KR20190078792A - Multi system bracket - Google Patents

Multi system bracket Download PDF

Info

Publication number
KR20190078792A
KR20190078792A KR1020170180467A KR20170180467A KR20190078792A KR 20190078792 A KR20190078792 A KR 20190078792A KR 1020170180467 A KR1020170180467 A KR 1020170180467A KR 20170180467 A KR20170180467 A KR 20170180467A KR 20190078792 A KR20190078792 A KR 20190078792A
Authority
KR
South Korea
Prior art keywords
stone
horizontal bar
bracket
construction
tile
Prior art date
Application number
KR1020170180467A
Other languages
Korean (ko)
Inventor
김운식
Original Assignee
김운식
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김운식 filed Critical 김운식
Priority to KR1020170180467A priority Critical patent/KR20190078792A/en
Publication of KR20190078792A publication Critical patent/KR20190078792A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/0805Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/14Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The present invention relates to a multipurpose system bracket for construction. According to the present invention, the multipurpose system bracket for construction is to install various finishing materials by extrusion of a metallic material for construction. To achieve the purpose of the present invention, the finishing material can be installed since the finishing material is extruded and formed using an A.L sheet panel. Also, construction technique is generalized and widely used as a construction method is improved. Specifically, for a wet tile, ready-mixed-mortar is charged 100%, and generation of a defect can be reduced. The multipurpose system bracket for construction is economical by being reused. A weight stone and a panel are constructed based on structure calculation to be different from a lightweight finishing material. The multipurpose system bracket for construction enables the various finishing materials to be applied and installed.

Description

건축용 다용도 시스템 브라켓{MULTI SYSTEM BRACKET}Multi-purpose system bracket for construction {MULTI SYSTEM BRACKET}

본 발명은 벽체 타일, 석재시공, A.L SHEET판넬, 복합판넬,CRC보드, 고밀도 목재패널, 가벽등을 시공할수 있는 다용도 시스템 브라켓 발명임.The present invention is a multi-use system bracket which can be used for wall tile, stone construction, A.L SHEET panel, composite panel, CRC board, high density wood panel,

기존 타일 시공은 시멘트로 타일 뒷면에 일정량을 붙여 하부부터 시멘트량으로 수평 수직면을 잡으면서 시공을 합니다. 이럴 경우 수직면을 시멘트량으로 조절하면서 시공하다보니 시공기술이 필요하고 시공 시간이 오래 걸리기도 하며 무엇보다 시멘트량을 조절시공 함으로 타일 뒷면은 타일면의 60~70% 가량만 시멘트로 채워집니다. 이럴 경우 타일 하자 발생 위험이 높으며 이를 해결하기 위해선 전체 설치 후 틈을 메우기 위해 또 다른 작업을 해야 함으로 추가 노임과 비용이 발생 합니다.Existing tile construction is done by attaching a certain amount to the back side of tile with cement and holding horizontal vertical side from bottom to cement amount. In this case, when adjusting the vertical surface to the amount of cement, it is necessary to apply the construction technique and it takes a long time to construct the cement. As a result, the backside of the tile is filled with cement of 60 ~ 70% of the tile surface. In this case, there is a high risk of tile defects. To solve this problem, additional work and expenses are incurred because another operation is required to fill the gaps after the whole installation.

석재 시공은 우선 한줄 한줄 수평 라인을 잡기위해 수평 실을 띄어서 수평 수직을 잡으며 시공하고 또한 석재 뒷면 또는 석재 바닥에 스텐 석재하스너 및 앙카를 이용하여 고정(에폭시로 시공 합니다. 석재 한 장에 시공 방법에 따라 하스너를 2개내지 4개를 사용하여야 하며 무거운 석재를 가공하면서 수평 수직을 일일이 확인 하며 설치합니다.To construct a stone line, first horizontal line is placed horizontally to catch a horizontal line, then it is applied horizontally and vertically, and it is fixed to the back side of stone or stone floor using stainless steel washer and anchor. , Use 2 to 4 washerers, and check the horizontal and vertical as you process heavy stone.

각종판넬(알미늄시트,복합판넬,CRC보드,고밀도 목재패널)를 설치하기 위해서는 스틸각파이프를 이용해 하지틀을 짜서 외벽등 수평수직을 맞춰 시공후 판넬을 피스 고정 설치합니다. 하지틀 설치는 작업에 60%를 차지하는 공정입니다.In order to install various panels (aluminum sheet, composite panel, CRC board, high density wood panel), use steel square pipe to frame and install the panel in horizontal and vertical alignment. The foundation frame installation is a process that occupies 60% of the work.

