CN207988285U - Stone curtain wall installation hanging device - Google Patents
Stone curtain wall installation hanging device Download PDFInfo
- Publication number
- CN207988285U CN207988285U CN201820328836.8U CN201820328836U CN207988285U CN 207988285 U CN207988285 U CN 207988285U CN 201820328836 U CN201820328836 U CN 201820328836U CN 207988285 U CN207988285 U CN 207988285U
- Authority
- CN
- China
- Prior art keywords
- stone
- curtain wall
- adapter
- stone curtain
- surface material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
本实用新型涉及一种石材幕墙安装用挂接装置,竖龙骨沿建筑土建主体竖向布置,并与建筑土建主体连接,横龙骨横向连接相邻的两个竖龙骨,并与竖龙骨固定连接,横龙骨上设置有转接件,石材幕墙的石材面材的顶部通过顶部勾板钩挂连接在转接件上,石材幕墙的石材面材的下部通过下部挂件连接在转接件上,下部挂件通过背部锚栓与石材幕墙的石材面板连接。是在石材幕墙的石材面材的顶部采用勾板挂接的结构形式,使石材面材的顶部不承担重力荷载,只承担风荷载及侧向荷载,受力模型较清晰;在石材面材的下部采用背栓式干挂结构形式,石材面材受力状态较好,保证板面强度,结构安全可靠。
The utility model relates to a hooking device for installing a stone curtain wall. The vertical keel is vertically arranged along the main body of the building civil work and connected with the main body of the building civil work. The horizontal keel is horizontally connected to two adjacent vertical keels and fixedly connected to the vertical keel. An adapter is provided on the horizontal keel, and the top of the stone surface material of the stone curtain wall is connected to the adapter piece through the top hook plate hook, and the lower part of the stone surface material of the stone curtain wall is connected to the adapter piece through the lower hanger, and the lower hanger It is connected to the stone panel of the stone curtain wall through the back anchor bolt. The top of the stone surface material of the stone curtain wall adopts the structural form of the hook plate, so that the top of the stone surface material does not bear the gravity load, but only bears the wind load and lateral load, and the force model is relatively clear; in the stone surface material The lower part adopts the back-bolt type dry-hanging structure, and the stone surface material is in a good stress state, ensuring the strength of the board surface, and the structure is safe and reliable.
Description
技术领域technical field
本实用新型涉及建筑外墙装饰技术领域,具体涉及一种石材幕墙安装用挂接装置。The utility model relates to the technical field of building exterior wall decoration, in particular to a hooking device for installing a stone curtain wall.
背景技术Background technique
幕墙是利用各种强劲、轻盈、美观的建筑材料取代传统的砖石或窗墙结合的外墙工法,是包围在主结构的外围而使整栋建筑达到美观,使用功能健全而又安全的外墙工法。Curtain wall is an external wall construction method that uses various strong, light and beautiful building materials to replace the traditional masonry or window-wall combination. It is surrounded by the periphery of the main structure to make the whole building beautiful, functional and safe. Wall construction method.
石材幕墙以其高贵、亮丽的质感使建筑物表现的古朴典雅、庄重大方、高贵豪华。石材幕墙主要由与主体连接的连接件、竖框及横框组成的框架、石材面材及各种形式的石材挂接系统等组成。现有的石材幕墙的挂接系统大多是在石材面材的背面中部设置挂接组件,通过挂接组件挂接在竖框及横框组成的框架上,此种挂接方式石材面材受力点在石材面材的中部,其上下两端不受力,自由度较大,但是,石材幕墙及建筑土建主体受外界环境影响较大,热胀冷缩现象明显,由于石材面材上下两端不受力,热胀冷缩容易造成石材面材上下两端的鼓包或凹陷,石材面材中部挂接,在安装时,石材面材上下两端会以挂接处为中心发生偏移,影响安装精度及安装后石材幕墙表面的平整度,影响石材幕墙的美观。With its noble and bright texture, the stone curtain wall makes the building appear simple and elegant, solemn and generous, noble and luxurious. The stone curtain wall is mainly composed of connectors connected to the main body, a frame composed of mullions and horizontal frames, stone surface materials and various forms of stone mounting systems. Most of the existing hooking systems for stone curtain walls are to set up a hooking component in the middle of the back of the stone surface material, and hang it on the frame composed of the mullion and the horizontal frame through the hooking component. The point is in the middle of the stone surface material, its upper and lower ends are not stressed, and the degree of freedom is relatively large. However, the stone curtain wall and the main body of the building civil work are greatly affected by the external environment, and the phenomenon of thermal expansion and contraction is obvious. Because the upper and lower ends of the stone surface material Unstressed, thermal expansion and cold contraction may easily cause bulges or depressions at the upper and lower ends of the stone surface material. The middle part of the stone surface material is hooked. During installation, the upper and lower ends of the stone surface material will be shifted centered on the joint, which will affect the installation. The accuracy and flatness of the surface of the stone curtain wall after installation will affect the beauty of the stone curtain wall.
