CN205172025U - Interim support and straining beam structure of scissors formula of outer outrigger - Google Patents
Interim support and straining beam structure of scissors formula of outer outrigger Download PDFInfo
- Publication number
- CN205172025U CN205172025U CN201520743176.6U CN201520743176U CN205172025U CN 205172025 U CN205172025 U CN 205172025U CN 201520743176 U CN201520743176 U CN 201520743176U CN 205172025 U CN205172025 U CN 205172025U
- Authority
- CN
- China
- Prior art keywords
- girder steel
- cantilever beam
- cantilever beams
- straining
- oblique pull
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520743176.6U CN205172025U (en) | 2015-09-23 | 2015-09-23 | Interim support and straining beam structure of scissors formula of outer outrigger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520743176.6U CN205172025U (en) | 2015-09-23 | 2015-09-23 | Interim support and straining beam structure of scissors formula of outer outrigger |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205172025U true CN205172025U (en) | 2016-04-20 |
Family
ID=55736028
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520743176.6U Active CN205172025U (en) | 2015-09-23 | 2015-09-23 | Interim support and straining beam structure of scissors formula of outer outrigger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205172025U (en) |
-
2015
- 2015-09-23 CN CN201520743176.6U patent/CN205172025U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
TWI506190B (en) | A?high-rise safety construction lifting platform | |
CN106088637B (en) | Construction assembled high-altitude protection canopy and its assembly method | |
CN204126230U (en) | Assembly scaffold unit | |
CN201486120U (en) | Detachable steel column connecting construction operation platform | |
CN205172025U (en) | Interim support and straining beam structure of scissors formula of outer outrigger | |
CN204590556U (en) | With the steel pipe lifting scaffold of steel sash net safeguard structure | |
CN204311721U (en) | A kind of double bracket hanging basket is encorbelmented device | |
CN205224272U (en) | Steel construction factory building is with structure of encorbelmenting | |
CN203238925U (en) | Net rack work platform erected by utilizing factory building crane | |
CN207553565U (en) | A kind of crosshead of truss | |
CN201943350U (en) | Supporting steel frame for die holder of high-altitude large span overhanging structure | |
CN202706495U (en) | Ladder type air basket | |
CN203308109U (en) | External carrying net device | |
CN205955257U (en) | Assembled high altitude protection canopy for construction | |
CN204703542U (en) | The assembled passage of a kind of Construction of Steel Structure regularization | |
CN210459260U (en) | High pile cap construction platform of encorbelmenting | |
CN203699828U (en) | Simple tool-type lifting frame for mounting of steel reinforcement cages | |
CN210947661U (en) | Installation device of socket type overhanging scaffold | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN208151835U (en) | A kind of stable type moon bridge | |
CN208235587U (en) | A kind of large-span deep foundation pit underground power house rack assembling construction platform | |
CN204781317U (en) | Steel construction beam column sliding connection node | |
CN204590553U (en) | Semi-automaticly climb formula exterior wall safeguard structure | |
CN204311768U (en) | A kind of building operations rain cover sun-proof device | |
CN204826588U (en) | Elevartor shaft protection operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Interim support and straining beam structure of scissors formula of outer outrigger Effective date of registration: 20180129 Granted publication date: 20160420 Pledgee: Bank of Beijing Limited by Share Ltd. Shenzhen branch Pledgor: China Construction Steel Structure Corp.,Ltd. Registration number: 2018440020010 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
CP03 | Change of name, title or address |
Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province Patentee after: China Construction Engineering Group Co.,Ltd. Address before: 518000 Guangdong city of Shenzhen province Futian District Che Kung Temple Binhe Tairan industry tipping 17 storey building No. 17A Patentee before: China Construction Steel Structure Corp.,Ltd. |
|
CP03 | Change of name, title or address | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20221207 Granted publication date: 20160420 Pledgee: Bank of Beijing Limited by Share Ltd. Shenzhen branch Pledgor: China Construction Steel Structure Corp.,Ltd. Registration number: 2018440020010 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |