CN205077805U - Dry pendant mounting structure of wall - Google Patents

Dry pendant mounting structure of wall Download PDF

Info

Publication number
CN205077805U
CN205077805U CN201520909871.5U CN201520909871U CN205077805U CN 205077805 U CN205077805 U CN 205077805U CN 201520909871 U CN201520909871 U CN 201520909871U CN 205077805 U CN205077805 U CN 205077805U
Authority
CN
China
Prior art keywords
wall
hook
mounting structure
suspension member
article mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520909871.5U
Other languages
Chinese (zh)
Inventor
林志伟
翁开明
吴思
曾建明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WANFENG COMPOUND STONE TECHNOLOGY Co Ltd
Original Assignee
WANFENG COMPOUND STONE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WANFENG COMPOUND STONE TECHNOLOGY Co Ltd filed Critical WANFENG COMPOUND STONE TECHNOLOGY Co Ltd
Priority to CN201520909871.5U priority Critical patent/CN205077805U/en
Application granted granted Critical
Publication of CN205077805U publication Critical patent/CN205077805U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a dry pendant mounting structure of wall, its characterized in that, it includes the fossil fragments system that sets up on building basic unit's wall body or steelframe, set up at the pendant at the wall module back, install the hook support in the fossil fragments systems, pendant and the cooperation of hook support hook. The utility model discloses simple structure, the installation is adjusted conveniently, and is with low costs, and stability is good.

