CN105256969A - Installation method and structure of background wall - Google Patents
Installation method and structure of background wall Download PDFInfo
- Publication number
- CN105256969A CN105256969A CN201510782649.8A CN201510782649A CN105256969A CN 105256969 A CN105256969 A CN 105256969A CN 201510782649 A CN201510782649 A CN 201510782649A CN 105256969 A CN105256969 A CN 105256969A
- Authority
- CN
- China
- Prior art keywords
- wall
- stone material
- keel bracket
- stone
- suspension member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The invention discloses an installation method and structure of a background wall. The installation method is characterized in that the integral background wall is partitioned to be modularized, a framework support is built on a base wall body of a building, and then partitioned stones forming the background wall are sequentially installed on the framework support in a dry hanging mode, so that bonding fixation treatment is performed on the stone wall plates without needing a bonding agent in the background wall installation process. According to installation method and structure of the background wall, the background wall can be quickly, safely and economically installed on the wall surface of the building to achieve a better decorative effect.
Description
Technical field
The present invention relates to building decoration technology field, relate to a kind of mounting method and mounting structure of wall more specifically.
Background technology
At present, by the wall of stone laying, be applied to the Household fit-up and decoration of family's living-room TV wall, sofa wall, entry, bedroom wall etc. gradually, also can be applied to the fitting-up of the public places of entertainment such as hotel, restaurant, KTV, night club, can also be applied in the wall decoration of the sound-absorbing sound isolation requirement specialties such as the performing art Room, cinema, opera house, audiovisual studio, studio hall, recording room.Wall is with the design of its novelty, and advanced technique, not only meets the needs of customer's decorations, more embodies the makings of art, makes product become business and artistic perfect adaptation.In stone material wall conventional machining process, one width wall is pasted on metope by numerous dull and stereotyped on-site consolidation of stone material processed by certain size to form, and due to the restriction of construction condition, often occurs that seam is too much, engineering time is long, the problem that construction cost is higher.
Summary of the invention
Object of the present invention is exactly deficiency in order to solve prior art and the one provided not only operates easy to adjust, can be wall is quick, safe, economical be installed on building wall, play the mounting method of the wall of better decorative effect.
It is simple that another object of the present invention is to provide a kind of structure, installs the mounting structure of wall easy to adjust.
The present invention adopts following technical solution to realize above-mentioned purpose: a kind of mounting method of wall, it is characterized in that, it is by overall for wall bulk-breaking modularization, and keel bracket is set up on building base course wall, being installed to forming each bulk-breaking stone material of wall successively on keel bracket by cladding mode again, making the installation process of wall all without the need to being adhesively fixed process to stone material wallboard by bonding agent.
Further illustrating as such scheme, it comprises following concrete installation steps:
A, building base course wall line location;
B, installation keel bracket, the line according to base course wall is located, and is fixed on by keel bracket on base course wall;
C, corner brace component is set on described keel bracket, at each bulk-breaking back face of stone mounting suspension member of wall;
D, stone material are installed, and divide layout according to wall entirety, install each bulk-breaking stone material successively, the suspension member of each bulk-breaking stone material coordinates with corresponding corner brace component hook;
E, joint filling process, after wall installs, first clean out the dust impurity in the gap between each bulk-breaking stone material, then carry out joint filling with gap-filling glue.
Further, in described step a process, the horizon determined when being and doing smallpox according to carpenter, ejects the location lines of keel bracket, makes wall outter frame shelf figure and wall base level line at base course wall with infrared ray gradienter, ink fountain; After having played location lines and wall outside framework figure, carrying out repetition measurement size by diagonally opposing corner bracing wire has had zero deflection, and adjusts accordingly.
The design scheme considering that the material selection of base course wall is suitable is needed before the installation keel bracket of described step b:
When base course wall can bear the safe pulling force of wall, then select directly keel bracket is installed fastening;
When base course wall insufficient strength, then take to install abutment sleeve or fixed head additional at keel bracket two ends, connect with ground and smallpox concrete, thus guaranteed strength requirement;
When the wall installation site of base course wall is installed without metope or non-metope of being close to, make corresponding steelframe according to field condition, the keel bracket of wall is fixed on steelframe.
Must guarantee that U-shaped material is perpendicular to the ground when described installation keel bracket, check in front and side with ultrared projectoscope, if metope out-of-flatness can correct by shimming.
Before the installation stone material of described steps d, in the hook groove of suspension member, smear AB glue, the hardening time of the AB glue of employing is 0.8-1.5 hour, because AB adhesive curing speed is slow, does not affect stone material installation and rises after installing solidification and fill fixation.
In the installation stone material process of described steps d, initial workpiece stone material install time, must check correct its tram, other bulk-breaking stone materials then with its position for benchmark carries out assembled, prevent wall overall dimensions from exceeding default installation site; For heavier bulk-breaking stone material, be adsorbed on stone surface by hand pump sucker or glass holder, then with carrying and installation.
In the installation stone material process of described steps d, when difference of height or height gap appear in the splicing of bulk-breaking stone material, done by the trimming bolt adjusting suspension member top and finely tune up and down; When occurring that the out-of-flatness of sheet material front then carries out leveling with adjustable sucking disc, be fixed in two boards material intersection adhesive back after leveling.
A kind of mounting structure of wall, it is characterized in that, it is included in keel bracket, polylith stone material assembly in bulk-breaking modularized design that building base course wall is set up, polylith stone material assembly to be fixed on keel bracket in cladding mode and split to be a wall overall.
Described keel bracket comprise some stand to and/or the U-shaped material of horizontally set, the notch of U-shaped material builds base course wall dorsad.
The back side of described stone material assembly is fixed with suspension member, keel bracket is provided with the hook bearing coordinated with suspension member hook.
Described suspension member adopts ear type suspension member, the end of ear type suspension member is provided with the hook groove that Open Side Down, hook bearing settlement has the support portion corresponding with hook groove, support portion is inserted in hook groove, the top of support portion is stood to being provided with fine adjustment screw, one end of this fine adjustment screw enters from the top of hook groove, pushes up press-fit through after hook groove with the top of the support portion of hook bearing, can realize the fine setting in the vertical direction of stone material assembly by regulating fine adjustment screw.
Described hook bearing comprises the fixed corner code be arranged on keel bracket and the movable corner connectors be movably arranged on fixed corner code, and the longitudinal part one of fixed corner code is close to keel bracket, and transverse part one stretches out and arrange slotted eye one on transverse part one; The transverse part two of movable corner connectors is close to the transverse part one of fixed corner code, and it is corresponding with slotted eye one to arrange slotted eye two on transverse part two, slotted eye two and slotted eye one are provided with securing member movable corner connectors and fixed corner code are connected and fixed, by regulating the lap position of two slotted eyes, realize the adjustment of the distance between movable corner connectors and keel bracket;
The longitudinal part two of movable corner connectors supports as the hook of suspension member the end standing on transverse part two.
The described stone material assembly in bulk-breaking modularized design comprises the stone decoration board and stone decoration frame that form wall agent structure, the back side of stone decoration board is provided with the reinforcement supporting mechanism be made up of stiffener and/or reinforcing rib, and suspension member is fixed on to be strengthened on supporting mechanism.
Stiffener in described reinforcement supporting mechanism and/or reinforcing rib are set to latticed, stiffener and/or be adhered to the back side of stone decoration board, the stiffener of the longitudinal direction that crosses of contacting with each other and horizontally set and/or be bonded as one.
The beneficial effect that the present invention adopts above-mentioned technical solution to reach is:
1, the mounting structure of wall that adopts of the present invention, by by after overall for wall bulk-breaking modularization, then by special hardware hanging part and grid system, wall is quick, safe, economical is installed on building wall, plays better decorative effect.
2, the present invention adopts dry-hanging method to install time that a set of wall only needs 1.5-2 days, compared with prior art, substantially reduces the engineering time.
3, wall dry-hanging method of the present invention have employed modularization composite structure, and intermodule has certain thermal deformation space, the relative freedom and flexibility of size, and dilatancy space is not limited, not easily cracks, unrestricted to the size of sheet material.
Keel bracket is directly fixed on metope and concrete structure by the dry-hanging method that 4, the present invention adopts, and suspension member and drawing of stone material dial Force meansurement value all at more than 3KN, and higher than national standard requirement, reach shock resistance requirement completely, application life is longer.
5, moisture protection is strong, in the city that some plum rain seasons of south are longer, does not also affect by this.
6, installation cost is low, according to statistics, often overlaps wall and can save installation cost nearly 1,000 yuan.
7, good decorating effect, the dry-hanging method that the present invention adopts has carried out block combiner to wall entirety in advance, and splicing seams is few, and whole structure is more attractive in appearance.
Accompanying drawing explanation
Fig. 1 is the structural representation of wall of the present invention;
Fig. 2 is wall splicing construction schematic diagram of the present invention;
Fig. 3 is keel bracket mounting structure schematic diagram of the present invention;
Fig. 4 is building base course wall of the present invention line network for location;
Fig. 5 is stone material erection sequence figure of the present invention;
Fig. 6 is wall suspension member mounting structure schematic diagram of the present invention;
Fig. 7 is the reinforcement structural representation of wall stone material assembly of the present invention.
Description of reference numerals: 1, building base course wall 1-1, ground 1-2, smallpox concrete 1-3, abutment sleeve or fixed head 1-4, location lines 1-5, wall outter frame shelf line 1-6, wall base level line 2, keel bracket 3, stone material assembly 3-1, stone decoration board 3-2, stone decoration frame 3-3, stiffener 4, suspension member 4-1, hook groove 5, hook bearing 5-1, support portion 5-2, fixed corner code 5-21, longitudinal part one 5-22, transverse part one 5-3, movable corner connectors 5-31, transverse part 26, fine adjustment screw.
Detailed description of the invention
Below in conjunction with specific embodiment, the technical program is explained in detail.
The present invention is a kind of mounting method of wall, it is by overall for wall bulk-breaking modularization, and keel bracket is set up on building base course wall, being installed to forming each bulk-breaking stone material of wall successively on keel bracket by cladding mode again, making the installation process of wall all without the need to being adhesively fixed process to stone material wallboard by bonding agent.
It comprises following concrete installation steps:
A, building base course wall line location; Before this, also need to carry out following preparation:
A1, first will analyze working drawing: hold wall overall dimensions, concrete installation site, consider being connected of wall and both sides, receiving frontier juncture is; According to the splicing relation of plan view (as Fig. 1) and the clearly each board material splice position of sectional drawing, flush or flanging, shown in Fig. 2;
A2, analysis base course wall: if base course wall is common brick or cement wall, the safe pulling force of wall can be born, then select and directly U-shaped material is installed fastening by position shown in working drawing;
If base course wall insufficient strength, as shown in Figure 3, then must take to install abutment sleeve or fixed head 1-3 additional at U-shaped material two, connect with ground 1-1 and smallpox concrete 1-2, thus guaranteed strength requirement;
If wall installation site is installed without metope or non-metope of being close to, manufacture corresponding steelframe according to field condition, the U-shaped material of wall is fixed on steelframe;
In building base course wall line position fixing process, the horizon determined when being and doing smallpox according to carpenter, eject the location lines 1-4 of keel bracket with infrared ray gradienter, ink fountain at base course wall, make wall outter frame shelf line 1-5 and wall base level line 1-6, as shown in Figure 4; The single size of repetition measurement is carried out and overall dimensions has zero deflection after having played U-shaped material network for location and wall frame diagram; Wherein, the repetition measurement of overall dimensions is generally carry out repetition measurement size by diagonally opposing corner bracing wire to have zero deflection, and adjusts accordingly;
B, installation keel bracket, the line according to base course wall is located, and is fixed on by keel bracket on base course wall; To guarantee during installation that U-shaped material is perpendicular to the ground, check in front and side with ultrared projectoscope, if metope out-of-flatness shimming corrects;
C, corner brace component is set on described keel bracket, at each bulk-breaking back face of stone mounting suspension member of wall; Wherein, corner brace component in a pre-installation, according to suspension member setting height(from bottom), ejects installation reference line (often arranging suspension member overhead height reference line) with ink fountain, is then fixed on U-shaped material by the corner brace component of some and suspension member on U-shaped material;
D, stone material are installed, and as shown in Figure 5, divide layout according to wall entirety, install each bulk-breaking stone material successively, the suspension member of each bulk-breaking stone material coordinates with corresponding corner brace component hook; Wherein, the wall back side is 115mm with the normal pitch of building base course wall, and owing to affecting by factors such as degree of plainness for wall surface, sheet material thickness deviation, machining deviations, it is ± 10mm that regulated quantity is reserved in front and back;
Determine stone material datum clamp face: whether be arranged in unified plane or on parallel surface for convenience of detection background wall front, with ink fountain at distance wall outermost facade 90-120mm place bullet one straight line, line of reference when wall is installed as a setting, whether consistent to the distance of reference line to every block sheet material tape measure two ends during installation, prevent mounted wall facing from becoming distorted shape, affect attractive in appearance;
After the good line of bullet, just can stone material block-by-block be suspended on U-shaped material suspension member by suspension member, when stone material is installed, order must install according to the installation drawing of its construction, otherwise comparatively large and some modules of installation deviation can be caused to inlay;
Initial workpiece stone material install time, must check correct its tram, other modules then with its position for benchmark carries out assembled, prevent wall overall dimensions from exceeding default installation site;
For heavier stone material assembly, be adsorbed on stone surface by hand pump sucker or glass holder, then with carrying and installation; Occur when installation that difference of height or height gap can be done by the stainless steel trimming bolt at suspension member top to finely tune up and down;
Then carry out leveling with adjustable sucking disc if there is the out-of-flatness of sheet material front, be fixed in two boards material intersection adhesive back after leveling;
One block of stone material is often installed in installation process and need detects its verticality with infrared ray gradienter from front and side, prevent overall dimensions to be out of shape and cause excessive and some modules of splicing seams to install;
E, joint filling process, after wall installs, first clean out the dust impurity in the gap between each bulk-breaking stone material, then carry out joint filling with gap-filling glue; Further, after cleaning out the dust impurity in crack, paste U.S. line paper in case gap-filling glue pollutes stone surface at sheet edge, then carry out joint filling according to the gap-filling glue of the model adapted same hue of sheet material, after playing glue, require that glue-line is smooth straight.
Further, before the installation stone material of described steps d, in the hook groove of suspension member, smear AB glue, the hardening time of the AB glue of employing is 1 hour, because AB adhesive curing speed is slow, does not affect stone material installation and rises after installing solidification and fill fixation.
As shown in figs 1 to 6, below the wall mounting structure corresponding with the mounting method of described wall, it is included in keel bracket 2, polylith stone material assembly 3 in bulk-breaking modularized design that building base course wall 1 is set up, polylith stone material assembly to be fixed on keel bracket in cladding mode and split to be a wall overall.Keel bracket 2 comprises the many U-shaped materials stood to arranging, and the notch of U-shaped material builds base course wall dorsad.It should be noted that described U-shaped material except standing to except arranging, also can horizontally set, but consider from the efficiency of installing and integrally-built stability, U-shaped material adopts the form stood to arranging more suitable.
The back side of described stone material assembly is fixed with suspension member 4, keel bracket 2 is provided with the hook bearing 5 coordinated with suspension member hook.In the present embodiment, suspension member 4 adopts ear type suspension member, the end of ear type suspension member is provided with the hook groove 4-1 that Open Side Down, hook bearing 5 is provided with the support portion 5-1 corresponding with hook groove, support portion is inserted in hook groove, and the top of support portion is stood to being provided with fine adjustment screw 6, and one end of this fine adjustment screw enters from the top of hook groove, pushing up press-fit through after hook groove with the top of the support portion of hook bearing, the fine setting in the vertical direction of stone material assembly can be realized by regulating fine adjustment screw.
