CN208533939U - A kind of pavement system - Google Patents

A kind of pavement system Download PDF

Info

Publication number
CN208533939U
CN208533939U CN201821110357.5U CN201821110357U CN208533939U CN 208533939 U CN208533939 U CN 208533939U CN 201821110357 U CN201821110357 U CN 201821110357U CN 208533939 U CN208533939 U CN 208533939U
Authority
CN
China
Prior art keywords
mating formation
module
pedestal
pavement system
corner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821110357.5U
Other languages
Chinese (zh)
Inventor
寻杰
马彪炳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Set Construction Technology Co Ltd
Original Assignee
Qingdao Set Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Set Construction Technology Co Ltd filed Critical Qingdao Set Construction Technology Co Ltd
Priority to CN201821110357.5U priority Critical patent/CN208533939U/en
Application granted granted Critical
Publication of CN208533939U publication Critical patent/CN208533939U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to building decoration technology field, discloses a kind of pavement system.Pavement system, including pedestal and module of mating formation.The leveling jacks that height can be adjusted are provided on pedestal.Module of mating formation carries out leveling support, the fixed top for being layed in pedestal by leveling jacks.In the utility model, by dividing into bottom set seat in module of mating formation, and leveling support is carried out to module of mating formation by the leveling jacks on pedestal, so that when mating formation operation, on the basis of guaranteeing structural strength and flatness, the operation difficulty of levelling operation is reduced, the dosage of the binding materials such as cement mortar is saved, it is effectively simplified process of mating formation, improves efficiency of mating formation.

