CN106088637B - Construction assembled high-altitude protection canopy and its assembly method - Google Patents

Construction assembled high-altitude protection canopy and its assembly method Download PDF

Info

Publication number
CN106088637B
CN106088637B CN201610674579.9A CN201610674579A CN106088637B CN 106088637 B CN106088637 B CN 106088637B CN 201610674579 A CN201610674579 A CN 201610674579A CN 106088637 B CN106088637 B CN 106088637B
Authority
CN
China
Prior art keywords
floor
fixed
steel wire
protection network
cantilever beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610674579.9A
Other languages
Chinese (zh)
Other versions
CN106088637A (en
Inventor
王福全
陈惠强
杨盛钱
宋威
甘文民
王青刚
徐超凡
刘学敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN201610674579.9A priority Critical patent/CN106088637B/en
Publication of CN106088637A publication Critical patent/CN106088637A/en
Application granted granted Critical
Publication of CN106088637B publication Critical patent/CN106088637B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3209Temporary tunnels specially adapted against falling objects
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3266Safety nets

Abstract

The invention discloses a kind of assembled high-altitude protection canopy and its assembly method in construction.Assembled high-altitude protection canopy is assemblied in floor, on three floors of intermediate floor and lower floor and outside each floor, it includes several Cantilever Beams for being fixed on lower floor, the part that each Cantilever Beams are stretched out outside lower floor is fixed by outrigger off-load steel wire rope and intermediate floor outward flange and it is provided with external scaffolding above, the end of encorbelmenting of each Cantilever Beams is provided with a fixed beam jointly above, interval is provided with some hold-down supports in fixed beam, the lower end of protection network is rotatablely connected with each hold-down support and upper end is fixed by several oblique pull steel wire ropes with upper floor outward flange, protection network oblique pull steel wire rope lead drag decentralization to horizontal plane it is at an acute angle.The present invention is easy to assembly, quick, can have enough to meet the need reuse, and danger is low in assembling process, it can be ensured that construction is complete, practical.

Description

Construction assembled high-altitude protection canopy and its assembly method
Technical field
The present invention relates to a kind of assembled high-altitude protection canopy and this assembly method of high-altitude protection canopy in construction, Belong to and field is protected outside high-altitude.
Background technology
Protection canopy be in high-building construction for a kind of horizontal protective facility for preventing falling object from high altitude and generally setting, In practical set, protection canopy is protruded from outside building, is generally required with increasing for building and is set up multiple tracks, the width of protection canopy Degree is typically between 4 meters~6 meters.Most construction site is generally using steel tube fastener formula protection canopy, this protection canopy at present Greatly danger be present because protection canopy protrudes from the architectural characteristic outside building when setting up, annual China all occurred More cause protection canopies set up and caused by security incident.
The content of the invention
It is an object of the invention to provide a kind of construction assembled high-altitude protection canopy and its assembly method, this assembling Formula high-altitude protection canopy is easy to assembly, quick, can have enough to meet the need reuse, and danger is low in assembling process, practical.
To achieve these goals, present invention employs following technical scheme:
A kind of construction assembled high-altitude protection canopy, it is assemblied in three floor, intermediate floor and lower floor buildings On layer and outside each floor, it is characterised in that:It includes being fixed on several Cantilever Beams of lower floor, and each Cantilever Beams stretch out Part outside lower floor is fixed by outrigger off-load steel wire rope and intermediate floor outward flange and it is provided with external scaffolding above, A fixed beam is installed at the end of encorbelmenting of each Cantilever Beams jointly above, and interval is provided with some hold-down supports, protection network in fixed beam Lower end be rotatablely connected with each hold-down support and upper end is fixed by several oblique pull steel wire ropes with upper floor outward flange, protection network Oblique pull steel wire rope lead drag decentralization to horizontal plane it is at an acute angle.
Each Cantilever Beams are mutually fixed by two outrigger off-load steel wire ropes with the intermediate floor outward flange, its In, in one end that two outrigger off-load steel wire ropes are mutually fixed with the intermediate floor outward flange, two outrigger off-loads Acute angle is formed between steel wire rope.
The hold-down support includes steel plate, and steel plate is provided with fixed mount, and fixed mount and steel plate are consolidated by fixing bolt together Be scheduled in the fixed beam, be rotatably connected to adjustable shelf above fixed mount, adjustable shelf relative to fixed mount rotate and make both Changed between opening and closing, wherein:When adjustable shelf and fixed mount close, adjustable shelf and fixed mount each on it is semicircle recessed Groove synthesizes a circular accommodation space for being used for housing the protection network lower end.
When the adjustable shelf and the fixed mount close, the adjustable shelf is consolidated by clamping screw and the fixed mount It is fixed.
The protection network includes some rectangular frames being connected, and framework is made up of cross bar, montant and brace, pacified on framework Equipped with steel wire, the lower end of framework is provided with the fix bar for being used for being contained on the hold-down support, and the upper end of framework is provided with suspension ring.
A kind of assembly method of described construction assembled high-altitude protection canopy, it is characterised in that it includes as follows Step:
1) Cantilever Beams are installed on the lower floor;
2) in the part that each Cantilever Beams are stretched out outside the lower floor good external scaffolding installed above;
3) in the end of encorbelmenting of each Cantilever Beams good fixed beam installed above;
4) hold-down support is installed in the fixed beam;
5) protection network is hung to above the hold-down support in vertical state by tower crane;
6) lower end of the protection network is rotatably coupled with each hold-down support, in the upper end of the protection network and institute State and install the oblique pull steel wire rope between floor;
7) the oblique pull steel wire rope is slowly loosened, the protection network drags decentralization in the leading for oblique pull steel wire rope, until Stop between the protection network and horizontal plane during inclination at an acute angle;
8) protection network is in place, and oblique pull steel wire rope is secured the above using rope card.
The step 1) is fixed on including the Cantilever Beams by ground fixing bolt on the lower floor and the Cantilever Beams The part stretched out outside the lower floor is mutually fixed by the outrigger off-load steel wire rope and the intermediate floor outward flange.
The step 6) is specially:Fix bar on the protection network is contained in the accommodation space of each hold-down support Realization is rotatably connected with each hold-down support, and lower end and the suspension ring on the protection network of the oblique pull steel wire rope can turn Bolt dynamicly and the upper end of the oblique pull steel wire rope is connected with the upper outer peripheral anchor bar of floor.
Compared with conventional steel fastener type protection canopy, the present invention has advantages below:
1st, high-altitude protection canopy of the present invention assembles for tool-type, convenient and swift, can have enough to meet the need reuse, and service life length is real It is strong with property.
2nd, high-altitude protection canopy and Cantilever Beams of the present invention, main building structure (upper floor, intermediate floor) are connected to a fixed, and External scaffolding is designed with, so as to greatly reduce the danger in assembling process.
3rd, high-altitude protection canopy of the present invention is light and handy, firm and durable, and protection network angle of inclination can flexible modulation, it can be ensured that uses peace Entirely.
4th, the inventive method takes the working measure that shilling protection network is vertically slowly put down again close to external scaffolding, it is ensured that The construction safety of high-altitude protection canopy.
Brief description of the drawings
Fig. 1 is the structural representation of high-altitude protection canopy of the present invention.
Fig. 2 is the structural representation of hold-down support.
Fig. 3 is Fig. 2 vertical view partial schematic diagram (steel bar end, fixed beam is not shown).
Fig. 4 is the structural representation of protection network.
Fig. 5 is the schematic diagram of tower crane lifting protection network.
Fig. 6 is the schematic diagram for mutually being fixed protection network with upper floor by oblique pull steel wire rope.
Fig. 7 is the schematic diagram of protection network decentralization.
Embodiment
Construction of the present invention with assembled high-altitude protection canopy be assemblied in upper floor 30, intermediate floor 20 and lower floor 10 this On three floors and outside each floor.In a vertical direction, main building structure includes several floors, in actual implementation In three continuous floors may be selected, such as Fig. 1, three continuous floors of selection are from top to bottom followed successively by floor 30, middle building Layer 20, lower floor 10.
As shown in Figures 1 to 4, construction assembled high-altitude protection canopy of the present invention includes fixing by ground fixing bolt 11 Between several Cantilever Beams 40 of lower floor 10, each Cantilever Beams 40 can parallel interval set, each Cantilever Beams 40 stretch out lower floor Part outside 10 is mutually fixed with the outward flange of intermediate floor 20 by outrigger off-load steel wire rope 60 and each Cantilever Beams 40 stretch out and gone downstairs Part external scaffolding 50 installed above outside layer 10, specifically, one end of outrigger off-load steel wire rope 60 is with being fixed on centre The outer peripheral anchor bar 400 of floor 20 is connected, and the other end entangles the part that Cantilever Beams 40 are stretched out outside lower floor 10, to outstanding Outrigger 40 plays fixed purpose, and a fixed beam 100 is installed at the end of encorbelmenting of each Cantilever Beams 40 jointly above, in general, Gu Determine beam 100 and Cantilever Beams 40 are perpendicular, interval is provided with several hold-down supports 90, the lower end of protection network 80 in fixed beam 100 It is rotatablely connected with each hold-down support 90 and upper end is mutually fixed by several oblique pull steel wire ropes 70 with the upper outward flange of floor 30, specifically For, one end of oblique pull steel wire rope 70 is connected with being fixed on the outer peripheral anchor bar 300 of upper floor 30, the other end and protection The upper end of net 80 rotationally bolts, and protection network 80 drags decentralization to itself and horizontal plane Cheng Rui in leading for oblique pull steel wire rope 70 Angle (between 10 degree~30 degree), so as to play horizontal protective purpose, is now also formed between protection network 80 and oblique pull steel wire rope 70 Acute angle.
Specifically, as Fig. 1, each Cantilever Beams 40 pass through two outrigger off-load steel wire ropes 60 and the outward flange of intermediate floor 20 Mutually fixed, one end of each outrigger off-load steel wire rope 60 is connected with being fixed on the outer peripheral anchor bar 400 of intermediate floor 20, separately The part that Cantilever Beams 40 are stretched out outside lower floor is entangled in one end, wherein, in two outrigger off-load steel wire ropes 60 and intermediate floor 20 From the point of view of one end that outward flange is mutually fixed, acute angle is formed between two outrigger off-load steel wire ropes 60, to improve fixed Cantilever Beams 40 dynamics and stability.
In actual design, external scaffolding 50 can be made up of cross bar, vertical rod, diagonal brace, and the height of external scaffolding 50 should meet Scaffold building specification.
As shown in Figures 2 and 3, hold-down support 90 may include steel plate 91, and steel plate 91 is provided with fixed mount 92, the He of fixed mount 92 Steel plate 91 is fixed in fixed beam 100 by fixing bolt 95 together, and fixed mount 92 is rotatably connected to adjustable shelf 93 above, i.e., living One end of moving frame 93 is rotatablely connected with corresponding one end of fixed mount 92 by fastening bolt 96, and adjustable shelf 93 is relative to fixed mount 92 Rotate and adjustable shelf 93 and fixed mount 92 is changed between opening and closing, wherein:When adjustable shelf 93 and fixed mount 92 close When, adjustable shelf 93 and fixed mount 92 each on semi-circular recesses synthesize one for housing the fix bar 84 of the lower end of protection network 80 Circular accommodation space 94.
When adjustable shelf 93 and fixed mount 92 close, adjustable shelf 93 is fixed by clamping screw 97 and the phase of fixed mount 92, i.e., The other end of adjustable shelf 93 is fixedly connected with the corresponding other end of fixed mount 92 by clamping screw 97, so that adjustable shelf 93 is with consolidating Determine frame 92 and no longer produce rotation between the two, fix bar 84 is now buckled in accommodation space 94.
Such as Fig. 3, it is preferred that fixed mount 92 can be wider than adjustable shelf 93, so that adjustable shelf 93 is rotatably placed in fixed mount In 92 elongated slot, to strengthen the stability between adjustable shelf 93 and fixed mount 92.
In actual design, the both sides of fixed beam 100 can increase steadiness by way of fixed steel bars first 110, such as Fig. 2, steel bar end 110 are welded and fixed with the phase of Cantilever Beams 40.
Such as Fig. 4, protection network 80 may include some rectangular frames being connected, and framework is by cross bar 81, montant 82 and brace 83 Form, steel wire 86 is installed on framework, the lower end of framework, which is provided with, to be used to be contained in the accommodation space 94 on hold-down support 90 Fix bar 84, the upper end of framework is provided with suspension ring 85, and the number of suspension ring 85 should determine depending on the size of framework.Certainly, in reality In design, the structure of protection network 80 can also have other forms of the composition, it is not limited to above-mentioned.
The assembly method of construction assembled high-altitude protection canopy of the present invention comprises the following steps:
1) Cantilever Beams 40 are installed on lower floor 10;
2) the part good external scaffolding 50 installed above under the stretching of each Cantilever Beams 40 outside floor 10;
3) in the end good fixed beam 100 installed above of encorbelmenting of each Cantilever Beams 40;
4) hold-down support 90 is installed in fixed beam 100;
5) protection network 80 that ground processes is hung to the top of hold-down support 90 (such as Fig. 5) in vertical state by tower crane 200;
6) lower end of protection network 80 is rotatably coupled with each hold-down support 90, in the upper end of protection network 80 and upper floor 30 Between install oblique pull steel wire rope 70 (such as Fig. 6);
7) slowly loosening oblique pull steel wire rope 70 makes protection network 80 fall slowly, and such as Fig. 7, protection network 80 is in oblique pull steel wire rope 70 Lead to drag down and transfer slowly, stop (between 10 degree~30 degree) during inclination until at an acute angle between protection network 80 and horizontal plane;
8) protection network 80 is in place, fixes oblique pull steel wire rope 70 using rope card, oblique pull steel wire rope 70 is no longer extended, so as to Construction of the present invention is constructed with assembled high-altitude protection canopy and completed.
When actually implementing, step 1) is fixed on lower floor 10 and encorbelmented by ground fixing bolt 11 including Cantilever Beams 40 The part that beam 40 is stretched out outside lower floor 10 is mutually fixed by outrigger off-load steel wire rope 60 and the outward flange of intermediate floor 20.
When actually implementing, step 6) is specially:Fix bar 84 on protection network 80 is contained in the appearance of each hold-down support 90 Realize in 94 between being empty and to be rotatably connected with each hold-down support 90, the suspension ring on the lower end of oblique pull steel wire rope 70 and protection network 80 85 rotationally bolt and the upper end of oblique pull steel wire rope 70 is connected with the outer peripheral anchor bar 300 of upper floor 30.
In actually implementing, step 3)~6) it can be completed by external scaffolding 50.
In actually implementing, construction of the present invention also may be mounted in main building structure with assembled high-altitude protection canopy On discontinuous three floors, it is not limited to above-mentioned.
Compared with conventional steel fastener type protection canopy, the present invention has advantages below:
1st, high-altitude protection canopy of the present invention assembles for tool-type, convenient and swift, can have enough to meet the need reuse, and service life length is real It is strong with property.
2nd, high-altitude protection canopy and Cantilever Beams of the present invention, main building structure (upper floor, intermediate floor) are connected to a fixed, and External scaffolding is designed with, so as to greatly reduce the danger in assembling process.
3rd, high-altitude protection canopy of the present invention is light and handy, firm and durable, and protection network angle of inclination can flexible modulation, it can be ensured that uses peace Entirely.
4th, the inventive method takes the working measure that shilling protection network is vertically slowly put down again close to external scaffolding, it is ensured that The construction safety of high-altitude protection canopy.
The technical principle described above for being present pre-ferred embodiments and its being used, come for those skilled in the art Say, without departing from the spirit and scope of the present invention, any equivalent transformation based on the basis of technical solution of the present invention, Simple replacement etc. is obvious to be changed, and is belonged within the scope of the present invention.

Claims (6)

1. a kind of construction assembled high-altitude protection canopy, it is assemblied in three floor, intermediate floor and lower floor floors Go up and be in outside each floor, it is characterised in that:It includes being fixed on several Cantilever Beams of lower floor, under each Cantilever Beams stretch out Part outside floor is fixed by outrigger off-load steel wire rope and intermediate floor outward flange and it is provided with external scaffolding above, respectively A fixed beam is installed at the end of encorbelmenting of Cantilever Beams jointly above, and interval is provided with some hold-down supports in fixed beam, protection network Lower end is rotatablely connected with each hold-down support and upper end is fixed by several oblique pull steel wire ropes with upper floor outward flange, and protection network exists The leading of oblique pull steel wire rope drags decentralization at an acute angle with horizontal plane;Hold-down support includes steel plate, and steel plate is provided with fixed mount, Fixed mount and steel plate are fixed in fixed beam by fixing bolt together, and adjustable shelf, adjustable shelf are rotatably connected to above fixed mount Rotated relative to fixed mount and both is changed between opening and closing, wherein:When adjustable shelf and fixed mount close, activity Frame and fixed mount each on semi-circular recesses synthesize a circular accommodation space for being used for housing protection network lower end.
2. construction as claimed in claim 1 assembled high-altitude protection canopy, it is characterised in that:
Each Cantilever Beams are mutually fixed by two outrigger off-load steel wire ropes with the intermediate floor outward flange, wherein, In one end that two outrigger off-load steel wire ropes are mutually fixed with the intermediate floor outward flange, two outrigger off-load steel wires Acute angle is formed between rope.
3. construction as claimed in claim 1 assembled high-altitude protection canopy, it is characterised in that:
When the adjustable shelf and the fixed mount close, the adjustable shelf is fixed by clamping screw and the fixed mount.
4. construction as claimed in claim 1 assembled high-altitude protection canopy, it is characterised in that:
The protection network includes some rectangular frames being connected, and framework is made up of cross bar, montant and brace, is provided with framework Steel wire, the lower end of framework are provided with the fix bar for being used for being contained on the hold-down support, and the upper end of framework is provided with suspension ring.
5. a kind of assembly method of the construction assembled high-altitude protection canopy any one of Claims 1-4, it is special Sign is that it comprises the following steps:
1) Cantilever Beams are installed on the lower floor;
2) in the part that each Cantilever Beams are stretched out outside the lower floor good external scaffolding installed above;
3) in the end of encorbelmenting of each Cantilever Beams good fixed beam installed above;
4) hold-down support is installed in the fixed beam;
5) protection network is hung to above the hold-down support in vertical state by tower crane;
6) lower end of the protection network is rotatably coupled with each hold-down support, the upper end of the protection network with it is described on The oblique pull steel wire rope is installed between floor;
7) the oblique pull steel wire rope is slowly loosened, the protection network drags decentralization in the leading for oblique pull steel wire rope, until described Stop between protection network and horizontal plane during inclination at an acute angle;
8) protection network is in place, and oblique pull steel wire rope is secured the above using rope card;
Wherein, step 6) is specially:Fix bar on the protection network is contained in the accommodation space of each hold-down support real Now it is rotatably connected with each hold-down support, the lower end of the oblique pull steel wire rope and the suspension ring on the protection network are rotatable Ground bolts and the upper end of the oblique pull steel wire rope is connected with the upper outer peripheral anchor bar of floor.
6. assembly method as claimed in claim 5, it is characterised in that:
The step 1) is fixed on the lower floor including the Cantilever Beams by ground fixing bolt and the Cantilever Beams stretch out Part outside the lower floor is mutually fixed by the outrigger off-load steel wire rope and the intermediate floor outward flange.
CN201610674579.9A 2016-08-16 2016-08-16 Construction assembled high-altitude protection canopy and its assembly method Active CN106088637B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610674579.9A CN106088637B (en) 2016-08-16 2016-08-16 Construction assembled high-altitude protection canopy and its assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610674579.9A CN106088637B (en) 2016-08-16 2016-08-16 Construction assembled high-altitude protection canopy and its assembly method

Publications (2)

Publication Number Publication Date
CN106088637A CN106088637A (en) 2016-11-09
CN106088637B true CN106088637B (en) 2018-04-10

Family

ID=58069662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610674579.9A Active CN106088637B (en) 2016-08-16 2016-08-16 Construction assembled high-altitude protection canopy and its assembly method

Country Status (1)

Country Link
CN (1) CN106088637B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301630A (en) * 2017-12-30 2018-07-20 中建三局第建设工程有限责任公司 A kind of turnable assembled protection shed device and its application method
CN108590149B (en) * 2018-03-27 2023-11-21 中国建筑第八工程局有限公司 Construction protection operation frame
CN108396981A (en) * 2018-05-08 2018-08-14 广西家之宝网络科技有限公司 A kind of safety protection device for building construction and method
CN109555300A (en) * 2018-12-27 2019-04-02 上海建工二建集团有限公司 A kind of builder's jack
CN110185264A (en) * 2019-07-10 2019-08-30 福州建工(集团)总公司 A kind of construction site assembled protection device and its building method
CN110439308B (en) * 2019-08-12 2024-02-09 上海宝冶集团南京建筑有限公司 Multi-functional adjustable high-rise building safety device that prevents weighing down thing of instrument formula
CN111502316B (en) * 2020-03-27 2021-11-09 中国建筑第八工程局有限公司 Portable shaped steel protection platform that encorbelments
CN113323373A (en) * 2021-05-12 2021-08-31 江苏省华建建设股份有限公司 Fastener type steel pipe outer frame safety type protection device with anti-falling function
CN113482377B (en) * 2021-06-21 2022-06-28 湖北全洲扬子江建设工程有限公司 Building engineering outward-projecting net device with guiding and sliding functions
CN116145981A (en) * 2022-10-31 2023-05-23 中冶(上海)钢结构科技有限公司 Construction method of horizontal overhanging protection net suitable for outer vertical surface of irregular building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000020539U (en) * 1999-05-08 2000-12-05 김송근 protection fence for dropping things
CN102094516A (en) * 2009-12-10 2011-06-15 顾晓刚 Discharging platform
CN202324571U (en) * 2011-11-01 2012-07-11 江苏瑞峰建设集团有限公司 Overhanging type double-row scaffold
CN204738548U (en) * 2015-06-19 2015-11-04 中建八局第三建设有限公司 Design safe plain net of encorbelmenting
CN205955257U (en) * 2016-08-16 2017-02-15 中铁建工集团有限公司 Assembled high altitude protection canopy for construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000020539U (en) * 1999-05-08 2000-12-05 김송근 protection fence for dropping things
CN102094516A (en) * 2009-12-10 2011-06-15 顾晓刚 Discharging platform
CN202324571U (en) * 2011-11-01 2012-07-11 江苏瑞峰建设集团有限公司 Overhanging type double-row scaffold
CN204738548U (en) * 2015-06-19 2015-11-04 中建八局第三建设有限公司 Design safe plain net of encorbelmenting
CN205955257U (en) * 2016-08-16 2017-02-15 中铁建工集团有限公司 Assembled high altitude protection canopy for construction

Also Published As

Publication number Publication date
CN106088637A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN106088637B (en) Construction assembled high-altitude protection canopy and its assembly method
CN105604334B (en) A kind of rapid constructing method for large span steel truss integral installation
CN201649678U (en) Semi-automatic safety protective shed for high-rise building construction
CN102383588B (en) Lifting platform for protecting safety of high-level construction
CN107100187B (en) Tower crane steel girder erection structure and installation method
CN203080894U (en) Building steel structure construction protector
CN103236656B (en) Column suspension type crossing structure and operating method thereof
CN205955257U (en) Assembled high altitude protection canopy for construction
CN212836630U (en) All-steel integrated operation scaffold
CN205100531U (en) Lift scaffold support body assembly
CN203684625U (en) Suspending cord pipe combined full scaffolding construction platform and protection system
CN217461573U (en) Fast-assembling high-rise horizontal protection shed
CN207892092U (en) A kind of curtain wall support structure
JP5535719B2 (en) Simple assembly type derrick
CN212581394U (en) Portable small-size material transport device
JP5881381B2 (en) Simple crane for assembling rooftop and method for carrying in or carrying out suspended load using this crane
CN208684255U (en) A kind of Elements of Space Grid Truss high altitude bulk assembled positioning device
CN210828267U (en) Externally-hung drilling construction platform
CN214941217U (en) Movable sound-absorbing, sound-insulating and noise-reducing device
CN208280571U (en) A kind of external wall coat of paint maintenance hanging basket
CN203393628U (en) Ground basket device
CN216141160U (en) Assembled tower crane operation platform
CN217999035U (en) Safety rope fixing climbing component for building construction and safety rope fixing structure
CN218406387U (en) Steel platform suitable for suspended ceiling of hotel lobby installation
CN217420443U (en) Special-shaped hanging basket rear support reinforcing and stabilizing mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant