CN204040436U - For the self-balancing steel builder's jack of overlength cantilevered structure framed bent construction - Google Patents

For the self-balancing steel builder's jack of overlength cantilevered structure framed bent construction Download PDF

Info

Publication number
CN204040436U
CN204040436U CN201420441624.2U CN201420441624U CN204040436U CN 204040436 U CN204040436 U CN 204040436U CN 201420441624 U CN201420441624 U CN 201420441624U CN 204040436 U CN204040436 U CN 204040436U
Authority
CN
China
Prior art keywords
steel
outrigger
self
diagonal brace
balancing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420441624.2U
Other languages
Chinese (zh)
Inventor
罗玲丽
包晓达
于中涛
徐浩航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LONGYUAN CONSTRUCTION GROUP CO Ltd
Original Assignee
LONGYUAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LONGYUAN CONSTRUCTION GROUP CO Ltd filed Critical LONGYUAN CONSTRUCTION GROUP CO Ltd
Priority to CN201420441624.2U priority Critical patent/CN204040436U/en
Application granted granted Critical
Publication of CN204040436U publication Critical patent/CN204040436U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a kind of self-balancing steel builder's jack for the construction of overlength cantilevered structure framed bent, comprise the steel outrigger that overlength is encorbelmented, a shaped steel column for fixing pull-up diagonal brace is installed at steel outrigger fulcrum place, at least one pull-up diagonal brace upper end is fixedly connected on the shaped steel column of the end side of encorbelmenting being in steel outrigger, lower end is fixedly connected with the end of encorbelmenting of steel outrigger, simultaneously at shaped steel column opposite side rear anchor steel diagonal brace for steel outrigger self-balancing together with arranging at least between anchor end after steel outrigger.Steel builder's jack is externally chosen framed bent by self-balancing and is carried, and without the need to relying on next Rotating fields, reaching monolithic stability by rear anchor and longitudinal restraint, guaranteeing that bent frame system is stablized, be reduced to minimum by the danger of framed bent of encorbelmenting, and installs and sets up quality and also easily ensure.

Description

For the self-balancing steel builder's jack of overlength cantilevered structure framed bent construction
Technical field
When the utility model relates to the construction of a kind of overlength cantilevered structure, type steel support structure, below especially a kind of thing, floor height is higher or choose the self-balancing steel builder's jack that overlength causes diagonal brace longer outward.
Background technology
When running into the construction of overlength cantilevered structure, the general steel builder's jack that adopts is set up, and namely adopts type steel support form below girder steel in the past.The stressed power transmission of original technical system is obvious, and form is simple.But when diagonal brace is below long, the easy unstability of diagonal brace, needs to form steel truss form and just can guarantee resistance to overturning.Meanwhile, below one deck floor height must not be too high, otherwise also can cause type steel support unstability, or need the shaped steel diagonal brace taking relatively large number, therefore cause diagonal brace longer when cutting optimal height is higher or choose overlength outward, steel bracket adopt below diagonal brace time, diagonal brace length is very long.Therefore adopt pull-up diagonal brace to solve the stressed and amount of deflection problem of steel bracket.But smash because superstructure concrete now not yet waters, pull-up diagonal brace cannot be fixed, and original Technical Economy and safety all not ideal enough.
Summary of the invention
The utility model to provide a kind of self-balancing steel builder's jack for the construction of overlength cantilevered structure framed bent, steel builder's jack is externally chosen framed bent by self-balancing and is carried, without the need to relying on next Rotating fields, monolithic stability is reached by rear anchor and longitudinal restraint, guarantee that bent frame system is stablized, the danger of framed bent of encorbelmenting is reduced to minimum, installs and set up quality and also easily ensure.
For achieving the above object, the technical solution used in the present invention is: a kind of self-balancing steel builder's jack for the construction of overlength cantilevered structure framed bent, comprise the steel outrigger that overlength is encorbelmented, a shaped steel column for fixing pull-up diagonal brace is installed at steel outrigger fulcrum place, at least one pull-up diagonal brace upper end is fixedly connected on the shaped steel column of the end side of encorbelmenting being in steel outrigger, lower end is fixedly connected with the end of encorbelmenting of steel outrigger, simultaneously at shaped steel column opposite side rear anchor steel diagonal brace for steel outrigger self-balancing together with arranging at least between anchor end after steel outrigger.
When the cantilever span of steel outrigger is not more than 2m, arrange one pull-up diagonal brace, corresponding shaped steel column is rear anchor steel diagonal brace together with arranging between anchor end after steel outrigger.
During the cantilever span 2m-4m of steel outrigger, two road pull-up diagonal braces are set, after corresponding shaped steel column and steel outrigger, between anchor end, anchor steel diagonal brace behind two roads are set.
Shaped steel column is provided with the cannelure steel cross strut for self-balancing steel builder's jack population equilibrium.
After steel outrigger, anchor end is fixedly connected with structure floor, wherein, i iron two side in steel outrigger in anchor end and upper end installing timber wedge, timber wedge is around with pressure ring reinforcing bar, pressure ring reinforcing bar two end anchored end respectively with soffit bar connecting after, in floor, extend one section of anchored end reinforcing bar meeting anchorage length.
The beneficial effects of the utility model are:
Floor height is higher below, steel bracket adopt below diagonal brace time, diagonal brace length is very long.Therefore adopt pull-up diagonal brace to solve the stressed and amount of deflection problem of steel bracket.But smash because superstructure concrete now not yet waters, pull-up diagonal brace cannot be fixed, so corresponding framework is set self by steel builder's jack carry out system stress balance.At steel outrigger fulcrum place, a shaped steel column is installed, fixes pull-up diagonal brace by shaped steel column, carry out shaped steel diagonal brace balance at shaped steel column opposite side simultaneously, longitudinally by channel-section steel bridging, population equilibrium is carried out to shaped steel column.Steel outrigger is externally chosen framed bent by self-balancing and is carried, and without the need to relying on next Rotating fields, reaching monolithic stability by rear anchor and longitudinal restraint, guaranteeing that bent frame system is stablized, be reduced to minimum by the danger of framed bent of encorbelmenting, and installs and sets up quality and also easily ensure.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is steel builder's jack body plane arrangement diagram of the present utility model;
Fig. 3 is the example structure schematic diagram of steel builder's jack body;
Fig. 4 is anchor end and structure floor fixed point structure sectional view after steel outrigger.
Detailed description of the invention
As shown in Figures 1 to 4, a kind of self-balancing steel builder's jack for the construction of overlength cantilevered structure framed bent, comprises steel outrigger 1 that overlength encorbelments, shaped steel column 2, pull-up diagonal brace 3, rear anchor steel diagonal brace 4 etc. for fixing pull-up diagonal brace.
A shaped steel column 2 is installed at steel outrigger 1 fulcrum place, at least one pull-up diagonal brace 3 upper end is fixedly connected on the shaped steel column 2 of the end side of encorbelmenting being in steel outrigger 1, lower end is fixedly connected with the end of encorbelmenting of steel outrigger 1, for the rear anchor steel diagonal brace 4 of steel outrigger self-balancing simultaneously together with arranging at least between shaped steel column 2 opposite side with anchor end after steel outrigger 1.Shaped steel column 2 is provided with the cannelure steel cross strut for self-balancing steel builder's jack population equilibrium.
As shown in Figure 4, after steel outrigger 1, anchor end is fixedly connected with structure floor 5, wherein, i iron two side in steel outrigger 1 in anchor end and upper end installing timber wedge 6, timber wedge 6 is around with pressure ring reinforcing bar 7, after pressure ring reinforcing bar 7 two end anchored end is connected with soffit reinforcing bar 8 respectively, in structure floor 5, extend the anchored end reinforcing bar that a section meets anchorage length.In steel outrigger 1, anchor end and structure floor 5 are effectively fixed, and need if desired to carry out partial structurtes reinforcing.
As shown in Figure 3, when the cantilever span of steel outrigger 1 is not more than 2m, one pull-up diagonal brace 3 is set, anchor steel diagonal brace 4 after together with arranging between corresponding shaped steel column 2 with anchor end after steel outrigger 1.
As shown in Figure 1, during the cantilever span 2m-4m of steel outrigger 1, two road pull-up diagonal braces 3 are set, after corresponding shaped steel column 2 and steel outrigger 1, between anchor end, anchor steel diagonal brace 4 behind two roads are set.
The utility model scope of application: consider general floor height situation, according to the design principle of self-balancing steel builder's jack, choosing length outside cantilevered structure, to be not more than 4m more applicable.When wherein cantilever span is not more than 2m, arrange one pull-up diagonal brace 3, after corresponding column, anchor also arranges anchor steel diagonal brace 4 together; During cantilever span 2m-4m, arrange two road pull-up diagonal braces 3, after corresponding column, anchor also arranges anchor steel diagonal brace 4 behind two roads.

Claims (5)

1. the self-balancing steel builder's jack for the construction of overlength cantilevered structure framed bent, comprise the steel outrigger (1) that overlength is encorbelmented, it is characterized in that: a shaped steel column (2) for fixing pull-up diagonal brace is installed at steel outrigger (1) fulcrum place of institute, at least one pull-up diagonal brace (3) upper end is fixedly connected on the shaped steel column (2) of the end side of encorbelmenting being in steel outrigger (1), lower end is fixedly connected with the end of encorbelmenting of steel outrigger (1), for the rear anchor steel diagonal brace (4) of steel outrigger self-balancing together with arranging at least between anchor end afterwards with steel outrigger (1) at shaped steel column (2) opposite side simultaneously.
2. the self-balancing steel builder's jack for the construction of overlength cantilevered structure framed bent according to claim 1, it is characterized in that: when the cantilever span of described steel outrigger (1) is not more than 2m, one pull-up diagonal brace (3) is set, anchor steel diagonal brace (4) after together with corresponding shaped steel column (2) and steel outrigger (1) are arranged between anchor end afterwards.
3. the self-balancing steel builder's jack for the construction of overlength cantilevered structure framed bent according to claim 1, it is characterized in that: during the cantilever span 2m-4m of described steel outrigger (1), arrange two roads pull-up diagonal brace (3), corresponding shaped steel column (2) and steel outrigger (1) arrange anchor steel diagonal brace (4) behind two roads afterwards between anchor end.
4. the self-balancing steel builder's jack for the construction of overlength cantilevered structure framed bent according to any one of claims 1 to 3, is characterized in that: described shaped steel column (2) is provided with the cannelure steel cross strut for self-balancing steel builder's jack population equilibrium.
5. the self-balancing steel builder's jack for the construction of overlength cantilevered structure framed bent according to any one of claims 1 to 3, it is characterized in that: described steel outrigger (1) afterwards anchor end is fixedly connected with structure floor (5), wherein, i iron two side in the interior anchor end of steel outrigger (1) and upper end installing timber wedge (6), timber wedge (6) is around with pressure ring reinforcing bar (7), after pressure ring reinforcing bar (7) two end anchored end is connected with soffit reinforcing bar (8) respectively, in structure floor (5), extend the anchored end reinforcing bar that a section meets anchorage length.
CN201420441624.2U 2014-08-07 2014-08-07 For the self-balancing steel builder's jack of overlength cantilevered structure framed bent construction Active CN204040436U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420441624.2U CN204040436U (en) 2014-08-07 2014-08-07 For the self-balancing steel builder's jack of overlength cantilevered structure framed bent construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420441624.2U CN204040436U (en) 2014-08-07 2014-08-07 For the self-balancing steel builder's jack of overlength cantilevered structure framed bent construction

Publications (1)

Publication Number Publication Date
CN204040436U true CN204040436U (en) 2014-12-24

Family

ID=52241119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420441624.2U Active CN204040436U (en) 2014-08-07 2014-08-07 For the self-balancing steel builder's jack of overlength cantilevered structure framed bent construction

Country Status (1)

Country Link
CN (1) CN204040436U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107354946A (en) * 2017-08-16 2017-11-17 中铁第四勘察设计院集团有限公司 A kind of supporting construction of encorbelmenting for foundation pit steel support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107354946A (en) * 2017-08-16 2017-11-17 中铁第四勘察设计院集团有限公司 A kind of supporting construction of encorbelmenting for foundation pit steel support

Similar Documents

Publication Publication Date Title
CN102839675B (en) Method of long-span pre-stress fish belly sill for foundation pit support
CN202881856U (en) Concrete pouring support prepressing device
CN104389419A (en) Cantilevered formwork platform installation structure and construction method
CN105544398A (en) Horizontal force self-balancing type splayed heavy type upper air support system and installation method thereof
CN103866986A (en) Installing method of large-span variable-cross-section screw bolt ball node reticulated shell
CN105178200A (en) Construction method of cable-stayed combined support for construction of first segment of suspended-pouring arch bridge
CN203867159U (en) Sleeve type cantilever scaffold structure
CN204825914U (en) A reinforced concrete roof beam and fish belly sill combined supporting structure for complicated plane foundation ditch
CN204112335U (en) A kind ofly reduce the puller system that foundation ditch encloses purlin horizontal component
CN105040591A (en) Positioning device for waveform steel web and positioning method thereof
US10823150B2 (en) Connecting structure for steel tube truss and tower barrel of lattice wind power generation tower, prestressed polygon wind tower provided with circular box girder for direct fan on top of tower, wind power generation tower, and wind tower having prestressed anti-fatigue structure
CN204040436U (en) For the self-balancing steel builder's jack of overlength cantilevered structure framed bent construction
CN203546618U (en) Splayed supporting frame for bridge cast-in-place concrete formwork
CN205224272U (en) Steel construction factory building is with structure of encorbelmenting
CN104790299A (en) Internal-span unsupported convenient construction support and method for bridge cast-in-place box beam
CN204491420U (en) A kind of reinforcement structure of bracket
CN202989786U (en) Old bridge external prestressing reinforced structure
CN203188109U (en) Multi-span ground anchor type suspension bridge
CN105887692A (en) Arch bridge supporting tool for improving arch bridge construction stability and construction method thereof
CN105060087A (en) Rectangular tube truss without support
CN204475851U (en) Without supporting cantilevered plate die mould steel work in housing beam
CN205617249U (en) Increase arched bridge supporting tool of arched bridge construction stability
CN203821812U (en) Cantilever frame body for beam plate aerial structure
CN101586329B (en) Anchor ear angle-table bracket for large-span prestressed concrete bridge cantilever pouring construction
CN203346779U (en) Novel rib arch bridge transverse aseismic structure system with buckling restrained braces

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant