CN205444782U - Install pendant structure of wall ceramic tile fast - Google Patents

Install pendant structure of wall ceramic tile fast Download PDF

Info

Publication number
CN205444782U
CN205444782U CN201521093156.5U CN201521093156U CN205444782U CN 205444782 U CN205444782 U CN 205444782U CN 201521093156 U CN201521093156 U CN 201521093156U CN 205444782 U CN205444782 U CN 205444782U
Authority
CN
China
Prior art keywords
wall
pendant
keel
tripod
leveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201521093156.5U
Other languages
Chinese (zh)
Inventor
尤陈刚
周东珊
余广
万胜
黄慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201521093156.5U priority Critical patent/CN205444782U/en
Application granted granted Critical
Publication of CN205444782U publication Critical patent/CN205444782U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

一种快速安装墙面瓷砖的挂件结构,属于建筑装饰技术领域。它包括挂件、龙骨及两个三角架找平件,挂件内表面上设有开口向下的L型挂钩,龙骨上设有第一挂板及第二挂板,三角架找平件上设有条形槽,L型挂钩与第一挂板、第二挂板挂接连接,龙骨通过螺钉固定在其中一个三角架找平件的条形槽上,另一个三角架找平件固定在墙体上,两个三角架找平件固定连接,墙面瓷砖固定在挂件外表面。本实用新型通过在三角架找平件上设有条形槽,两个三角架找平件分别连接墙体与龙骨,根据实际需要,能调节该挂件结构相对墙体的竖直位置和水平位置,达到灵活调整目的,安装方便、结构稳定、功能性强,能快速该墙面瓷砖快速安装在墙体上,同时起装饰美观的作用。

A pendant structure for quickly installing wall tiles belongs to the technical field of architectural decoration. It includes a pendant, a keel and two tripod leveling pieces. The inner surface of the pendant is provided with an L-shaped hook with an opening downward. The keel is provided with a first hanging plate and a second hanging plate. The L-shaped hook is connected with the first hanging board and the second hanging board. The keel is fixed on the strip groove of one of the tripod leveling parts by screws, and the other tripod leveling part is fixed on the wall. Two The tripod leveling piece is fixedly connected, and the wall tiles are fixed on the outer surface of the pendant. The utility model is provided with strip grooves on the leveling parts of the tripod, and the two leveling parts of the tripod are respectively connected to the wall and the keel. According to actual needs, the vertical position and the horizontal position of the pendant structure relative to the wall can be adjusted to achieve Flexible adjustment purpose, convenient installation, stable structure, strong functionality, can quickly install the wall tiles on the wall, and at the same time play a decorative and beautiful role.

Description

一种快速安装墙面瓷砖的挂件结构A pendant structure for quickly installing wall tiles

技术领域 technical field

本实用新型属于建筑装饰技术领域,具体涉及一种将墙面瓷砖安装在墙体上的快速安装墙面瓷砖的挂件结构。 The utility model belongs to the technical field of architectural decoration, in particular to a pendant structure for quickly installing wall tiles on a wall body.

背景技术 Background technique

目前常规使用的安装墙面瓷砖的方法是通过金属挂件将墙面瓷砖直接吊挂于墙面或空挂于龙骨之上,不需再灌浆粘贴。其原理是在主体结构上设主要受力点,通过金属挂件将饰面板固定在建筑物上,形成装饰墙面。但目前使用的方法中需要对面板进行二次加工,破坏完整性;而且干挂构件太多,增加构件数量,多占用室内空间,同时加大了工程的施工难度,延长工程的施工周期。 The currently conventional method of installing wall tiles is to directly hang the wall tiles on the wall or hang them on the keel through metal pendants, without grouting and pasting. The principle is to set the main stress points on the main structure, and fix the veneer on the building through metal pendants to form a decorative wall. However, the currently used method requires secondary processing of the panel, which destroys the integrity; and there are too many dry-hanging components, which increases the number of components, takes up more indoor space, increases the difficulty of construction, and prolongs the construction period of the project.

