CN204715721U - The removable Hanging Basket of a kind of Steel Structure Installation - Google Patents

The removable Hanging Basket of a kind of Steel Structure Installation Download PDF

Info

Publication number
CN204715721U
CN204715721U CN201520462074.7U CN201520462074U CN204715721U CN 204715721 U CN204715721 U CN 204715721U CN 201520462074 U CN201520462074 U CN 201520462074U CN 204715721 U CN204715721 U CN 204715721U
Authority
CN
China
Prior art keywords
hanging basket
basket
bar
rod
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520462074.7U
Other languages
Chinese (zh)
Inventor
门贤君
曾文
宁满海
陈建刚
黄晓斌
王宇浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201520462074.7U priority Critical patent/CN204715721U/en
Application granted granted Critical
Publication of CN204715721U publication Critical patent/CN204715721U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型公开了一种钢结构安装可移动挂篮,属于建筑施工技术领域,上抱梁悬挂杆的上端与稳定杆连接,上抱梁悬挂杆的下端通过紧固螺母螺栓与悬挂拉杆连接,悬挂拉杆与篮底连接杆通过紧固螺母螺栓连接,操作挂篮底部边框与篮底连接杆的底部连接,篮底连接杆上方连接有操作挂篮护栏立杆,操作挂篮护栏立杆的外侧设有钢板网,操作挂篮护栏立杆的中间设有数个操作挂篮护栏横杆,两个上抱梁悬挂杆之间设有伸缩装置,上抱梁悬挂杆的下段均设有起吊挂耳,稳定杆顶部的内侧设有稳定杆挂腿,稳定杆挂腿的内侧设有侧面顶轮。它便于安装、拆卸转运,可抗风、牢固稳定、安全系数高,可有效提高钢结构安装效率及作业安全;便于次梁的安装、刷漆、屋面板安装等作业。

The utility model discloses a movable hanging basket for steel structure installation, which belongs to the technical field of building construction. The upper end of the suspension rod of the upper embracing beam is connected with the stabilizer bar, and the lower end of the suspension rod of the upper embracing beam is connected with the suspension rod through fastening nuts and bolts. The suspension rod is connected to the connecting rod at the bottom of the basket by tightening nuts and bolts, the bottom frame of the operating hanging basket is connected to the bottom of the connecting rod at the bottom of the basket, the upper part of the connecting rod of the basket is connected to the pole for operating the hanging basket guardrail, and the outer side of the pole for operating the hanging basket guardrail is connected. Equipped with expanded metal mesh, there are several operating basket guardrail cross bars in the middle of the operating basket guardrail pole, a telescopic device is installed between the two upper beam suspension rods, and the lower section of the upper beam suspension rods is equipped with lifting lugs , the inner side of the top of the stabilizer bar is provided with a stabilizer bar hanging leg, and the inner side of the stabilizer bar hanging leg is provided with a side top wheel. It is easy to install, disassemble and transfer, can resist wind, is firm and stable, and has a high safety factor, which can effectively improve the installation efficiency and operation safety of steel structures; it is convenient for the installation of secondary beams, painting, roof panel installation and other operations.

Description

一种钢结构安装可移动挂篮A steel structure installation movable hanging basket

技术领域:Technical field:

    本实用新型涉及建筑施工技术领域,具体涉及一种钢结构安装可移动挂篮。The utility model relates to the technical field of building construction, in particular to a movable hanging basket for steel structure installation.

背景技术:Background technique:

目前钢结构施工时,次梁安装及节点的焊接、涂刷等工序,基本以无防护高空作业为主,仅设置一条钢丝绳作为生命绳,个别施工有使用简易的钢筋笼子样式的挂篮,制作不规范、不能移动,使用不方便且安全系数低。At present, during the construction of steel structures, the installation of secondary beams and the welding and painting of joints are basically based on unprotected high-altitude operations. Only one steel wire rope is set as a lifeline. Some constructions use simple steel cage-style hanging baskets. Irregular, unable to move, inconvenient to use and low safety factor.