타일 시공 기술 일반화.Generalization of tile construction technology.

타일벽면 틈새 시멘트 100%충진100% filling of tile wall gap gap

작업속도 단축 및 인건비 절약.Reduce work speed and labor costs.

유지보수 및 타일 교체 간단.Easy to maintain and replace tiles.

석재시공 하지틀 한번에 시공완료.(수평수직 동시 작업)Completion of the construction of the stone frame. (Horizontal and vertical simultaneous operation)

시공기술 일반화 및 작업시간 단축.Generalization of construction technology and reduction of work time.

CRC보드, A.L SHEET PANEL, A.L 복합판넬, 고밀도 판넬시 하지 공정 불필요.합판시공 불필요.하지작업은 전체공정의 60%차지 하며 시공 기술 일반화 인건비 절감과 작업시간 단축.CRC board, A.L SHEET PANEL, A.L composite panel, high density panel No need for underfloor process.No plywood construction.Doing work takes 60% of whole process, generalization of construction technology reduces labor costs and shortens work time.

본 발명은 다양한 마감을 할수 있는 틀을 형성해주는 건축재 금속제 형재에 있어서 마감재의 종류에 따른 중량,하중을 견딜수 있는 구조적인 검토가 필수적이다.In the present invention, it is indispensable to investigate the structural and mechanical strength of a shape-forming metal-made frame that forms a frame capable of various finishes, in order to withstand the weight and load according to the kind of the finishing material.

이를 위해 경량,중량 두가지로 나누어 구조계산을 전문 업체에 의뢰하여 구조 계산에 맞는 두께와 크기를 조정하여 형재를 압출하여아 한다. 구조값만 나오면 금형 설계후 샘플압출후 샘플 테스트 단계로 이루어 져야 한다.For this purpose, it is divided into two parts, light weight and weight, and the structural calculation is requested by a professional company to adjust the thickness and size according to the structural calculation. If only the structural value is shown, the sample should be tested after the mold design and after the sample extrusion.

본 발명의 효과로는 타일,석재,각종 판넬등을 시공하기 위해 이발명품으로 하지(BASE) 작업으로 사용할 수 있다는 것. 시공의 용이하며, 작업시간 단축과 고도의 숙련공으로 인한 인건비 절약 효과. 특히 타일의 경우는 하자발생 감소.The effect of the present invention is that it can be used as a BASE work as a barber premium product for the construction of tiles, stones, various panels and the like. It is easy to construct, shortens work time and saves labor costs due to highly skilled workers. Especially in the case of tiles, the occurrence of defects decreased.

[도면 1] 발명의 구성도
[도면 2] 발명의 분해 사시도
[도면 3] 발명의 조립 사시도
[도면 4] 타일,CRC,경량석재, 합판 및 석고보드 단면도
[도면 5] 석재 조립 사시도.
[도면 6] 석재 단면,입면도.
[도면 7] A.L SHEET,복합판넬,고밀도목재패널단면도.
[Drawing 1] Structure of the Invention
[Fig. 2] An exploded perspective view of the invention
[Drawing 3] An assembly perspective view of the invention
[Drawing 4] Tile, CRC, lightweight stone, plywood and gypsum board section
[Drawing 5] Stone assembly perspective view.
[Figure 6] Stone section, elevation.
[FIG. 7] AL SHEET, composite panel, high density wood panel sectional view.

본 발명을 첨부된 도면을 참조하여 상세히 설명하면 다음과 같다.The present invention will now be described in detail with reference to the accompanying drawings.

타일,석재,A.L SHEET.A.L복합판넬,고밀도 목재판넬 마감재등와 가벽을 형성할수 있는 하지작업에 있어서 이 발명품으로 인해 누구나 쉽게 시공할 수 있도록 하기 위함이다.Tile, stone, A.L SHEET.A.L composite panel, high-density wood panel finishing materials and so on, which can be formed easily by anyone with this invention.

