CN107740553B - Hard plate material mounts construction method - Google Patents

Hard plate material mounts construction method Download PDF

Info

Publication number
CN107740553B
CN107740553B CN201711010285.7A CN201711010285A CN107740553B CN 107740553 B CN107740553 B CN 107740553B CN 201711010285 A CN201711010285 A CN 201711010285A CN 107740553 B CN107740553 B CN 107740553B
Authority
CN
China
Prior art keywords
drag
plate
line
lateral member
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711010285.7A
Other languages
Chinese (zh)
Other versions
CN107740553A (en
Inventor
叶君华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenling Puli Building Material Technology Co Ltd
Original Assignee
Wenling Puli Building Material Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenling Puli Building Material Technology Co Ltd filed Critical Wenling Puli Building Material Technology Co Ltd
Priority to CN201711010285.7A priority Critical patent/CN107740553B/en
Publication of CN107740553A publication Critical patent/CN107740553A/en
Application granted granted Critical
Publication of CN107740553B publication Critical patent/CN107740553B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/0805Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall
    • E04F13/0808Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall adjustable in several directions one of which is perpendicular to the wall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/081Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements
    • E04F13/0821Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements located in-between two adjacent covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/081Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements
    • E04F13/0821Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements located in-between two adjacent covering elements
    • E04F13/0825Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements located in-between two adjacent covering elements engaging side holes preformed into the covering elements

Abstract

The invention discloses a kind of hard plate materials to mount construction method, solve the problems, such as that the inconvenient cost of plate construction is high on existing metope, the technical solution taken: plate of the side with fastening structure is selected, pass through the fixed several horizontally disposed lateral members of wall face in wall, interval in the vertical direction between adjacent transverse part is corresponding with panel height, and each plate is successively connected in lateral member by hook.Realize the fixation that lateral member can adapt to the secured of wall body structure, between the drag-line by being arranged along the vertical direction and lateral member, stabilization of the Lai Jiagu lateral member on wall is fixed to drag-line on the collar tie beam on wall, so that the fastness of drag-line itself is good.