Description

A kind of pavement system
Technical field
The utility model relates to building decoration technology field more particularly to a kind of pavement systems.
Background technique
Traditional architecture ground (such as mat formation floor tile, floor, carpet) in ground pavement, needs first to be looked for cement, sand etc. It is repaved after flat and pastes other surface layers, which needs a large amount of cement mortar at the scene, and construction operation program is cumbersome, and scene is stirred Cement mortar is mixed, dirty construction site, unrest, difference are caused, it is undesirable to the high and last flatness of the technical requirements of worker.
Utility model content
The purpose of this utility model is to provide a kind of pavement systems, in ground pavement, guarantee structural strength and On the basis of flatness, mat formation high-efficient, process of mating formation is simple.
For this purpose, the utility model uses following technical scheme:
A kind of pavement system, comprising:
Pedestal is provided with the leveling jacks that height can be adjusted on the pedestal;
Mat formation module, carries out leveling support, the fixed top for being layed in the pedestal by the leveling jacks.
Preferably, the pedestal includes:
Bracket, can be installed on the ground in room, and the leveling jacks are bolted in the bracket vertically;
Connector sleeve, is fixed on the bracket, and the module of mating formation is connected to the connector sleeve by adhesives.
Preferably, the bracket includes horizontal part and lug boss interconnected, the connector sleeve is fixed on the water Flat portion, the leveling jacks are bolted in the lug boss vertically.
Preferably, the module of mating formation includes:
Substrate;
Stabilizer blade is connected, the bottom surface edge of the substrate is set to, link slot, the connection is provided on the connector sleeve Be perfused with adhesives in slot, the connection stabilizer blade can extend into the adhesives through the solidification of the adhesives and The connector sleeve is connected as one.
Preferably, the module of mating formation further includes joint member, the joint member is fixed on the substrate, for adjacent Other modules of mating formation be supported.
Preferably, the joint member includes stull portion and erects every portion, described erect is vertically arranged at the stull portion every portion On the symmetry axis of top surface, the top surface in the stull portion is separated into two parts, a portion is fixed on the substrate, Another part is for being supported another described substrate.
Preferably, the module of mating formation further includes panel, the panel is set to the top surface of the substrate.
Preferably, further including abutment wall keel, corner seat and wall side seat;
The abutment wall keel installation is supported on the metope in room for module of mating formation described in mating formation to patch wall;
The corner seat is installed at the corner of room floors, for being connected with the connection stabilizer blade;
The wall side seat is installed at the wall side of room floors, for being connected with the connection stabilizer blade.
Preferably, the corner seat includes being installed on the corner shelf of room floors and being fixed on the corner of the corner shelf Set, the wall side seat include the wall side set for being installed on the wall frame side of room floors and being fixed on the wall frame side.
Preferably, the leveling jacks are provided on each pedestal, it is each described to mat formation module by one The leveling jacks are positioned, and are supported by cured adhesives in the pedestal.
The utility model has the beneficial effects that
By dividing into bottom set seat in module of mating formation, and leveling support is carried out to module of mating formation by the leveling jacks on pedestal, So that on the basis of guaranteeing structural strength and flatness, reducing the operation difficulty of levelling operation when mating formation operation, saving The dosage of the binding materials such as cement mortar, is effectively simplified process of mating formation, and improves efficiency of mating formation.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of pedestal described in the utility model embodiment;
Fig. 2 is the structural schematic diagram of module of mating formation described in the utility model embodiment;
Fig. 3 is the structural schematic diagram of joint member described in the utility model embodiment;
Fig. 4 is the structural schematic diagram of abutment wall keel described in the utility model embodiment;
Fig. 5 is the structural schematic diagram of the seat of corner described in the utility model embodiment;
Fig. 6 is the structural schematic diagram of wall side seat described in the utility model embodiment;
Fig. 7 is the structural representation for drawing grid lines and being fixedly mounted after completing pedestal, abutment wall keel, corner seat and wall side seat Figure;
Fig. 8 is the structural schematic diagram of module of mating formation;
Fig. 9 is the structural schematic diagram for completing to mat formation.
In figure:
1, pedestal;11, leveling jacks;12, bracket;121, horizontal part;122, lug boss;13, connector sleeve;
2, mat formation module;21, substrate;22, stabilizer blade is connected;23, joint member;231, stull portion;232, it erects every portion;24, face Plate;
3, abutment wall keel;
4, corner seat;41, corner shelf;42, corner covers;
5, wall side seat;51, wall frame side;52, wall side covers.
Specific embodiment
The embodiments of the present invention are described below in detail, the example of embodiment is shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, it is intended to for explaining the utility model, and should not be understood as the limit to the utility model System.
Further illustrate the technical solution of the utility model below with reference to the accompanying drawings and specific embodiments.
As shown in figs. 1-9, the utility model provides a kind of pavement system, including pedestal 1 and module 2 of mating formation.Wherein, The leveling jacks 11 that height can be adjusted are provided on pedestal 1.Module of mating formation 2 carries out leveling support by leveling jacks 11, fixed It is layed in the top of pedestal 1.
In the utility model, by dividing into bottom set seat 1 in module 2 of mating formation, and by the leveling jacks 11 on pedestal 1 to mating formation Module 2 carries out leveling support, so that on the basis of guaranteeing structural strength and flatness, reducing levelling work when mating formation operation The operation difficulty of industry saves the dosage of the binding materials such as cement mortar, is effectively simplified process of mating formation, and improves effect of mating formation Rate.
In the present embodiment, pedestal 1 further includes bracket 12 and connector sleeve 13.Wherein, bracket 12 is installed on the bottom surface in room, Leveling jacks 11 are bolted in bracket 12 vertically.Connector sleeve 13 is fixed on bracket 12, and module of mating formation 2 can be connected by binding material In connector sleeve 13.
Specifically, bracket 12 includes horizontal part 121 interconnected and lug boss 122.Wherein, connector sleeve 13 is fixed on water Flat portion 121, leveling jacks 11 are bolted in lug boss 122 vertically.The setting of lug boss 122 so that leveling jacks 11 have it is sufficiently large Vertical adjusting surplus.
In the present embodiment, module of mating formation 2 includes substrate 21, connection stabilizer blade 22, joint member 23 and panel 24.Wherein, base Plate 21 is the higher substrates of hardness such as cement plate.Connection stabilizer blade 22 is set to the bottom surface edge of substrate 21, sets on connector sleeve 13 It is equipped with link slot, connection stabilizer blade 22 can extend into binding material and 13 phase of connector sleeve in link slot by being poured into link slot Connection.Joint member 23 is fixed on substrate 21, for being supported to adjacent other modules 2 of mating formation.Panel 24 is set to substrate The decoration bar sections such as 21 top surface, specially ceramic tile, plank or carpet.
Specifically, joint member 23 includes stull portion 231 and erects every portion 232, it is perpendicular to be vertically arranged at stull portion 231 every portion 232 On the symmetry axis of top surface, the top surface in stull portion 231 is separated into two parts, a portion is fixed on a substrate 21, separately A part is for being supported another substrate 21.
The dress system of the utility model further includes abutment wall keel 3, corner seat 4 and wall side seat 5.Wherein, abutment wall keel 3 are installed In on the metope in room, the module 2 of mating formation for mating formation to patch wall is supported, and is provided with and is matched with wall side seat 5 Opening, connection stabilizer blade 22 can pass through the opening and be connected to wall side seat 5.Corner seat 4 is installed at the corner of room floors, is used for It is connected with stabilizer blade 22 is connect.Wall side seat 5 is installed at the wall side of room floors, for connect stabilizer blade 22 and be connected.Specifically , corner seat 4 includes the corner set 42 for being installed on the corner shelf 41 of room floors and being fixed on corner shelf 41, and wall side seat 5 includes It is installed on the wall frame side 51 of room floors and is fixed on the wall side set 52 of wall frame side 51.
In the present embodiment, there are four connect stabilizer blade 22, each pedestal for the bottom surface setting of the substrate 21 for module 2 of each mating formation A leveling jacks 11 are provided on 1, module of each mating formation 2 is positioned (leveling supports) by a leveling jacks 11, the bottom of by Cured adhesives is overally supported in seat 1.It is paved on four connection stabilizer blades 22 of the module 2 of mating formation at corner, one It is connected to corner set 42 by binding material, two are connected to wall side set 52 by binding material, and one is connected by binding material It is connected to connector sleeve 13, is leveled and is supported by abutment wall keel 3.It is paved on four connection stabilizer blades 22 of the module 2 of mating formation at wall side, two It is connected to wall side set 52 by binding material, two are connected to connector sleeve 13 by binding material, by abutment wall keel 3 and adjacent The joint member 23 of module of mating formation 2 carries out leveling support.Others are mated formation four connection stabilizer blades 22 of module 2, pass through bonding respectively Material is connected to connector sleeve 13, carries out leveling support by the joint member 23 of adjacent module 2 of mating formation.
As shown in figs. 7 to 9, the utility model additionally provides a kind of method for paving, is spread using above-mentioned pavement system Dress, comprising the following steps:
Step 1: drawing grid lines in room floors according to the size of room-sized and module 2 of mating formation.
In this step, by gridding, each module 2 of mating formation is enabled to correspond to a grid.
Step 2: setting abutment wall keel 3 on room metope upper berth.
In this step, it firstly, according to the actual conditions of room floors, is played well on room metope by level meter Line.Then rim wall keel 3 are glued according to horizontal line.
Step 3: in the infall mounting seat 1 of grid lines and the height of leveling jacks 11 on adjustment base 1.
In this step, in the infall of grid lines by way of gas gun nailing etc. by pedestal 1 with being fixed on room Face, after installing pedestal 1, according to the height of the height adjustment leveling jacks 11 of abutment wall keel 3 on horizontal line, so that abutment wall keel 3 and leveling jacks 11 supporting surface (point) in same level.
In addition, corner seat 4 is fixedly mounted at the corner in room floors, wall is fixedly mounted at the wall side of room floors Side seat 5.
Step 4: the module 2 that will mat formation is placed on grid, is leveled and supported by leveling jacks 11, fixation is layed in pedestal 1 Top.
In this step, binding material (cement, adhesive etc.) is modulated first, then fills the binding material made In the wall side set 52 for infusing the connector sleeve 13 in pedestal 1, the corner set 42 of corner seat 4 and wall side seat 5, solidify it in binding material Before, four connection stabilizer blades 22 of module 2 of mating formation are respectively protruding into four connector sleeves 13, and (connector sleeve 13, corner set 42, wall side cover 52) in, ground is fixed on after adhesives solidification and forms cylinder, 2 connector sleeve 13 of the module that will mat formation and room floors are fixed on one It rises.
In the present embodiment, mat formation first at a corner first module 2 of mating formation, two sides of the module 2 of mating formation It is supported by abutment wall keel 3, joint member 23 is provided on other two side, be used to support the adjacent module 2 of mating formation then mated formation. Then close to first module 2 of mating formation, second and second module 2 of mating formation of mating formation, second and second module 2 of mating formation Two sides are supported by the joint member 23 and abutment wall keel 3 of first module 2 of mating formation, and joint member 23 is provided on other two side. And so on, guarantee that all 2 flatness of module of mating formation mated formation are unified consistent, and being capable of effectively load power transmission.
Obviously, the above embodiments of the present invention is used for the purpose of clearly illustrating examples for clearly illustrating the present invention, and It is not limitations of the embodiments of the present invention.For those of ordinary skill in the art, in above description On the basis of can also make other variations or changes in different ways.There is no need and unable to give all embodiments Exhaustion.Any modifications, equivalent replacements, and improvements made within the spirit and principle of the present invention etc., should be included in Within the protection scope of the utility model claims.