Description

The dry hanging article mounting structure of wall
Technical field
The utility model relates to building decoration technology field, relates to a kind of dry hanging article mounting structure of wall more specifically.
Background technology
At present, by the wall of stone laying, be applied to the Household fit-up and decoration of family's living-room TV wall, sofa wall, entry, bedroom wall etc. gradually, also can be applied to the fitting-up of the public places of entertainment such as hotel, restaurant, KTV, night club, can also be applied in the wall decoration of the sound-absorbing sound isolation requirement specialties such as the performing art Room, cinema, opera house, audiovisual studio, studio hall, recording room.Wall is with the design of its novelty, and advanced technique, not only meets the needs of customer's decorations, more embodies the makings of art, makes product become business and artistic perfect adaptation.Wall conventional mounting arrangements is mainly wet combining method and organic gel mounting method, and the set-up time is long, and site operation is complicated, and security risk is large, and installation cost is high, does not often reach the decorative effect of anticipation after installation.
Summary of the invention
The one that the purpose of this utility model is exactly deficiency in order to solve prior art and provides not only structure is simple, and install easy to adjust, the construction period is short, and efficiency of construction is high, and safety is good, the dry hanging article mounting structure of the wall that installation cost is low.
The utility model adopts following technical solution to realize above-mentioned purpose: a kind of dry hanging article mounting structure of wall, it is characterized in that, it is included in grid system, the suspension member being arranged on wall module backside, the hook bearing be arranged in grid system that building base course wall or steelframe are set up, suspension member coordinates with hook bearing hook, and wall module is affiliated in grid system piece by piece by installation requirement order.
Further illustrating as such scheme, described grid system comprise some stand to and/or the keel bracket bar of horizontally set.
Described keel bracket bar is U-shaped material or C-type steel, and the notch of U-shaped material or C-type steel builds base course wall or steelframe dorsad, is conducive to the cladding installation of wall module.
Described suspension member adopts back of the body bolt suspension member.
The end of described suspension member is provided with the hook groove that Open Side Down, hook bearing settlement has the support portion corresponding with hook groove, support portion is inserted in hook groove, the top of support portion is stood to being provided with fine adjustment screw, one end of this fine adjustment screw enters from the top of hook groove, pushing up press-fit through after hook groove with the top of the support portion of hook bearing, the fine setting in the vertical direction of wall module can be realized by regulating fine adjustment screw.
Described hook bearing comprises the fixed corner code be arranged on keel bracket bar and the movable corner connectors be movably arranged on fixed corner code, and the longitudinal part one of fixed corner code is close to keel bracket bar, and transverse part one stretches out and arrange slotted eye one on transverse part one; The transverse part two of movable corner connectors is close to the transverse part one of fixed corner code, and it is corresponding with slotted eye one to arrange slotted eye two on transverse part two, slotted eye two and slotted eye one are provided with securing member movable corner connectors and fixed corner code are connected and fixed, by regulating the lap position of two slotted eyes, realize the adjustment of the distance between movable corner connectors and keel bracket bar;
The longitudinal part two of movable corner connectors supports as the hook of suspension member the end standing on transverse part two.
Described wall module comprises the stone decoration board and stone decoration frame that form wall agent structure, and the back side of stone decoration board is provided with the reinforcement supporting mechanism be made up of stiffener and/or reinforcing rib, and suspension member is fixed on to be strengthened on supporting mechanism.
Stiffener in described reinforcement supporting mechanism and/or reinforcing rib are set to latticed, stiffener and/or be adhered to the back side of stone decoration board, the stiffener of the longitudinal direction that crosses of contacting with each other and horizontally set and/or be bonded as one.
Smear AB glue in the hook groove of described suspension member, the hardening time of the AB glue of employing is 0.8-1.5 hour, because AB adhesive curing speed is slow, does not affect stone material installation and rises after installing solidification and fill fixation.
The beneficial effect that the utility model adopts above-mentioned technical solution to reach is:
Grid system is directly fixed on metope, concrete structure or steelframe by the dry-hanging method that 1, the utility model adopts, and suspension member and drawing of stone material dial Force meansurement value all at more than 3KN, higher than national standard requirement, reach shock resistance requirement completely, application life is longer.
3, wall dry-hanging method of the present utility model have employed modularization composite structure, and intermodule has certain thermal deformation space, the relative freedom and flexibility of size, and dilatancy space is not limited, not easily cracks, unrestricted to the size of sheet material.
4, the fine adjustment screw of the suspension member of the utility model employing can carry out up-down adjustment, and suspension member can carry out the adjustment that horizontally slips on hook bearing; The movable corner connectors of hook bearing and the combined connecting structure of fixed corner code, movable corner connectors can regulate and be tightened by bolts in front and back, fixed corner code can regulate along its axial direction on keel bracket bar, and locked by hex bolts and spring nut, form the dried hanging hang structure of three-dimensional regulation, installation and maintenance are convenient, efficient, a set of wall only needs the time of 1.5-2 days, compared with prior art, substantially reduces the engineering time.
5, installation cost is low, good stability, according to statistics, often overlaps wall and can save installation cost nearly 1,000 yuan.
5, good decorating effect, the dried hanging hang structure that the utility model adopts has carried out block combiner to wall entirety in advance, and splicing seams is few, and whole structure is more attractive in appearance.
Accompanying drawing explanation
Fig. 1 is the structural representation of wall of the present utility model;
Fig. 2 is wall splicing construction schematic diagram of the present utility model;
Fig. 3 is keel bracket mounting structure schematic diagram of the present utility model;
Fig. 4 is building base course wall of the present utility model line network for location;
Fig. 5 is stone material erection sequence figure of the present utility model;
Fig. 6 is wall suspension member mounting structure schematic diagram of the present utility model;
Fig. 7 is the reinforcement structural representation of wall stone material assembly of the present utility model.
Description of reference numerals: 1, build base course wall or steelframe 2, grid system 3, wall module 3-1, stone decoration board 3-2, stone decoration frame 3-3, stiffener 4, suspension member 4-1, hook groove 5, hook bearing 5-1, support portion 5-2, fixed corner code 5-21, longitudinal part one 5-22, transverse part one 5-3, movable corner connectors 5-31, transverse part 26, fine adjustment screw.
Detailed description of the invention
Below in conjunction with specific embodiment, the technical program is explained in detail.
As shown in Figure 6, the utility model is a kind of dry hanging article mounting structure of wall, it is included in grid system 2, the suspension member 4 being arranged on wall module 3 back side, the hook bearing 5 be arranged in grid system that building base course wall or steelframe 1 are set up, suspension member 4 coordinates with hook bearing 5 hook, and wall module is affiliated in grid system piece by piece by installation requirement order.Grid system 2 comprises the some keel bracket bars stood to arranging.It should be noted that described keel bracket bar except standing to except arranging, also can horizontally set, but, considering from the efficiency of installing and integrally-built stability, adopting the form stood to arranging more suitable.Keel bracket bar is U-shaped material or C-type steel, and what the present embodiment adopted is C-type steel, and the notch of C-type steel builds base course wall or steelframe dorsad, is conducive to the cladding installation of wall module.