实用新型内容:Utility model content:

针对上述问题,本实用新型要解决的技术问题是提供一种便于安装、拆卸转运,可抗风、牢固稳定、安全系数高,可有效提高钢结构安装效率及作业安全的钢结构安装可移动挂篮。In view of the above problems, the technical problem to be solved by this utility model is to provide a movable hanger for steel structure installation that is easy to install, disassemble and transfer, can resist wind, is firm and stable, has a high safety factor, and can effectively improve the efficiency of steel structure installation and work safety. basket.

本实用新型的一种钢结构安装可移动挂篮,它包含上抱梁悬挂杆、稳定杆、悬挂拉杆、篮底连接杆、操作挂篮底部边框、操作挂篮护栏立杆、操作挂篮护栏横杆、钢板网、紧固螺母螺栓;上抱梁悬挂杆的上端与稳定杆连接,上抱梁悬挂杆的下端通过紧固螺母螺栓与悬挂拉杆连接,悬挂拉杆与篮底连接杆通过紧固螺母螺栓连接,操作挂篮底部边框与篮底连接杆的底部连接,篮底连接杆上方连接有操作挂篮护栏立杆,操作挂篮护栏立杆的外侧设有钢板网,操作挂篮护栏立杆的中间设有数个操作挂篮护栏横杆,两个上抱梁悬挂杆之间设有伸缩装置,上抱梁悬挂杆的下段均设有起吊挂耳,上抱梁悬挂杆顶部的内侧设有抱梁杆挂腿,抱梁杆挂腿的内侧设有顶轮,抱梁杆挂腿的下方设有PVC滚轮,一个上抱梁悬挂杆的中间设有安全锁,另一个上抱梁悬挂杆的中间设有安全锁旋钮,且安全锁旋钮与安全锁的位置相对应,稳定杆顶部的内侧设有稳定杆挂腿,稳定杆挂腿的内侧设有侧面顶轮。The utility model relates to a steel structure installation movable hanging basket, which includes an upper beam suspension rod, a stabilizing rod, a suspension pull rod, a connecting rod at the bottom of the basket, a bottom frame for operating the hanging basket, a vertical rod for operating the hanging basket guardrail, and an operating hanging basket guardrail Cross bars, steel mesh, fastening nuts and bolts; the upper end of the suspension rod of the upper beam is connected with the stabilizer bar, the lower end of the suspension rod of the upper beam is connected with the suspension rod through fastening nuts and bolts, and the suspension rod and the connecting rod at the bottom of the basket are fastened Nut and bolt connection, the bottom frame of the operation hanging basket is connected with the bottom of the connecting rod at the bottom of the basket, the upper part of the connecting rod at the bottom of the basket is connected with the pole of the guardrail of the operating basket, the outer side of the pole of the guardrail of the operating hanging basket is provided with steel mesh, and the guardrail of the operating hanging basket is upright In the middle of the bar, there are several operating hanging basket guardrail bars. A telescopic device is installed between the two upper beam suspension bars. The lower section of the upper beam suspension bar is equipped with lifting lugs. There are beam-holding pole hanging legs, the inner side of the beam-holding pole hanging legs is equipped with a top wheel, the bottom of the beam-holding pole hanging legs is equipped with PVC rollers, one is equipped with a safety lock in the middle of the beam-holding suspension rod, and the other is suspended on the beam-holding pole. A safety lock knob is provided in the middle of the bar, and the safety lock knob corresponds to the position of the safety lock. The inside of the top of the stabilizer bar is provided with a stabilizer bar hanging leg, and the inside of the stabilizer bar hanging leg is provided with a side top wheel.

作为优选,所述的稳定杆上均匀设有数个通孔一,便于调节安装高度。As a preference, several through holes are uniformly arranged on the stabilizer bar, which is convenient for adjusting the installation height.

作为优选,所述的上抱梁悬挂杆的上半段均匀设有数个通孔二,与稳定杆上的通孔一相同,均用来调节高度的。As a preference, several through-holes 2 are evenly provided on the upper half of the suspension rod of the upper embracing beam, which are the same as the through-hole 1 on the stabilizer bar, and are used for height adjustment.