도-2를 보면 본 발명품에 대한 기존적인 사시도로 마감재를 설치하기 위한 수평바(3)을 설치 이를 잡아주는 브라켓(1)을 벽면에 설치한다. 설치시 수평과 수직면만 확인하면 된다.2, a horizontal bar 3 for installing a finishing material is installed in a conventional perspective view of the present invention, and a bracket 1 for holding the horizontal bar 3 is installed on a wall surface. You only need to check the horizontal and vertical surfaces during installation.

수직면은 체결구(9)로 조정이 가능하며, 수평바(3)은 마감재 높이에 맞춰 설치만 하면 된다.The vertical surface can be adjusted with the fasteners (9), and the horizontal bar (3) only needs to be installed according to the height of the finishing material.

도-3 타일시공시 타일(11)번 상하테두리에 접착제(12)를 접착후 수식바 5를 측면에 잡고 있으면서 수평바(3,4)에 붙이기만 하면 된다. 수직바(5)를 사용하는 것은 습식일 경우인데 타일(11)을 모두 설치 하고 휴대용 자동 펌프로 레미탈을 타일 맨 상부에 호스로 레미탈을 주입하면 된다. 지금 타일시공시 타일 면적에 60~70%정도 사용하여 시공하고 있으며 이는 하자 발생이 높다. 건식 타일 시공은 습식방법에서 레미탈을 주입하지 않으면 된다.It is sufficient to attach the adhesive 12 to the upper and lower edges of the tile 11 and to affix the bar 5 to the horizontal bars 3 and 4 while holding the bar 5 on the side. The use of the vertical bar (5) may be accomplished by wetting the tiles (11) and injecting the remotely into the top of the tile with a portable automatic pump. Currently, 60 ~ 70% of the tile area is used for tile construction. Dry tile construction requires no remicade in the wet method.

따라서 본 발명품으로 타일을 시공 하게 되면 우선 작업이 단순해 질수 있다. 또한 일반인도 쉽게 시공할수 있는 방법이다.Therefore, if the tile is constructed with the present invention, the work can be simplified first. It is also a method that can be easily constructed by ordinary people.

도-4를 보면 타일 시공방법에 CRC보드, 합판(11)을 접착제(12)를 이용 시공이 가능하다.4, the CRC board and the plywood 11 can be applied to the tile construction method using the adhesive 12.

위와 같은 방법으로 도-5,도-6 석재시공, 도-7 A.L SHEET, AL 복합판넬, 고밀도 목재패널 시공 원리는 같으며, 다만 도-7 A.L SHEET, A.L 복합판넬, 고밀도 목재패널은 피스고정후 줄눈 코킹마감은 기존의 방식과 다르지 않다.AL SHEET, AL composite panel and high density wood panel construction principle are the same, but AL-7 AL SHEET, AL composite panel and high density wood panel are fixed in the same way. The jointing caulking finish is not different from the conventional method.

다만 석재시공시 석재마다 석재하스너 2개 내지 4개 사용 및 수평실을 띄우고 한 장 한 장 시공할 때 수평과 수직을 확인 시공 하는 작업 시간등을 보완 단축 할수 있다,However, it is possible to use two or four stone harseners for each stone when installing stone, and to supplement and shorten the time for horizontally and vertically confirming the construction when one horizontal sheet is laid out,

A.L SHEET, A.L 복합판넬,고밀도 목재 패널 시공 시에는 하지 작업이 필수다. 기존의 하지 작업 공정을 단축 할수 있으며 철재로 하지 작업을 하다보니 용접으로 인한 화재 발생이 있으나 본 발명품은 용접이 필요하지 않다.A.L SHEET, A.L Composite Panel, High Density Wood panel is required for the construction work. The conventional work process can be shortened, and when welding is performed with iron, there is a fire caused by welding, but the present invention does not require welding.

지금의 타일시공,석재시공, 판낼(A.L SHEET, 복합판넬,고밀도 목재 패널)시공,가벽시공은 별도로 시공하고 있다. 본 발명품을 이용하면 위의 모든 공정을 응용할수 있으며, 무엇보다 작업 기술의 일반화, 작업시간 단축의 효과, 비철금속의 재료로 반영구 재사용이 용이하다.Currently, tile construction, stone construction, plank (A.L SHEET, composite panel, high density wood panel) construction and wall construction are separately constructed. By using the present invention, all of the above processes can be applied. In addition, it is easy to generalize work techniques, shorten work time, and reuse semi-permanent materials with non-ferrous materials.

도면의 주요 부분에 대한 부호의 설명.
1. 브라켓 2.END브라켓(상,하) 3.수평바 4.END수평바 5.수직바 6.CL(CENTER라인)
7. 연결레일 8.END연결레일 9.체결구 10.체결공 11.마감재 12. 접착제
13.벽체 14.브라켓A 15.END브라켓A 16.수평바A 17.END수평바A 18.석재
19.수평바B 20.판넬(A.L SHEET,복합판넬,목재패널,합판+징크핀넬)
1,2,3,4,5는 타일,CRC보드,경량 석재용,가벽 설치용.
14,15,16,17,18은 석재용
A.L SHEET, A.L 복합판넬, CRC보드 설치용.
Description of the Related Art
1. Bracket 2. END bracket (upper and lower) 3. Horizontal bar 4. END Horizontal bar 5. Vertical bar 6. CL (CENTER line)
7. Connection rail 8. END Connection rail 9. Fastening hole 10. Fastening hole 11. Finishing material 12. Adhesive
13. Wall 14. Bracket A 15.END Bracket A 16. Horizontal Bar A 17.END Horizontal Bar A 18. Stone
19. Horizontal Bar B 20. Panel (AL SHEET, Composite Panel, Wood Panel, Laminate + Zinc Pincer)
1,2,3,4,5 for tile, CRC board, lightweight stone, glazing.
14, 15, 16, 17,
AL SHEET, AL composite panel, CRC board installation.

Claims (4)