Suspension member 4 adopts back of the body bolt suspension member.The end of suspension member 4 is provided with the hook groove 4-1 that Open Side Down, and hook bearing 5 is provided with the support portion 5-1 corresponding with hook groove, and support portion is inserted in hook groove, enables suspension member along left and right, the top transverse shifting of support portion.The top of support portion is stood to being provided with fine adjustment screw 6, one end of this fine adjustment screw enters from the top of hook groove, pushing up press-fit through after hook groove with the top of the support portion of hook bearing, the fine setting in the vertical direction of wall module can be realized by regulating fine adjustment screw.Hook bearing 5 comprises the fixed corner code 5-2 be arranged on keel bracket bar 2-1 and the movable corner connectors 5-3 be movably arranged on fixed corner code, longitudinal part one 5-21 of fixed corner code 5-2 is close to keel bracket bar, and transverse part one 5-22 stretches out and arrange slotted eye one on transverse part one; Transverse part two 5-31 of movable corner connectors 5-3 is close to transverse part one 5-22 of fixed corner code, and it is corresponding with slotted eye one to arrange slotted eye two on transverse part two, slotted eye two and slotted eye one are provided with securing member movable corner connectors and fixed corner code are connected and fixed, by regulating the lap position of two slotted eyes, realize the adjustment of the distance between movable corner connectors and keel bracket; The longitudinal part two of movable corner connectors supports as the hook of suspension member the end standing on transverse part two.
Smear AB glue in the hook groove of suspension member, the hardening time of the AB glue of employing is 0.8-1.5 hour, because AB adhesive curing speed is slow, does not affect stone material installation and rises after installing solidification and fill fixation.
Further, described wall module 3 comprises the stone decoration board 3-1 and stone decoration frame 3-2 that form wall agent structure, the back side of stone decoration board is provided with the reinforcement supporting mechanism be made up of polylith stiffener 3-3, and suspension member is fixed on to be strengthened on supporting mechanism.As shown in Figure 7, the stiffener strengthened in supporting mechanism is set to latticed, and stiffener is adhered to the back side of stone decoration board, and the stiffener of the longitudinal direction that crosses of contacting with each other and horizontally set is bonded as one.It should be noted that except adopting stiffener structure, also can adopt the reinforcement structure that reinforcing rib or employing reinforcing rib and stiffener are used in combination.
It is below the construction method of described wall, it is by overall for wall bulk-breaking modularization, and grid system is set up on building base course wall, being installed to forming each bulk-breaking module of wall successively in grid system by cladding mode again, making the installation process of wall all without the need to being adhesively fixed process to wallboard by bonding agent.
It comprises following concrete installation steps:
A, building base course wall line location; Before this, also need to carry out following preparation:
A1, first will analyze working drawing: hold wall overall dimensions, concrete installation site, consider being connected of wall and both sides, receiving frontier juncture is; According to the splicing relation of plan view (as Fig. 1) and the clearly each board material splice position of sectional drawing, flush or flanging, shown in Fig. 2;
A2, analysis base course wall: if base course wall is common brick or cement wall, the safe pulling force of wall can be born, then select and directly keel bracket bar is installed fastening by position shown in working drawing;
If base course wall insufficient strength, as shown in Figure 3, then must take to install abutment sleeve or fixed head 1-3 additional at keel bracket bar two, connect with ground 1-1 and smallpox concrete 1-2, thus guaranteed strength requirement;
If wall installation site is installed without metope or non-metope of being close to, manufacture corresponding steelframe according to field condition, the U-shaped material of wall is fixed on steelframe;
In building base course wall line position fixing process, the horizon determined when being and doing smallpox according to carpenter, eject the location lines 1-4 of keel bracket with infrared ray gradienter, ink fountain at base course wall, make wall outter frame shelf line 1-5 and wall base level line 1-6, as shown in Figure 4; The single size of repetition measurement is carried out and overall dimensions has zero deflection after having played U-shaped material network for location and wall frame diagram; Wherein, the repetition measurement of overall dimensions is generally carry out repetition measurement size by diagonally opposing corner bracing wire to have zero deflection, and adjusts accordingly;
B, installation grid system, the line according to base course wall is located, and is fixed on base course wall by keel bracket bar; To guarantee during installation that keel bracket bar is perpendicular to the ground, check in front and side with ultrared projectoscope, if metope out-of-flatness shimming corrects;
C, hook bearing is set on described keel bracket bar, at each bulk-breaking module backside mounting suspension member of wall; Wherein, hook bearing in a pre-installation, according to suspension member setting height(from bottom), ejects installation reference line (often arranging suspension member overhead height reference line) with ink fountain, is then fixed on keel bracket bar by the hook bearing of some and suspension member on U-shaped material;
D, stone material are installed, as shown in Figure 5, layout is divided according to wall entirety, install each bulk-breaking stone material successively, the suspension member of each bulk-breaking stone material coordinates with corresponding corner brace component hook, and carries out top to bottom, left and right, front and rear fine setting, reach best and effect is installed, wherein, up-down adjustment regulates fine adjustment screw, and left and right adjusting on hook bearing, carries out the realization that horizontally slips by suspension member; Front and back adjustment is regulated by the front and back of the movable corner connectors of hook bearing and the link position of fixed corner code; The wall back side is 115mm with the normal pitch of building base course wall, and owing to affecting by factors such as degree of plainness for wall surface, sheet material thickness deviation, machining deviations, it is ± 10mm that regulated quantity is reserved in front and back;
Initial workpiece stone material install time, must check correct its tram, other modules then with its position for benchmark carries out assembled, prevent wall overall dimensions from exceeding default installation site;
For heavier wall module, be adsorbed on wall Modular surface by hand pump sucker or glass holder, then with carrying and installation; Occur when installation that difference of height or height gap can be done by the stainless steel trimming bolt at suspension member top to finely tune up and down;
Then carry out leveling with adjustable sucking disc if there is the out-of-flatness of sheet material front, be fixed in two boards material intersection adhesive back after leveling;
One block of stone material is often installed in installation process and need detects its verticality with infrared ray gradienter from front and side, prevent overall dimensions to be out of shape and cause excessive and some modules of splicing seams to install;
E, joint filling process, after wall installs, first clean out the dust impurity in the gap between each wall module, then carry out joint filling with gap-filling glue; Further, after cleaning out the dust impurity in crack, paste U.S. line paper in case gap-filling glue pollutes stone surface at sheet edge, then carry out joint filling according to the gap-filling glue of the model adapted same hue of sheet material, after playing glue, require that glue-line is smooth straight.
When described keel bracket bar is installed, degree control, in ± 3mm, adjusts by square pad.Single wall module carries on the back bolt nodes and is no less than 4, and module load-bearing and distortion preventing requirement must be met; When single wall module back of the body bolt nodes is less than 4, sticky backboard must be added at adjacent two module backs, make the total nodes of two modules be greater than more than 4.
Compared with prior art, its wall material back of the body bolt drawing value is up to state standards requirement the wall dry hanging article mounting structure of the technical program; C-type steel keel installation matrix strength meets wall load-bearing requirements, and when matrix strength can not meet requirement of strength, installs firm banking additional at C-type steel upper and lower side or build load-bearing steelframe, Stability Analysis of Structures.
The mounting technique of the comprehensive pottery of the technical program, stone material, photovoltaic industry, photovoltaic bracket and the module that back of the body bolt technology is applied to wall are installed, solves some defects that conventional mounting mode exists, have the following advantages:
1. simple installation, three-dimensional dimension is adjustable.
2. the construction period is short, and efficiency of construction is high.
3. safety is high, can not produce sagging phenomenon.
4. installation cost is lower than traditional approach.
Above-described is only preferred embodiment of the present utility model; it should be pointed out that for the person of ordinary skill of the art, under the prerequisite not departing from the utility model creation design; can also make some distortion and improvement, these all belong to protection domain of the present utility model.

Claims (9)

1. the dry hanging article mounting structure of a wall, it is characterized in that, it is included in grid system, the suspension member being arranged on wall module backside, the hook bearing be arranged in grid system that building base course wall or steelframe are set up, and suspension member coordinates with hook bearing hook.
2. the dry hanging article mounting structure of wall according to claim 1, is characterized in that, described grid system comprise some stand to and/or the keel bracket bar of horizontally set.
3. the dry hanging article mounting structure of wall according to claim 1, is characterized in that, described keel bracket bar is U-shaped material or C-type steel, and the notch of U-shaped material or C-type steel builds base course wall or steelframe dorsad.
4. the dry hanging article mounting structure of wall according to claim 1, is characterized in that, described suspension member adopts back of the body bolt suspension member.
5. the dry hanging article mounting structure of wall according to claim 1, it is characterized in that, the end of described suspension member is provided with the hook groove that Open Side Down, hook bearing settlement has the support portion corresponding with hook groove, support portion is inserted in hook groove, the top of support portion is stood to being provided with fine adjustment screw, and one end of this fine adjustment screw enters from the top of hook groove, pushes up press-fit through after hook groove with the top of the support portion of hook bearing.
6. the dry hanging article mounting structure of wall according to claim 1, it is characterized in that, described hook bearing comprises the fixed corner code be arranged on keel bracket bar and the movable corner connectors be movably arranged on fixed corner code, the longitudinal part one of fixed corner code is close to keel bracket bar, and transverse part one stretches out and arrange slotted eye one on transverse part one; The transverse part two of movable corner connectors is close to the transverse part one of fixed corner code, and it is corresponding with slotted eye one to arrange slotted eye two on transverse part two, slotted eye two and slotted eye one are provided with securing member movable corner connectors and fixed corner code are connected and fixed, by regulating the lap position of two slotted eyes, realize the adjustment of the distance between movable corner connectors and keel bracket bar;
The longitudinal part two of movable corner connectors supports as the hook of suspension member the end standing on transverse part two.
7. the dry hanging article mounting structure of wall according to claim 1, it is characterized in that, described wall module comprises the stone decoration board and stone decoration frame that form wall agent structure, the back side of stone decoration board is provided with the reinforcement supporting mechanism be made up of stiffener and/or reinforcing rib, and suspension member is fixed on to be strengthened on supporting mechanism.
8. the dry hanging article mounting structure of wall according to claim 7, it is characterized in that, stiffener in described reinforcement supporting mechanism and/or reinforcing rib are set to latticed, stiffener and/or be adhered to the back side of stone decoration board, the stiffener of the longitudinal direction that crosses of contacting with each other and horizontally set and/or be bonded as one.
9. the dry hanging article mounting structure of wall according to claim 5, is characterized in that, smears AB glue in the hook groove of described suspension member, and the hardening time of the AB glue of employing is 0.8-1.5 hour.
CN201520909871.5U 2015-11-13 2015-11-13 Dry pendant mounting structure of wall Active CN205077805U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520909871.5U CN205077805U (en) 2015-11-13 2015-11-13 Dry pendant mounting structure of wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520909871.5U CN205077805U (en) 2015-11-13 2015-11-13 Dry pendant mounting structure of wall

