and existing frame type catch pit are made similar, and well seat, derrick (well post and collar tie beam) adopt cast-in-place, and ring baffle adopts prefabricated, adopt reinforced concrete structure.The initial setting height(from bottom) of steel pipe requires definite according to the flood control of Tailings Dam, the installation number of plies is identical with the ring baffle number of plies.
All derricks are built with ring baffle is prefabricated and are completed and reach after lifting intensity, can lift one by one suspension ring baffle, then in steel pipe, insert steel pin and be bearing on well post.For preventing that steel pin is because of long period corrosion lost strength, when being installed, steel pin must coat anticorrosive paint.
When catch pit internal diameter increases, can be 0.3m by the height adjustment of ring baffle, ensure that the weight of every baffle plate is no more than 2 tons, use the bottle gouard moved by hands that lifting capacity is slightly large instead and can complete the work of lifting by crane and transferring ring baffle.Due to after catch pit internal diameter increases, well post quantity also increases, and the changes in weight that every steel pin bears is little, and steel pin diameter can be constant.For guarantee, personnel are easy to operate, on well post and ring baffle, foot iron should be set.
The utility model is, after conventional frame type catch pit structural shape is adjusted, prefabricated baffle plate to be suspended on the well post of catch pit in advance.In use, along with raising, water level transfers one by one again.The utility model later stage is convenient to operation, time saving and energy saving, safe and reliable.

Claims (4)

1. a frame type catch pit, comprise well seat (11), well seat (11) top is provided with derrick, derrick comprises well post (2) and collar tie beam (14), well post (2) vertical direction is provided with pin shaft hole, pin shaft hole is fitted with bearing pin (8), between adjacent well post (2), be provided with collar tie beam (14), the vertical closed assembly in inner space that well post (2) encloses with collar tie beam (14) has ring baffle (5), ring baffle (5) is cylindric, the inwall of ring baffle (5) is provided with hanger (13), the inwall of the outer wall of ring baffle (5) and well post (2) and collar tie beam (14) is suitable, each ring baffle (5) is supported by the bearing pin (8) of sustained height, the top of well seat (11) is provided with annular support platform (17), between the bottom of nethermost ring baffle and support platform (17), be drainage channel (15).
2. a kind of frame type catch pit according to claim 1, it is characterized in that: the top of well post (2) is provided with suspension bracket (6) and operating platform, suspension bracket (6) is provided with bottle gouard moved by hands (7), and bottle gouard moved by hands (7) is fixed with stay cord (16).
3. according to a kind of frame type catch pit described in claim 1 or 2, it is characterized in that: embedded steel tube in pin shaft hole.
4. a kind of frame type catch pit according to claim 3, is characterized in that: the pitch of holes of neighbouring pin shaft hole is greater than 5 centimetres of the height of ring baffle (5), large 3~5 millimeters than pin diameter of pipe diameters.
CN201420182158.0U 2014-04-06 2014-04-06 Frame type draining well Expired - Fee Related CN203782863U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420182158.0U CN203782863U (en) 2014-04-06 2014-04-06 Frame type draining well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420182158.0U CN203782863U (en) 2014-04-06 2014-04-06 Frame type draining well

Publications (1)

Publication Number Publication Date
CN203782863U true CN203782863U (en) 2014-08-20

Family

ID=51319065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420182158.0U Expired - Fee Related CN203782863U (en) 2014-04-06 2014-04-06 Frame type draining well

Country Status (1)

Country Link
CN (1) CN203782863U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924653A (en) * 2014-04-06 2014-07-16 金建工程设计有限公司 Framework type drainage well and construction method thereof
CN106968711A (en) * 2017-04-28 2017-07-21 中国恩菲工程技术有限公司 For drainning off floodwaters and backwater composite device for Tailings Dam
CN109235616A (en) * 2018-11-16 2019-01-18 洛阳栾川钼业集团股份有限公司 A kind of tailing dam gully arch bar installation method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924653A (en) * 2014-04-06 2014-07-16 金建工程设计有限公司 Framework type drainage well and construction method thereof
CN103924653B (en) * 2014-04-06 2016-03-30 金建工程设计有限公司 A kind of frame type catch pit and construction method thereof
CN106968711A (en) * 2017-04-28 2017-07-21 中国恩菲工程技术有限公司 For drainning off floodwaters and backwater composite device for Tailings Dam
CN106968711B (en) * 2017-04-28 2023-07-14 中国恩菲工程技术有限公司 Flood drainage and backwater sharing device for tailing pond
CN109235616A (en) * 2018-11-16 2019-01-18 洛阳栾川钼业集团股份有限公司 A kind of tailing dam gully arch bar installation method

Similar Documents

Publication Publication Date Title
CN108019076B (en) Construction method of large-diameter reinforced concrete silo and device for conical shell construction
CN101302760A (en) Ultralong overweight concrete filling pile reinforcement type reinforcing steel bar caging
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN102913248B (en) The overall upset hanging template of wholecircle and formwork erection, release method
CN202467191U (en) Hydraulic slip form device used for construction of circular reinforced concrete chimney wall
CN103924653B (en) A kind of frame type catch pit and construction method thereof
CN203878965U (en) Device for construction of elevator shaft
CN103255838A (en) Construction method with adoption of large-tonnage long-stroke oil cylinder jacking mold frame
CN203782863U (en) Frame type draining well
CN110685433A (en) Chimney construction device and construction method applying hydraulic lifting and rollover technology
CN102733608B (en) Construction method for spray head layer of granulation tower
CN205917601U (en) Integrally lift up device of bridge arch rib
CN206352388U (en) A kind of special scaffold of dual operation platform elevator
CN205224050U (en) Steel reinforcement cage is hung and is put device
CN203878979U (en) Bolt opposite-pulling type track sliding formwork
CN108222006B (en) Construction method of square underground continuous wall
CN210737607U (en) A hang braced system for reverse construction method beam slab construction
CN206108724U (en) Simple and easy installing support device of long large -diameter pile base steel reinforcement cage self -control
CN106677075B (en) A kind of cofferdam for Bridge Pier Construction hangs stake and method of passing the flood period
CN104404923A (en) Arch dam bracket template device and construction method based on arch dam bracket template device
CN210597326U (en) Precast concrete bearing structure that can assemble
CN105401598B (en) Automatic formwork lowering system hoisting device and method for top-down construction
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN201212146Y (en) Reinforcement reinforced bar caging of ultralong and overweight concrete filling pile
CN101344004B (en) Mounting method of deep well high pressure aeration reactor steel drum

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820

Termination date: 20190406

CF01 Termination of patent right due to non-payment of annual fee