实用新型内容Utility model content
综上所述,为了克服现有技术问题的不足,本实用新型提供了一种石材幕墙安装用挂接装置,它是在石材幕墙的石材面材的顶部采用勾板挂接的结构形式,使石材面材的顶部不承担重力荷载,只承担风荷载及侧向荷载,受力模型较清晰;在石材面材的下部采用背栓式干挂结构形式,石材面材受力状态较好,保证板面强度,结构安全可靠。To sum up, in order to overcome the deficiencies of the existing technical problems, the utility model provides a hooking device for stone curtain wall installation, which is a structural form of hook plate hooking on the top of the stone surface material of the stone curtain wall, so that The top of the stone surface material does not bear the gravity load, but only bears the wind load and lateral load, and the force model is relatively clear; the lower part of the stone surface material adopts the back-bolt type dry-hanging structure, and the stone surface material is in a good stress state, ensuring Board strength, safe and reliable structure.
为解决上述技术问题,本实用新型采用的技术方案为:In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is:
一种石材幕墙安装用挂接装置,其中:包括竖龙骨,横龙骨,转接件,顶部勾板,下部挂件及背部锚栓,所述的竖龙骨沿建筑土建主体竖向布置,并与建筑土建主体连接,横龙骨横向连接相邻的两个竖龙骨,并与竖龙骨固定连接,所述的横龙骨上设置有转接件,石材幕墙的石材面材的顶部通过顶部勾板钩挂连接在转接件上,石材幕墙的石材面材的下部通过下部挂件连接在转接件上,所述的下部挂件通过背部锚栓与石材幕墙的石材面板连接。A hooking device for installing a stone curtain wall, which includes a vertical keel, a horizontal keel, an adapter, a top hook plate, a lower hanger and a back anchor bolt. The vertical keel is arranged vertically along the main body of the building, and The main body of the civil construction is connected, and the horizontal keel is horizontally connected to two adjacent vertical keels, and is fixedly connected with the vertical keel. The horizontal keel is provided with an adapter, and the top of the stone surface material of the stone curtain wall is hooked and connected by the top hook plate. On the adapter piece, the lower part of the stone surface material of the stone curtain wall is connected to the adapter piece through the lower hanger, and the lower hanger is connected with the stone panel of the stone curtain wall through the back anchor bolt.
进一步,所述的转接件包括一体结构的水平部、竖直部及沟回部,所述的水平部位于竖直部的一侧,沟回部位于竖直部的另一侧,所述的水平部上设置有连接透孔,转接件通过穿过连接透孔的连接螺栓与横龙骨紧固连接,所述的连接透孔为长孔,所述的竖直部的上部与下部挂件连接,所述的沟回部与顶部勾板连接。Further, the adapter includes a horizontal part, a vertical part and a groove part of an integral structure, the horizontal part is located on one side of the vertical part, and the groove part is located on the other side of the vertical part, and the The horizontal part is provided with a connecting through hole, and the adapter is fastened to the horizontal keel through the connecting bolt passing through the connecting through hole. The connecting through hole is a long hole, and the upper and lower hanging parts of the vertical part Connection, the groove part is connected with the top hook plate.
进一步,所述的下部挂件的下端与转接件的沟回部及顶部勾板之间设置有限位块。Further, a limiting block is provided between the lower end of the lower hanging part, the groove part of the adapter part and the top hook plate.