Claims (10)

1. a kind of pavement system characterized by comprising
Pedestal (1) is provided with the leveling jacks (11) that height can be adjusted on the pedestal (1);
Module of mating formation (2) carries out leveling support, the fixed top for being layed in the pedestal (1) by the leveling jacks (11).
2. pavement system according to claim 1, which is characterized in that the pedestal (1) includes:
Bracket (12), can be installed on the ground in room, and the leveling jacks (11) are bolted in the bracket (12) vertically;
Connector sleeve (13) is fixed on the bracket (12), and the module of mating formation (2) is connected to the connector sleeve by adhesives (13)。
3. pavement system according to claim 2, which is characterized in that the bracket (12) includes horizontal part interconnected (121) it is fixed on the horizontal part (121) with lug boss (122), the connector sleeve (13), the vertical spiral shell of the leveling jacks (11) It is connected to the lug boss (122).
4. pavement system according to claim 2, which is characterized in that the module of mating formation (2) includes:
Substrate (21);
It connects stabilizer blade (22), is set to the bottom surface edge of the substrate (21), is provided with link slot on the connector sleeve (13), Adhesives is perfused in the link slot, the connection stabilizer blade (22) can extend into the adhesives through the bonding The solidification of material is connected as one with the connector sleeve (13).
5. pavement system according to claim 4, which is characterized in that the module of mating formation (2) further includes joint member (23), The joint member (23) is fixed on the substrate (21), for being supported to adjacent other modules (2) of mating formation.
6. pavement system according to claim 5, which is characterized in that the joint member (23) include stull portion (231) and It is perpendicular every portion (232), it is described perpendicular every on the symmetry axis that portion (232) are vertically arranged at stull portion (231) top surface, by the stull The top surface in portion (231) is separated into two parts, and a portion is fixed on the substrate (21), and another part is used for another One substrate (21) is supported.
7. pavement system according to claim 5, which is characterized in that the module of mating formation (2) further includes panel (24), institute State the top surface that panel (24) is set to the substrate (21).
8. pavement system according to claim 5, which is characterized in that further include abutment wall keel (3), corner seat (4) and wall Side seat (5);
The abutment wall keel (3) are installed on the metope in room, prop up for module (2) of mating formation described in mating formation to patch wall Support;
The corner seat (4) is installed at the corner of room floors, for being connected with the connection stabilizer blade (22);
The wall side seat (5) is installed at the wall side of room floors, for being connected with the connection stabilizer blade (22).
9. pavement system according to claim 8, which is characterized in that the corner seat (4) includes being installed on room floors Corner shelf (41) and be fixed on the corner shelf (41) corner set (42), the wall side seat (5) include with being installed on room The wall frame side (51) in face and the wall side set (52) for being fixed on the wall frame side (51).
10. -9 any pavement system according to claim 1, which is characterized in that be provided with one on each pedestal (1) A leveling jacks (11), each module (2) of mating formation is positioned by a leveling jacks (11), by the bottom Cured adhesives is supported in seat (1).
CN201821110357.5U 2018-07-13 2018-07-13 A kind of pavement system Expired - Fee Related CN208533939U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821110357.5U CN208533939U (en) 2018-07-13 2018-07-13 A kind of pavement system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821110357.5U CN208533939U (en) 2018-07-13 2018-07-13 A kind of pavement system

Publications (1)

Publication Number Publication Date
CN208533939U true CN208533939U (en) 2019-02-22

Family

ID=65387754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821110357.5U Expired - Fee Related CN208533939U (en) 2018-07-13 2018-07-13 A kind of pavement system

Country Status (1)

Country Link
CN (1) CN208533939U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042483A (en) * 2019-12-31 2020-04-21 浙江亚厦装饰股份有限公司 Leveling assembly and ground leveling method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042483A (en) * 2019-12-31 2020-04-21 浙江亚厦装饰股份有限公司 Leveling assembly and ground leveling method
CN111042483B (en) * 2019-12-31 2021-08-31 浙江亚厦装饰股份有限公司 Leveling assembly and ground leveling method

Similar Documents

Publication Publication Date Title
CN104929297B (en) A kind of decoration panel installation of ceiling technique
CN208533939U (en) A kind of pavement system
CN107476583A (en) A kind of concrete assembled building builds construction method
CN102251537A (en) Construction method for installing block slurry of sizing block by equipment
CN110067360A (en) Aerial adjustable terrace system
CN106193589A (en) Concrete superelevation heavy type beam and superimposed sheet combinative structure method for supporting
CN110863631A (en) Spliced floor tile
CN204059844U (en) Indoor wall, ground decoration keel frame
CN103919504A (en) Waterproof base plate of integrated bathroom
CN110185230B (en) Assembly type ceramic tile installation structure and construction process thereof
CN205330078U (en) Ground composite decoration board's structure of mating formation
CN206512533U (en) A kind of empty rail of suspension type installs positioning underground frock
CN210134616U (en) Dry-method overall paving structure of fabricated ground
CN204920244U (en) Supporting structure of large -span steel construction segmentation hoist and mount
CN205530690U (en) Load and unload convenient wallboard and floor connection structure
CN209837523U (en) Stone stair structure
CN105715042B (en) Tool-type building drop panel assembly and its construction method
CN211548536U (en) Ceramic tile concrete composite sheet wall leveling and strutting arrangement
CN205077805U (en) Dry pendant mounting structure of wall
CN110714585A (en) Paving system and paving method
CN210127599U (en) Leveling bearing assembly integrally paved by dry method of assembled ground facing material
CN113389344A (en) Ground overhead leveling structure and building method thereof
CN203776785U (en) Waterproof bottom tray of unit bathroom
CN201794332U (en) Mobile base station
CN205622574U (en) Solar panel installing support frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190222

Termination date: 20210713

CF01 Termination of patent right due to non-payment of annual fee