市面上现有的铝合金干挂件虽然解决了上述部分缺陷,但其本身也有一定问题:本身结构有缺陷,支撑点不够,导致拼接咬合之后支撑力不足,容易松动;细凹槽和V字缝不对应,降低了经济效益,增加了工人施工难度。 Although the existing aluminum alloy dry hangers on the market solve some of the above defects, they also have certain problems: their own structure is defective, and the support points are not enough, resulting in insufficient support after splicing and occlusal, easy to loosen; thin grooves and V-shaped seams If it does not correspond, it reduces the economic benefits and increases the difficulty of construction for workers.

实用新型内容 Utility model content

针对现有技术中存在的上述问题,本实用新型的目的在于提供一种将墙面瓷砖安装在墙体上的快速安装墙面瓷砖的挂件结构,其标准和精确度高,尤其适用超薄墙面瓷砖的快速安装,并且可以美化处理。 In view of the above problems in the prior art, the purpose of this utility model is to provide a pendant structure for quickly installing wall tiles on the wall, which has high standards and accuracy, and is especially suitable for ultra-thin walls. Quick installation of facing tiles, and can be beautified.

所述的一种快速安装墙面瓷砖的挂件结构,包括挂件、龙骨及两个三角架找平件,其特征在于所述挂件内表面上设有开口向下的L型挂钩,龙骨上设有第一挂板及第二挂板,三角架找平件上设有条形槽,所述挂件与龙骨通过L型挂钩与第一挂板、第二挂板挂接连接,龙骨通过螺钉固定在其中一个三角架找平件的条形槽上,另一个三角架找平件固定在墙体上,两个三角架找平件固定连接,墙面瓷砖固定在挂件外表面。 The pendant structure for quickly installing wall tiles includes a pendant, a keel and two tripod leveling pieces, and is characterized in that the inner surface of the pendant is provided with an L-shaped hook with an opening downward, and the keel is provided with a second hook. The first hanging board and the second hanging board, the leveling part of the tripod is provided with a strip groove, the hanging part and the keel are connected with the first hanging board and the second hanging board through an L-shaped hook, and the keel is fixed on one of them by screws On the strip groove of the tripod leveling piece, another tripod leveling piece is fixed on the wall, the two tripod leveling pieces are fixedly connected, and the wall tiles are fixed on the outer surface of the pendant.

所述的一种快速安装墙面瓷砖的挂件结构,其特征在于所述挂件上还设有螺丝槽及加强肋,螺丝槽与L型挂钩位于同一面,且螺丝槽位于L型挂钩上方,加强肋间隔设置在挂件的外表面,相邻两个加强肋之间形成溢胶缝。 The pendant structure for quickly installing wall tiles is characterized in that the pendant is also provided with a screw groove and a reinforcing rib, the screw groove and the L-shaped hook are located on the same surface, and the screw groove is located above the L-shaped hook, strengthening The ribs are arranged on the outer surface of the pendant at intervals, and a glue overflow joint is formed between two adjacent reinforcing ribs.

所述的一种快速安装墙面瓷砖的挂件结构,其特征在于所述龙骨包括第一转角壁、第二转角壁,第一转角壁一端与第二转角壁一端由连接臂连接,第一转角壁另一端设置第一挂板,第二转角壁另一端连接支撑壁一端,支撑壁另一端设有第二挂板,所述连接臂上设置定位孔,定位孔与条形槽位置对应。 The pendant structure for quickly installing wall tiles is characterized in that the keel includes a first corner wall and a second corner wall, one end of the first corner wall and one end of the second corner wall are connected by a connecting arm, and the first corner The other end of the wall is provided with a first hanging board, the other end of the second corner wall is connected to one end of the supporting wall, the other end of the supporting wall is provided with a second hanging board, and a positioning hole is provided on the connecting arm, and the positioning hole corresponds to the position of the strip groove.