본 발명은 다용도 시스템 브라켓(MULTI SYSTEM BRACKET)을 이용하여 다양한 마감재를 누구나 쉽게 시공할수 있게 해주는 발명품이다. [도면 2] 4(END수평바) 길이에 맞는 2(END 브라켓)의 수량을 끼운다. (일정한 간격의 수량) 기준점을 잡기위해 맨하부 바닥 레벨에 맞춰 10(체결공)을 기준으로 벽체 홀을 뚫고 9를 체결하면서 시공하는 벽면 전체를 시공한다. 여기서 수직면 확인.
3(수평바)을 1(브라켓)에 역시 길이에 맞는 수량을 끼운다. 수평 기준점을 잡은 상태로 마감재 높이에 맞춰 3(수평바)와 1(브라켓)을 시공한다. 3(수평바)와 1(브라켓)은 6 (CENTER 라인)이 표시되어 있어 수평 잡을 때 사용한다.수직면 확인.
MULTI SYSTEM BRACKET을 우선 설치를 완료만 하면, 수평과 수직면을 잡아 놓은 틀에 마감재를 끼우는 방식의 시공하는 발명품으로 누구나 쉽게 다양한 마감재를 설치를 할 수 있다.
The present invention is an invention that enables various finish materials to be easily constructed by anyone using a multi-purpose system bracket (MULTI SYSTEM BRACKET). [Drawing 2] Insert the number of 2 (END brackets) corresponding to the length of 4 (END horizontal bar). (Quantity of regular interval) To catch the reference point, drill wall hole based on 10 (fastening hole) according to the bottom floor level and tighten 9 to construct the whole wall to be installed. Here we see the vertical plane.
3 (horizontal bar) to 1 (bracket) to fit the length of the appropriate length. 3 (horizontal bar) and 1 (bracket) are applied to the finishing material height while holding the horizontal reference point. 3 (horizontal bar) and 1 (bracket) are displayed for 6 (CENTER line).
Once the MULTI SYSTEM BRACKET has been installed, it is possible to install various finishing materials easily by putting the finishing material in a frame holding horizontal and vertical surfaces.
제1항에 있어서 [도면 3]에 11번(타일,CRC보드,경량석재) 후면에 12(접착제)를 테두리에 부착후 3(수평바),4(END수평바)에 붙이기만 하면 된다. 타일붙일 때 측면에 5(수직바)를 끼우면서 시공한다. 타일시공 완료후 [도면 4] 에 타일단면도의 경우 11(마감재)와13(벽체) 사이를 레미탈로 충진을 해줘야 된다. 휴대용 자동펌프로 레미탈 채워준다. 레미탈 충진시 타일과 타일 보통 3~5MM 수직과 수평 줄눈으로 레미탈 누출을 막기위해 3(수평바)와 5(수직바)가 레미탈 누출을 막는다. 또한 건식으로 타일을 시공할 경우 19(수평바B)에 합판을 설치후 합판 위에 타일을 시공한다. 합판고정은 스큐류나 타카핀으로 고정할 수 있다.
CRC보드나 경량석재는5번을 제외해도 무방하다. 또한, 가벽을 세우기 위해 기존의 각재로 하지틀, STUD에 합판이나 석고보드를 시공할 경우도 3(수평바)대신 19(수평바B)를 설치함으로 목재하지틀,STUD 간격@300~450 보다 보통 @600~1200 간격까지 시공하여 경제적인 효과가 있다. 철거후 다른 마감을 할 경우 기존의 이 발명품을 계속해서 사용 가능하며 비철재료로 인한 녹이 발생할 경우가 없어 반영구적이다.
In FIG. 1, it is only necessary to attach 12 (adhesive) to the rim 11 (tile, CRC board, lightweight stone) on the rear surface, and then attach it to 3 (horizontal bar) and 4 (END horizontal bar). When attaching tile, put 5 (vertical bar) on the side and install it. After completion of the tile construction, [Fig. 4], the tile section should be filled with remitals between 11 (finishing material) and 13 (wall). It is filled with remotely by a portable automatic pump. Tile and tile during refill filling Typical 3 to 5 mm vertical and horizontal joints to prevent remitive leakage 3 (horizontal bar) and 5 (vertical bar) prevent remitive leaks. Also, if dry tiles are to be installed, install plywood on 19 (horizontal bar B) and install tiles on the plywood. Plywood fixation can be fixed with skewer or takapin.
CRC boards and lightweight stones may be excluded. In addition, when installing a plywood or gypsum board in a foundation frame or a STUD as an existing slab to build a wall, it is necessary to install a wooden foundation frame, a STUD interval of 300 to 450 It is usually economically effective by constructing it at intervals of @ 600 ~ 1200. In case of other finishing after demolition, the existing invention can continue to be used, and there is no rust due to non-ferrous material, which is semi-permanent.
제1항에 있어서 [도면 5] 석재에 사용시 중량이 있는 석재이기 때문에 14(브라켓A)나 4(END브라켓A), 16(수평바A), 17(END수평바A) 의 두께나 크기가 커지고 시공법은 같으며 석재 9-1은 수직면을 조절할수 있고 단열재가 있는 경우는 9(체결구)의 기장이 긴 것을 사용한다.사이즈(H)에 맞게 본 발명품을 설치를 한다. 18(석재)가 큰경우 [도면 6] 입면도에 18(석재)가 14(브라켓A)에 겹치도록 시공을 하며, 작을 경우엔 14(브라켓A)는 일정한 간격을 두어 시공할수 있다.
일반적으로 12(접착제)로도 시공이 가능 하며 접착제를 애폭시로 사용 하며 16(수평바A)에 6-1를 주어 접착력을 좋게한다. 또한 [도면 6] 에 석재 시공 방법중 하나인 6-2(PIN)를 이용한 시공으로 16(수평바A)와 18(석재) 부분에 홀가공으로 PIN 고정 시공이 가능하다.
단 석재시공시 5(수직바)는 사용하지 않는다.
Since the stone used in the stone is heavy, the thickness and size of 14 (bracket A), 4 (END bracket A), 16 (horizontal bar A) and 17 (END horizontal bar A) The construction method is the same, Stone 9-1 can control the vertical plane, and when there is insulation, the long length of 9 (fastener) is used. 18 (stone) is large [Fig. 6] The construction is made so that 18 (stone) is overlapped on 14 (bracket A) in the elevation, and 14 (bracket A) is small when it is small.
Generally, it can be applied with 12 (adhesive). Adhesive is used as epoxy and 16-1 (horizontal bar A) is given 6-1 to improve adhesion. In addition, it is possible to fix the PIN by using holes 6 (horizontal bar A) and 18 (stone) by using 6-2 (PIN), one of the stone construction methods in [6].
Do not use 5 (vertical bar) when installing stone.
제1항에 있어서 [청구항 3] 석재 시공 때와 동일하지만 19(수평바B)를 이용하면 [도면 7] 에 20(A.L SHEET나 복합판넬,고밀도 목재패널)을 스큐류로 고정후 줄눈에 코킹마감 처리 하면 된다.
단 외벽등 높이가 높게 설치 할 경우는 석재와 동일로 수평으로 시공외에 수직 방향으로 발명품을 설치 할 수 있다. 이유는 수직면을 잡아주는 것이 본 발명품의 작업 속도를 좀 더 빨리 할 수 있으며 폭만 확인 하면서 수직면 확인(9-1) 시공이 수월하며 마감재 하중을 견디가가 좋다. 수직 한 라인만 잡으면 6(CENTER LINE) 기준으로 차례대로 시공하면 된다.
외벽에 단열재가 있는경우도 9(체결구)를 긴 것을 사용하면 된다.
또하나 장점은 기존 스틸 하지를 사용할 경우 용접으로 인한 화재 발생 요인이 있으나 본 발명품은 용접 부위가 없기 때문에 화재 발생 요인이 없다.
[Claim 3] The method of claim 1, wherein the same as in the case of stone construction, but using 19 (horizontal bar B), 20 (AL SHEET, composite panel, high density wood panel) Finish it.
In the case of installation with high height such as outer wall, it can be installed horizontally in the same way as stone, but in the vertical direction. The reason is that holding the vertical plane can speed up the working speed of the present invention, and it is easy to construct the vertical plane (9-1) while confirming the width, and to endure the load of the finishing material. If you only hold a vertical line, you can do it in 6 (CENTER LINE) basis.
In the case where a heat insulating material is provided on the outer wall, a long one as shown in Fig. 9 (fastener) can be used.
Another advantage is that there is a cause of fire due to welding when the conventional steel bottom is used, but there is no cause of fire because the present invention has no welding part.
KR1020170180467A 2017-12-27 2017-12-27 Multi system bracket KR20190078792A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170180467A KR20190078792A (en) 2017-12-27 2017-12-27 Multi system bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170180467A KR20190078792A (en) 2017-12-27 2017-12-27 Multi system bracket

Publications (1)

Publication Number Publication Date
KR20190078792A true KR20190078792A (en) 2019-07-05

Family

ID=67225350

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170180467A KR20190078792A (en) 2017-12-27 2017-12-27 Multi system bracket

Country Status (1)

Country Link
KR (1) KR20190078792A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102451321B1 (en) 2022-02-07 2022-10-06 조기환 Supporting Functional Bracket
KR102490413B1 (en) 2022-01-28 2023-01-19 조기환 bracket

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102490413B1 (en) 2022-01-28 2023-01-19 조기환 bracket
KR102451321B1 (en) 2022-02-07 2022-10-06 조기환 Supporting Functional Bracket

Similar Documents

Publication Publication Date Title
US10837166B2 (en) Building structure and construction method for same
CN108797847B (en) Assembled steel frame infilled wall structure system and construction method thereof
CN103835505B (en) Compound heat-insulation board of outer wall constructional method
CN101775862A (en) Composite heat preserving template and building main body integrated construction heat preserving system
CN110409811B (en) Non-dismantling forming column template containing reinforcement cage, template structure and building process
CN110409813B (en) Non-dismantling forming beam template containing reinforcement cage, template structure and building process
KR20140049413A (en) A facing apparatus of outer wall
CN104895279A (en) Dry hanging connecting structure of precast outer wallboard and precast beam and construction method of dry hanging connecting structure
CN112814235B (en) Construction method of layered diversion open type stone curtain wall
CN104895193A (en) Precast outer wallboard connecting box and connecting joint
KR20190078792A (en) Multi system bracket
CN112064833A (en) Assembled partition wall structure
CN110130546A (en) A kind of assembled anti-knock internal partition wall and its installation method
CN113802760A (en) Heat preservation is decorated and is maintained integration wallboard and wall structure
CN104912231A (en) Dry-hanging connecting structure of precast outer wall panel and shear wall and construction method of same
CN205063248U (en) Prefabricated exterior wall board and precast beam hang connection structure futilely
CN204001289U (en) There is the light steel keel partition that carries the arm of encorbelmenting
CN103015656B (en) Component type exterior wall heat insulating decorative board and preparation method thereof and exterior wall mounting method
CN214169600U (en) Laminated floor slab
CN114934673A (en) Construction method of glass curtain wall of wood structure system
CN210105043U (en) Ultralow energy consumption steel construction heat preservation integration wall structure
CN112127501A (en) Combined wall structure and construction method thereof
CN112575980A (en) Quick wall surface decoration method
CN201826535U (en) Connecting fastener
CN204728474U (en) Precast wall panel connecting box

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application