Description

Hard plate material mounts construction method
Technical field
The present invention relates to a kind of construction methods, and hard plate material is articulated to the construction of the mounting on wall more particularly to a kind of Method.
Background technique
In modern architecture construction field, usually it is required to carry out decoration processing to the wall face of New Buildings, it is existing Being handled mainly the wall face of building has painting to rinse coating, sandblasts and plate is arranged, since the setting of plate can be outside Building is beautified well on seeing, facilitates the promotion of building class, therefore, compares on the wall face of present building More is the set-up mode using plate.
Plate setting can be in such a way that adhesive is bonded or is cladding to the method on wall, pass through bonding Mode plate is arranged onto wall, usually applies and is carrying out bonding decoration to indoor metope;For skin face Decoration, cladding mode is usually used to realize.In the decoration for carrying out skin face plate, need first in exterior wall Mounting rack is built on face, and then plate is articulated on mounting rack.Since the length of material of building mounting rack is limited, in building Wall face on build monoblock type mounting rack operation it is inconvenient, and structure is relatively complicated, and cost is high.The wall of existing structure Body is made of the collar tie beam of frame structure and the brick between collar tie beam, and existing brick generally uses foamed bricks, foaming The internal structure of brick is comparatively loose, relatively poor to the fixed fastness of mounting rack, it is often necessary to by welding Realize the reinforcing to mounting rack internal intensity, this makes operation inconvenient, and operating efficiency is relatively low.
Summary of the invention
The technical problem to be solved in the invention is: providing a kind of hard plate material mounting construction method, passes through the construction party Method carries out mounting construction to hard plate material, and plate can be stably placed on wall face, and operation is convenient, low cost.
Solve the technical solution of present invention problem: a kind of hard plate material mounting construction method, for hard plate material It is articulated on metope, which comprises the steps of:
Plate is taken, side is taken to have the plate of fastening structure;
Fixed lateral part is in the horizontal direction fixed on more lateral members on metope by anchoring piece, in the vertical direction, Interval between adjacent two lateral members is corresponding with panel height;
Stay guy, a lateral member at least correspond to two drag-lines, and drag-line is arranged along the vertical direction, the both ends difference of drag-line It is connected on a fixing piece, fixing piece is anchored on the collar tie beam of wall;
Drag-line is tightened, drag-line is tightened by cord holder, is fixed on the both ends of drag-line on fixing piece;
Cross-fixing, drag-line realize drag-line and lateral member in the interval across lateral member and wall, by hoop fitting Between " ten " word cross-fixing;
Plate is mounted, the hook of plate is fixed in lateral member, passes through the snapping knot on the mouth of hook and plate on hook Structure matches and plate is articulated at position corresponding between adjacent two lateral member.
The fastening structure of side face of plate material can be groove, be also possible to that the socket of side face of plate material is arranged in, by groove or Socket is matched with the mouth of hook on hook, and is realized hook and fixed to the snapping of plate.Lateral member is usually angle bar described as follows, It is also possible to band iron, the interval between adjacent two lateral members is on the basis of the height of plate, and fixed pair of the installation of one block of plate Two lateral members are answered, this two lateral members are respectively fixed plate from the two sides up and down of plate.The collar tie beam refers to frame Part in the building of posture other than brick wall is to play main support to building as made of steel bar concrete casting Effect.
Further, setting pillow bar, pillow bar are anchored on wall along the vertical direction on metope, and pillow bar passes through lateral member In interval between wall, lateral member and pillow bar are fixed together.A kind of this reinforcement for resting the head on bar and being optionally and being arranged Part, it is not required that the back side of every lateral member is respectively provided with pillow bar, only in the construction process, it is believed that it needs to reinforce lateral member, Pillow bar is set in corresponding position.Pillow bar is used to support between lateral member and metope, to increase lateral member on wall Stability guarantees the intensity of lateral member itself.
Further, selected lateral member is angle bar, and hook is T-shaped, links up with and is formed by the mouth of hook point in opposite sides It is not matched with the fastening structure in adjacent two plates, the inboard portion of plate is extend at the horizontal part position of angle bar.It is logical The setting of the hook of T shape is crossed, being connected and fixed between Lai Shixian plate and lateral member, structure is simple, and operation is convenient.Pass through plate Inboard portion support on angle bar, ensure that stability of the plate in lateral member.
Further, further include leveling step, there is the threaded shank stretched out, lateral member set to the anchoring piece of lateral member anchoring It connects in threaded shank, the opposite sides of the socket part in threaded shank in lateral member is threaded with an adjusting nut respectively, leads to The change of adjusting nut position on screw rod of the two sides is crossed to realize the leveling to lateral member.Pass through the tune of two adjusting nuts Section, the adjustment of position of the Lai Shixian lateral member on wall, structure is simple, easy to adjust, has an accurate position convenient for plate Set basis.
Further, the position of drag-line and anchoring piece is mutually close.Using the restriction of anchoring piece and drag-line relative position, so that It is relied on each other between drag-line, lateral member and anchoring piece and forms a firm connected body, plate is stablized to form one The basis of support.
Further, the hoop fitting includes the body of rod of U-shaped, and the body of rod hoop of U-shaped is connect on drag-line, the both ends point of the body of rod Not Chuan Guo lateral member, drag-line and lateral member are fixed by the end that fastening nut is threaded in the body of rod.Pass through the U-shaped body of rod Be arranged to realize the fixation between drag-line and lateral member, structure is simple, easy to operate, can be well adapted for drag-line and transverse direction Fixed requirement between part.
Further, in mounting plate step, when carrying out linking up with fixed, the mouth of hook of hook is rested on lateral member On lateral surface;First the fastening structure on plate downside is matched with the mouth of hook on lower layer's hook, righting plate position, upper The mouth of hook on layer hook is plugged into the fit structure on plate upper side, and upper layer hook is then fixed on adjacent upper layer In lateral member.When plate is fixed, successively it is fixedly mounted upwards from the bottom of plate.In the leveling for realizing lateral member Afterwards, hook can be accurately fixed to plate stabilization in lateral member on the basis of lateral member.
Further, the fixing piece of selection includes fixed plate, and fixed plate is bonded fixation with collar tie beam, is welded in fixed plate convex The end of block, drag-line is connected on convex block.The fixation to stay cable end is realized by the fixing piece of this structure, it can be fine Ground adapts to require the fixed of drag-line.
Further, on the vertical direction of wall, drag-line uses the set-up mode of segmented, the both ends point of every section of drag-line It is not fixed on by fixing piece on two adjacent collar tie beams.It that is to say that the drag-line of this segmented corresponds to one in building Floor, so that drag-line only stablizes plate corresponding to first floor.
Further, on the vertical direction of wall, drag-line is contour with wall, and drag-line and all collar tie beams in wall are solid It is fixed.This mode is usually the construction for the plate being suitable on the relatively small number of building of total floor, and drag-line is laid down from top layer After tightening, other than realizing and fix between lateral member, it is also necessary to drag-line be fixed to using fixing piece the circle that can be reached Liang Shang.
Therefore, beneficial effects of the present invention: corresponding to the height of plate by setting lateral member, and plate is consolidated in realization It is fixed, so that the setting of lateral member can be well adapted for the fixation to plate.By the way that drag-line is arranged, and pass through drag-line and lateral member Between fixation, hold together between each lateral member to realize, so that the fixation for being plate on wall face provides one Stable basis.Drag-line can be made relatively long, convenient to be arranged on the vertical direction of wall when realizing installation, drawing It is also convenient for fixing between rope and lateral member.Drag-line, using the high intensity of collar tie beam itself, is made by being fixed on the collar tie beam of building Obtaining fastness of the drag-line on wall can guarantee, consequently facilitating drag-line is to the fixation between each lateral member.Due to drag-line itself With certain elasticity, drag-line can be well adapted for the connection between each corresponding lateral member.It is constructed using this mounting Method realizes setting of the plate on wall body outer wall face, is arranged very convenient, is not usually required to the operation mode using welding, Longitudinal structure can be with one-time laying, and operation and material cost are relatively low.This construction method can be according to the tool of plate Body size is constructed, and can be well adapted for installing the plate of different dimensions.
Detailed description of the invention
Fig. 1 is that decorating structure partial side view is formed by wall by this mounting construction method.
Fig. 2 is the connecting relation structure chart between lateral member and drag-line.
Fig. 3 is the structure chart that drag-line is connected on wall with lateral member.
Fig. 4 is the structure chart after plate is installed in lateral member.
Specific embodiment
This mounting construction method is described further in conjunction with attached drawing, this mounting construction method is for hard plate material 7 are articulated on the wall face of wall 1, similar to the dry hanging construction of existing skin face.This mounting construction method includes Following steps are rapid.
Plate 7 is taken, the plate 7 that side has fastening structure is chosen, is usually machined in the peripheric surface of plate 7 recessed Slot.The material of plate 7 can be stone material, can be the face brick of ceramics, can be glass plate, be also possible to Aluminum curtain wall plate etc..
Fixed lateral part, on wall face in the horizontal direction with ink fountain pop up hookup wire, lateral member by anchoring piece 2 with On the basis of hookup wire, and it is fixed on metope.It is suitable according to installation from bottom to top on wall 1 when progress lateral member is fixed Sequence is fixed, and in the vertical direction, between adjacent two lateral members on the basis of the height of plate 7, carries out interval fixation.It is horizontal To the length generally also appearance with regard to three to four meters of part, is generally required between several lateral members on same layer and pass through coupling structure And it is linked together.
Stay guy 3, a lateral member at least correspond to two drag-lines 3, end of this two drag-lines 3 respectively close to lateral member Portion, if the length of lateral member reaches, several meter levels are other, general to require to there is provision of a drag-line 3 at the medium position of lateral member. Drag-line 3 is arranged along the vertical direction, and the both ends of drag-line 3 are connected on the collar tie beam 9 of wall 1 by fixing piece 10 securely respectively. The collar tie beam 9 is to constitute the main support structure of frame-type building made of concrete casting, be embodied in building itself In structure, collar tie beam 9 is all had between two adjacent floors.
Drag-line 3 is tightened, after the connection in place of drag-line 3, needs to tighten drag-line 3 by cord holder, this cord holder can Claw type can be used in the case where drag-line 3 is shorter using the cord holder arrived as used in high-voltage power transmission cable erection process Cord holder tenses drag-line 3, by the operation of cord holder, and is tightened in drag-line 3 on two fixing pieces 10.Tighten drag-line 3 can be and carry out before lateral member is fixed on wall 1, be also possible to carry out again after being fixed on wall 1 lateral member.
Cross-fixing, drag-line 3 is in the interval across lateral member and wall 1, by hoop fitting realization drag-line 3 and laterally " ten " word cross-fixing between part.
Plate 7 is mounted, the hook 6 of plate is fixed in lateral member, passes through the button on the mouth of hook and plate 7 on hook 6 Binding structure matches and plate 7 is articulated at position corresponding between adjacent two lateral member.Under normal circumstances, adjacent Should be there are gap between plate 7, expansion joint of the gap as plate 7, or form Ornamental Stitching, between adjacent two lateral member between Every the height of also slightly larger than plate 7.
Under normal circumstances, after lateral member is fixed on wall 1, interval is needed to form between lateral member and wall 1.It is right Lateral member is supported, and bar is rested the head in setting along the vertical direction on metope, and pillow bar is usually metallic rod, and pillow bar is anchored at wall 1 On.Bar is rested the head in the interval across lateral member and wall 1, lateral member is connect with pillow bar by screw flight and is fixed on one It rises.
For the order of above steps, usually first fixed lateral part, then stay guy 3.
The specific structure of lateral member is angle bar 5, and angle bar 5 is unsymmetric structure, and the size of the horizontal part of angle bar 5 is less than perpendicular The size in straight portion.Link up with it is 6 T-shaped, link up be formed by 6 opposite sides the mouth of hook respectively with the snapping in adjacent two plates 7 Structure matches, and the inboard portion of plate 7 is extend at the horizontal part position of angle bar 5, in the plate 7 of 5 upside of angle bar Side can support on the horizontal part of angle bar 5.
When angle bar 5 is fixed, also need to level using level of the horizontal ruler to angle bar 5 itself.To lateral member The anchoring piece 2 of anchoring has the threaded shank stretched out, and the vertical portion of angle bar 5 is socketed in threaded shank, vertical in angle bar 5 in threaded shank The opposite sides in portion is threaded with an adjusting nut 4 respectively, passes through the change of the position on screw rod of adjusting nut 4 of the two sides The leveling to angle bar 5 can be realized.Therefore, after being installed to angle bar 5, there is interval, angle bar 5 between angle bar 5 and wall 1 It is equivalent to and is suspended on anchoring piece 2.Anchoring piece 2 is usually expansion bolt, and the screw rod itself in expansion bolt has relatively long Extension, for being matched with the vertical portion of angle bar 5, to adapt to be adjusted the position of angle bar 5.
An opposite angle bar 5, drag-line 3 corresponding to the number of the anchoring piece 2 anchored to the angle bar 5 and the angle bar 5 Number be usually it is equal, the position of anchoring piece 2 and drag-line 3 is mutually close one by one respectively.The hoop fitting includes the body of rod of U-shaped, Under normal circumstances, in the fixing step for carrying out angle bar 5, the body of rod hoop of U-shaped can be connect on drag-line 3, the both ends difference of the body of rod Across the vertical portion of angle bar 5, drag-line 3 and angle bar 5 are fixed by the end that fastening nut 8 is threaded in the body of rod.
In mounting 7 step of plate, when carrying out 6 fixation of hook, the mouth of hook of hook 6 is rested on the lateral surface of lateral member On.When the hook 6 to T shape is fixed, the connection part on hook 6 is adhesively secured to the water of angle bar 5 by fastening bolt In flat portion, the outer side edges of the mouth of hook and 5 horizontal part of angle bar on hook 6 fit, and realize the position to hook 6 on angle bar 5 It is accurate fixed.When progress plate 7 is fixed, first the mouth of hook matching on the fastening structure and lower layer's hook 6 on 7 downside of plate It closes, 7 position of righting plate, the mouth of hook on upper layer hook 6 is plugged into the fit structure on 7 upper side of plate, then upper Layer hook 6 is fixed on the horizontal part of adjacent upper layer angle bar 5.
Angle bar 5 needs the corresponding position on angle bar 5 to punch, before being fixed to wear box cupling fitting, fixing bolt And anchoring piece.
The fixing piece 10 includes fixed plate, and fixed plate is bonded fixation with collar tie beam 9, convex block is welded in fixed plate, convex Block is arranged vertically at fixed plate, and the end of drag-line 3 is connected on convex block.
It include two kinds to the set-up mode of drag-line 3 on wall 1.One is: on the vertical direction of wall 1, drag-line 3 is adopted With the set-up mode of segmented, the both ends of every section of drag-line 3 pass through fixing piece 10 respectively and are fixed on two adjacent collar tie beams 9, I.e. this section of drag-line 3 is arranged on the wall face of first floor.Another kind is: on the vertical direction of wall 1, drag-line 3 and wall 1 etc. Height, drag-line 3 are laid down from above building, and the end connection of drag-line 3 is tightened, then all collar tie beams in drag-line 3 and wall 1 9 realize fixation by anchoring type structure.For drag-line 3 and wall 1 it is contour in the case of, be also possible to every it is several layers of and Relatively firm fixation is carried out on corresponding collar tie beam 9, so that drag-line 3 pulls and supports plate 7 corresponding to several floors.

Claims (8)

1. a kind of hard plate material mounts construction method, for hard plate material to be articulated in metope, which is characterized in that including as follows Step:
Plate is taken, side is taken to have the plate of fastening structure;
Fixed lateral part is in the horizontal direction fixed on more lateral members on metope by anchoring piece, in the vertical direction, adjacent Interval between two lateral members is corresponding with panel height;
Stay guy, a lateral member at least correspond to two drag-lines, and drag-line is arranged along the vertical direction, and the both ends of drag-line couple respectively On a fixing piece, fixing piece is anchored on the collar tie beam of wall;
Drag-line is tightened, drag-line is tightened by cord holder, is fixed on the both ends of drag-line on fixing piece;
Cross-fixing, drag-line are realized between drag-line and lateral member in the interval across lateral member and wall by hoop fitting " ten " word cross-fixing;
Plate is mounted, the hook of plate is fixed in lateral member, passes through the mouth of hook on hook and the fastening structure phase on plate Cooperate and plate is articulated at position corresponding between adjacent two lateral member;
Leveling has the threaded shank stretched out to the anchoring piece of lateral member anchoring, and lateral member is socketed in threaded shank, in threaded shank in The opposite sides of the socket part of lateral member is threaded with an adjusting nut respectively, by the adjusting nut of the two sides in screw rod The change of upper position is to realize the leveling to lateral member;
Setting pillow bar, pillow bar are anchored on wall along the vertical direction on metope, rest the head on bar across lateral member and wall In interval, lateral member and pillow bar are fixed together.
2. construction method according to claim 1, which is characterized in that selected lateral member is angle bar, and hook is T-shaped, It is formed by the mouth of hook in hook opposite sides to match with the fastening structure in adjacent two plates respectively, the inboard portion of plate It extend at the horizontal part position of angle bar.
3. construction method according to claim 1, which is characterized in that the position of drag-line and anchoring piece is mutually close.
4. construction method according to claim 1, which is characterized in that the hoop fitting includes the body of rod of U-shaped, U-shaped Body of rod hoop connects on drag-line, and the both ends of the body of rod are each passed through lateral member, and the end of the body of rod is threaded in by fastening nut Drag-line and lateral member are fixed.
5. construction method according to claim 1, which is characterized in that in mounting plate step, carrying out hook fixation When, the mouth of hook of hook is rested on the lateral surface of lateral member;First on the fastening structure and lower layer's hook on plate downside The mouth of hook match, righting plate position is plugged into the mouth of hook that upper layer is linked up in the fit structure on plate upper side, so Upper layer hook is fixed in the lateral member on adjacent upper layer afterwards.
6. construction method according to claim 1, which is characterized in that the fixing piece of selection includes fixed plate, fixed plate with Collar tie beam fitting is fixed, and is welded with convex block in fixed plate, the end of drag-line is connected on convex block.
7. construction method according to claim 1, which is characterized in that on the vertical direction of wall, drag-line is using segmentation The set-up mode of formula, the both ends of every section of drag-line pass through fixing piece respectively and are fixed on two adjacent collar tie beams.
8. construction method according to claim 1, which is characterized in that on the vertical direction of wall, drag-line and wall etc. All collar tie beams in height, drag-line and wall are fixed.
CN201711010285.7A 2017-10-25 2017-10-25 Hard plate material mounts construction method Active CN107740553B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711010285.7A CN107740553B (en) 2017-10-25 2017-10-25 Hard plate material mounts construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711010285.7A CN107740553B (en) 2017-10-25 2017-10-25 Hard plate material mounts construction method

Publications (2)

Publication Number Publication Date
CN107740553A CN107740553A (en) 2018-02-27
CN107740553B true CN107740553B (en) 2019-05-07

Family

ID=61237121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711010285.7A Active CN107740553B (en) 2017-10-25 2017-10-25 Hard plate material mounts construction method

Country Status (1)

Country Link
CN (1) CN107740553B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397242B (en) * 2019-07-02 2021-09-10 浙江金泽节能建材科技有限公司 Fixing structure of natural stone decorative panel
CN111576776B (en) * 2020-05-12 2022-03-04 中铁十四局集团建筑工程有限公司 Wall brick fixing device and construction method for installing wall bricks
CN113802796B (en) * 2021-11-01 2023-03-24 重庆思贝肯节能技术开发有限公司 Light curtain wall and preparation method thereof

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2332766Y (en) * 1998-08-24 1999-08-11 王召鹏 Dry hanging fixer for outer curtain wall decorative stone of building
CN200992755Y (en) * 2006-12-29 2007-12-19 白宝鲲 Multi-supports curtainwall suspension system and suspension rib connecting device
KR100978389B1 (en) * 2008-12-10 2010-08-30 주식회사 백림종합건축사사무소 an assembly for installation the decoration panel
GB2495475A (en) * 2011-10-03 2013-04-17 Hardie James Technology Ltd Non combustible flooring comprising decking components and intermediate joining members
CN203308047U (en) * 2013-06-05 2013-11-27 郑念标 Installing and suspending assembly of finish material
CN103541534B (en) * 2013-10-24 2016-07-20 蒙娜丽莎集团股份有限公司 The construction method of light ceramics thin plate curtain wall dried hanging structure
CN203961077U (en) * 2014-06-21 2014-11-26 陕西建工集团总公司 The cladding system of open clay plate curtain wall
CN106639229A (en) * 2016-12-16 2017-05-10 温岭市普利建材科技有限公司 Rigid board construction method
CN107152135A (en) * 2017-06-30 2017-09-12 温岭市普利建材科技有限公司 Wall decorating plate mounts construction method

Also Published As

Publication number Publication date
CN107740553A (en) 2018-02-27

Similar Documents

Publication Publication Date Title
CN107740553B (en) Hard plate material mounts construction method
CN208844848U (en) A kind of wall fitting heat-insulating integral mechanism and wall fitting attemperator
CN208792663U (en) A kind of room finishing system
CN102947519A (en) Variable fastener for fixing curtain wall
CN104929297B (en) A kind of decoration panel installation of ceiling technique
CN107327111A (en) A kind of dried hanging hang structure and finishing systems
WO2010065034A2 (en) Insulated exterior cladding system
CN107905536A (en) Glass curtain wall construction method
CN109183988A (en) A kind of profile steel house and construction method
CN107587684A (en) Skin face decoration device
CN112064833A (en) Assembled partition wall structure
CN104499614A (en) Wall heat-preservation integration point hanging system and mounting method thereof
CN109723180A (en) A kind of assembled ceiling structure and its installation method
CN207348353U (en) Skin face decoration device
CN108240089B (en) Metope component and metope installation method
CN110130546A (en) A kind of assembled anti-knock internal partition wall and its installation method
CN209011473U (en) A kind of wall board fixed system and wall board
CN107227829B (en) A kind of quick levelling hanging structure of metope
CN216340293U (en) Double-layer curtain wall system with outer curtain wall made of UHPC material
CN108179893A (en) Assembled kitchen and its installation method
KR20190078792A (en) Multi system bracket
CN211114252U (en) Wall and lower margin module
CN211313162U (en) Improved light dry-hanging wallboard structure
CN208899791U (en) A kind of decoration cladding panel structure
CN208430734U (en) For hanging the metal structure shell system of substantially furring tile or inorganic decorative board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant