CN205224272U - Steel construction factory building is with structure of encorbelmenting - Google Patents
Steel construction factory building is with structure of encorbelmenting Download PDFInfo
- Publication number
- CN205224272U CN205224272U CN201520896804.4U CN201520896804U CN205224272U CN 205224272 U CN205224272 U CN 205224272U CN 201520896804 U CN201520896804 U CN 201520896804U CN 205224272 U CN205224272 U CN 205224272U
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- cantilever beams
- cantilever beam
- support column
- factory building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a steel construction factory building is with structure of encorbelmenting, including two parallel arrangement's a cantilever beam, lie in two parallel arrangement's of cantilever beam below the 2nd cantilever beam and lie in two parallel arrangement's of the 2nd cantilever beam below the 3rd cantilever beam, lie in same one side a cantilever beam, the 2nd cantilever beam and the 3rd cantilever beam all connect through the main tributary vaulting pole, and the main tributary vaulting pole sets up two along the 2nd cantilever beam's orientation is equidistant a cantilever beam connects two through first crossbeam the 2nd cantilever beam passes through the second crossbeam and connects two the 3rd cantilever beam passes through the third crossbeam and connects, between first crossbeam and the second crossbeam, all be equipped with deputy support rod between second crossbeam and the third crossbeam. The utility model discloses reasonable in design structurally, the installation is simple and convenient, reduces the operating expenses and the construction degree of difficulty by a wide margin, have reliable security in the work progress, and the installation accuracy is high, and stability is good.
Description
Technical field
The utility model relates to steel-structure factory building cantilevered structure technical field, particularly relates to a kind of steel-structure factory building cantilevered structure.
Background technology
Along with the fast development of economy and the progress of building technology, a lot of steel work cantilevered structures has been there is in technical field of buildings, this class formation can meet the demand of construction aesthetic perception, good using function can be realized again, become a kind of development trend, the structural focus of general cantilevered structure is all in outside structure itself, often there will be poor stability and the weak problem of shock resistance when mounted, existing steel-structure factory building is when installing cantilevered structure, all install bracing frame additional on the top of cantilevered structure, after complete cantilevered structure to be installed, remove above-mentioned bracing frame again, the construction of the prior art scheme is more loaded down with trivial details, the Master Cost of bracing frame, installation measure costly, particularly when the height of cantilevered structure is very high time, cost can be higher, therefore, be necessary to improve.
Utility model content
The purpose of this utility model is to solve the shortcoming existed in prior art, and a kind of steel-structure factory building cantilevered structure proposed.
To achieve these goals, the utility model have employed following technical scheme:
A kind of steel-structure factory building cantilevered structure, comprise two the first Cantilever Beams be arranged in parallel, be positioned at the 3rd Cantilever Beams that two below the first Cantilever Beams the second Cantilever Beams be arranged in parallel be arranged in parallel with two of being positioned at below the second Cantilever Beams, be positioned at described first Cantilever Beams of the same side, second Cantilever Beams is all connected by main support rod with the 3rd Cantilever Beams, and main support rod is along the equidistant setting in direction of the second Cantilever Beams, two described first Cantilever Beams are connected by first crossbeam, two described second Cantilever Beams are connected by second cross beam, two described 3rd Cantilever Beams are connected by the 3rd crossbeam, between described first crossbeam and second cross beam, secondary support bar is equipped with between second cross beam and the 3rd crossbeam, the bottom of described 3rd crossbeam is provided with support column, the two ends, bottom of described 3rd crossbeam are all connected with connecting rod, described connecting rod connects support column away from one end of the 3rd crossbeam.
Preferably, described connecting rod is fixed on support column and the 3rd crossbeam by lock-screw, and connecting rod, support column and the 3rd crossbeam structure triangular in shape.
Preferably, described support column is along the first Cantilever Beams direction spaced set 2-6.
Preferably, the lower end of described support column is provided with fastening devices, and fastening devices is lock-screw.
In the utility model, set gradually the first Cantilever Beams from top to bottom, second Cantilever Beams and the 3rd Cantilever Beams, connected by main support rod, total is made to be inverted trapezoidal structure, two adjacent crossbeams are connected and structure triangular in shape by the secondary support bar in two main support rods, make overall structure more firm, can install on ground in advance, attach it on support column by boom hoisting again, there is fitting operation advantage easily, the utility model is structurally reasonable in design, installation process is simple and convenient, significantly reduce operating expenses and difficulty of construction, there is in work progress reliable safety, and installation accuracy is high, good stability.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of steel-structure factory building cantilevered structure that the utility model proposes;
Fig. 2 is the side structure schematic diagram of a kind of steel-structure factory building cantilevered structure that the utility model proposes.
In figure: 1 first Cantilever Beams, 2 main support rods, 3 second Cantilever Beams, 4 the 3rd Cantilever Beams, 5 support columns, 6 second cross beams, 7 first crossbeams, 8 secondary support bars, 9 connecting rods, 10 the 3rd crossbeams.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
With reference to Fig. 1-2, a kind of steel-structure factory building cantilevered structure, comprise two the first Cantilever Beams 1 be arranged in parallel, the second Cantilever Beams 3 that two of being positioned at below the first Cantilever Beams 1 be arranged in parallel and the 3rd Cantilever Beams 4 that two of being positioned at below the second Cantilever Beams 3 be arranged in parallel, namely the first Cantilever Beams 1 has been set gradually from top to bottom, second Cantilever Beams 3 and the 3rd Cantilever Beams 4, be positioned at first Cantilever Beams 1 of the same side, second Cantilever Beams 3 is all connected by main support rod 2 with the 3rd Cantilever Beams 4, total is made to be inverted trapezoidal structure, and main support rod 2 is along the equidistant setting in direction of the second Cantilever Beams 3, two the first Cantilever Beams 1 are connected by first crossbeam 7, two the second Cantilever Beams 3 are connected by second cross beam 6, two the 3rd Cantilever Beams 4 are connected by the 3rd crossbeam 10, between first crossbeam 7 and second cross beam 6, secondary support bar 8 is equipped with between second cross beam 6 and the 3rd crossbeam 10, two adjacent crossbeams are connected and structure triangular in shape by the secondary support bar 8 in two main support rods 2, make total uniform force, make overall structure more firm, can install on ground in advance, attach it on support column 5 by boom hoisting again, the bottom of the 3rd crossbeam 10 is provided with support column 5, the two ends, bottom of the 3rd crossbeam 10 are all connected with connecting rod 9, connecting rod 9 connects support column 5 away from one end of the 3rd crossbeam 10.
Connecting rod 9 is fixed on support column 5 and the 3rd crossbeam 10 by lock-screw, and connecting rod 9, support column 5 and the 3rd crossbeam 10 structure triangular in shape, make structure more firm.
Support column 5 is along the first Cantilever Beams 1 direction spaced set 2-6, and support column 5 supports main steel work.
The lower end of support column 5 is provided with fastening devices, and fastening devices is lock-screw, by fastening devices, support column 5 is fixed on ground, completes installation.
The utility model has set gradually the first Cantilever Beams 1, second Cantilever Beams 3 and the 3rd Cantilever Beams 4 from top to bottom, connected by main support rod 2, total is made to be inverted trapezoidal structure, two adjacent crossbeams are connected and structure triangular in shape by the secondary support bar 8 in two main support rods 2, make overall structure more firm, can install on ground in advance, then be attached it on support column 5 by boom hoisting, there is fitting operation advantage easily.
The above; be only the utility model preferably detailed description of the invention; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; be equal to according to the technical solution of the utility model and utility model design thereof and replace or change, all should be encompassed within protection domain of the present utility model.
Claims (4)
1. a steel-structure factory building cantilevered structure, comprise two the first Cantilever Beams (1) be arranged in parallel, be positioned at two the second Cantilever Beams (3) be arranged in parallel of the first Cantilever Beams (1) below and be positioned at two the 3rd Cantilever Beams (4) be arranged in parallel of the second Cantilever Beams (3) below, it is characterized in that, be positioned at described first Cantilever Beams (1) of the same side, second Cantilever Beams (3) is all connected by main support rod (2) with the 3rd Cantilever Beams (4), and main support rod (2) is along the equidistant setting in direction of the second Cantilever Beams (3), two described first Cantilever Beams (1) are connected by first crossbeam (7), two described second Cantilever Beams (3) are connected by second cross beam (6), two described 3rd Cantilever Beams (4) are connected by the 3rd crossbeam (10), between described first crossbeam (7) and second cross beam (6), secondary support bar (8) is equipped with between second cross beam (6) and the 3rd crossbeam (10), the bottom of described 3rd crossbeam (10) is provided with support column (5), the two ends, bottom of described 3rd crossbeam (10) are all connected with connecting rod (9), described connecting rod (9) connects support column (5) away from one end of the 3rd crossbeam (10).
2. a kind of steel-structure factory building cantilevered structure according to claim 1, it is characterized in that, described connecting rod (9) is fixed on support column (5) and the 3rd crossbeam (10) by lock-screw, and connecting rod (9), support column (5) and the 3rd crossbeam (10) structure triangular in shape.
3. a kind of steel-structure factory building cantilevered structure according to claim 1, is characterized in that, described support column (5) is along the first Cantilever Beams (1) direction spaced set 2-6.
4. a kind of steel-structure factory building cantilevered structure according to claim 1, is characterized in that, the lower end of described support column (5) is provided with fastening devices, and fastening devices is lock-screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520896804.4U CN205224272U (en) | 2015-11-12 | 2015-11-12 | Steel construction factory building is with structure of encorbelmenting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520896804.4U CN205224272U (en) | 2015-11-12 | 2015-11-12 | Steel construction factory building is with structure of encorbelmenting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205224272U true CN205224272U (en) | 2016-05-11 |
Family
ID=55899347
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520896804.4U Expired - Fee Related CN205224272U (en) | 2015-11-12 | 2015-11-12 | Steel construction factory building is with structure of encorbelmenting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205224272U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106285104A (en) * | 2016-08-31 | 2017-01-04 | 李全瑞 | Steel construction assembled solid parking |
CN107447863A (en) * | 2017-09-20 | 2017-12-08 | 中国三冶集团有限公司 | A kind of steel-structure factory building cantilevered structure |
-
2015
- 2015-11-12 CN CN201520896804.4U patent/CN205224272U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106285104A (en) * | 2016-08-31 | 2017-01-04 | 李全瑞 | Steel construction assembled solid parking |
CN107447863A (en) * | 2017-09-20 | 2017-12-08 | 中国三冶集团有限公司 | A kind of steel-structure factory building cantilevered structure |
CN107447863B (en) * | 2017-09-20 | 2023-06-16 | 中国三冶集团有限公司 | Cantilever structure for steel structure factory building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204125899U (en) | A kind of long piled wharf super large framed bent cast-in-situ pile cap bed die support system | |
CN104594201B (en) | A kind of method utilizing one-sided pier-side bracket to set up pier top girder steel | |
CN202227590U (en) | Column rib positioner for reinforced concrete column | |
CN205224272U (en) | Steel construction factory building is with structure of encorbelmenting | |
CN203247868U (en) | Large-span steel structure construction temporary supporting frame | |
CN105040591A (en) | Positioning device for waveform steel web and positioning method thereof | |
CN204282803U (en) | To encorbelment formwork structure for mounting platform | |
CN103088950A (en) | Floor plate steel truss structure | |
CN102191822A (en) | Shearing type parallel mild steel quake-proof damper for building structures | |
CN205663282U (en) | Light -duty lattice formula steel column of large capacity | |
CN204152239U (en) | A kind of assembled lattice support H profile steel support | |
CN209941512U (en) | Supporting shear part for lower cross beam of inclined tower of cable-stayed bridge | |
CN103397638A (en) | Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support | |
CN201598652U (en) | Bidirectional synchronous construction converting structure | |
CN203795824U (en) | Suspension type fastener scaffold erecting device | |
CN203256614U (en) | Large-span bent cap lower-bearing type Bailey frame formwork device | |
CN204040436U (en) | For the self-balancing steel builder's jack of overlength cantilevered structure framed bent construction | |
CN201420400Y (en) | Supporting structure of towering reticulated shell structure | |
CN204825952U (en) | Tower machine steel platform basis fixed leg | |
CN205242988U (en) | Cantilever type steel with inclined support at bottom | |
CN203684777U (en) | 220 kV substation framework | |
CN203271193U (en) | Large overhang stand with space structure | |
CN203684749U (en) | Recyclable prefabricated steel processing shed | |
CN205476444U (en) | Light -duty support post based on low level jacking die carrier system | |
CN203834675U (en) | High-strength steel structure building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160511 Termination date: 20161112 |
|
CF01 | Termination of patent right due to non-payment of annual fee |