本实用新型安装时,将抱梁杆挂腿焊接在上抱梁悬挂杆上,在抱梁杆挂腿下安装PVC滚轮、在挂腿侧面安装顶轮、将伸缩杆套筒焊接在抱梁杆上;将稳定杆挂腿焊接在稳定杆顶部的内侧,再安装侧面顶轮;组装操作挂篮底部边框、铺钢板网;安装底座与挂篮拉杆的连接杆;安装连接杆、安装上抱梁悬挂杆及稳定杆,安装伸缩杆内杆、将梁片抱梁杆连接在一起;安装操作挂篮护栏立杆、操作挂篮护栏横杆、钢板网。When the utility model is installed, the hanging legs of the beam-holding rod are welded on the upper beam-holding suspension rod, PVC rollers are installed under the hanging legs of the beam-holding rod, top wheels are installed on the side of the hanging legs, and the telescopic rod sleeve is welded on the beam-holding rod Top; Weld the hanging legs of the stabilizer bar on the inner side of the top of the stabilizer bar, and then install the top wheel on the side; Assemble the bottom frame of the hanging basket and lay steel mesh; Install the connecting rod between the base and the hanging basket pull rod; Install the connecting rod, install the upper holding beam Suspension rods and stabilizer rods, install the inner rods of the telescopic rods, and connect the beams and beams together; install and operate hanging basket guardrail poles, operate hanging basket guardrail cross bars, and steel mesh.

本实用新型操作时,(1)吊车就位、挂耳上挂吊钩、松开各手拧螺母、松开伸缩杆;When the utility model is in operation, (1) the crane is in place, the hook is hung on the hanging lug, each hand-tightened nut is loosened, and the telescopic rod is loosened;

(2)借助吊车将挂篮放在钢结构梁下—→升高挂篮—→挂篮内进人旋紧伸缩杆使抱梁杆插入钢结构梁腹板内—→PVC滚轮落在钢结构梁翼缘板上—→撤除吊车吊挂—→调节伸缩杆至挂篮可自由移动—→移动到需作业位置—→再旋紧伸缩杆使抱梁杆挂腿顶紧钢结构梁腹板—→安全锁挂钩落锁并旋紧旋钮—→旋紧各手拧螺母—→挂篮稳定可进行施工作业;(2) Place the hanging basket under the steel structure beam with the help of a crane—→raise the hanging basket—→enter the hanging basket and tighten the telescopic rod so that the beam holding rod is inserted into the web of the steel structure beam—→the PVC roller falls on the steel structure On the beam flange—→Remove the crane suspension—→Adjust the telescopic rod until the hanging basket can move freely—→Move to the position required for operation—→Tighten the telescopic rod to make the hanging legs of the beam hold against the steel structure beam web—→Safety Lock the hook and tighten the knob—→tighten the hand-tightened nuts—→the hanging basket is stable and can be used for construction work;

(3)作业完毕移动时:松开各手拧螺母—→松开安全锁旋钮—→旋松伸缩杆至挂篮可自由移动—→移动到需作业位置—→……(之后同步骤2);(3) When moving after the operation: Loosen the hand-tightened nuts—→loosen the safety lock knob—→unscrew the telescopic rod until the hanging basket can move freely—→move to the position to be operated—→... ;

(4)拆除转运至下一跨时:吊车挂钩挂到位—→松开各手拧螺母—→松开安全锁旋钮打开安全锁挂钩—→旋松伸缩杆至抱梁杆挂腿均脱开梁翼缘板范围—→吊钩降低使挂篮脱开钢结构梁—→吊运到下一跨。(4) When dismantling and transferring to the next span: hang the crane hook in place—→ loosen each hand-tightened nut—→ loosen the safety lock knob to open the safety lock hook—→ loosen the telescopic rod until the hanging legs of the beam holding rod are all disengaged from the beam flange Plate range——→The hook is lowered so that the hanging basket is disengaged from the steel structure beam——————————————————————————————————————————————————————————

本实用新型的有益效果:带有滚轮可方便移动、带有保险挂锁确保安全,且便于安装、拆卸转运,可抗风、牢固稳定、安全系数高,可有效提高钢结构安装效率及作业安全;便于次梁的安装、刷漆、屋面板安装等作业。Beneficial effects of the utility model: it is equipped with rollers for easy movement, safety padlock for safety, easy installation, disassembly and transfer, wind resistance, firmness and stability, high safety factor, and can effectively improve steel structure installation efficiency and operation safety; It is convenient for the installation of secondary beams, painting, roof panel installation and other operations.