所述的一种快速安装墙面瓷砖的挂件结构,其特征在于所述L型挂钩由横板和竖板连接构成,横板固定在挂件上,L型挂钩与第一挂板、第二挂板挂接时,第一挂板、第二挂板位于横板下表面且顶触配合。 The pendant structure for quickly installing wall tiles is characterized in that the L-shaped hook is formed by connecting a horizontal plate and a vertical plate, the horizontal plate is fixed on the pendant, and the L-shaped hook is connected with the first hanging plate and the second hanging plate. When the boards are hooked, the first hanging board and the second hanging board are located on the lower surface of the horizontal board and are in contact with each other.

所述的一种快速安装墙面瓷砖的挂件结构,其特征在于所述竖板向外倾斜10-15°。 The above-mentioned pendant structure for quickly installing wall tiles is characterized in that the vertical board is inclined outward by 10-15°.

上述的一种快速安装墙面瓷砖的挂件结构,包括挂件、龙骨及两个三角架找平件,挂件内表面上设有开口向下的L型挂钩,龙骨上设有第一挂板及第二挂板,三角架找平件上设有条形槽,所述挂件与龙骨通过L型挂钩与第一挂板、第二挂板挂接连接,龙骨通过螺钉固定在其中一个三角架找平件的条形槽上,另一个三角架找平件固定在墙体上,两个三角架找平件固定连接,墙面瓷砖固定在挂件外表面。本实用新型通过采用上述技术,在三角架找平件上设有条形槽,两个三角架找平件中其中一个与龙骨连接,可以根据实际需要,调节用于龙骨的竖直位置,另一个龙骨与墙体连接,可以根据实际需要,调节该挂件结构相对于墙体的水平位置,达到灵活调整其位置,安装方便、结构稳定、功能性强,能快速该墙面瓷砖快速安装在墙体上,同时起装饰美观的作用。 The above-mentioned pendant structure for quickly installing wall tiles includes a pendant, a keel and two tripod leveling parts. The inner surface of the pendant is provided with an L-shaped hook with an opening downward, and the keel is provided with a first hanging plate and a second hanging plate. The hanging plate and the leveling part of the tripod are provided with strip grooves, the hanging part and the keel are connected with the first hanging plate and the second hanging plate through an L-shaped hook, and the keel is fixed on the strip of one of the tripod leveling parts by screws. On the shaped groove, another tripod leveling piece is fixed on the wall, the two tripod leveling pieces are fixedly connected, and the wall tiles are fixed on the outer surface of the pendant. The utility model adopts the above technology, and a strip groove is provided on the leveling part of the tripod. One of the two leveling parts of the tripod is connected with the keel, and the vertical position of the keel can be adjusted according to actual needs, and the other keel Connected with the wall, the horizontal position of the pendant structure relative to the wall can be adjusted according to actual needs, so as to achieve flexible adjustment of its position, easy installation, stable structure, strong functionality, and can quickly install the wall tiles on the wall , and at the same time play a decorative role.

附图说明 Description of drawings

图1为本实用新型的挂件结构示意图; Fig. 1 is the structural representation of the pendant of the present utility model;

图2为本实用新型的龙骨结构示意图; Fig. 2 is the keel structure schematic diagram of the present utility model;

图3为本实用新型的三角架找平件结构示意图; Fig. 3 is the structural representation of tripod leveling part of the present utility model;

图4为本实用新型的安装状态结构示意图。 Fig. 4 is a structural schematic diagram of the utility model in an installed state.

图中:1-挂件,101-L型挂钩,101a-横板,101b-竖板,102-螺丝槽,103-加强肋,104-溢胶缝,2-龙骨,201-第一挂板,202-第一转角壁,203-定位孔,204-连接臂,205-第二转角壁,206-支撑壁,207-第二挂板,3-三角架找平件,301-条形槽,4-墙面瓷砖,5-墙体。 In the figure: 1-hanging piece, 101-L-type hook, 101a-horizontal plate, 101b-vertical plate, 102-screw groove, 103-reinforcing rib, 104-overflow glue joint, 2-keel, 201-first hanging plate, 202-first corner wall, 203-positioning hole, 204-connecting arm, 205-second corner wall, 206-support wall, 207-second hanging plate, 3-tripod leveling piece, 301-bar groove, 4 -Wall tiles, 5-Wall.

具体实施方式 detailed description

以下结合说明书附图对本实用新型作进进一步的描述,但本实用新型的保护范围并不仅限于此: The utility model is further described below in conjunction with the accompanying drawings of the description, but the protection scope of the utility model is not limited thereto:

如图1-3所示,本实用新型的一种快速安装墙面瓷砖的挂件结构,包括挂件1、龙骨2及两个三角架找平件3,所述挂件1内表面设有开口向下的L型挂钩101和螺丝槽102,螺丝槽102位于L型挂钩101上方,挂件1外表面间隔设置一组加强肋103,相邻两个加强肋103之间形成溢胶缝104;所述龙骨2包括第一转角壁202、第二转角壁205,第一转角壁202一端与第二转角壁205一端由连接臂204连接,第一转角壁202另一端设置第一挂板201,第二转角壁205另一端连接支撑壁206一端,支撑壁206另一端设有第二挂板207,所述连接臂204上设置定位孔203,定位孔203与条形槽301位置对应;所述三角架找平件3上设有条形槽301,所述挂件1与龙骨2通过L型挂钩101与第一挂板201、第二挂板207挂接连接,龙骨2通过螺钉固定在其中一个三角架找平件3的条形槽301上,另一个三角架找平件3固定在墙体上,两个三角架找平件3固定连接,墙面瓷砖固定在挂件1外表面。 As shown in Figure 1-3, a pendant structure for quickly installing wall tiles of the present utility model includes a pendant 1, a keel 2 and two tripod leveling parts 3, and the inner surface of the pendant 1 is provided with a downward opening. L-shaped hook 101 and screw groove 102, the screw groove 102 is located above the L-shaped hook 101, a group of reinforcing ribs 103 are arranged at intervals on the outer surface of the pendant 1, and a glue overflow seam 104 is formed between two adjacent reinforcing ribs 103; the keel 2 Including a first corner wall 202 and a second corner wall 205, one end of the first corner wall 202 and one end of the second corner wall 205 are connected by a connecting arm 204, the other end of the first corner wall 202 is provided with a first hanging board 201, the second corner wall The other end of 205 is connected to one end of the support wall 206, and the other end of the support wall 206 is provided with a second hanging plate 207, and a positioning hole 203 is set on the connecting arm 204, and the positioning hole 203 corresponds to the position of the strip groove 301; the tripod leveling part 3 is provided with a strip groove 301, the pendant 1 and the keel 2 are hooked and connected with the first hanging plate 201 and the second hanging plate 207 through the L-shaped hook 101, and the keel 2 is fixed on one of the tripod leveling parts 3 by screws. On the strip groove 301, another tripod leveling part 3 is fixed on the wall, two tripod leveling parts 3 are fixedly connected, and wall tiles are fixed on the outer surface of the pendant 1.

如图所示,所述L型挂钩101由横板101a和竖板101b连接构成,横板101a固定在挂件1上,L型挂钩101与第一挂板201、第二挂板207挂接时,第一挂板201、第二挂板207位于横板101a下表面且顶触配合;为了便于安装,本实用新型将竖板101b设为向外倾斜,倾斜角度为10-15°。 As shown in the figure, the L-shaped hook 101 is formed by connecting a horizontal plate 101a and a vertical plate 101b. The horizontal plate 101a is fixed on the pendant 1. , the first hanging plate 201 and the second hanging plate 207 are located on the lower surface of the horizontal plate 101a and are in contact with each other; in order to facilitate installation, the utility model sets the vertical plate 101b to be inclined outward, and the inclination angle is 10-15°.