Publications (1)

Publication Number Publication Date
CN205077805U true CN205077805U (en) 2016-03-09

Family

ID=55430219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520909871.5U Active CN205077805U (en) 2015-11-13 2015-11-13 Dry pendant mounting structure of wall

Country Status (1)

Country Link
CN (1) CN205077805U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374287A (en) * 2019-07-16 2019-10-25 江苏金蟾装饰工程有限公司 A kind of wall brick cladding mounting structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374287A (en) * 2019-07-16 2019-10-25 江苏金蟾装饰工程有限公司 A kind of wall brick cladding mounting structure

Similar Documents

Publication Publication Date Title
CN104929297B (en) A kind of decoration panel installation of ceiling technique
CN102947519A (en) Variable fastener for fixing curtain wall
CN203308046U (en) Thermal insulation decorative plate hanging buckle assembly
CN201801987U (en) High aseismic combination stone curtain wall with replaceable aluminium suspension member
CN202401616U (en) Stone pendant
CN110029761A (en) A kind of curtain wall Fast Installation attachment device and its construction method
CN205077805U (en) Dry pendant mounting structure of wall
CN205444780U (en) General system of hanging futilely of wall of interchangeable surface course material
CN107740553B (en) Hard plate material mounts construction method
CN207003902U (en) A kind of decorative panel suspension member and Side fascia
CN105256969A (en) Installation method and structure of background wall
CN207988285U (en) Stone curtain wall installation hanging device
CN205025027U (en) Wallboard of getting ready
CN201273044Y (en) Independently detachable installation apparatus for architectural decoration plate
CN205077800U (en) Mounting structure of wall
CN208456020U (en) A kind of wallboard installing structure convenient for assembly
CN215166987U (en) Short-slot type stone pendant structure
CN211499622U (en) Ground overhead device
CN205444782U (en) Install pendant structure of wall ceramic tile fast
CN210947276U (en) Partition wall ground of assembled light gauge steel mounting structure of making level
CN208396210U (en) A kind of installation node of connection component and cladding panel
CN207177177U (en) Wood veneer cladding system
CN208533939U (en) A kind of pavement system
CN110748119A (en) Ground overhead device and construction method thereof
CN105256966A (en) Background wall and graph splicing method and structure thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 517583 Guangdong Xian Heyuan Dongyuan Xian Tang Town Industrial Park (Guangdong high micro crystal technology Co., Ltd. factory building)

Patentee after: WANFENG COMPOUND STONE TECHNOLOGY CO., LTD.

Address before: 528300 Wan Feng, stone road, three Road revitalization Road, Shunde District, Foshan, Guangdong, 15, China.

Patentee before: WANFENG COMPOUND STONE TECHNOLOGY CO., LTD.

CP02 Change in the address of a patent holder