进一步,所述的下部挂件包括一体结构的上竖板、横板及两个下竖板,上竖板位于横板的之上,两个下竖板位于横板之下,上竖板通过背部锚栓与石材幕墙的石材面材连接,所述的两个下竖板形成插接槽,插接槽连接在转接件的竖直部的上端,转接件的竖直部的上端插装在插接槽内。Further, the lower hanging part includes an upper vertical board, a horizontal board and two lower vertical boards in an integrated structure, the upper vertical board is located above the horizontal board, the two lower vertical boards are located under the horizontal board, and the upper vertical board passes through the back The anchor bolt is connected with the stone surface material of the stone curtain wall, and the two lower vertical plates form an insertion slot, and the insertion slot is connected to the upper end of the vertical part of the adapter, and the upper end of the vertical part of the adapter is inserted in the socket.
进一步,所述的顶部勾板的截面形状为“n”型,其一侧插装在转接件的沟回部内,所述的石材幕墙的石材面材的顶端设置有插装槽,顶部勾板的另一侧插装在石材幕墙的石材面材的顶端的插装槽内,且顶部勾板与插装槽之间设置有弹性胶垫。Further, the cross-sectional shape of the top hook plate is "n" type, one side of which is inserted into the ditch of the adapter, the top of the stone surface material of the stone curtain wall is provided with an insertion groove, and the top hook The other side of the board is inserted into the insertion groove at the top of the stone surface material of the stone curtain wall, and an elastic rubber pad is arranged between the top hook plate and the insertion groove.
进一步,所述的转接件的水平部与横龙骨之间设置有绝缘垫片。Further, an insulating gasket is provided between the horizontal part of the adapter and the transverse keel.
本实用新型的有益效果为:The beneficial effects of the utility model are:
1、本实用新型的石材幕墙的石材面材的顶端通过勾板挂接,用勾板实现石材面材顶端的定位,达到定位安装的目的。顶部勾板与石材面材上的插装槽配合处加弹性胶垫塞紧,以实现定位要求,并保证充分的伸缩空间,以充分保证结构弹性,最大限度地满足温差变形,以及帷幕系统的平面变形的要求。1. The top of the stone surface material of the stone curtain wall of the present utility model is hooked by a hook plate, and the hook plate is used to realize the positioning of the top of the stone surface material, so as to achieve the purpose of positioning and installation. Elastic rubber pads are added to the joint between the top hook plate and the insertion groove on the stone surface material to meet the positioning requirements, and to ensure sufficient expansion and contraction space, so as to fully ensure the structural elasticity, meet the maximum temperature difference deformation, and the curtain system. plane deformation requirements.
2、本实用新型的石材幕墙的石材面材的下部采用背栓式干挂结构形式,石材面材受力状态较好,保证板面强度,结构安全可靠。采用背部锚栓将下部挂件固定在石材面材上。下部挂件将石材面材直接挂接在转接件上,现场安装时只需要安装好竖龙骨与横龙骨后,调整转接件与横龙骨的相对位置并锁紧后,直接将石材面材与转接件挂接即可,现场工作量小,施工速度快,保证工期要求。2. The lower part of the stone surface material of the stone curtain wall of the utility model adopts a back-bolt type dry-hanging structure, and the stone surface material is in a better stress state, ensuring the strength of the board surface, and the structure is safe and reliable. The lower pendant is secured to the stone face with back anchors. The lower part hangs the stone surface material directly on the adapter piece. When installing on site, you only need to install the vertical keel and the horizontal keel, adjust the relative position of the adapter piece and the horizontal keel and lock them, and then directly connect the stone surface material to the adapter piece. The adapter can be hooked up, the on-site workload is small, the construction speed is fast, and the construction period requirements are guaranteed.
3、本实用新型结构简单、使用方便、安装容易,能够实现单块石材面材的上端挂接及单块石材面材的下部挂接,实现单块石材面材上下两端定位受力,保证石材面材结构稳定性,保证幕墙使用寿命。3. The utility model has the advantages of simple structure, convenient use and easy installation. It can realize the hooking of the upper end of a single stone surface material and the lower part of a single stone surface material, and realize the positioning of the upper and lower ends of a single stone surface material. The structural stability of the stone surface material ensures the service life of the curtain wall.