如图所示,本实用新型的加强肋103纵向呈直线型等距分布,挂钩101主要用于与龙骨镶嵌而卡住,从而起到固定和增加摩擦力的作用;挂件1用于悬挂与墙面瓷砖复合的型材;所述加强勒103为长方形块状,主要是起到增加强度,增加摩擦力;溢胶缝104主要作用是螺丝打孔定位在同一高度上。 As shown in the figure, the reinforcing ribs 103 of the utility model are distributed in a straight line and equidistant in the longitudinal direction, and the hook 101 is mainly used to be inlaid with the keel and stuck, so as to fix and increase friction; the pendant 1 is used for hanging on the wall Surface ceramic tile composite profiles; the reinforcement 103 is a rectangular block, mainly to increase the strength and friction; the main function of the overflow glue joint 104 is to position the screw holes at the same height.

如图2所示,本实用新型龙骨2的连接臂204由T型螺栓穿过定位孔203和条形槽301安装在三角架找平件3上,可以根据实际需要,调整T型螺栓在条形槽301上的位置,达到调整体整个挂件结构相对墙体的垂直位置;连接龙骨2的三角架找平件3通过T型螺栓固定在另一三角架找平件3的条形槽301(横向)上,可以根据实际需要,调整T型螺栓在该条形槽301上的位置,达到调整体整个挂件结构相对墙体5的水平位置;安装时,将两个三角架找平件的位置固定,再将龙骨2固定在条形槽301呈竖直状的三角架找平件3上,再将墙面瓷砖4(即瓷砖塑木复合板)固定在挂件1上,通过挂钩101将该挂件1挂接在龙骨2的挂板上即可,该结构用于墙面快速干挂体系,实现快速干挂目的,一个龙骨可挂上下两个挂件,可以节约一根龙骨,安装时可以直接把挂件挂在龙骨上,安装便捷,其操作简便,精确度高,环保、经济,有效控制装饰成本,简化了装饰基层找平的施工工作,提高施工效率,能满足装饰行业工业化生产的需求,基层找平达到建筑装饰工业化。 As shown in Figure 2, the connecting arm 204 of the keel 2 of the present invention is installed on the tripod leveling part 3 through the positioning hole 203 and the strip groove 301 by the T-bolt, and the T-bolt can be adjusted in the strip shape according to actual needs. The position on the groove 301 reaches the vertical position of the entire pendant structure of the adjustment body relative to the wall; the tripod leveling part 3 connecting the keel 2 is fixed on the strip groove 301 (horizontal direction) of the other tripod leveling part 3 through T-shaped bolts , the position of the T-bolt on the strip groove 301 can be adjusted according to actual needs, so as to reach the horizontal position of the entire pendant structure of the adjustment body relative to the wall 5; during installation, the positions of the two tripod leveling parts are fixed, and then the The keel 2 is fixed on the vertical tripod leveling piece 3 of the strip groove 301, and then the wall tile 4 (that is, the tile-plastic-wood composite board) is fixed on the pendant 1, and the pendant 1 is hung on the pendant 1 through the hook 101. The hanging plate of the keel 2 is enough. This structure is used for the quick dry hanging system on the wall to achieve the purpose of quick dry hanging. One keel can hang two pendants up and down, which can save one keel. The pendant can be directly hung on the keel during installation In terms of features, it is easy to install, easy to operate, high in accuracy, environmentally friendly and economical, effectively controls decoration costs, simplifies the construction work of decorative base leveling, improves construction efficiency, and can meet the needs of industrialized production in the decoration industry. Base leveling achieves industrialization of architectural decoration .

上述所描述的具体实施例仅仅是对本实用新型的构思作优选举例说明。凡在本实用新型的精神和原则之内所做的任何修改或补充或等同替代,均应包含在本实用新型权利要求的保护范围之内。 The specific embodiments described above are only preferred illustrations for the concept of the present utility model. Any modification, supplement or equivalent replacement made within the spirit and principle of the present utility model shall be included in the protection scope of the claims of the utility model.

Claims (5)

1.一种快速安装墙面瓷砖的挂件结构,包括挂件(1)、龙骨(2)及两个三角架找平件(3),其特征在于所述挂件(1)内表面上设有开口向下的L型挂钩(101),龙骨(2)上设有第一挂板(201)及第二挂板(207),三角架找平件(3)上设有条形槽(301),所述挂件(1)与龙骨(2)通过L型挂钩(101)与第一挂板(201)、第二挂板(207)挂接连接,龙骨(2)通过螺钉固定在其中一个三角架找平件(3)的条形槽(301)上,另一个三角架找平件(3)固定在墙体上,两个三角架找平件(3)固定连接,墙面瓷砖固定在挂件(1)外表面。 1. A pendant structure for quickly installing wall tiles, including a pendant (1), a keel (2) and two tripod leveling pieces (3), characterized in that the inner surface of the pendant (1) is provided with an opening to The lower L-shaped hook (101), the keel (2) is provided with the first hanging plate (201) and the second hanging plate (207), and the tripod leveling piece (3) is provided with a strip groove (301). The hanger (1) and the keel (2) are hooked and connected with the first hanging plate (201) and the second hanging plate (207) through the L-shaped hook (101), and the keel (2) is fixed on one of the tripods for leveling by screws On the strip groove (301) of piece (3), another tripod leveling piece (3) is fixed on the wall, the two tripod leveling pieces (3) are fixedly connected, and the wall tiles are fixed outside the pendant (1) surface. 2.根据权利要求1所述的一种快速安装墙面瓷砖的挂件结构,其特征在于所述挂件(1)上还设有螺丝槽(102)及加强肋(103),螺丝槽(102)与L型挂钩(101)位于同一面,且螺丝槽(102)位于L型挂钩(101)上方,加强肋(103)间隔设置在挂件(1)的外表面,相邻两个加强肋(103)之间形成溢胶缝(104)。 2. A pendant structure for quickly installing wall tiles according to claim 1, characterized in that the pendant (1) is also provided with screw grooves (102) and reinforcing ribs (103), and the screw grooves (102) It is located on the same surface as the L-shaped hook (101), and the screw groove (102) is located above the L-shaped hook (101), and the reinforcing ribs (103) are arranged on the outer surface of the pendant (1) at intervals, and two adjacent reinforcing ribs (103 ) to form overflow glue joints (104). 3.根据权利要求1所述的一种快速安装墙面瓷砖的挂件结构,其特征在于所述龙骨(2)包括第一转角壁(202)、第二转角壁(205),第一转角壁(202)一端与第二转角壁(205)一端由连接臂(204)连接,第一转角壁(202)另一端设置第一挂板(201),第二转角壁(205)另一端连接支撑壁(206)一端,支撑壁(206)另一端设有第二挂板(207),所述连接臂(204)上设置定位孔(203),定位孔(203)与条形槽(301)位置对应。 3. A pendant structure for quickly installing wall tiles according to claim 1, characterized in that the keel (2) includes a first corner wall (202), a second corner wall (205), a first corner wall One end of (202) is connected to one end of the second corner wall (205) by a connecting arm (204), the other end of the first corner wall (202) is provided with a first hanging board (201), and the other end of the second corner wall (205) is connected to a support One end of the wall (206), the other end of the supporting wall (206) is provided with a second hanging plate (207), the connecting arm (204) is provided with a positioning hole (203), and the positioning hole (203) and the strip groove (301) corresponding to the position. 4.根据权利要求1所述的一种快速安装墙面瓷砖的挂件结构,其特征在于所述L型挂钩(101)由横板(101a)和竖板(101b)连接构成,横板(101a)固定在挂件(1)上,L型挂钩(101)与第一挂板(201)、第二挂板(207)挂接时,第一挂板(201)、第二挂板(207)位于横板(101a)下表面且顶触配合。 4. A pendant structure for quickly installing wall tiles according to claim 1, characterized in that the L-shaped hook (101) is formed by connecting a horizontal plate (101a) and a vertical plate (101b), and the horizontal plate (101a ) is fixed on the pendant (1). It is located on the lower surface of the horizontal plate (101a) and fits in top contact. 5.根据权利要求4所述的一种快速安装墙面瓷砖的挂件结构,其特征在于所述竖板(101b)向外倾斜10-15°。 5 . The pendant structure for quickly installing wall tiles according to claim 4 , characterized in that the riser ( 101 b ) is inclined outward by 10-15°.
CN201521093156.5U 2015-12-25 2015-12-25 Install pendant structure of wall ceramic tile fast Expired - Lifetime CN205444782U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521093156.5U CN205444782U (en) 2015-12-25 2015-12-25 Install pendant structure of wall ceramic tile fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521093156.5U CN205444782U (en) 2015-12-25 2015-12-25 Install pendant structure of wall ceramic tile fast

Publications (1)

Publication Number Publication Date
CN205444782U true CN205444782U (en) 2016-08-10

Family

ID=56586782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521093156.5U Expired - Lifetime CN205444782U (en) 2015-12-25 2015-12-25 Install pendant structure of wall ceramic tile fast

Country Status (1)

Country Link
CN (1) CN205444782U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107201815A (en) * 2017-07-14 2017-09-26 中民筑友科技投资有限公司 A kind of hanging plate, suspension member, the preparation method for installing node and hanging plate of cladding panel
CN111664641A (en) * 2019-03-05 2020-09-15 Bsh家用电器有限公司 Domestic refrigerating appliance with inner door wall provided integrally with suspension rib

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107201815A (en) * 2017-07-14 2017-09-26 中民筑友科技投资有限公司 A kind of hanging plate, suspension member, the preparation method for installing node and hanging plate of cladding panel
CN111664641A (en) * 2019-03-05 2020-09-15 Bsh家用电器有限公司 Domestic refrigerating appliance with inner door wall provided integrally with suspension rib

Similar Documents

Publication Publication Date Title
TWM527046U (en) Architectural decoration panel dry hanging structure
CN110424661A (en) Construction method for dry-hanging granite slab
CN212104681U (en) On-spot assembled partition wall
CN103291043B (en) The installation suspension assembly of finishing material
CN205444782U (en) Install pendant structure of wall ceramic tile fast
CN203066412U (en) Installing component of plug-in quickly-installed boards
CN202658773U (en) Bamboo-board curtain wall system
CN109372176B (en) Suspended ceiling and suspended ceiling mounting method
CN207003903U (en) A kind of decorative panel suspension member and Side fascia
CN212613312U (en) Assembled indoor roofing system
CN110056115B (en) A method of using a ceiling-mounted metal keel structure
CN209670163U (en) A kind of light steel keel gypsum board ceiling structure
CN205348693U (en) Horizontal big moulding of stone material curtain
CN204728619U (en) Aluminium-plastic panel mounting connection structure
CN103953152B (en) Two grades of ceiling decoration section bars
CN103382748B (en) A kind of Terracotta panel curtain wall installation structure
CN207260404U (en) Furred ceiling bulk and furred ceiling
CN112814323B (en) Integrated combined hanging piece
CN204626853U (en) A kind of unit assembled mounting structure of special-shaped cambered surface moulding GRG decoration panel
CN211817324U (en) Indoor corrugated suspended ceiling external corner installation node structure
CN205012593U (en) Fixing device of wall honeycomb panel
CN212224372U (en) Mounting structure of prefabricated drop level furred ceiling of assembled
CN209837564U (en) Novel wall ceramic tile dry-hanging bracket
CN209585508U (en) Whole kitchen wallboard
CN207003901U (en) A kind of cladding suspension member of decoration panel detachably installed and mount system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20160810