CN108240089B - Metope component and metope installation method - Google Patents

Metope component and metope installation method Download PDF

Info

Publication number
CN108240089B
CN108240089B CN201711490413.2A CN201711490413A CN108240089B CN 108240089 B CN108240089 B CN 108240089B CN 201711490413 A CN201711490413 A CN 201711490413A CN 108240089 B CN108240089 B CN 108240089B
Authority
CN
China
Prior art keywords
mounting part
shingle nail
frame body
metope
connecting block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711490413.2A
Other languages
Chinese (zh)
Other versions
CN108240089A (en
Inventor
王文广
丁欣欣
庄惟敏
周东珊
侯建群
任宝双
余广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201711490413.2A priority Critical patent/CN108240089B/en
Publication of CN108240089A publication Critical patent/CN108240089A/en
Priority to PCT/CN2018/103865 priority patent/WO2019128292A1/en
Application granted granted Critical
Publication of CN108240089B publication Critical patent/CN108240089B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/0805Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall
    • E04F13/0808Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall adjustable in several directions one of which is perpendicular to the wall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The embodiment of the invention discloses a kind of metope component, the metope component includes: frame body, shingle nail, Clamp connecting block, the first mounting part being set on frame body and the second mounting part for being set to the wallboard fastener back side.The embodiment of the invention also provides a kind of metope installation methods, comprising: setting frame body;Clamp connecting block and the first mounting part are installed on the frame body;Second mounting part is installed on shingle nail;Shingle nail is inserted into Clamp connecting block and mounts the second mounting part and the first mounting part.The embodiment of the present invention efficiently solves the cladding levelling cumbersome drawback in the process of tradition, efficiently avoids drawback present in traditional construction mode, improve industrialized level by mounting the Fast Installation for realizing metope block with the connection type of grafting.

Description

Metope component and metope installation method
Technical field
The present invention relates to decorations field more particularly to a kind of metope components and metope installation method.
Background technique
In current existing building decoration, the mode of tile laying is broadly divided into wet combining and cladding two ways.Wherein wet combining Mainly realized by cement mortar or tile binding material, it is cladding to be mainly achieved by cladding component.
The main problem of both prior arts is as follows: use wet combining mode, work progress is longer, construction professional standards compared with High and quality control difficulty is larger, and has pollution to construction environment;And common dry hanging is used, wasting space is larger, peace Levelling adjusting is relatively complicated during dress, and single ceramic tile is cladding, and ceramic tile is easy to be crushed.
Summary of the invention
In view of the drawbacks of the prior art, the purpose of the embodiment of the present invention is that providing a kind of metope that can be realized Fast Installation Component and metope installation method.
The embodiment of the invention provides a kind of metope component, the metope component includes: frame body, shingle nail, clamping Module, the first mounting part being set on frame body and the second mounting part for being set to the wallboard fastener back side, in which: the card Connection module is arranged on frame body, has the clamping portion of clamping shingle nail on Clamp connecting block;The shingle nail is hung by second The first mounting part in socket part and frame body mounts, and the upper edge of the shingle nail and lower edge support are in the clamping In portion.
In one alternate embodiment, Clamp connecting block includes at least one of lower component: for being clamped under shingle nail The bottom fastener at end, the wallboard fastener for being clamped adjacent shingle nail.
In one alternate embodiment, the metope component further includes the plate supporting element for limiting fitting depth, institute It states plate supporting element to be connected on frame body, a side of plate supporting element is contacted with the fitting of the back side of shingle nail.
In one alternate embodiment, have on the side contacted on the plate supporting element with the fitting of the back side of shingle nail Flexible pad.
In one alternate embodiment, first mounting part and the second mounting part are hooked together, the first mounting part with The contact portion of metope back is provided with flexible pad.
In one alternate embodiment, the frame body has the verticality and levelness for adjusting frame body First regulating member.
In one alternate embodiment, the first regulating member includes being arranged on frame body vertical beam for adjusting installation water The rivet nut and adjusting foot of Pingdu.
In one alternate embodiment, second mounting part further includes for adjusting corresponding shingle nail vertical position Two regulating members.
In one alternate embodiment, second regulating member is the adjusting bolt being arranged on the second mounting part, institute The screw hole cooperation for adjusting bolt and the second mounting part vertical direction is stated, to drive second to hang by adjusting bolt described in helical rotation Shingle nail where socket part is mobile.
The embodiment of the invention also provides a kind of metope installation methods, which comprises setting frame body;Described Clamp connecting block and the first mounting part are installed on frame body;Second mounting part is installed on shingle nail;Shingle nail is inserted into and is clamped Module simultaneously mounts the second mounting part and the first mounting part.
In one alternate embodiment, Clamp connecting block includes at least one of lower component: for being clamped under shingle nail The bottom fastener at end, the wallboard fastener for being clamped adjacent wall board are installed Clamp connecting block and first on the frame body and are hung Socket part includes: the installation bottom fastener on the frame body;First mounting part is installed on the frame body;In the first wall Second mounting part is installed on panel;Bottom fastener is inserted into the lower end of first shingle nail and is hung the second of the first shingle nail Socket part and the first mounting part mount.
In one alternate embodiment, the method also includes the first clamping portions of: the wallboard fastener to be clamped the second wall The top edge of panel, and wallboard fastener is installed on the frame body.
In one alternate embodiment, the method also includes: the first mounting part is installed on the frame body;? Second mounting part is installed on two shingle nails;Second shingle nail is inserted into the second clamping portion of the wallboard fastener;And by second Second mounting part of shingle nail and first mounting part mount.
In one alternate embodiment, setting frame body includes: and installs on frame body for limiting fitting depth Plate supporting element, the plate supporting element is connected on frame body, and a side of plate supporting element is used for and shingle nail The back side be bonded contact.
In one alternate embodiment, setting frame body includes: the staking spiral shell for adjusting and being arranged on frame body vertical beam Female and adjusting foot, to adjust installation level.
In one alternate embodiment, the method also includes: adjust the adjusting bolt that is arranged on the second mounting part, institute The screw hole cooperation for adjusting bolt and the second mounting part vertical direction is stated, passes through adjusting bolt described in helical rotation and drives the second mounting Shingle nail where portion is mobile.
The embodiment of the present invention is efficiently solved by mounting the Fast Installation for realizing metope block with the connection type of grafting It is traditional it is cladding during levelling cumbersome drawback, efficiently avoid drawback present in traditional construction mode, improve work Industryization is horizontal.
Therefore, the technical solution installation of the embodiment of the present invention is more convenient, and faster, the embodiment of the present invention provides speed of application Metope component and its installation method the specialized techniques of worker are required lower, reduce the difficulty of construction.
Detailed description of the invention
Fig. 1 is the overall schematic in the embodiment of the present invention after the installation of metope component;
Fig. 2 is the partial structural diagram of the seam of shingle nail after the installation of metope component in the embodiment of the present invention;
Fig. 3 is the structural schematic diagram of metope component locking site in the embodiment of the present invention;
Fig. 4 is the structural schematic diagram of bottom fastener in metope component in the embodiment of the present invention;
Fig. 5 is the structural schematic diagram of metope component mesoplate supporting element in the embodiment of the present invention;
Fig. 6 is the structural schematic diagram of the first mounting part in metope component in the embodiment of the present invention;
Fig. 7 is the partial enlarged view of the first mounting part in metope component in the embodiment of the present invention;
Fig. 8 is the structural schematic diagram of the second mounting part in metope component in the embodiment of the present invention;
Fig. 9 is the structural schematic diagram of frame body in metope component in the embodiment of the present invention.
Specific embodiment
In a specific embodiment of the invention, the direction term being related to refers to the installation direction of metope, that is, " back side " Or " back side " refers to the side of the metope backwards to user;"upper", "lower" refer to that metope component is completed after installing on vertical direction Relative direction.
Fig. 1 is the overall schematic in the embodiment of the present invention after the installation of metope component;Fig. 2 is metope in the embodiment of the present invention The partial structural diagram of the seam of shingle nail after component installation;Fig. 3 is metope component locking site in the embodiment of the present invention Structural schematic diagram;Fig. 4 is the structural schematic diagram of bottom fastener in metope component in the embodiment of the present invention;Fig. 5 is of the invention real Apply the structural schematic diagram of metope component mesoplate supporting element in example;Fig. 6 is the first mounting in metope component in the embodiment of the present invention The structural schematic diagram in portion;Fig. 7 is the partial enlarged view of the first mounting part in metope component in the embodiment of the present invention;Fig. 8 is this hair In bright embodiment in metope component the second mounting part structural schematic diagram;Fig. 9 is frame in metope component in the embodiment of the present invention The structural schematic diagram of ontology.
A kind of metope component 100 is provided in the embodiment of the present invention, the metope component includes: frame body 110, metope Plate 120, Clamp connecting block 130, the first mounting part 140 being set on frame body and the second extension for being set to the wallboard fastener back side Socket part 150.
Frame body 110 can be overlapped by components such as square tube, square pipe connecting pieces and be formed, and be taken by square tube and square pipe connecting piece The independent three-dimensional system built up.Frame body 110 is used to provide installation foundation for components such as shingle nail 120, Clamp connecting blocks 130 Component without relying on primitive architecture metope, therefore has and establishes one's own system, the flexible advantage of operation strategies.
Shingle nail 120 can be combined wall board or wooden wallboard, and combined wall board can be laminated by multiple material and is combined, Such as it can be wooden backboard and tile panel is compounded to form combined wall board.The back side of shingle nail 120 needs to connect the second mounting Portion 150, the back side of shingle nail 120 need to be adapted for the operation such as drill, be spirally connected, weld, bonding, therefore the back of shingle nail 120 Face is made with wooden or metal.
The Clamp connecting block 130 is arranged on frame body 110, has the card of clamping shingle nail 120 on Clamp connecting block 130 Socket part.
In an embodiment of the present invention, Clamp connecting block 130 may include at least one of lower component: for being clamped wall The bottom fastener 131 of panel lower end, the wallboard fastener 132 for being clamped adjacent wall board.Clamp connecting block 130 is used to be used as and directly hold The component of support, clamping shingle nail 120,130 one end of Clamp connecting block are connect with frame body 110, and the other end and shingle nail 120 block It connects.Clamp connecting block 130 can by metal by casting, metal plate or other be machined mode and be made.Clamp connecting block 130 can have A variety of ways of realization, in an embodiment of the present invention, Clamp connecting block 130 can be the bottom fastener for being clamped shingle nail lower end 131 or the wallboard fastener 132 for being clamped adjacent wall board.Wherein, bottom fastener 131 is mounted on 110 lower section of frame body, is used for One piece of shingle nail 120 of support lower side, as shown, bottom fastener 131 has the clamping portion that is folded upward at, for support or It is clamped the lower edge of shingle nail 120.Wallboard fastener 132 is to be mounted on centre for being mounted on 110 middle part of frame body Adjacent two pieces of shingle nails 120 directly provide the component of support or clamping.For example, the shingle nail for being mounted on lower section is the first metope Plate;The shingle nail of side adjacent and mounted thereto with the first shingle nail is the second shingle nail, then there are two cards for the tool of wallboard fastener 132 Socket part, the first clamping portion 1321 are used to be clamped the lower edge of the second shingle nail, and the first clamping portion 1322 is for being clamped the first metope The top edge of plate.Clamp connecting block 130 also defines that fitting depth, the fitting depth refer to 120 place plane of shingle nail simultaneously At a distance from frame body 110.As shown, bottom fastener 131 or wallboard fastener 132 all have where keeping shingle nail 120 The structure of distance between plane and frame body 110.
First mounting part 140 is mounted on frame body 110, comes the second mounting part of support 150 as one " hook " Component, meanwhile, the rear-face contact of a side 1401 and shingle nail 120 of the first mounting part 140.In the embodiment of the present invention In, in order to avoid causing to damage to shingle nail 120, the contact portion of the first mounting part 140 and the back side of shingle nail 120 is provided with Flexible pad can inlay flexible pad 1411 in first groove 141 as shown, the first mounting part has the first groove 141.Institute Stating flexible pad can be made of rubber or other flexible materials.
As the component with 140 clasp joint of the first mounting part, the second mounting part 150 is mounted on the back side of shingle nail 120.At this In the embodiment of invention, the second mounting part 150 is including further including the second adjustment portion for adjusting corresponding shingle nail vertical position Part.Second regulating member is the adjusting bolt 151 being arranged on the second mounting part 150, the adjusting bolt 151 and second The screw hole 152 of mounting part vertical direction cooperates, and when needing to be finely adjusted shingle nail 120, then adjusts spiral shell described in helical rotation Bolt 151 so that the shingle nail 120 at place is mobile, and then adjusts shingle nail with can be convenient by driving the second mounting part 150 Installation level.The installation level refers to the flatness of the entire plane of installation shingle nail.Each second mounting part 150 On can configure two it is secondary adjust bolts 151 and adjust bolt 152, so as to more symmetrical, horizontal balancedly to the installation of shingle nail Degree is adjusted.As shown, second mounting part 150 is by with cavity in order to further mitigate the weight of the second mounting part 150 153 profile is made.
As shown, the first mounting part 140, the second mounting part 150 by tapping screw respectively with frame body 110 and Shingle nail 120 connects.First mounting part 140, the second mounting part 150 can be made of metal.
When installing to metope component 100, the shingle nail 120 passes through on the second mounting part 150 and frame body 110 The mounting of first mounting part 140, and the upper edge of the shingle nail 120 and lower edge support are in the bottom fastener 131 or wall In the clamping portion of board card piece 132.
In an embodiment of the present invention, the metope component 100 further includes the plate supporting element for limiting fitting depth 160, the plate supporting element 160 is made of flexible material, such as PVC material is made, using being elastically engaged at frame On ontology 110, moreover, a side of plate supporting element 160 is snugly contacted with the back side of shingle nail, in order to avoid due to right The directly contact of shingle nail 120 causes to damage, on the side contacted on the plate supporting element 160 with the fitting of the back side of shingle nail It is provided with flexible pad 161.Setting plate supporting element 160 is to preferably support to shingle nail 120.Because in many situations Under, the area or length of usual shingle nail 120 are larger, if only hanging by Clamp connecting block 130, the first mounting part 140, second Shingle nail 120 is fixed in the clamping of socket part 150, and since shingle nail is larger, Clamp connecting block 130, first mounting part 140, second are hung Plate face between the supporting point of socket part 150 is just easy to bend, and generates certain amount of deflection, it is easy to influence the use of metope Service life and quality, therefore the plate face that plate supporting element 160 can preferably be shingle nail 120 is set between these supporting points and be mentioned For support, the deformation of plate face is avoided, improves product quality and service life.
