CN206352388U - A kind of special scaffold of dual operation platform elevator - Google Patents
A kind of special scaffold of dual operation platform elevator Download PDFInfo
- Publication number
- CN206352388U CN206352388U CN201621452971.0U CN201621452971U CN206352388U CN 206352388 U CN206352388 U CN 206352388U CN 201621452971 U CN201621452971 U CN 201621452971U CN 206352388 U CN206352388 U CN 206352388U
- Authority
- CN
- China
- Prior art keywords
- platform
- mat
- bar
- lower floor
- upper strata
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
A kind of special scaffold of dual operation platform elevator, is related to architectural engineering elevator shaft structure construction scaffolding, including upper strata operating platform, lower level operations platform, connection ladder, four vertical reinforcements and two suspension rods;Upper strata operating platform includes top mat, and in the online hinged closures of top bars, bamboo slab rubber is connected in the top of top mat;Lower level operations platform includes lower floor's bar-mat reinforcement, and slidingtype scaffold board is set in the top of lower floor's bar-mat reinforcement;Connection ladder is connected between upper strata operating platform and lower level operations platform;The upper end of four vertical reinforcements is welded on four angles of top mat, and lower end is welded on four angles of lower floor's bar-mat reinforcement;Two pairs of annulus are welded on the net in top bars, and suspension rod is set in annulus.The utility model can carry out installing for upper former and is used with dismounting, and the metope that can have been constructed by lower floor's platform is repaired, and set opening for the horizontal safety net in elevator to set by lower floor's platform, safe and reliable, economic, practical.
Description
Technical field
The utility model is related to architectural engineering elevator shaft structure construction scaffolding, mainly solves in main structure construction,
Elevator inner template is installed, with being carried out in frame, elevator, horizontal safety net closing is used, elevator inner wall surface is repaired for dismounting
It is used.
Background technology
At present in skyscraper, frame-shear-wall structure, framework core wall structure occupy higher proportion.These buildings
One common feature of thing is elevator using reinforced concrete shear wall structure come the horizontal shear of resisting structure, is met simultaneously
The need for the installation of building elevator is fixed.But in elevator shaft structure work progress, because from basement to roof, it is middle not every
Layer, elevator is a big passage, is required to use scaffold when its internal formwork erection, dismounting, for skyscraper,
Traditional scaffold is to take top layer always from basement, and it is more that scaffold material requested is set up in inside, and because there is wall on its periphery
Closing, the quality of scaffold is not easy to check, is difficult to ensure that safely.Therefore scaffold for elevator shaft is pacified into during civil engineering
The emphasis worked entirely.
The content of the invention
In order to which the drawbacks of scaffold, the utility model provides a kind of dual operation platform electricity needed for overcoming current construction of lift well
The special scaffold of stair shaft, one is that can carry out installing for upper former to be used with dismounting, and two can be by lower floor's platform progress
Metope of having constructed is repaired, and three be to set the opening for horizontal safety net in elevator to set by lower floor's platform, safe and reliable,
Economic, practical, material-saving, saving of labor.
What the purpose of this utility model was realized in:A kind of special scaffold of dual operation platform elevator, including upper strata
Operating platform, lower level operations platform, connection ladder, four vertical reinforcements and two suspension rods;The upper strata operating platform includes upper strata
Bar-mat reinforcement, sets in the middle of top mat and imports and exports, in the online hinged closures of top bars, cover plate is covered in import and export
Place, bamboo slab rubber is connected in the top of top mat;The lower level operations platform includes lower floor's bar-mat reinforcement, in lower floor's bar-mat reinforcement
Top sets slidingtype scaffold board;The connection ladder is connected between upper strata operating platform and lower level operations platform, and is connected
The upper end of ladder is arranged on the import and export of top mat;The upper end of four vertical reinforcements is welded on four angles of top mat
On, the lower end of four vertical reinforcements is welded on four angles of lower floor's bar-mat reinforcement;Two pairs of circles are welded on the net in the top bars
Ring, wherein a suspension rod is set in a pair of annulus, another suspension rod is set in another pair annulus.
The utility model is designed more than, and 1, upper strata operating platform, formed by Φ 20 reinforcement welding, in addition to skeleton,
Inside carries out arrangement welding by the mm of spacing 300, and middle correct position stays a hole(Import and export)It is easy to personnel flat into lower level operations
Platform.Laid and be fixed with bamboo slab rubber on framework of steel reinforcement, box out position sets openable removable cover.2nd, lower level operations are put down
Platform, preparation method is identical with upper strata, is discontented with paving bamboo slab rubber, and is replaced with two pieces of scaffold boards, to ensure that lower horizontal peace can be carried out
The tensioning of the whole network.3rd, it is weldingly connected between levels operating platform with Φ 20 vertical reinforcement from four angles.4th, it is guarantee
The fixation of this double-layer electric stair shaft operating platform, is provided with annulus facing each other, in order to same with steel pipe in the bottom of upper platform
When through shear wall hole to be provided, platform reserve ring, platform reserve ring, shear wall hole to be provided mode, by this double-deck operating platform
Fixed to the required position in elevator.The steel pipe and circumferential ring need 2 sets, to ensure its stability.
It is of the present utility model to install:1st, it is after the completion of foundation engineering, the dual operation platform elevator made in advance is special
Hung in scaffold in elevator foundation pit, its size, per the small 50mm in side, can be lifted by crane normally than elevator inwall during so as to normal effect.
2nd, before current layer concreting, the about 100mm height under position of the shear wall from corner 75mm, plate, elevator has the wall of door
And its Φ 75 PVC sleeve pipes are reserved on the wall on opposite.After form removable, that is, form hole to be provided.3rd, in current layer form removable
Afterwards, the dual operation face special scaffold of elevator is sling by specified altitude assignment by tower crane, pvc is penetrated from elevator outside by suspension rod
Reserved sleeve pipe, the reinforcing bar collar, the reinforcing bar collar, pvc are reserved in sleeve pipe, complete consolidating for the dual operation special scaffold of platform elevator
It is fixed.4th, in completion after layer operation, continuation in the same way moves up this special frame, until completing the construction of whole floors.
It is of the present utility model to use:1st, installing and removing for current layer template is carried out.2nd, removed in lower template, it is special
Frame is hung to behind upper strata, by the operating platform of lower floor, carries out the finishing of lower floor's metope.3rd, by lower level operations platform, in shelf
Bottom carries out opening for horizontal safety net and set, and meets the requirement of elevator internal portioning layer protection.
The utility model is simple in construction, easy to make, easy to use, material economy, can be used in turn.
Preferably, skirting board is welded in the surrounding of lower floor's bar-mat reinforcement, to ensure the safe operation of lower floor personnel, the bottom of at
Plate surrounding sets the high skirting boards of 150mm.
For ease of the lifting of whole support body, suspension ring are respectively welded on four angles of the top mat.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is A-A direction views in Fig. 1.
Fig. 3 is B-B direction view in Fig. 1.
Fig. 4 is stereogram of the present utility model.
Embodiment
As Figure 1-4, the special scaffold of dual operation platform elevator, mainly includes upper strata operating platform 1, lower floor and grasps
Make platform 11, connection ladder 10, four vertical reinforcements 14 and two suspension rods 6.
Upper strata operating platform 1 includes top mat 2, and top mat 2 is formed by Φ 20 reinforcement welding, and surrounding is sealed
Frame is closed, inside carries out arrangement welding by the mm of spacing 300, is set in the middle of top mat 2 and imports and exports 5, in upper strata steel
Hinged closures 4 on muscle net 2, cover plate 4 is covered at import and export 5, and bamboo slab rubber 3 is connected in the top of top mat 2.In upper strata steel
Suspension ring 7 are respectively welded on four angles of the top of muscle net 2.
Lower level operations platform 11 includes lower floor's bar-mat reinforcement 12, and slidingtype scaffold board is set in the top of lower floor's bar-mat reinforcement 12
13, in the high skirting boards 15 of the surrounding welding 150mm of lower floor's bar-mat reinforcement 12, it is ensured that the safe operation of lower floor personnel.
Connect ladder 10 to be connected between upper strata operating platform 1 and lower level operations platform 11, and connect the upper end of ladder 10 and set
Put at the import and export 5 of top mat 2.
The upper end of four vertical reinforcements 14 is welded on four angles of top mat 2, the lower end of four vertical reinforcements 14
It is welded on four angles of lower floor's bar-mat reinforcement 12.
Two pairs of annulus 8 are welded in the lower section of top mat 2, wherein a suspension rod 6 is set in a pair of annulus 8, it is another
Root suspension rod 6 is set in another pair annulus 8.Suspension rod 6 is reserved also cross shear wall hole to be provided 9, annulus 8, annulus 8, shear wall
The mode in hole 9, the required position in elevator is fixed to by this double-deck operating platform.The suspension rod 6 and annulus 8 need two sets, to protect
Demonstrate,prove its stability.
Claims (3)
1. a kind of special scaffold of dual operation platform elevator, it is characterised in that:Put down including upper strata operating platform, lower level operations
Platform, connection ladder, four vertical reinforcements and two suspension rods;The upper strata operating platform includes top mat, in top mat
Middle set import and export, in the online hinged closures of top bars, cover plate is covered in import and export, in the upper of top mat
Side's connection bamboo slab rubber;The lower level operations platform includes lower floor's bar-mat reinforcement, and slidingtype pin hand is set in the top of lower floor's bar-mat reinforcement
Plate;It is described connection ladder be connected between upper strata operating platform and lower level operations platform, and connect ladder upper end be arranged on upper strata
The import and export of bar-mat reinforcement;The upper end of four vertical reinforcements is welded on four angles of top mat, four vertical reinforcements
Lower end is welded on four angles of lower floor's bar-mat reinforcement;Two pairs of annulus are welded on the net in the top bars, wherein a suspension rod is worn
Put in a pair of annulus, another suspension rod is set in another pair annulus.
2. the special scaffold of dual operation platform elevator according to claim 1, it is characterised in that:In lower floor's reinforcing bar
The surrounding welding skirting board of net.
3. the special scaffold of dual operation platform elevator according to claim 1 or 2, it is characterised in that:On the upper strata
Suspension ring are respectively welded on four angles of bar-mat reinforcement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621452971.0U CN206352388U (en) | 2016-12-28 | 2016-12-28 | A kind of special scaffold of dual operation platform elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621452971.0U CN206352388U (en) | 2016-12-28 | 2016-12-28 | A kind of special scaffold of dual operation platform elevator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206352388U true CN206352388U (en) | 2017-07-25 |
Family
ID=59348848
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621452971.0U Expired - Fee Related CN206352388U (en) | 2016-12-28 | 2016-12-28 | A kind of special scaffold of dual operation platform elevator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206352388U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108775139A (en) * | 2018-07-03 | 2018-11-09 | 江苏盛浩工程科技有限公司 | A kind of climbing frame bottom pulley formula walkway board |
CN111962849A (en) * | 2020-07-31 | 2020-11-20 | 晟通科技集团有限公司 | Operation platform |
CN112900900A (en) * | 2021-01-21 | 2021-06-04 | 北京燕化天钲建筑工程有限责任公司 | Elevartor shaft entrance to a cave protection platform |
CN113482312A (en) * | 2021-07-01 | 2021-10-08 | 广西建工集团控股有限公司 | Guide type double-layer structure elevator shaft operating platform and construction method based on platform |
-
2016
- 2016-12-28 CN CN201621452971.0U patent/CN206352388U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108775139A (en) * | 2018-07-03 | 2018-11-09 | 江苏盛浩工程科技有限公司 | A kind of climbing frame bottom pulley formula walkway board |
CN111962849A (en) * | 2020-07-31 | 2020-11-20 | 晟通科技集团有限公司 | Operation platform |
CN112900900A (en) * | 2021-01-21 | 2021-06-04 | 北京燕化天钲建筑工程有限责任公司 | Elevartor shaft entrance to a cave protection platform |
CN113482312A (en) * | 2021-07-01 | 2021-10-08 | 广西建工集团控股有限公司 | Guide type double-layer structure elevator shaft operating platform and construction method based on platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106223360B (en) | Using the open cut cast in place and precast construction subway station construction method of stake supporting system | |
CN103924711B (en) | The construction technology of assembling grillage shear wall structural system | |
CN206352388U (en) | A kind of special scaffold of dual operation platform elevator | |
CN101886466B (en) | Construction method for support structure of coal tower template for tamping type coke oven | |
CN208586936U (en) | A kind of control protects brick mixed building joist and demolishes walls constructing device | |
CN104695337B (en) | Self-lifting sliding and turnover construction system and construction method | |
CN205077845U (en) | Hydraulic intelligent climbing operation scaffold for core barrel well of building | |
CN105649360A (en) | Integral assembling type building system and installing method | |
CN109811878A (en) | The shell integrated structure of the cast-in-place coinsiding die of assembled architecture and construction method | |
CN206016309U (en) | A kind of overall assembled building system | |
CN205917702U (en) | Whole system of transferring of bridge deep basal pit steel sheet piling cofferdam internal stay | |
CN205025086U (en) | Strength nature skeleton concrete beam construction suspend template in midair | |
CN106869548B (en) | A kind of newel frame assembled underground parking structural system and construction method | |
CN101225708A (en) | Method for mounting up-sliding bottom-brick-building derrick-free hydraulic sliding formwork of chimney | |
CN103352537B (en) | Overall load bearing heat preserving wallboard and production construction process thereof | |
CN206233541U (en) | A kind of interior top external climbing mould bases operation platform for construction of super highrise building | |
CN104652813A (en) | Tower crane construction technology used for super high-rise building steel structure | |
CN107642179A (en) | Assembled frame-shear structure steel plate keyway attachment structure and assembling method | |
CN208072415U (en) | Deep foundation pit reinforced concrete support part changes structure | |
CN204781927U (en) | Elevartor shaft formwork and elevartor shaft concrete placement operation platform | |
CN206538862U (en) | Prefabrication structural system | |
CN206267309U (en) | A kind of assembled steel concrete frame core wall structure system | |
CN205976167U (en) | Based on cast -in -place floor structures of detachable positioning control spare | |
CN103758045B (en) | Box girder wet joint formwork construction method under space limitation condition | |
CN105347142B (en) | A kind of building hoist is mounted on the threading installation method on basement roof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170725 Termination date: 20171228 |