CN205224561U - Rail mounted removes scaffold - Google Patents

Rail mounted removes scaffold Download PDF

Info

Publication number
CN205224561U
CN205224561U CN201520984414.2U CN201520984414U CN205224561U CN 205224561 U CN205224561 U CN 205224561U CN 201520984414 U CN201520984414 U CN 201520984414U CN 205224561 U CN205224561 U CN 205224561U
Authority
CN
China
Prior art keywords
metal
scaffold
guide rail
sleeper
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520984414.2U
Other languages
Chinese (zh)
Inventor
冯超
任国华
冯淼
夏黎山轻
冯钢
冯晶
周鑫
李志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Lyuneng Environmental Protection Integrated Wooden House Co Ltd
Original Assignee
Jiangsu Lyuneng Environmental Protection Integrated Wooden House Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Lyuneng Environmental Protection Integrated Wooden House Co Ltd filed Critical Jiangsu Lyuneng Environmental Protection Integrated Wooden House Co Ltd
Priority to CN201520984414.2U priority Critical patent/CN205224561U/en
Application granted granted Critical
Publication of CN205224561U publication Critical patent/CN205224561U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a rail mounted removes scaffold, including scaffold main part, metal truckle, metal rail, sleeper and connecting piece, the sleeper is spread on ground and is kept the level, and metal rail fixed mounting is on the sleeper to for parallel double guide rail, scaffold main part below fixed mounting has the metal truckle, metal truckle and metal rail roll connection, wherein the metal truckle install the number of scaffold main part at least for 4, the scaffold main part passes through that the connecting piece is detachable to be connected on the building masonry wall. The utility model discloses convenient, safe and reliable are dismantled in simple and practical, installation to to the building of co -altitude not, the scaffold main part can the successive layer stack, makes its scope that is suitable for wider.

Description

A kind of rail type mobile scaffold
Technical field
The utility model belongs to building construction servicing unit technical field, particularly a kind of traveling stage.
Background technology
Current most of building construction adopts steel pipe to set up full hall frame as operation platform, and because construction area is large, the steel pipe quantity required for setting for this platform is a lot, and then installation and removal are all very loaded down with trivial details, wastes a large amount of building manually.The steel pipe of full hall frame, fixture, nut, screw and erecting tools etc. are installed once drop easily cause security incident.Same existing movable Scaffold adopts common castor, and due to building site pavement roughness, therefore scaffold moves inconvenience, easily turns on one's side, and safe and reliable coefficient is low.
Utility model content
The purpose of this utility model overcomes above-mentioned deficiency, provides a kind of simple and practical, easy installation and removal, safe and reliable rail type mobile scaffold.
The technical scheme that the utility model provides for achieving the above object: a kind of rail type mobile scaffold, it is characterized in that: comprise scaffold main body, metal castor, metal guide rail, sleeper and connector, described sleeper to be layered on ground and maintenance level, described metal guide rail is fixedly mounted on described sleeper, and be parallel double guide rail, metal castor is installed with below scaffold main body, described metal castor rolls with metal guide rail and is connected, and described scaffold main body is connected on building masonry wall by connector is detachable.
Further, described scaffold main body is at least one deck, and the distance of itself and building masonry wall is 20 ~ 40cm, and by aluminium alloy extrusions or steel pipe assembled.
Further, described metal castor is at least 4.
Further, between described metal guide rail, spacing is 30 ~ 200cm.
The utility model is simple and practical, easy installation and removal, safe and reliable, adopt horizontal parallel two-rail, such scaffold on two-rail mobile get up more steady.For high-rise building, require different construction height, scaffold main body successively can be superposed, what make it be suitable for is wider.
Accompanying drawing explanation
The movable Scaffold perspective view of Fig. 1 individual layer
The side-looking structural representation of the two-layer movable Scaffold using state of Fig. 2
In figure: 1, scaffold main body, 2, metal castor, 3, metal guide rail, 4, sleeper, 5, connector, 6, building masonry wall.
Detailed description of the invention
Describe the utility model in detail below in conjunction with specific embodiment and accompanying drawing, but the utility model is not limited to specific embodiment.
Embodiment 1
A kind of individual layer rail type mobile scaffold as shown in Figure 1, comprises scaffold main body 1, metal castor 2, metal guide rail 3, sleeper 4 and connector 5.Sleeper 4 to be layered on ground and maintenance level, and ensure that scaffold can steadily movement like this, sleeper 4 is made by flitch.Metal guide rail 3 is fixedly mounted on sleeper 4, and is parallel double guide rail, and between metal guide rail 3, spacing is 30cm, and metal guide rail 3 material is cast iron, and through hard surfacing process, increases metal guide rail 3 abrasion resistance.Be installed with metal castor 2 below scaffold main body 1, metal castor 2 rolls with metal guide rail 3 and is connected, and wherein metal castor 2 is arranged on the number of scaffold main body 1 is 4.As shown in Figure 2, scaffold main body 1 is connected on building masonry wall 6 by connector 5 is detachable.Itself and building masonry wall 6 are apart from being 20cm, and scaffold main body 1 is assembled by steel pipe.
During construction, as requested, movable Scaffold can be moved to the construction location of specifying, then by connector 5, movable Scaffold is fixed on building masonry wall 6.If it is higher to run into construction location, crane can be utilized to sling scaffold main body 1, then successively superpose, until it highly meets construction requirement.
Embodiment 2
A kind of individual layer rail type mobile scaffold as shown in Figure 1, comprises scaffold main body 1, metal castor 2, metal guide rail 3, sleeper 4 and connector 5.Sleeper 4 to be layered on ground and maintenance level, and ensure that scaffold can steadily movement like this, sleeper 4 is formed by concrete for making.Metal guide rail 3 is fixedly mounted on sleeper 4, and is parallel double guide rail, and between metal guide rail 3, spacing is 100cm, and metal guide rail 3 material is cast iron, and through hard surfacing process, increases metal guide rail 3 abrasion resistance.Be installed with metal castor 2 below scaffold main body 1, metal castor 2 rolls with metal guide rail 3 and is connected, and wherein metal castor 2 is arranged on the number of scaffold main body 1 is 6.As shown in Figure 2, scaffold main body 1 is connected on building masonry wall 6 by connector 5 is detachable.Scaffold main body 1 successively can superpose according to construction height, and itself and building masonry wall 6 are apart from being 30cm, and scaffold main body 1 is assembled by steel pipe.
Embodiment 3
The two-layer rail type mobile scaffold of one as shown in Figure 2, comprises scaffold main body 1, metal castor 2, metal guide rail 3, sleeper 4 and connector 5.Sleeper 4 to be layered on ground and maintenance level, and ensure that scaffold can steadily movement like this, sleeper 4 is formed by concrete for making.Metal guide rail 3 is fixedly mounted on sleeper 4, and is parallel double guide rail, and between metal guide rail 3, spacing is 200cm, and metal guide rail 3 material is manganese steel, and through hard surfacing process, increases metal guide rail 3 abrasion resistance.Be installed with metal castor 2 below scaffold main body 1, metal castor 2 rolls with metal guide rail 3 and is connected, and wherein metal castor 2 is arranged on the number of scaffold main body 1 is 8.As shown in Figure 2, scaffold main body 1 is connected on building masonry wall 6 by connector 5 is detachable.Scaffold main body 1 successively can superpose according to construction height, and itself and building masonry wall 6 are apart from being 40cm, and scaffold main body 1 is assembled by aluminium alloy extrusions.

Claims (4)

1. a rail type mobile scaffold, it is characterized in that: comprise scaffold main body (1), metal castor (2), metal guide rail (3), sleeper (4) and connector (5), described sleeper (4) to be layered on ground and maintenance level, described metal guide rail (3) is fixedly mounted on described sleeper (4), and be parallel double guide rail, scaffold main body (1) below is installed with metal castor (2), described metal castor rolls with metal guide rail (3) and is connected, described scaffold main body (1) is connected on building masonry wall (6) by connector (5) is detachable.
2. a kind of rail type mobile scaffold according to claim 1, it is characterized in that: described scaffold main body (1) is at least one deck, the distance of itself and building masonry wall (6) is 20 ~ 40cm, and by aluminium alloy extrusions or steel pipe assembled.
3. a kind of rail type mobile scaffold according to claim 1, is characterized in that: described metal castor (2) is at least 4.
4. a kind of rail type mobile scaffold according to claim 1, is characterized in that: between described metal guide rail (3), spacing is 30 ~ 200cm.
CN201520984414.2U 2015-12-02 2015-12-02 Rail mounted removes scaffold Expired - Fee Related CN205224561U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520984414.2U CN205224561U (en) 2015-12-02 2015-12-02 Rail mounted removes scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520984414.2U CN205224561U (en) 2015-12-02 2015-12-02 Rail mounted removes scaffold

Publications (1)

Publication Number Publication Date
CN205224561U true CN205224561U (en) 2016-05-11

Family

ID=55899636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520984414.2U Expired - Fee Related CN205224561U (en) 2015-12-02 2015-12-02 Rail mounted removes scaffold

Country Status (1)

Country Link
CN (1) CN205224561U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107780640A (en) * 2017-09-29 2018-03-09 上海二十冶建设有限公司 Movable Scaffold and its application method for exterior wall
CN108049620A (en) * 2017-12-20 2018-05-18 玉林市金腾建材有限公司 A kind of construction scaffold
CN113565312A (en) * 2021-08-23 2021-10-29 江苏广前建设集团有限公司 A suspension type scaffold for demolising tall and erect structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107780640A (en) * 2017-09-29 2018-03-09 上海二十冶建设有限公司 Movable Scaffold and its application method for exterior wall
CN108049620A (en) * 2017-12-20 2018-05-18 玉林市金腾建材有限公司 A kind of construction scaffold
CN113565312A (en) * 2021-08-23 2021-10-29 江苏广前建设集团有限公司 A suspension type scaffold for demolising tall and erect structure
CN113565312B (en) * 2021-08-23 2024-03-26 江苏广前建设集团有限公司 Suspended scaffold for dismantling towering structures

Similar Documents

Publication Publication Date Title
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN205224561U (en) Rail mounted removes scaffold
CN101858148A (en) Steel column splicing three-dimensional adjusting method
CN201635379U (en) Safety platform for installation and construction of roof contour plate hang ceiling
CN105464358A (en) Multi-layer construction basket
CN202483154U (en) High bearing capacity suspending scaffold
CN102602834A (en) Platform-free lifting method and system of installing large rectangular devices to high-rise buildings
CN206987381U (en) A kind of tool-type hoistway formwork platform
CN102677907A (en) Method for manually installing steel beam at top of silo
CN203359889U (en) Wall plate lifting and installation integrated operation platform
CN207048353U (en) A kind of prefabricated post installed height mark control device
CN202415081U (en) Automatic lifting device for color steel coil
CN103112766A (en) Construction elevator suspending over basement roof of building and construction method thereof
CN102777026A (en) Method for constructing ultra-long rear casting plate supporting system by using Bailey frames
CN201535061U (en) Light scaffold with protective shed
CN203531354U (en) Underneath type lifting scaffold for high-rise building
CN202530803U (en) Wall-attaching laneway stacking type stereo garage
CN205296213U (en) Utility tunnel lining cutting platform truck
CN204754150U (en) Dish -type node formula scaffold
CN203961015U (en) Super High large span large area assembled integral steel lattice boxlike " bunchy Tong " and " Tong in bunchy Tong " structure
CN203531355U (en) Overhead type lifting scaffold for high-rise building
CN102733612B (en) Mounting method of electric hoist orbit
CN205100571U (en) Quick device of taking one's place of installing in prefabricated whole bathroom
CN202370540U (en) Grotto bridge type construction trolley of large-span underground powerhouse
CN207003972U (en) A kind of portable construction operation platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160511

Termination date: 20181202