附图说明Description of drawings
图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
竖龙骨1,横龙骨2,转接件3,顶部勾板4,下部挂件5,背部锚栓6,限位块7,绝缘垫片8,弹性胶垫9,插装槽10,石材面材11。Vertical keel 1, horizontal keel 2, adapter 3, top hook plate 4, lower pendant 5, back anchor bolt 6, limit block 7, insulating gasket 8, elastic rubber pad 9, insertion groove 10, stone surface material 11.
图2为本实用新型的转接件的结构示意图;Fig. 2 is the structural representation of the adapter of the present utility model;
水平部31、竖直部32,沟回部33。Horizontal part 31 , vertical part 32 , groove back part 33 .
图3为本实用新型的下部挂件的结构示意图;Fig. 3 is a schematic structural view of the lower part of the utility model;
上竖板51、横板52,下竖板53,插接槽54。Upper vertical board 51, horizontal board 52, lower vertical board 53, insertion groove 54.
图4为本实用新型的顶部勾板的结构示意图。Fig. 4 is a structural schematic diagram of the top hook plate of the present invention.
具体实施方式Detailed ways
下面结合附图对本实用新型作进一步的详细说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.
如图1、图2、图3、图4所示,一种石材幕墙安装用挂接装置,包括竖龙骨1,横龙骨2,转接件3,顶部勾板4,下部挂件5及背部锚栓6,所述的竖龙骨1沿建筑土建主体竖向布置,并与建筑土建主体连接,横龙骨2横向连接相邻的两个竖龙骨1,并与竖龙骨1固定连接,所述的横龙骨2上设置有转接件3,转接件3的水平部31与横龙骨2之间设置有绝缘垫片8,转接件3包括一体结构的水平部31、竖直部32及沟回部33,所述的水平部31位于竖直部32的一侧,沟回部33位于竖直部32的另一侧,所述的水平部31上设置有连接透孔,转接件3通过穿过连接透孔的连接螺栓与横龙骨2紧固连接,所述的连接透孔为长孔,所述的竖直部32的上部与下部挂件5连接,所述的沟回部33与顶部勾板4连接,下部挂件5的下端与转接件3的沟回部33及顶部勾板4之间设置有限位块7;石材幕墙的石材面材11的顶部通过顶部勾板4钩挂连接在转接件3上,顶部勾板4的截面形状为“n”型,其一侧插装在转接件3的沟回部33内,所述的石材幕墙的石材面材11的顶端设置有插装槽10,顶部勾板4的另一侧插装在石材幕墙的石材面材11的顶端的插装槽10内,且顶部勾板4与插装槽10之间设置有弹性胶垫9;石材幕墙的石材面材11的下部通过下部挂件5连接在转接件3上,所述的下部挂件5通过背部锚栓6与石材幕墙的石材面板连接。所述的下部挂件5包括一体结构的上竖板51、横板52及两个下竖板53,上竖板51位于横板52的之上,两个下竖板53位于横板52之下,上竖板51通过背部锚栓6与石材幕墙的石材面材11连接,所述的两个下竖板53形成插接槽54,插接槽54连接在转接件3的竖直部32的上端,转接件3的竖直部32的上端插装在插接槽54内。As shown in Figure 1, Figure 2, Figure 3, and Figure 4, a hooking device for stone curtain wall installation, including vertical keel 1, horizontal keel 2, adapter 3, top hook plate 4, lower pendant 5 and back anchor Bolt 6, the vertical keel 1 is vertically arranged along the main body of the building civil work, and connected with the main body of the building civil work, the horizontal keel 2 connects two adjacent vertical keel 1 horizontally, and is fixedly connected with the vertical keel 1, the horizontal keel 2 An adapter 3 is provided on the keel 2, and an insulating gasket 8 is provided between the horizontal part 31 of the adapter 3 and the horizontal keel 2. The adapter 3 includes a horizontal part 31, a vertical part 32 and a groove back part 33, the horizontal part 31 is located on one side of the vertical part 32, the ditch part 33 is located on the other side of the vertical part 32, the horizontal part 31 is provided with a connection through hole, and the adapter 3 passes through The connecting bolt passing through the connecting through hole is fastened to the transverse keel 2, the connecting through hole is a long hole, the upper part of the vertical part 32 is connected with the lower hanging part 5, and the groove back part 33 is connected with the top The hook plate 4 is connected, and the lower end of the lower pendant 5 is provided with a limit block 7 between the groove part 33 of the adapter 3 and the top hook plate 4; the top of the stone surface material 11 of the stone curtain wall is hooked and connected by the top hook plate 4 On the adapter 3, the cross-sectional shape of the top hook plate 4 is "n" type, one side of which is inserted into the ditch 33 of the adapter 3, and the top end of the stone surface material 11 of the stone curtain wall is set There is an insertion groove 10, and the other side of the top hook plate 4 is inserted into the insertion groove 10 at the top of the stone surface material 11 of the stone curtain wall, and an elastic rubber pad is arranged between the top hook plate 4 and the insertion groove 10 9. The lower part of the stone surface material 11 of the stone curtain wall is connected to the adapter 3 through the lower hanger 5 , and the lower hanger 5 is connected to the stone panel of the stone curtain wall through the back anchor bolt 6 . The lower hanging part 5 includes an upper vertical board 51, a horizontal board 52 and two lower vertical boards 53 of an integral structure, the upper vertical board 51 is located above the horizontal board 52, and the two lower vertical boards 53 are located below the horizontal board 52 , the upper vertical plate 51 is connected to the stone surface material 11 of the stone curtain wall through the back anchor bolt 6, and the two lower vertical plates 53 form an insertion groove 54, and the insertion groove 54 is connected to the vertical part 32 of the adapter 3 The upper end of the vertical portion 32 of the adapter 3 is inserted into the insertion slot 54 .
竖龙骨1与建筑主体结构通过预埋件可靠地连接在一起,横龙骨2通过焊接或螺栓连接的方式与竖龙骨1连接在一起,转接件3通过不锈钢连接螺栓与横龙骨2连接在一起,转接件3可实现石材幕墙的进出调节。转接件3与横龙骨2之间添加绝缘垫片8以不同材质之间防止电化腐蚀。The vertical keel 1 is reliably connected with the main structure of the building through embedded parts, the horizontal keel 2 is connected with the vertical keel 1 by welding or bolting, and the adapter 3 is connected with the horizontal keel 2 through stainless steel connecting bolts , The adapter 3 can realize the adjustment of the entrance and exit of the stone curtain wall. An insulating gasket 8 is added between the adapter 3 and the transverse keel 2 to prevent galvanic corrosion between different materials.
石材面材11在加工厂开好背栓孔及插装槽10,把背部锚栓6与石材面材11安装在一起后,发往施工现场。现场安装石材面材11前,把下部挂件5与背部锚栓6通过螺母组装在一起,将顶部勾板4插装在石材面材11顶端的插装槽10内,并在插装槽10内注入云石胶,待胶固化后安装石材面材11。Stone surface material 11 is opened back bolt hole and inserting groove 10 in processing factory, after back anchor bolt 6 and stone material surface material 11 are installed together, send to the construction site. Before installing the stone surface material 11 on site, assemble the lower pendant 5 and the back anchor bolt 6 through nuts, insert the top hook plate 4 into the insertion groove 10 at the top of the stone surface material 11, and place it in the insertion groove 10. Inject marble glue, and install the stone surface material 11 after the glue is cured.
石材面材11的安装自下而上施工,首先安装下部的石材面材11,下部挂件5钩挂在转接件3上,转接件3的竖直部32的上端插装在插接槽54内,顶部勾板4钩挂在转接件3的沟回部33内,调整石材面材11安装位置,然后在下部挂件5的下端与顶部勾板4及转接件3的沟回部33之间安装限位块7,实现定位、限位的功能。再自下而上顺序安装石材面材11,有序施工。The installation of the stone surface material 11 is carried out from bottom to top. Firstly, the lower stone surface material 11 is installed. The lower hanging part 5 is hooked on the adapter 3, and the upper end of the vertical part 32 of the adapter 3 is inserted into the insertion groove. 54, the top hook plate 4 is hooked in the ditch 33 of the adapter 3, adjust the installation position of the stone surface material 11, and then connect the lower end of the lower hanger 5 with the top hook 4 and the ditch of the adapter 3. Space-limiting block 7 is installed between 33, realizes the function of location, space-limiting. Then install the stone surface material 11 sequentially from bottom to top, and orderly construction.
要说明的是,上述实施例是对本实用新型技术方案的说明而非限制,所属技术领域普通技术人员的等同替换或者根据现有技术而做的其它修改,只要没超出本实用新型技术方案的思路和范围,均应包含在本实用新型所要求的权利范围之内。It should be noted that the above-mentioned embodiment is an illustration of the technical solution of the utility model rather than a limitation, equivalent replacements by those of ordinary skill in the art or other modifications made according to the prior art, as long as they do not exceed the thinking of the technical solution of the utility model and scope should be included in the scope of rights required by the utility model.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820328836.8U CN207988285U (en) | 2018-03-12 | 2018-03-12 | Stone curtain wall installation hanging device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820328836.8U CN207988285U (en) | 2018-03-12 | 2018-03-12 | Stone curtain wall installation hanging device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207988285U true CN207988285U (en) | 2018-10-19 |
Family
ID=63826592
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820328836.8U Expired - Fee Related CN207988285U (en) | 2018-03-12 | 2018-03-12 | Stone curtain wall installation hanging device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207988285U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111809823A (en) * | 2020-08-06 | 2020-10-23 | 北京承达创建装饰工程有限公司 | Indoor wall surface stone decorative plate semi-unit type dry hanging system and installation method thereof |
| CN112049287A (en) * | 2020-08-20 | 2020-12-08 | 北京东方泰洋装饰工程有限公司 | Small-unit detachable gabion curtain wall |
| CN112647623A (en) * | 2020-12-18 | 2021-04-13 | 苏州广林建设有限责任公司 | Detachable stone curtain wall system |
-
2018
- 2018-03-12 CN CN201820328836.8U patent/CN207988285U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111809823A (en) * | 2020-08-06 | 2020-10-23 | 北京承达创建装饰工程有限公司 | Indoor wall surface stone decorative plate semi-unit type dry hanging system and installation method thereof |
| CN112049287A (en) * | 2020-08-20 | 2020-12-08 | 北京东方泰洋装饰工程有限公司 | Small-unit detachable gabion curtain wall |
| CN112647623A (en) * | 2020-12-18 | 2021-04-13 | 苏州广林建设有限责任公司 | Detachable stone curtain wall system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203308046U (en) | Thermal insulation decorative plate hanging buckle assembly | |
| CN102094480B (en) | Stone ceramic plate hanging buckle component and mounting process thereof | |
| CN207003902U (en) | A kind of decorative panel suspension member and Side fascia | |
| CN103174275A (en) | Thermal insulating decorative board hook assembly and installation method thereof | |
| CN103243890A (en) | Hanging and buckling assembly of heat-insulating decorating plate and installation process of buckle assembly | |
| CN207376909U (en) | Aluminium sheet mounts installation system | |
| CN103938830B (en) | The non-curtain wall pendant of a kind of stone material, non-curtain wall unit and exempt from the non-Curtain Wall of keel | |
| CN205314448U (en) | Side fascia anchor assembly | |
| CN107090960B (en) | Support and limit device for dry hanging of wall bricks and construction method of assembled dry hanging of wall bricks | |
| CN114837314A (en) | External wall heat insulation structure and external wall heat insulation construction method | |
| CN211622374U (en) | A kind of stone dry hanging structure | |
| CN201738538U (en) | Wall connecting piece of plug-in type low-carbon heat-insulation energy-saving plate | |
| CN113898151A (en) | Dry hanging system for outer wall decoration | |
| CN108385895A (en) | A kind of fast-assembling walling system | |
| CN209585374U (en) | A hanging glass curtain wall structure | |
| CN111206737A (en) | Wall connecting piece of plug-in type low-carbon heat-preservation energy-saving plate | |
| CN206844552U (en) | The cladding supporting and limiting device of wall brick | |
| CN218028249U (en) | Anti-falling device for heat-insulating layer of building outer wall | |
| CN102877580B (en) | Back fastening locking type close seam mounting stone curtain wall dry hanging structure | |
| CN112832477B (en) | An exterior wall concrete hanging board | |
| CN212346177U (en) | Anti-deformation curtain box structure | |
| CN219281014U (en) | Stable mounting structure suitable for curtain wall | |
| CN109594731B (en) | Unit type face brick system | |
| CN219732357U (en) | An exterior wall structure based on inorganic plasticized microporous insulation panels | |
| CN218323591U (en) | Integral type external wall insulation nail, heated board mounting structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181019 Termination date: 20210312 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |