CN204827454U - Subway construction engineering construction shaft - Google Patents

Subway construction engineering construction shaft Download PDF

Info

Publication number
CN204827454U
CN204827454U CN201520370446.3U CN201520370446U CN204827454U CN 204827454 U CN204827454 U CN 204827454U CN 201520370446 U CN201520370446 U CN 201520370446U CN 204827454 U CN204827454 U CN 204827454U
Authority
CN
China
Prior art keywords
well body
construction
vertical shaft
subway
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520370446.3U
Other languages
Chinese (zh)
Inventor
于天光
于建欣
王栋
李涛
魏天邦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO URBAN CONSTRUCTION GROUP Co Ltd
Original Assignee
QINGDAO URBAN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO URBAN CONSTRUCTION GROUP Co Ltd filed Critical QINGDAO URBAN CONSTRUCTION GROUP Co Ltd
Priority to CN201520370446.3U priority Critical patent/CN204827454U/en
Application granted granted Critical
Publication of CN204827454U publication Critical patent/CN204827454U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a subway construction engineering construction shaft belongs to the subway construction field. The utility model discloses subway construction engineering construction shaft, including the well body, the periphery of the well body sets up the stock, the transverse section of the well body is the ellipse, well body top is equipped with the fore shaft collar tie beam, the fixed hoisting device that sets up on the fore shaft collar tie beam, well body bottom is equipped with the pit. Horizontal steel shotcrete and angle brace can be cancelled to oval shaft, the demand greatly reduced of grid reinforcing bar simultaneously, very big reduction construction cost, the horizontal steel shotcrete of cancellation is convenient for the portal crane and is slagged tap, improves the efficiency of construction, reduces the construction risk.

Description

A kind of subway construction engineering construction vertical shaft
Technical field
The present invention relates to subway construction field, particularly a kind of subway construction engineering construction vertical shaft.
Background technology
Along with the development of subway construction, especially in Station construction, construction shaft is more and more applied.The vertical shaft adopted in current subway construction is mostly rectangle vertical shaft, and must set up when section is comparatively large or foundation ditch is darker and support firmly, work progress is too loaded down with trivial details, and temporary support structure affects greatly follow-up construction.
Summary of the invention
In order to make up above deficiency, the invention provides a kind of subway construction engineering construction vertical shaft being beneficial to construction, saving material, efficiency of construction be provided, reduce construction risk.
Technical scheme of the present invention is:
A kind of subway construction engineering construction vertical shaft, comprise well body, the periphery of described well body arranges anchor pole; The lateral cross section ovalize of described well body; Described well body top is provided with fore shaft collar tie beam, is provided with pit bottom described well body.
Preferably, described fore shaft collar tie beam is fixedly installed lifting appliance.
Preferably, described well body is formed by being filled with concrete steel grating.
Preferably, described lifting appliance comprises portal frame and is arranged on the electric block on portal frame.
Further, described portal frame periphery adopts dividing plate to close.
Preferably, the long axis length of oval well body is 1.3-2 times of minor axis length.
Research calculates first internal force of rectangle vertical shaft and oval vertical shaft, and result is as shown in table 1;
First internal force comparison sheet of table 1 rectangle vertical shaft and oval vertical shaft
Can find out by just propping up internal force result: under identical loading condition, traditional rectangular vertical shaft corner hogging moment concentration phenomenon, its well bore hogging moment maximum value is 3.5 times of oval vertical shaft, and well bore positive bending moment maximum value is 3 times of oval vertical shaft.Its impact is exactly that grid reinforcing bar demand area is double, and needs increase by one Horizontal steelwork bracing to resist long limit positive bending moment in the middle part of vertical shaft, and bight need increase angle brace to share bight hogging moment.And load can be converted into axle power by oval vertical shaft stress system, make full use of concrete compressive strength.Under the prerequisite significantly reducing bending and shearing, improve axle power, favourable to arrangement of reinforcement control critical eigenvalue.
With form of fracture 12m × 8m, the degree of depth is that the vertical shaft of 26m is analyzed:
Adopt ellipsoidal structure form of fracture to compare traditional rectangular cross section form and reduce concrete angle brace 60, each cost 612 yuan, amount to cost-saving 36720 yuan.Bracing members 15 in the middle of reducing, every root cost 1095 yuan, amounts to cost-saving 16425 yuan.Amount to cost-saving 53145 yuan.
Owing to eliminating the fabrication and installation time of heel brace and middle bracing members, the engineering time of often circulating reduces 14 hours, and vertical shaft amounts to point 26 circulation constructions, saves time altogether 364 hours about 15 days.
To Construction of Silo takes up an area little, reduces the impact on surrounding enviroment and resident to greatest extent.
Oval vertical shaft can cancel Horizontal steelwork bracing and angle brace, and the demand of grid reinforcing bar reduces greatly simultaneously, greatly reduces construction cost, cancels Horizontal steelwork bracing and is convenient to straddle truck and slags tap, improve efficiency of construction, reduce construction risk.
Beneficial effect of the present invention is:
Oval vertical shaft can cancel Horizontal steelwork bracing and angle brace, and the demand of grid reinforcing bar reduces greatly simultaneously, greatly reduces construction cost, cancels Horizontal steelwork bracing and is convenient to straddle truck and slags tap, improve efficiency of construction, reduce construction risk.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the cross section structure schematic diagram of subway construction engineering construction vertical shaft of the present invention;
Fig. 2 is the vertical section structure schematic diagram of subway construction engineering construction vertical shaft of the present invention.
Detailed description of the invention
Embodiment 1
As shown in Figure 1 and Figure 2, subway construction engineering construction vertical shaft of the present invention, comprises the well body 5 of lateral cross section ovalize, and the long axis length of oval well body 5 is 1.3-2 times of minor axis length.Well body 5 is formed by being filled with concrete steel grating; The periphery of well body 5 arranges anchor pole 4.Pit 6 is provided with bottom well body 5; Well body 5 top is provided with fore shaft collar tie beam 3, fore shaft collar tie beam 3 is fixedly installed portal frame 2, portal frame 2 is fixedly installed at least two electric blocks 1.In order to noise decrease and dust pollution, portal frame periphery adopts dividing plate to close.

Claims (6)

1. a subway construction engineering construction vertical shaft, comprises well body, and the periphery of described well body arranges anchor pole; It is characterized in that: the lateral cross section ovalize of described well body; Described well body top is provided with fore shaft collar tie beam, is provided with pit bottom described well body.
2. subway construction engineering construction vertical shaft as claimed in claim 1, is characterized in that: described fore shaft collar tie beam is fixedly installed lifting appliance.
3. subway construction engineering construction vertical shaft as claimed in claim 1, is characterized in that: described well body is formed by being filled with concrete steel grating.
4. subway construction engineering construction vertical shaft as claimed in claim 2, is characterized in that: described lifting appliance comprises portal frame and is arranged on the electric block on portal frame.
5. subway construction engineering construction vertical shaft as claimed in claim 4, is characterized in that: described portal frame periphery adopts dividing plate to close.
6. the subway construction engineering construction vertical shaft as described in any one of claim 1-5, is characterized in that: the long axis length of oval well body is 1.3-2 times of minor axis length.
CN201520370446.3U 2015-06-02 2015-06-02 Subway construction engineering construction shaft Expired - Fee Related CN204827454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520370446.3U CN204827454U (en) 2015-06-02 2015-06-02 Subway construction engineering construction shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520370446.3U CN204827454U (en) 2015-06-02 2015-06-02 Subway construction engineering construction shaft

Publications (1)

Publication Number Publication Date
CN204827454U true CN204827454U (en) 2015-12-02

Family

ID=54685065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520370446.3U Expired - Fee Related CN204827454U (en) 2015-06-02 2015-06-02 Subway construction engineering construction shaft

Country Status (1)

Country Link
CN (1) CN204827454U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107401176A (en) * 2017-07-27 2017-11-28 上海市政工程设计研究总院(集团)有限公司 A kind of bridge bearing platform foundation pit structure for excavating protection subway

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107401176A (en) * 2017-07-27 2017-11-28 上海市政工程设计研究总院(集团)有限公司 A kind of bridge bearing platform foundation pit structure for excavating protection subway

Similar Documents

Publication Publication Date Title
CN201671226U (en) Expanded flanged cross-shaped steel SRC column
CN102080384B (en) Construction method for mounting lifter on top plate of underground parking garage
CN103640834A (en) Small-size transporter
CN201963316U (en) Template system for tunnel wall construction
CN102777037B (en) Simple and practical hoisting construction method of long-span steel girder
CN204827454U (en) Subway construction engineering construction shaft
CN205617651U (en) Precast concrete board
CN204662458U (en) Detachable pretightning force combined support frame system brace summer transition Connection Block
CN103061514A (en) Long-span steel structure corridor construction method
CN205294673U (en) Change basic connection structure
CN102798295A (en) Ribbing cooling tower
CN107840244B (en) Four limbs side column bilayer shoulder beam support construction
CN205296966U (en) Transmission line iron tower
CN204920244U (en) Supporting structure of large -span steel construction segmentation hoist and mount
CN212129882U (en) Prefabricated construction outrigger drawknot structure
CN204662477U (en) Beam foundation structure
CN207714741U (en) A kind of lift novel integral fine strain of millet template system of adjustable length and width
CN204211357U (en) A kind of gantry crane girder adopting U-shaped muscle
CN205348389U (en) Influence of intelligence jacking steel platform truss is steel plate wall segmentation merogenesis structure down
CN204873511U (en) Embedded trolley frame of two roof beam hoists
CN204848024U (en) Girder steel hoist device for construction
CN204000889U (en) A kind of two anchors and soil nailing mixed type soil-baffling structure
CN207582980U (en) A kind of steel flxer journey benefit puts cushion block construction auxiliary tool
CN108487261A (en) A kind of arch steel structure support
CN207918273U (en) A kind of subway is total to pole door type truss combined hanging and sets

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202