In an embodiment of the present invention, the frame body 110 has the verticality and level for adjusting frame body First regulating member of degree.First regulating member includes being arranged on frame body vertical beam for adjusting the staking of installation level Nut 111 and adjusting foot 112.It draws fourth of the twelve Earthly Branches nut 111 that can be fixed in the vertical square tube for constituting frame body 110, adjusts foot 112 Be mounted on and draw on fourth of the twelve Earthly Branches nut 111, by adjusting the adjustings foot 112, adjustable frame body 110 and basis metope away from From so as to adjust the installation level of shingle nail 120.Adjusting to foot 112 is adjusted, can carry out by level meter.And It adjusts foot 112 and provides support to frame body 110, so that frame body 110 be made to form stable space structure.
The embodiments of the present invention also provide a kind of metope installation methods, which comprises
Step 210, frame body 110 is set.According to design requirement, frame is built with components such as square tube, square pipe connecting pieces Ontology.Frame body 110 may include top frame, under(-)chassis and braced frame, so that the support for constituting 3 D stereo is empty Between.
Step 220, Clamp connecting block 130 and the first mounting part 140 are installed on the frame body 110.Wherein, it is clamped mould There is the clamping portion of clamping shingle nail 120 on block 130.
Step 230, the second mounting part 150 is installed on shingle nail 120.Second mounting part 150 is used for and the first mounting part 140 mountings.
Step 240, shingle nail 120 is inserted into the clamping portion of Clamp connecting block 130, and the second mounting part 150 and first is hung Socket part 140 mounts, to complete the Fast Installation of metope component.
In another embodiment of the present invention, a kind of metope installation method is provided:
Step 310, frame body is set.According to design requirement, 3 D stereo is built with components such as square tube, square pipe connecting pieces Frame body.
Step 320, according to fitting depth, plate supporting element 160 is caught on frame body 110.It is carried out to foot 112 is adjusted It adjusts, so that frame body 110 is in horizontal, vertical, and secured adjusted foot 112 makes its frame body 110 tend towards stability.The plate Block supporting element 160 is connected on frame body 110, and a side of plate supporting element 160 is used to paste with the back side of shingle nail 120 Splice grafting touching.
Step 330, bottom fastener 131 is installed on the frame body.By self-tapping screw by bottom fastener and frame The bottom of ontology connects, and checks the level of bottom fastener 131.
Step 340, start that first block of wallboard is installed.Specifically, the first mounting part 140 is installed on the frame body.
Step 350, the second mounting part 150 is installed on the first shingle nail.
Step 360, by the card slot of the lower end of first shingle nail insertion bottom fastener 131, and by the first shingle nail The second mounting part 150 and the first mounting part 140 mount.
Step 370, the adjusting bolt 151 rotated on the second mounting part 150 is adjusted, and finely tunes shingle nail 120 by level meter Installation level.The cooperation of screw hole 152 for adjusting bolt 151 and the second mounting part vertical direction, passes through helical rotation institute It is mobile to state the shingle nail 120 adjusted where bolt 151 drives the second mounting part 150, to realize to 120 installation level of shingle nail Fine tuning.
Step 380, after the completion of Level tune, the protrusion in wallboard card 132 is caught in the card slot of 120 top edge of shingle nail In 121, that is, so that the second shingle nail 120 is inserted into the first clamping portion 1321 of the wallboard fastener 132, and pass through self-tapping screw Wallboard card 132 is connect with frame body 110.So far, the installation of first piece of shingle nail terminates.
Step 390, the first mounting part 140 is installed again on the frame body.Since the step, prepare installation second Block shingle nail, therefore first mounting part 140 is located above first piece of shingle nail, for mounting second piece of shingle nail.
Step 400, the second mounting part is installed on the second shingle nail.Second shingle nail is to be mounted on the first shingle nail The shingle nail of top adjacent position.It is similar that process of second mounting part with before is installed on the second shingle nail.
Step 410, the second shingle nail is inserted into the second clamping portion of the wallboard fastener;And by the of the second shingle nail Two mounting parts and first mounting part mount.
Subsequent similar as before to the installation of the second shingle nail, adjustment process, details are not described herein.It is subsequent according to from it is lower to The mode of upper installation successively mounts shingle nail, until being finally installed.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention Protect range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (12)

1. a kind of metope component, which is characterized in that the metope component includes: the frame body, shingle nail, clamping of 3 D stereo Module, the first mounting part being set on frame body and the second mounting part for being set to the wallboard fastener back side, in which: the frame Frame ontology, which is overlapped by square tube with square pipe connecting piece, to be formed;
The Clamp connecting block is arranged on frame body, has the clamping portion of clamping shingle nail on Clamp connecting block;
The shingle nail is mounted by the first mounting part on the second mounting part and frame body, and the top of the shingle nail Edge and lower edge support are in the clamping portion;Second mounting part further includes for adjusting corresponding shingle nail vertical position Second regulating member;
The metope component further includes the plate supporting element for limiting fitting depth, and the plate supporting element is connected to frame sheet On body, a side of plate supporting element is contacted with the fitting of the back side of shingle nail;
The frame body has for adjusting the verticality of frame body and the first regulating member of levelness, the first adjustment portion Part includes the rivet nut and adjusting foot being arranged on frame body vertical beam for adjusting installation level.
2. metope component according to claim 1, which is characterized in that Clamp connecting block includes at least one in lower component Kind: the bottom fastener for being clamped shingle nail lower end, the wallboard fastener for being clamped adjacent shingle nail.
3. metope component according to claim 2, which is characterized in that the back side on the plate supporting element with shingle nail Being bonded on the side of contact has flexible pad.
4. metope component according to claim 2, which is characterized in that first mounting part and the second mounting part are articulated in Together, the contact portion of the first mounting part and metope back is provided with flexible pad.
5. metope component according to claim 1, which is characterized in that second regulating member is setting in the second mounting Adjusting bolt in portion, the screw hole cooperation for adjusting bolt and the second mounting part vertical direction, by described in helical rotation The shingle nail adjusted where bolt drives the second mounting part is mobile.
6. a kind of method for carrying out metope installation using metope component described in claim 1, which is characterized in that the method packet It includes:
Frame body is set;
Clamp connecting block and the first mounting part are installed on the frame body;
Second mounting part is installed on shingle nail;
Shingle nail is inserted into Clamp connecting block and mounts the second mounting part and the first mounting part.
7. metope installation method according to claim 6, which is characterized in that Clamp connecting block include in lower component at least It is a kind of: the bottom fastener for being clamped shingle nail lower end, the wallboard fastener for being clamped adjacent wall board, on the frame body Installation Clamp connecting block and the first mounting part include:
Bottom fastener is installed on the frame body;
First mounting part is installed on the frame body;
Second mounting part is installed on the first shingle nail;
Bottom fastener is inserted into the lower end of first shingle nail and by the second mounting part of the first shingle nail and the first mounting part Mounting.
8. metope installation method according to claim 7, which is characterized in that the method also includes:
First clamping portion of the wallboard fastener is clamped the top edge of the second shingle nail, and wallboard fastener is installed to the frame On frame ontology.
9. metope installation method according to claim 7, which is characterized in that the method also includes:
First mounting part is installed on the frame body;
Second mounting part is installed on the second shingle nail;
Second shingle nail is inserted into the second clamping portion of the wallboard fastener;And by the second mounting part of the second shingle nail and institute State the mounting of the first mounting part.
10. the metope installation method according to any one of claim 6-9, which is characterized in that setting frame body packet It includes: the plate supporting element for limiting fitting depth is installed on frame body, the plate supporting element is connected to frame body On, a side of plate supporting element is used to contact with the fitting of the back side of shingle nail.
11. metope installation method according to claim 10, which is characterized in that setting frame body includes: to adjust setting Rivet nut and adjusting foot on frame body vertical beam, to adjust installation level.
12. the metope installation method according to any one of claim 6-9, which is characterized in that the method also includes:
The adjusting bolt being arranged on the second mounting part is adjusted, the screw hole for adjusting bolt and the second mounting part vertical direction is matched It closes, the shingle nail where driving the second mounting part by adjusting bolt described in helical rotation is mobile.
CN201711490413.2A 2017-12-30 2017-12-30 Metope component and metope installation method Active CN108240089B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201711490413.2A CN108240089B (en) 2017-12-30 2017-12-30 Metope component and metope installation method
PCT/CN2018/103865 WO2019128292A1 (en) 2017-12-30 2018-09-04 Wall component and wall mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711490413.2A CN108240089B (en) 2017-12-30 2017-12-30 Metope component and metope installation method

Publications (2)

Publication Number Publication Date
CN108240089A CN108240089A (en) 2018-07-03
CN108240089B true CN108240089B (en) 2019-01-22

Family

ID=62698349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711490413.2A Active CN108240089B (en) 2017-12-30 2017-12-30 Metope component and metope installation method

Country Status (2)

Country Link
CN (1) CN108240089B (en)
WO (1) WO2019128292A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108240089B (en) * 2017-12-30 2019-01-22 浙江亚厦装饰股份有限公司 Metope component and metope installation method
CN110424668B (en) * 2019-07-31 2021-02-19 深圳市全艺建筑工程有限公司 Wallboard mounting structure

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2644552Y (en) * 2003-08-04 2004-09-29 中建一局建设发展公司 Fixture for direct hanging stone on a slotted stone curtain wall
KR100609471B1 (en) * 2004-05-24 2006-08-08 지영화 An Assemble Device of Building Outer Wall Ornamental
CN2851389Y (en) * 2005-09-30 2006-12-27 李怀亮 Dry-hanging piece for stone curtain wall
CN101624850A (en) * 2008-07-09 2010-01-13 杜军桦 Dry-hanging structure of stone curtain wall
CN204326438U (en) * 2014-12-09 2015-05-13 深圳市晶宫设计装饰工程有限公司 Hanging buckle structure and there is the wooden facing decorative wall of this hanging buckle structure
CN205476258U (en) * 2015-12-31 2016-08-17 浙江亚厦装饰股份有限公司 Wall assembly
CN107217810A (en) * 2017-05-11 2017-09-29 福州百益百利自动化科技有限公司 A kind of cladding suspension member of decoration panel detachably installed and mount system and method
CN108240089B (en) * 2017-12-30 2019-01-22 浙江亚厦装饰股份有限公司 Metope component and metope installation method

Also Published As

Publication number Publication date
WO2019128292A1 (en) 2019-07-04
CN108240089A (en) 2018-07-03

Similar Documents

Publication Publication Date Title
CN108240089B (en) Metope component and metope installation method
CN208685989U (en) A kind of adjustable ceramic tile thin plate and inorganic decoration panel wall wallboard installation system
CN210288789U (en) Quick assembly's assembled partition wall mounting structure
CN107740553B (en) Hard plate material mounts construction method
CN207110329U (en) A kind of wallboard fast fixing structure
CN104895204A (en) Connecting structure of insertion connection type thermal insulation plate
CN211341561U (en) Plaque assembly
CN210947282U (en) Mounting structure of assembled fossil fragments partition wall
CN211736163U (en) Wall panel installation assembly
CN211341490U (en) Wall surface leveling assembly
CN108505669A (en) A kind of annular ceiling system
CN211396420U (en) Leveling device
CN205296475U (en) Aerated concrete window wrap panel fixed establishment's last structure
CN206360270U (en) A kind of adjustable flat metal fixed installation part of kitchen wall surface plate
CN106760340A (en) The production method of insulation and decoration hanging plate, heat-preserving decorating wall and heat-preserving decorating wall
CN208430734U (en) For hanging the metal structure shell system of substantially furring tile or inorganic decorative board
CN205297165U (en) Aerated concrete window wrap panel fixed establishment's lower structure
CN205297164U (en) Aerated concrete window wrap panel fixed establishment
CN214696628U (en) Wall brick dry hanging structure
CN215670331U (en) Limiting structure for bottom of assembled wall
CN212129776U (en) Quick installation device of compound thin ceramic decorative board of calcium silicate
CN205296474U (en) Aerated concrete window wrap panel fixed establishment's T -shaped layer board
CN210857822U (en) Shingle nail concatenation subassembly and shingle nail installation assembly
CN217631014U (en) Vertical hanging structure convenient to adjust left and right
CN214034550U (en) Hanging device convenient for adjusting overall dimension of stone

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wang Wenguang

Inventor after: Ding Xinxin

Inventor after: Zhuang Weimin

Inventor after: Zhou Dongshan

Inventor after: Hou Jianqun

Inventor after: Ren Baoshuang

Inventor after: Yu Guang

Inventor before: Wang Jinquan

Inventor before: Zhou Dongshan

Inventor before: Zhong Cheng

Inventor before: Yu Guang

Inventor before: Huang Hui

Inventor before: You Chengang

Inventor before: Pan Qing

Inventor before: Wang Liu

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant