Summary of the invention
In view of the drawbacks of the prior art, the purpose of the embodiment of the present invention is that providing a kind of metope that can be realized Fast Installation
Component and metope installation method.
The embodiment of the invention provides a kind of metope component, the metope component includes: frame body, shingle nail, clamping
Module, the first mounting part being set on frame body and the second mounting part for being set to the wallboard fastener back side, in which: the card
Connection module is arranged on frame body, has the clamping portion of clamping shingle nail on Clamp connecting block;The shingle nail is hung by second
The first mounting part in socket part and frame body mounts, and the upper edge of the shingle nail and lower edge support are in the clamping
In portion.
In one alternate embodiment, Clamp connecting block includes at least one of lower component: for being clamped under shingle nail
The bottom fastener at end, the wallboard fastener for being clamped adjacent shingle nail.
In one alternate embodiment, the metope component further includes the plate supporting element for limiting fitting depth, institute
It states plate supporting element to be connected on frame body, a side of plate supporting element is contacted with the fitting of the back side of shingle nail.
In one alternate embodiment, have on the side contacted on the plate supporting element with the fitting of the back side of shingle nail
Flexible pad.
In one alternate embodiment, first mounting part and the second mounting part are hooked together, the first mounting part with
The contact portion of metope back is provided with flexible pad.
In one alternate embodiment, the frame body has the verticality and levelness for adjusting frame body
First regulating member.
In one alternate embodiment, the first regulating member includes being arranged on frame body vertical beam for adjusting installation water
The rivet nut and adjusting foot of Pingdu.
In one alternate embodiment, second mounting part further includes for adjusting corresponding shingle nail vertical position
Two regulating members.
In one alternate embodiment, second regulating member is the adjusting bolt being arranged on the second mounting part, institute
The screw hole cooperation for adjusting bolt and the second mounting part vertical direction is stated, to drive second to hang by adjusting bolt described in helical rotation
Shingle nail where socket part is mobile.
The embodiment of the invention also provides a kind of metope installation methods, which comprises setting frame body;Described
Clamp connecting block and the first mounting part are installed on frame body;Second mounting part is installed on shingle nail;Shingle nail is inserted into and is clamped
Module simultaneously mounts the second mounting part and the first mounting part.
In one alternate embodiment, Clamp connecting block includes at least one of lower component: for being clamped under shingle nail
The bottom fastener at end, the wallboard fastener for being clamped adjacent wall board are installed Clamp connecting block and first on the frame body and are hung
Socket part includes: the installation bottom fastener on the frame body;First mounting part is installed on the frame body;In the first wall
Second mounting part is installed on panel;Bottom fastener is inserted into the lower end of first shingle nail and is hung the second of the first shingle nail
Socket part and the first mounting part mount.
In one alternate embodiment, the method also includes the first clamping portions of: the wallboard fastener to be clamped the second wall
The top edge of panel, and wallboard fastener is installed on the frame body.
In one alternate embodiment, the method also includes: the first mounting part is installed on the frame body;?
Second mounting part is installed on two shingle nails;Second shingle nail is inserted into the second clamping portion of the wallboard fastener;And by second
Second mounting part of shingle nail and first mounting part mount.
In one alternate embodiment, setting frame body includes: and installs on frame body for limiting fitting depth
Plate supporting element, the plate supporting element is connected on frame body, and a side of plate supporting element is used for and shingle nail
The back side be bonded contact.
In one alternate embodiment, setting frame body includes: the staking spiral shell for adjusting and being arranged on frame body vertical beam
Female and adjusting foot, to adjust installation level.
In one alternate embodiment, the method also includes: adjust the adjusting bolt that is arranged on the second mounting part, institute
The screw hole cooperation for adjusting bolt and the second mounting part vertical direction is stated, passes through adjusting bolt described in helical rotation and drives the second mounting
Shingle nail where portion is mobile.
The embodiment of the present invention is efficiently solved by mounting the Fast Installation for realizing metope block with the connection type of grafting
It is traditional it is cladding during levelling cumbersome drawback, efficiently avoid drawback present in traditional construction mode, improve work
Industryization is horizontal.
Therefore, the technical solution installation of the embodiment of the present invention is more convenient, and faster, the embodiment of the present invention provides speed of application
Metope component and its installation method the specialized techniques of worker are required lower, reduce the difficulty of construction.
Specific embodiment
In a specific embodiment of the invention, the direction term being related to refers to the installation direction of metope, that is, " back side "
Or " back side " refers to the side of the metope backwards to user;"upper", "lower" refer to that metope component is completed after installing on vertical direction
Relative direction.
Fig. 1 is the overall schematic in the embodiment of the present invention after the installation of metope component;Fig. 2 is metope in the embodiment of the present invention
The partial structural diagram of the seam of shingle nail after component installation;Fig. 3 is metope component locking site in the embodiment of the present invention
Structural schematic diagram;Fig. 4 is the structural schematic diagram of bottom fastener in metope component in the embodiment of the present invention;Fig. 5 is of the invention real
Apply the structural schematic diagram of metope component mesoplate supporting element in example;Fig. 6 is the first mounting in metope component in the embodiment of the present invention
The structural schematic diagram in portion;Fig. 7 is the partial enlarged view of the first mounting part in metope component in the embodiment of the present invention;Fig. 8 is this hair
In bright embodiment in metope component the second mounting part structural schematic diagram;Fig. 9 is frame in metope component in the embodiment of the present invention
The structural schematic diagram of ontology.
A kind of metope component 100 is provided in the embodiment of the present invention, the metope component includes: frame body 110, metope
Plate 120, Clamp connecting block 130, the first mounting part 140 being set on frame body and the second extension for being set to the wallboard fastener back side
Socket part 150.
Frame body 110 can be overlapped by components such as square tube, square pipe connecting pieces and be formed, and be taken by square tube and square pipe connecting piece
The independent three-dimensional system built up.Frame body 110 is used to provide installation foundation for components such as shingle nail 120, Clamp connecting blocks 130
Component without relying on primitive architecture metope, therefore has and establishes one's own system, the flexible advantage of operation strategies.
Shingle nail 120 can be combined wall board or wooden wallboard, and combined wall board can be laminated by multiple material and is combined,
Such as it can be wooden backboard and tile panel is compounded to form combined wall board.The back side of shingle nail 120 needs to connect the second mounting
Portion 150, the back side of shingle nail 120 need to be adapted for the operation such as drill, be spirally connected, weld, bonding, therefore the back of shingle nail 120
Face is made with wooden or metal.
The Clamp connecting block 130 is arranged on frame body 110, has the card of clamping shingle nail 120 on Clamp connecting block 130
Socket part.
In an embodiment of the present invention, Clamp connecting block 130 may include at least one of lower component: for being clamped wall
The bottom fastener 131 of panel lower end, the wallboard fastener 132 for being clamped adjacent wall board.Clamp connecting block 130 is used to be used as and directly hold
The component of support, clamping shingle nail 120,130 one end of Clamp connecting block are connect with frame body 110, and the other end and shingle nail 120 block
It connects.Clamp connecting block 130 can by metal by casting, metal plate or other be machined mode and be made.Clamp connecting block 130 can have
A variety of ways of realization, in an embodiment of the present invention, Clamp connecting block 130 can be the bottom fastener for being clamped shingle nail lower end
131 or the wallboard fastener 132 for being clamped adjacent wall board.Wherein, bottom fastener 131 is mounted on 110 lower section of frame body, is used for
One piece of shingle nail 120 of support lower side, as shown, bottom fastener 131 has the clamping portion that is folded upward at, for support or
It is clamped the lower edge of shingle nail 120.Wallboard fastener 132 is to be mounted on centre for being mounted on 110 middle part of frame body
Adjacent two pieces of shingle nails 120 directly provide the component of support or clamping.For example, the shingle nail for being mounted on lower section is the first metope
Plate;The shingle nail of side adjacent and mounted thereto with the first shingle nail is the second shingle nail, then there are two cards for the tool of wallboard fastener 132
Socket part, the first clamping portion 1321 are used to be clamped the lower edge of the second shingle nail, and the first clamping portion 1322 is for being clamped the first metope
The top edge of plate.Clamp connecting block 130 also defines that fitting depth, the fitting depth refer to 120 place plane of shingle nail simultaneously
At a distance from frame body 110.As shown, bottom fastener 131 or wallboard fastener 132 all have where keeping shingle nail 120
The structure of distance between plane and frame body 110.
First mounting part 140 is mounted on frame body 110, comes the second mounting part of support 150 as one " hook "
Component, meanwhile, the rear-face contact of a side 1401 and shingle nail 120 of the first mounting part 140.In the embodiment of the present invention
In, in order to avoid causing to damage to shingle nail 120, the contact portion of the first mounting part 140 and the back side of shingle nail 120 is provided with
Flexible pad can inlay flexible pad 1411 in first groove 141 as shown, the first mounting part has the first groove 141.Institute
Stating flexible pad can be made of rubber or other flexible materials.
As the component with 140 clasp joint of the first mounting part, the second mounting part 150 is mounted on the back side of shingle nail 120.At this
In the embodiment of invention, the second mounting part 150 is including further including the second adjustment portion for adjusting corresponding shingle nail vertical position
Part.Second regulating member is the adjusting bolt 151 being arranged on the second mounting part 150, the adjusting bolt 151 and second
The screw hole 152 of mounting part vertical direction cooperates, and when needing to be finely adjusted shingle nail 120, then adjusts spiral shell described in helical rotation
Bolt 151 so that the shingle nail 120 at place is mobile, and then adjusts shingle nail with can be convenient by driving the second mounting part 150
Installation level.The installation level refers to the flatness of the entire plane of installation shingle nail.Each second mounting part 150
On can configure two it is secondary adjust bolts 151 and adjust bolt 152, so as to more symmetrical, horizontal balancedly to the installation of shingle nail
Degree is adjusted.As shown, second mounting part 150 is by with cavity in order to further mitigate the weight of the second mounting part 150
153 profile is made.
As shown, the first mounting part 140, the second mounting part 150 by tapping screw respectively with frame body 110 and
Shingle nail 120 connects.First mounting part 140, the second mounting part 150 can be made of metal.
When installing to metope component 100, the shingle nail 120 passes through on the second mounting part 150 and frame body 110
The mounting of first mounting part 140, and the upper edge of the shingle nail 120 and lower edge support are in the bottom fastener 131 or wall
In the clamping portion of board card piece 132.
In an embodiment of the present invention, the metope component 100 further includes the plate supporting element for limiting fitting depth
160, the plate supporting element 160 is made of flexible material, such as PVC material is made, using being elastically engaged at frame
On ontology 110, moreover, a side of plate supporting element 160 is snugly contacted with the back side of shingle nail, in order to avoid due to right
The directly contact of shingle nail 120 causes to damage, on the side contacted on the plate supporting element 160 with the fitting of the back side of shingle nail
It is provided with flexible pad 161.Setting plate supporting element 160 is to preferably support to shingle nail 120.Because in many situations
Under, the area or length of usual shingle nail 120 are larger, if only hanging by Clamp connecting block 130, the first mounting part 140, second
Shingle nail 120 is fixed in the clamping of socket part 150, and since shingle nail is larger, Clamp connecting block 130, first mounting part 140, second are hung
Plate face between the supporting point of socket part 150 is just easy to bend, and generates certain amount of deflection, it is easy to influence the use of metope
Service life and quality, therefore the plate face that plate supporting element 160 can preferably be shingle nail 120 is set between these supporting points and be mentioned
For support, the deformation of plate face is avoided, improves product quality and service life.
In an embodiment of the present invention, the frame body 110 has the verticality and level for adjusting frame body
First regulating member of degree.First regulating member includes being arranged on frame body vertical beam for adjusting the staking of installation level
Nut 111 and adjusting foot 112.It draws fourth of the twelve Earthly Branches nut 111 that can be fixed in the vertical square tube for constituting frame body 110, adjusts foot 112
Be mounted on and draw on fourth of the twelve Earthly Branches nut 111, by adjusting the adjustings foot 112, adjustable frame body 110 and basis metope away from
From so as to adjust the installation level of shingle nail 120.Adjusting to foot 112 is adjusted, can carry out by level meter.And
It adjusts foot 112 and provides support to frame body 110, so that frame body 110 be made to form stable space structure.
The embodiments of the present invention also provide a kind of metope installation methods, which comprises
Step 210, frame body 110 is set.According to design requirement, frame is built with components such as square tube, square pipe connecting pieces
Ontology.Frame body 110 may include top frame, under(-)chassis and braced frame, so that the support for constituting 3 D stereo is empty
Between.
Step 220, Clamp connecting block 130 and the first mounting part 140 are installed on the frame body 110.Wherein, it is clamped mould
There is the clamping portion of clamping shingle nail 120 on block 130.
Step 230, the second mounting part 150 is installed on shingle nail 120.Second mounting part 150 is used for and the first mounting part
140 mountings.
Step 240, shingle nail 120 is inserted into the clamping portion of Clamp connecting block 130, and the second mounting part 150 and first is hung
Socket part 140 mounts, to complete the Fast Installation of metope component.
In another embodiment of the present invention, a kind of metope installation method is provided:
Step 310, frame body is set.According to design requirement, 3 D stereo is built with components such as square tube, square pipe connecting pieces
Frame body.
Step 320, according to fitting depth, plate supporting element 160 is caught on frame body 110.It is carried out to foot 112 is adjusted
It adjusts, so that frame body 110 is in horizontal, vertical, and secured adjusted foot 112 makes its frame body 110 tend towards stability.The plate
Block supporting element 160 is connected on frame body 110, and a side of plate supporting element 160 is used to paste with the back side of shingle nail 120
Splice grafting touching.
Step 330, bottom fastener 131 is installed on the frame body.By self-tapping screw by bottom fastener and frame
The bottom of ontology connects, and checks the level of bottom fastener 131.
Step 340, start that first block of wallboard is installed.Specifically, the first mounting part 140 is installed on the frame body.
Step 350, the second mounting part 150 is installed on the first shingle nail.
Step 360, by the card slot of the lower end of first shingle nail insertion bottom fastener 131, and by the first shingle nail
The second mounting part 150 and the first mounting part 140 mount.
Step 370, the adjusting bolt 151 rotated on the second mounting part 150 is adjusted, and finely tunes shingle nail 120 by level meter
Installation level.The cooperation of screw hole 152 for adjusting bolt 151 and the second mounting part vertical direction, passes through helical rotation institute
It is mobile to state the shingle nail 120 adjusted where bolt 151 drives the second mounting part 150, to realize to 120 installation level of shingle nail
Fine tuning.
Step 380, after the completion of Level tune, the protrusion in wallboard card 132 is caught in the card slot of 120 top edge of shingle nail
In 121, that is, so that the second shingle nail 120 is inserted into the first clamping portion 1321 of the wallboard fastener 132, and pass through self-tapping screw
Wallboard card 132 is connect with frame body 110.So far, the installation of first piece of shingle nail terminates.
Step 390, the first mounting part 140 is installed again on the frame body.Since the step, prepare installation second
Block shingle nail, therefore first mounting part 140 is located above first piece of shingle nail, for mounting second piece of shingle nail.
Step 400, the second mounting part is installed on the second shingle nail.Second shingle nail is to be mounted on the first shingle nail
The shingle nail of top adjacent position.It is similar that process of second mounting part with before is installed on the second shingle nail.
Step 410, the second shingle nail is inserted into the second clamping portion of the wallboard fastener;And by the of the second shingle nail
Two mounting parts and first mounting part mount.
Subsequent similar as before to the installation of the second shingle nail, adjustment process, details are not described herein.It is subsequent according to from it is lower to
The mode of upper installation successively mounts shingle nail, until being finally installed.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously
Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention
Protect range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.