Further, described hook bearing 5 comprises the fixed corner code 5-2 be arranged on keel bracket and the movable corner connectors 5-3 be movably arranged on fixed corner code, longitudinal part one 5-21 of fixed corner code 5-2 is close to keel bracket, and transverse part one 5-22 stretches out and arrange slotted eye one on transverse part one; Transverse part two 5-31 of movable corner connectors 5-3 is close to transverse part one 5-22 of fixed corner code, and it is corresponding with slotted eye one to arrange slotted eye two on transverse part two, slotted eye two and slotted eye one are provided with securing member movable corner connectors and fixed corner code are connected and fixed, by regulating the lap position of two slotted eyes, realize the adjustment of the distance between movable corner connectors and keel bracket; The longitudinal part two of movable corner connectors supports as the hook of suspension member the end standing on transverse part two.
The described stone material assembly 3 in bulk-breaking modularized design comprises the stone decoration board 3-1 and stone decoration frame 3-2 that form wall agent structure.As shown in Figure 7, the back side of stone decoration board is provided with the reinforcement supporting mechanism be made up of stiffener 3-3, and suspension member is fixed on to be strengthened on supporting mechanism.It should be noted that except adopting stiffener structure, also can adopt the reinforcement structure that reinforcing rib or employing reinforcing rib and stiffener are used in combination.In the present embodiment, the stiffener strengthened in supporting mechanism is set to latticed, and stiffener is adhered to the back side of stone decoration board, and the stiffener of the longitudinal direction that crosses of contacting with each other and horizontally set is bonded as one.
Compared with prior art, it is maximum is distinguished as the technical program:
1, the engineering time
Dry-hanging method installs the time that a set of wall only needs 1.5-2 days, and gluing must carry out carpenter's base plate according to the moulding scene of wall in advance, and then paste piece by piece, to the making of carpenter's base plate and construction requirement high, installing a set of wall used time must more than 3-5 day.
2, plate face size
Wall dry-hanging method have employed modularization composite structure, and intermodule has certain thermal deformation space, the relative freedom and flexibility of size, and gluing pastes the dilatancy limited space of rear stone material, easily cracks, therefore will do certain restriction to the size of sheet material.
3, shock resistance
Keel steelframe is directly fixed on metope and concrete structure by dry-hanging method, and suspension member and drawing of stone material dial Force meansurement value all at more than 3KN, higher than national standard requirement, reach shock resistance requirement completely, and suspension member uses galvanized steel suspension member and stainless steel part, application life is longer, not perishable.What gluing adopted is chemical analysis bonding adhesive, and affected by environment, easy ageing failure, weather resisteant is wayward, generally at 5-10, there is larger potential safety hazard.
4, moisture protection
After carpenter's base plate makes moist, easy layering departs from, and particularly in the city that some plum rain seasons of south are longer, risk is comparatively large, and dry hanging article does not affect by this.
5, installation cost
Because gluing will do carpenter's base plate in advance, comprehensive every material, the factor such as artificial, dry-hanging method has more certain advantage, often overlaps wall and can save installation cost nearly 1,000 yuan.
6, decorative effect
Dry-hanging method has carried out block combiner to wall entirety in advance, and splicing seams is few, and whole structure is more attractive in appearance, and gluing part is many, piece is many, and splicing seams affects by factors such as carpenter's bottom deformation, installation levels, difficult quality controls, and affects wall Integral decoration effect.
7, repeated removal is installed and used
Wall adopts dry-hanging method to install, and can realize secondary dismounting, repeat to install and use, and gluing can not secondary dismounting.
Above-described is only the preferred embodiment of the present invention, it should be pointed out that for the person of ordinary skill of the art, and without departing from the concept of the premise of the invention, can also make some distortion and improvement, these all belong to protection scope of the present invention.
Claims (15)
1. the mounting method of a wall, it is characterized in that, it is by overall for wall bulk-breaking modularization, and keel bracket is set up on building base course wall, being installed to forming each bulk-breaking stone material of wall successively on keel bracket by cladding mode again, making the installation process of wall all without the need to being adhesively fixed process to stone material wallboard by bonding agent.
2. the mounting method of wall according to claim 1, is characterized in that, it comprises following concrete installation steps:
A, building base course wall line location;
B, installation keel bracket, the line according to base course wall is located, and is fixed on by keel bracket on base course wall;
C, corner brace component is set on described keel bracket, at each bulk-breaking back face of stone mounting suspension member of wall;
D, stone material are installed, and divide layout according to wall entirety, install each bulk-breaking stone material successively, the suspension member of each bulk-breaking stone material coordinates with corresponding corner brace component hook;
E, joint filling process, after wall installs, first clean out the dust impurity in the gap between each bulk-breaking stone material, then carry out joint filling with gap-filling glue.
3. the mounting method of wall according to claim 2, it is characterized in that, in described step a process, the horizon determined when being and doing smallpox according to carpenter, eject the location lines of keel bracket with infrared ray gradienter, ink fountain at base course wall, make wall outter frame shelf figure and wall base level line; After having played location lines and wall outside framework figure, carrying out repetition measurement size by diagonally opposing corner bracing wire has had zero deflection, and adjusts accordingly.
4. the mounting method of wall according to claim 2, is characterized in that, needs the design scheme considering that the material selection of base course wall is suitable before the installation keel bracket of described step b:
When base course wall can bear the safe pulling force of wall, then select directly keel bracket is installed fastening;
When base course wall insufficient strength, then take to install abutment sleeve or fixed head additional at keel bracket two ends, connect with ground and smallpox concrete, thus guaranteed strength requirement;
When the wall installation site of base course wall is installed without metope or non-metope of being close to, make corresponding steelframe according to field condition, the keel bracket of wall is fixed on steelframe.
5. the mounting method of wall according to claim 2, is characterized in that, must guarantee that U-shaped material is perpendicular to the ground when described installation keel bracket, checks in front and side with ultrared projectoscope, if metope out-of-flatness can correct by shimming.
6. the mounting method of wall according to claim 2, is characterized in that, before the installation stone material of described steps d, in the hook groove of suspension member, smears AB glue, and the hardening time of the AB glue of employing is 0.8-1.5 hour.
7. the mounting method of wall according to claim 2, it is characterized in that, in the installation stone material process of described steps d, when initial workpiece stone material is installed, must check and correct its tram, other bulk-breaking stone materials then with its position for benchmark carries out assembled, prevent wall overall dimensions from exceeding default installation site; For heavier bulk-breaking stone material, be adsorbed on stone surface by hand pump sucker or glass holder, then with carrying and installation.
8. the mounting method of wall according to claim 2, is characterized in that, in the installation stone material process of described steps d, when difference of height or height gap appear in the splicing of bulk-breaking stone material, is done finely tune up and down by the trimming bolt adjusting suspension member top; When occurring that the out-of-flatness of sheet material front then carries out leveling with adjustable sucking disc, be fixed in two boards material intersection adhesive back after leveling.
9. the mounting structure of a wall corresponding with the mounting method of the wall described in claim 1-8, it is characterized in that, it is included in keel bracket, polylith stone material assembly in bulk-breaking modularized design that building base course wall is set up, polylith stone material assembly to be fixed on keel bracket in cladding mode and split to be a wall overall.
10. the mounting structure of wall according to claim 9, is characterized in that, described keel bracket comprise some stand to and/or the U-shaped material of horizontally set, the notch of U-shaped material builds base course wall dorsad.
The mounting structure of 11. walls according to claim 9, is characterized in that, the back side of described stone material assembly is fixed with suspension member, keel bracket is provided with the hook bearing coordinated with suspension member hook.
The mounting structure of 12. walls according to claim 10, it is characterized in that, described suspension member adopts ear type suspension member, the end of ear type suspension member is provided with the hook groove that Open Side Down, hook bearing settlement has the support portion corresponding with hook groove, support portion is inserted in hook groove, the top of support portion is stood to being provided with fine adjustment screw, one end of this fine adjustment screw enters from the top of hook groove, pushing up press-fit through after hook groove with the top of the support portion of hook bearing, the fine setting in the vertical direction of stone material assembly can be realized by regulating fine adjustment screw.
The mounting structure of 13. walls according to claim 10, it is characterized in that, described hook bearing comprises the fixed corner code be arranged on keel bracket and the movable corner connectors be movably arranged on fixed corner code, the longitudinal part one of fixed corner code is close to keel bracket, and transverse part one stretches out and arrange slotted eye one on transverse part one; The transverse part two of movable corner connectors is close to the transverse part one of fixed corner code, and it is corresponding with slotted eye one to arrange slotted eye two on transverse part two, slotted eye two and slotted eye one are provided with securing member movable corner connectors and fixed corner code are connected and fixed, by regulating the lap position of two slotted eyes, realize the adjustment of the distance between movable corner connectors and keel bracket;
The longitudinal part two of movable corner connectors supports as the hook of suspension member the end standing on transverse part two.
The mounting structure of 14. walls according to claim 9, it is characterized in that, the described stone material assembly in bulk-breaking modularized design comprises the stone decoration board and stone decoration frame that form wall agent structure, the back side of stone decoration board is provided with the reinforcement supporting mechanism be made up of stiffener and/or reinforcing rib, and suspension member is fixed on to be strengthened on supporting mechanism.
The mounting structure of 15. walls according to claim 9, it is characterized in that, stiffener in described reinforcement supporting mechanism and/or reinforcing rib are set to latticed, stiffener and/or be adhered to the back side of stone decoration board, the stiffener of the longitudinal direction that crosses of contacting with each other and horizontally set and/or be bonded as one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510782649.8A CN105256969A (en) | 2015-11-13 | 2015-11-13 | Installation method and structure of background wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510782649.8A CN105256969A (en) | 2015-11-13 | 2015-11-13 | Installation method and structure of background wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105256969A true CN105256969A (en) | 2016-01-20 |
Family
ID=55096871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510782649.8A Pending CN105256969A (en) | 2015-11-13 | 2015-11-13 | Installation method and structure of background wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105256969A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532867A (en) * | 2018-03-16 | 2018-09-14 | 付晓东 | Heating type wall wall image furred ceiling |
CN112681652A (en) * | 2020-12-24 | 2021-04-20 | 宝丰大博瓷画文化创意有限公司 | Manufacturing method and application of eye-protecting ultrathin diamond-jade television background wall |
CN113463882A (en) * | 2021-07-23 | 2021-10-01 | 浙江亚厦装饰股份有限公司 | Background wall edge closing structure and mounting method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWM346635U (en) * | 2008-07-24 | 2008-12-11 | Sgm Stone Co Ltd | Hanging structure for installing stone on wall |
CN201531075U (en) * | 2009-11-13 | 2010-07-21 | 苏州金螳螂幕墙有限公司 | Fixed device used for Back-tied type stone curtain wall |
KR20100092829A (en) * | 2009-02-13 | 2010-08-23 | 이상훈 | Reinforced stone panel installation structure and the method of the same |
CN201738542U (en) * | 2010-08-13 | 2011-02-09 | 中国建筑西南设计研究院有限公司 | Back-bolt type stone dry hanging system |
CN203654645U (en) * | 2013-11-05 | 2014-06-18 | 浙江鼎美电器有限公司 | Integrated background wall |
CN203782933U (en) * | 2014-04-30 | 2014-08-20 | 重庆了然展览展示有限公司 | Module type background wall bedframe unit and background wall with bedframe unit |
CN205077800U (en) * | 2015-11-13 | 2016-03-09 | 万峰石材科技股份有限公司 | Mounting structure of wall |
-
2015
- 2015-11-13 CN CN201510782649.8A patent/CN105256969A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWM346635U (en) * | 2008-07-24 | 2008-12-11 | Sgm Stone Co Ltd | Hanging structure for installing stone on wall |
KR20100092829A (en) * | 2009-02-13 | 2010-08-23 | 이상훈 | Reinforced stone panel installation structure and the method of the same |
CN201531075U (en) * | 2009-11-13 | 2010-07-21 | 苏州金螳螂幕墙有限公司 | Fixed device used for Back-tied type stone curtain wall |
CN201738542U (en) * | 2010-08-13 | 2011-02-09 | 中国建筑西南设计研究院有限公司 | Back-bolt type stone dry hanging system |
CN203654645U (en) * | 2013-11-05 | 2014-06-18 | 浙江鼎美电器有限公司 | Integrated background wall |
CN203782933U (en) * | 2014-04-30 | 2014-08-20 | 重庆了然展览展示有限公司 | Module type background wall bedframe unit and background wall with bedframe unit |
CN205077800U (en) * | 2015-11-13 | 2016-03-09 | 万峰石材科技股份有限公司 | Mounting structure of wall |
Non-Patent Citations (1)
Title |
---|
《品鉴家装细部设计》编写组: "《品鉴家装细部设计》", 31 July 2014 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532867A (en) * | 2018-03-16 | 2018-09-14 | 付晓东 | Heating type wall wall image furred ceiling |
CN112681652A (en) * | 2020-12-24 | 2021-04-20 | 宝丰大博瓷画文化创意有限公司 | Manufacturing method and application of eye-protecting ultrathin diamond-jade television background wall |
CN113463882A (en) * | 2021-07-23 | 2021-10-01 | 浙江亚厦装饰股份有限公司 | Background wall edge closing structure and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104929297B (en) | A kind of decoration panel installation of ceiling technique | |
CN203308046U (en) | Thermal insulation decorative plate hanging buckle assembly | |
CN105256969A (en) | Installation method and structure of background wall | |
CN201801987U (en) | High aseismic combination stone curtain wall with replaceable aluminium suspension member | |
CN110029761A (en) | A kind of curtain wall Fast Installation attachment device and its construction method | |
CN202401616U (en) | Stone pendant | |
CN103243890A (en) | Hanging and buckling assembly of heat-insulating decorating plate and installation process of buckle assembly | |
CN205077805U (en) | Dry pendant mounting structure of wall | |
CN209509297U (en) | The assembled furred ceiling of decoration panel is plugged and fixed | |
CN205077800U (en) | Mounting structure of wall | |
CN102747820B (en) | Novel wall protection plate for decoration | |
CN203977777U (en) | A kind of small plate Combined stone curtain wall | |
CN109610774A (en) | Ground assembly and method for paving | |
CN204645463U (en) | Wood facing | |
CN205077634U (en) | Structure is handled to seam of wall | |
CN210947276U (en) | Partition wall ground of assembled light gauge steel mounting structure of making level | |
CN207177177U (en) | Wood veneer cladding system | |
CN202544302U (en) | Bearing piece for dry hanging exterior wall decoration plate | |
CN108252438B (en) | Curtain wall dry hanging structure and decoration construction method thereof | |
CN205894576U (en) | Slot -in type wall wood veneer's mounting structure | |
CN206145845U (en) | Outer quick -witted safety auxiliary device of air conditioner | |
CN220555864U (en) | Assembled furred ceiling of adaptable furred ceiling thickness receives limit piece | |
CN204753947U (en) | Corridor suspended ceiling system | |
CN215563656U (en) | Hang stone material curtain futilely | |
CN110241988A (en) | Assembled stair clad structure and installation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160120 |
|
RJ01 | Rejection of invention patent application after publication |