附图说明:Description of drawings:

为了易于说明,本实用新型由下述的具体实施及附图作以详细描述。For ease of illustration, the utility model is described in detail by the following specific implementation and accompanying drawings.

图1是本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2是图1的俯视图;Fig. 2 is the top view of Fig. 1;

图3是图1的中间剖视图;Fig. 3 is the middle sectional view of Fig. 1;

图4是本实用新型中上抱梁悬挂杆的结构示意图;Fig. 4 is a schematic structural view of the upper beam suspension rod in the utility model;

图5本实用新型中稳定杆的结构示意图;The structural representation of stabilizer bar in Fig. 5 the utility model;

图中:In the picture:

    上抱梁悬挂杆1、稳定杆2、悬挂拉杆3、篮底连接杆4、操作挂篮底部边框5、操作挂篮护栏立杆6、操作挂篮护栏横杆7、钢板网8、紧固螺母螺栓9、伸缩装置10、起吊挂耳11、抱梁杆挂腿12、PVC滚轮13、安全锁14、安全锁旋钮15、稳定杆挂腿16、侧面顶轮17。Upper beam suspension rod 1, stabilizer rod 2, suspension rod 3, basket bottom connecting rod 4, bottom frame of the operation hanging basket 5, operation hanging basket guardrail pole 6, operation hanging basket guardrail cross bar 7, steel mesh 8, fastening Nut and bolt 9, telescopic device 10, lifting lug 11, beam-holding rod hanging leg 12, PVC roller 13, safety lock 14, safety lock knob 15, stabilizer bar hanging leg 16, side top wheel 17.

如图1至图5所示,本具体实施方式采用以下技术方案:它包含上抱梁悬挂杆1、稳定杆2、悬挂拉杆3、篮底连接杆4、操作挂篮底部边框5、操作挂篮护栏立杆6、操作挂篮护栏横杆7、钢板网8、紧固螺母螺栓9;上抱梁悬挂杆1的上端与稳定杆2连接,上抱梁悬挂杆1的下端通过紧固螺母螺栓9与悬挂拉杆3连接,悬挂拉杆3与篮底连接杆4通过紧固螺母螺栓9连接,操作挂篮底部边框5与篮底连接杆4的底部连接,篮底连接杆4上方连接有操作挂篮护栏立杆6,操作挂篮护栏立杆6的外侧设有钢板网8,操作挂篮护栏立杆6的中间设有数个操作挂篮护栏横杆7,两个上抱梁悬挂杆1之间设有伸缩装置10,上抱梁悬挂杆1的下段均设有起吊挂耳11,上抱梁悬挂杆1顶部的内侧设有抱梁杆挂腿12,抱梁杆挂腿12的内侧设有顶轮13,抱梁杆挂腿12的下方设有PVC滚轮13,一个上抱梁悬挂杆1的中间设有安全锁14,另一个上抱梁悬挂杆1的中间设有安全锁旋钮15,且安全锁旋钮15与安全锁14的位置相对应,稳定杆2顶部的内侧设有稳定杆挂腿16,稳定杆挂腿16的内侧设有侧面顶轮17。As shown in Figures 1 to 5, this specific embodiment adopts the following technical solutions: it includes an upper beam suspension rod 1, a stabilizer rod 2, a suspension rod 3, a basket bottom connecting rod 4, an operation hanging basket bottom frame 5, an operation hanging Basket guardrail vertical bar 6, operation hanging basket guardrail cross bar 7, expanded metal mesh 8, fastening nut bolt 9; The bolt 9 is connected with the suspension rod 3, the suspension rod 3 is connected with the bottom connecting rod 4 through fastening nuts and bolts 9, the bottom frame 5 of the operating hanging basket is connected with the bottom of the bottom connecting rod 4, and the upper part of the basket bottom connecting rod 4 is connected with an operation The hanging basket guardrail pole 6, the outer side of the hanging basket guardrail pole 6 is provided with steel mesh 8, the middle of the operating hanging basket guardrail pole 6 is provided with several operating hanging basket guardrail cross bars 7, and two upper beam suspension bars 1 A telescopic device 10 is arranged between them, the lower section of the upper beam suspension rod 1 is provided with lifting lugs 11, the inner side of the upper beam suspension rod 1 top is provided with a beam-holding rod hanging leg 12, and the inner side of the beam-holding rod hanging leg 12 There is a top wheel 13, a PVC roller 13 is provided under the hanging legs 12 of the beam-holding rod, a safety lock 14 is provided in the middle of one upper beam-holding suspension rod 1, and a safety lock knob is provided in the middle of the other upper-holding beam suspension rod 1 15, and the safety lock knob 15 corresponds to the position of the safety lock 14, the inboard of the stabilizer bar 2 top is provided with a stabilizer bar hanging leg 16, and the inboard of the stabilizer bar hanging leg 16 is provided with a side top wheel 17.

其中,所述的稳定杆2上均匀设有数个通孔一,便于调节安装高度。Wherein, the stabilizer bar 2 is evenly provided with several through holes 1, which is convenient for adjusting the installation height.

所述的上抱梁悬挂杆1的上半段均匀设有数个通孔二,与稳定杆2上的通孔一相同,均用来调节高度的。The upper half of the above beam suspension rod 1 is evenly provided with several through holes 2, which are the same as the through holes 1 on the stabilizer bar 2, and are used for height adjustment.

本具体实施方式安装时,将抱梁杆挂腿12焊接在上抱梁悬挂杆1上,在抱梁杆挂腿12下安装PVC滚轮、在挂腿侧面安装顶轮、将伸缩杆套筒焊接在抱梁杆上;将稳定杆挂腿16焊接在稳定杆2顶部的内侧,再安装侧面顶轮;组装操作挂篮底部边框5、铺钢板网8;安装底座与挂篮拉杆的连接杆4;安装连接杆3、安装上抱梁悬挂杆1及稳定杆2,安装伸缩杆内杆、将梁片抱梁杆连接在一起;安装操作挂篮护栏立杆6、操作挂篮护栏横杆7、钢板网8。During the installation of this specific embodiment, the beam-holding rod hanging leg 12 is welded on the upper beam-holding beam suspension rod 1, PVC rollers are installed under the beam-holding rod hanging leg 12, the top wheel is installed on the side of the hanging leg, and the telescopic rod sleeve is welded On the beam holding bar; weld the stabilizer bar hanging leg 16 on the inner side of the top of the stabilizer bar 2, and then install the side top wheel; assemble and operate the bottom frame 5 of the hanging basket, lay the steel mesh 8; install the connecting rod 4 between the base and the hanging basket pull rod Install the connecting rod 3, install the upper beam suspension rod 1 and the stabilizer rod 2, install the inner rod of the telescopic rod, and connect the beams and beams together; install and operate the hanging basket guardrail pole 6, and operate the hanging basket guardrail cross bar 7 , Steel mesh 8.

本实用新型操作时,(1)吊车就位、挂耳上挂吊钩、松开各手拧螺母、松开伸缩杆;When the utility model is in operation, (1) the crane is in place, the hook is hung on the hanging lug, each hand-tightened nut is loosened, and the telescopic rod is loosened;

(2)借助吊车将挂篮放在钢结构梁下—→升高挂篮—→挂篮内进人旋紧伸缩杆使抱梁杆插入钢结构梁腹板内—→PVC滚轮落在钢结构梁翼缘板上—→撤除吊车吊挂—→调节伸缩杆至挂篮可自由移动—→移动到需作业位置—→再旋紧伸缩杆使抱梁杆挂腿顶紧钢结构梁腹板—→安全锁挂钩落锁并旋紧旋钮—→旋紧各手拧螺母—→挂篮稳定可进行施工作业;(2) Place the hanging basket under the steel structure beam with the help of a crane—→raise the hanging basket—→enter the hanging basket and tighten the telescopic rod so that the beam holding rod is inserted into the web of the steel structure beam—→the PVC roller falls on the steel structure On the beam flange—→Remove the crane suspension—→Adjust the telescopic rod until the hanging basket can move freely—→Move to the position required for operation—→Tighten the telescopic rod to make the hanging legs of the beam hold against the steel structure beam web—→Safety Lock the hook and tighten the knob—→tighten each hand-tightened nut—→the hanging basket is stable and can be used for construction work;

(3)作业完毕移动时:松开各手拧螺母—→松开安全锁旋钮—→旋松伸缩杆至挂篮可自由移动—→移动到需作业位置—→……(之后同步骤2);(3) When moving after the operation: Loosen the hand-tightened nuts—→loosen the safety lock knob—→unscrew the telescopic rod until the hanging basket can move freely—→move to the position to be operated—→... ;

  (4)拆除转运至下一跨时:吊车挂钩挂到位—→松开各手拧螺母—→松开安全锁旋钮打开安全锁挂钩—→旋松伸缩杆至抱梁杆挂腿均脱开梁翼缘板范围—→吊钩降低使挂篮脱开钢结构梁—→吊运到下一跨。(4) When dismantling and transferring to the next span: hang the crane hook in place—→ loosen each hand-tightened nut—→ loosen the safety lock knob to open the safety lock hook—→ loosen the telescopic rod until the hanging legs of the beam holding rod are all disengaged from the beam flange Plate range——→The hook is lowered so that the hanging basket is disengaged from the steel structure beam————————————————————————————————————————————————————————————

本具体实施方式带有滚轮可方便移动、带有保险挂锁确保安全,且便于安装、拆卸转运,可抗风、牢固稳定、安全系数高,可有效提高钢结构安装效率及作业安全;便于次梁的安装、刷漆、屋面板安装等作业。This specific embodiment has rollers for easy movement, a safety padlock to ensure safety, and is convenient for installation, disassembly and transfer. It is wind-resistant, firm and stable, and has a high safety factor. Installation, painting, roof panel installation and other operations.

以上显示和描述了本实用新型的基本原理和主要特征以及本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定 The basic principles and main features of the utility model and the advantages of the utility model have been shown and described above. Those skilled in the art should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model The new model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model. The scope of protection required by the utility model is defined by the appended claims and their equivalents .

Claims (3)

1. the removable Hanging Basket of Steel Structure Installation, is characterized in that it comprises and embraces connecting rod at the bottom of beam hanger bar, stabiliser bar, suspension pull bar, basket, operation cradle bottom frame, operation Hanging Basket guardrail upright pole, operation Hanging Basket rail horizontal rod, expanded metal lath, clamp nut bolt, upper upper end of embracing beam hanger bar is connected with stabiliser bar, upper lower end of embracing beam hanger bar is connected with suspension pull bar by clamp nut bolt, hang pull bar to be connected by clamp nut bolt with connecting rod at the bottom of basket, operation cradle bottom frame is connected with the bottom of connecting rod at the bottom of basket, operation Hanging Basket guardrail upright pole is connected with above connecting rod at the bottom of basket, the outside of operation Hanging Basket guardrail upright pole is provided with expanded metal lath, the centre of operation Hanging Basket guardrail upright pole is provided with several operation Hanging Basket rail horizontal rod, two upper embracing between beam hanger bar are provided with stretching device, the upper hypomere embracing beam hanger bar is equipped with lifting hangers, upper inner side of embracing beam hanger bar top is provided with embraces beam column extension leg, the inner side of embracing beam column extension leg is provided with top wheel, the below of embracing beam column extension leg is provided with PVC roller, a upper centre of embracing beam hanger bar is provided with safety lock, the centre of another being embraced beam hanger bar is provided with safety lock knob, and safety lock knob is corresponding with the position of safety lock, the inner side at stabiliser bar top is provided with stabiliser bar and hangs leg, the inner side that leg hung by stabiliser bar is provided with top, side wheel.
2. the removable Hanging Basket of a kind of Steel Structure Installation according to claim 1, is characterized in that described stabiliser bar being evenly provided with several through hole one.
3. the removable Hanging Basket of a kind of Steel Structure Installation according to claim 1, is characterized in that the upper semisection of described upper armful beam hanger bar is evenly provided with several through hole two, identical with the through hole one on stabiliser bar.
CN201520462074.7U 2015-06-27 2015-06-27 The removable Hanging Basket of a kind of Steel Structure Installation Expired - Fee Related CN204715721U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520462074.7U CN204715721U (en) 2015-06-27 2015-06-27 The removable Hanging Basket of a kind of Steel Structure Installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520462074.7U CN204715721U (en) 2015-06-27 2015-06-27 The removable Hanging Basket of a kind of Steel Structure Installation

Publications (1)

Publication Number Publication Date
CN204715721U true CN204715721U (en) 2015-10-21

Family

ID=54314723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520462074.7U Expired - Fee Related CN204715721U (en) 2015-06-27 2015-06-27 The removable Hanging Basket of a kind of Steel Structure Installation

Country Status (1)

Country Link
CN (1) CN204715721U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105645323A (en) * 2016-04-15 2016-06-08 中国五冶集团有限公司 Overhead moving hanging basket and moving method
CN107130526A (en) * 2017-05-17 2017-09-05 贵州路桥集团有限公司 A kind of Hanging Basket uses the traveling method of this device with towed running gear and Hanging Basket
CN107268443A (en) * 2017-06-27 2017-10-20 武汉理工大学 detachable narrow beam hanging frame device
CN108532473A (en) * 2018-04-23 2018-09-14 中铁七局集团第四工程有限公司 Cast-in-place cantilever hanging basket system and construction method applied to variable cross-section continuous beam on many supports
CN109057309A (en) * 2018-09-13 2018-12-21 中信国安建工集团有限公司 A kind of suspended operating platform and its mounting and dismounting method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105645323A (en) * 2016-04-15 2016-06-08 中国五冶集团有限公司 Overhead moving hanging basket and moving method
CN105645323B (en) * 2016-04-15 2017-10-24 中国五冶集团有限公司 A kind of high-altitude movement construction hanging basket and moving method
CN107130526A (en) * 2017-05-17 2017-09-05 贵州路桥集团有限公司 A kind of Hanging Basket uses the traveling method of this device with towed running gear and Hanging Basket
CN107268443A (en) * 2017-06-27 2017-10-20 武汉理工大学 detachable narrow beam hanging frame device
CN108532473A (en) * 2018-04-23 2018-09-14 中铁七局集团第四工程有限公司 Cast-in-place cantilever hanging basket system and construction method applied to variable cross-section continuous beam on many supports
CN109057309A (en) * 2018-09-13 2018-12-21 中信国安建工集团有限公司 A kind of suspended operating platform and its mounting and dismounting method

Similar Documents

Publication Publication Date Title
CN204715721U (en) The removable Hanging Basket of a kind of Steel Structure Installation
CN206016226U (en) Tool type scaffold interlayer guard system
CN206513004U (en) A kind of movable hanger for being easy to roof inner slab to install
CN211736298U (en) Double-rod diagonal cantilever scaffold
CN202544468U (en) Drawbar-type electrical steel tubular rod
CN207245138U (en) Boat scaffold adjustable in pitch
CN210032558U (en) Scaffold for building convenient to dismouting
CN209261182U (en) Scaffolding for prefabricated building construction
CN203701543U (en) Stable scaffold
CN206376507U (en) Prefabrication outrigger
CN206636157U (en) A steel structure suitable for construction site assembly
CN216949411U (en) Be used for inserted lift scaffold to hang and establish protection pocket net device
CN207458703U (en) Shock-proof transformer stent and potential device
CN211422500U (en) A ladder that continues for steel pipe pole is climbed
CN115853246A (en) Aluminum alloy operation hanging frame for overhead arc door and building method thereof
CN203783106U (en) Hanging assembling moving platform
CN210798251U (en) But scaffold of automatically regulated height
CN203545501U (en) Auxiliary lifting device of inner crawl type tower crane in small space
CN206955520U (en) Anti-collapse three-leg support
CN206707239U (en) A kind of elevator Integral hoisting operating platform
CN201574572U (en) Angle-adjustable operating platform hanging rack
CN201850750U (en) Operation platform for slip form construction of tubular structure
CN103669821B (en) Detachable gantry installation frame and hanging basket
CN219411737U (en) Install construction scaffolding
CN204299207U (en) A kind of frame supported system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151021