CN207048353U - A kind of prefabricated post installed height mark control device - Google Patents
A kind of prefabricated post installed height mark control device Download PDFInfo
- Publication number
- CN207048353U CN207048353U CN201721021400.6U CN201721021400U CN207048353U CN 207048353 U CN207048353 U CN 207048353U CN 201721021400 U CN201721021400 U CN 201721021400U CN 207048353 U CN207048353 U CN 207048353U
- Authority
- CN
- China
- Prior art keywords
- prefabricated post
- post
- leveling bolt
- plate face
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
A kind of prefabricated post installed height mark control device, straight screw sleeve including leveling bolt and with sleeve pedestal, the bottom of multiple straight screw sleeves is cast in floor structure plate face, leveling bolt is installed with the straight screw sleeve, the nut of the leveling bolt exposes floor structure plate face, prefabricated post to be installed projects in the floor structure plate face and forms prefabricated post position to be installed, the straight screw sleeve is arranged on the point midway on prefabricated post four sides in position to be installed, so that the midpoint on prefabricated post four sides in position to be installed is at least provided with a leveling bolt, and leveling bolt 3cm~5cm apart from the post sideline of prefabricated post position to be installed.Before the lifting of the utility model prefabricated post, prefabricated post post bottom absolute altitude is pre-adjusted by swivel bolt, so as to ensure the accuracy of its absolute altitude after the completion of prefabricated post lifting, and present apparatus material is simple, easy to operate, it is not easily susceptible to disturb, can effectively controls the installed height mark of prefabricated post.
Description
Technical field
Assembled architecture construction field is the utility model is related to, particularly a kind of prefabricated post installed height mark control device.
Background technology
As country vigorously advocates to green building and green construction, assembled architecture already turns into building trade and developed
Inexorable trend.In assembled architecture, absolute altitude control of the vertical member such as prefabricated post and shear wall in installation process is dress
One of key with formula construction.Control prefabricated post installation mark in the form of post heelpiece sets steel plate washer mostly at this stage
Height, but steel plate washer is vulnerable to disturbance, and, it is necessary to the thickness type of steel plate washer is more when being adjusted to specific absolute altitude, operation inconvenience.
Utility model content
One kind is provided and simple and effective can be controlled in order to overcome the shortcomings of prefabricated post installed height mark control method at this stage
Prefabricated post installed height mark processed, improve the prefabricated post installed height mark control device of the qualification rate of prefabricated post installation.
Technical scheme is used by the utility model:A kind of prefabricated post installed height mark control device, including leveling bolt
With the straight screw sleeve with sleeve pedestal, the bottom of multiple straight screw sleeves is cast in floor structure plate face, described straight
Leveling bolt is installed with screw shell, the nut of the leveling bolt exposes floor structure plate face, and prefabricated post to be installed is in institute
State projection in floor structure plate face and form prefabricated post position to be installed, the straight screw sleeve is arranged on prefabricated post position to be installed four
The point midway on side so that the midpoint on prefabricated post four sides in position to be installed is at least provided with a leveling bolt, and leveling bolt
3cm~5cm apart from the post sideline of prefabricated post position to be installed.Using said structure, after pouring the present apparatus in floor structure plate face,
Before the lifting of prefabricated post, measured by spirit level and adjust the absolute altitude of four leveling bolts, comply with design and prefabricated post
The requirement of post bottom absolute altitude, the bullet for then carrying out all kinds of control lines are set and the correction of reserved steel bar position, then pass through leveling bolt
, it is necessary to steel plate washer when controlling prefabricated post absolute altitude, be vulnerable to disturbance so as to solve existing steel plate washer, and being adjusted to specific absolute altitude
Thickness type is more, operates the defects of inconvenient, has and uses material simple, easy to operate, is not easily susceptible to disturb, can effectively control
The advantages of installed height mark of prefabricated post processed.
Preferably, the nut upper surface of the leveling bolt is no more than 2cm apart from plate face.
Further, the leveling bolt is using the specification hex bolts of M24 × 60.Straight screw sleeve carries 60 × 60 × 4mm
Thick sleeve pedestal, sleeve pedestal are fixed with straight screw sleeve using welding manner.
In summary, before the lifting of the utility model prefabricated post, prefabricated post post bottom absolute altitude is pre-adjusted by swivel bolt,
So as to ensure the accuracy of its absolute altitude after the completion of prefabricated post lifting, and present apparatus material is simple, easy to operate, is not easily susceptible to disturb
It is dynamic, it can effectively control the installed height mark of prefabricated post.
Brief description of the drawings
Fig. 1 is the structural representation that the present apparatus is arranged in floor structure plate face.
Fig. 2 is present apparatus leveling bolt and straight screw sleeve combination diagram.
In accompanying drawing:1st, leveling bolt;2nd, floor structure plate face;3rd, post sideline;4th, the reserved steel bar of post;5th, straight thread set
Cylinder;6th, sleeve pedestal.
Embodiment
Specific embodiment of the present utility model is illustrated below in conjunction with the accompanying drawings so that feature of the present utility model and
Its advantage can be easier to be understood by those skilled in the art.
As described in Fig. 1,2, before the casting concrete of floor structure plate face 2, leveling bolt 1 is inserted in straight screw sleeve in advance
In 5, straight screw sleeve 5 carries sleeve pedestal 6, by its integral built-in near the midpoint on four sides of prefabricated post, distance post side
The about 3cm to 5cm of line 3, nut upper surface are no more than 2cm apart from plate face, fixed using welding manner.After the completion of concreting,
To prefabricated post bottom dabbing and leveling bolt 1 is found out, is measured by spirit level and adjusts the absolute altitude of four leveling bolts 1, make its symbol
Close design and the requirement of prefabricated post post bottom absolute altitude.After the completion of Pass line adjustment, the bullet for carrying out all kinds of control lines is set and reserved steel bar 4
The correction put, finally complete the lifting of prefabricated post.
Claims (3)
- A kind of 1. prefabricated post installed height mark control device, it is characterised in that the straight thread including leveling bolt and with sleeve pedestal Sleeve, the bottom of multiple straight screw sleeves are cast in floor structure plate face, and leveling is installed with the straight screw sleeve Bolt, the nut of the leveling bolt expose floor structure plate face, and prefabricated post to be installed projects in the floor structure plate face Prefabricated post position to be installed is formed, the straight screw sleeve is arranged on the point midway on prefabricated post four sides in position to be installed so that pre- The midpoint on post four sides in position to be installed processed is at least provided with a leveling bolt, and leveling bolt is apart from prefabricated post position to be installed Post sideline 3cm~5cm.
- 2. according to the prefabricated post installed height mark control device described in claim 1, it is characterised in that the spiral shell of the leveling bolt Cap upper surface is no more than 2cm apart from plate face.
- 3. according to the prefabricated post installed height mark control device described in claim 2, it is characterised in that the leveling bolt is six Corner bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721021400.6U CN207048353U (en) | 2017-08-15 | 2017-08-15 | A kind of prefabricated post installed height mark control device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721021400.6U CN207048353U (en) | 2017-08-15 | 2017-08-15 | A kind of prefabricated post installed height mark control device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207048353U true CN207048353U (en) | 2018-02-27 |
Family
ID=61503224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721021400.6U Expired - Fee Related CN207048353U (en) | 2017-08-15 | 2017-08-15 | A kind of prefabricated post installed height mark control device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207048353U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109518980A (en) * | 2018-11-26 | 2019-03-26 | 福建工程学院 | Prefabricated concrete structure column lifts absolute altitude and perpendicularity regulating device and its construction method |
-
2017
- 2017-08-15 CN CN201721021400.6U patent/CN207048353U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109518980A (en) * | 2018-11-26 | 2019-03-26 | 福建工程学院 | Prefabricated concrete structure column lifts absolute altitude and perpendicularity regulating device and its construction method |
CN109518980B (en) * | 2018-11-26 | 2021-04-27 | 福建工程学院 | Device for adjusting hoisting elevation and verticality of fabricated concrete structure column and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103628680B (en) | Large steel space truss hanging layer construction method | |
CN108118900A (en) | The construction method of prefabricated panel | |
CN103334496B (en) | Pre-embedded steel slab leveling bolt and application method under shock isolating pedestal | |
CN106639336A (en) | Prefabricated concrete wall panel installation and emplacement orientation adjustment device and construction method thereof | |
CN203097307U (en) | Horizontal adjuster for adjusting outer wallboard in installation of assembling type outer wallboard | |
CN106865414A (en) | A kind of combined hanging installation method of Con casting ladle panoramic table | |
CN203878965U (en) | Device for construction of elevator shaft | |
CN104032969A (en) | Precise positioning and process regulation and control device for vibration isolation support embedded plate | |
CN206873945U (en) | A kind of constructing device for lifting concrete floorslab thickness qualities | |
CN207048353U (en) | A kind of prefabricated post installed height mark control device | |
CN206902768U (en) | A kind of post-cast strip adjustable supporting | |
CN205224561U (en) | Rail mounted removes scaffold | |
CN203080931U (en) | Shear wall outer wall formwork bearing device | |
CN107829553A (en) | A kind of elevator hoistways construction platform system | |
CN208219724U (en) | A kind of bracing means for preventing diaphram wall from settling | |
CN107724419A (en) | A kind of equipment prefabricated foundation locator and its application method | |
CN204782194U (en) | Simple and easy emergency communication tower | |
CN203924411U (en) | Prefabricated assembled fire wall | |
CN207749817U (en) | A kind of builder's jack installation system | |
CN207525964U (en) | A kind of prefabricated composite wallboard pitched roof system | |
CN103711306B (en) | Collecting well, elevator pit sunk type close inside casing section mould plate construction method | |
CN206736949U (en) | The tower-crane foundation structure of building surrounding is covered in suitable for multi-layer underground building | |
CN206957206U (en) | A kind of concrete floor drop plate hangs mould servicing unit | |
CN206986918U (en) | A kind of asymmetric template for blower fan crab-bolt foundation grouting | |
CN206873639U (en) | Bay window wall adjusts absolute altitude structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180227 |
|
CF01 | Termination of patent right due to non-payment of annual fee |