CN105645323B - A kind of high-altitude movement construction hanging basket and moving method - Google Patents
A kind of high-altitude movement construction hanging basket and moving method Download PDFInfo
- Publication number
- CN105645323B CN105645323B CN201610233286.7A CN201610233286A CN105645323B CN 105645323 B CN105645323 B CN 105645323B CN 201610233286 A CN201610233286 A CN 201610233286A CN 105645323 B CN105645323 B CN 105645323B
- Authority
- CN
- China
- Prior art keywords
- arm
- mobile
- main
- lifting
- transverse axis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F11/00—Lifting devices specially adapted for particular uses not otherwise provided for
- B66F11/04—Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种钢结构厂房的施工吊篮领域,具体涉及一种高空移动施工吊篮及移动方法。The invention relates to the field of a construction hanging basket of a steel structure workshop, in particular to a high-altitude mobile construction hanging basket and a moving method.
背景技术Background technique
目前,在一般的钢结构厂房屋面内板施工中,由于厂房内部没有安装设备,因此通常可以在厂房内搭设移动式脚手架,以便安装屋面内板。然而对一些大型设备来说,它们需要从屋顶上空采用汽车吊吊入到厂房内,其组装也需要将构件从屋顶吊入厂房。屋面外板可以在屋顶上安装,但由于室内有设备,因此无法采用移动式脚手架来安装屋面内板。另外,对于一些钢结构厂房或者钢结构建筑来说,由于单层层高太高,容易使搭设移动脚手架的架体过于单薄,从而导致稳定性不好的缺点。另外,也容易使搭设架体过大,移动起来不方便,而如果搭设满堂脚手架,则成本太高。At present, in the construction of the inner panel of the general steel structure factory building, since there is no installation equipment inside the factory building, it is usually possible to set up a mobile scaffold in the factory building to install the inner roof panel. However, for some large-scale equipment, they need to be hoisted into the factory building from above the roof by trucks, and their assembly also requires the components to be hoisted into the factory building from the roof. The outer roof panel can be installed on the roof, but because of the equipment in the room, it is not possible to use mobile scaffolding to install the inner roof panel. In addition, for some steel structure workshops or steel structure buildings, because the single-story height is too high, it is easy to make the frame body of the mobile scaffold too thin, resulting in the disadvantage of poor stability. In addition, it is also easy to make the erection frame too large, which is inconvenient to move, and if a full house of scaffolding is erected, the cost will be too high.
另外,现有采用的施工吊篮在挂梁上移动也不方便,只能局部在钢结构厂房屋面内板施工,即使有具有移动功能施工吊篮,这种施工吊篮也只能在一根平滑无障碍的檩条上移动,当碰到檩条上有凸起障碍处无法跨越移动。In addition, it is inconvenient to move the existing construction hanging basket on the hanging beam, and it can only be partially constructed on the inner panel of the steel structure factory building. Move on the smooth and barrier-free purlins, and cannot move across the raised obstacles on the purlins.
发明内容Contents of the invention
本发明的目的即在于克服现有技术的不足,提供一种高空移动施工吊篮及移动方法,解决现有施工吊篮只能局部在钢结构厂房屋面内板施工,无法在挂梁上方便跨越障碍移动的问题。The purpose of the present invention is to overcome the deficiencies of the prior art, and provide a high-altitude mobile construction basket and a moving method to solve the problem that the existing construction basket can only be partially constructed on the inner panel of the steel structure factory building, and cannot be conveniently spanned on the hanging beam Problems with moving obstacles.
本发明的通过下述技术方案实现:一种高空移动施工吊篮,包括吊篮及固定设置在吊篮上的挂臂组件,所述的挂臂组件包括主吊杆和副吊杆;所述的主吊杆下部为主吊臂,所述的主吊杆上部为主吊钩;所述的副吊杆为U型结构,所述副吊杆左侧为第一副吊臂,所述副吊杆右侧为第二副吊臂,所述的第一副吊臂和第二副吊臂之间为移动横轴;所述的第一副吊臂和第二副吊臂上端均设有副吊钩;所述的主吊臂与移动横轴相互垂直设置,所述的移动横轴通过调节十字轴接头件与主吊臂连接,并通过调节十字轴接头件控制移动横轴相对于主吊臂上、下移动或左、右移动。或者,并通过调节十字轴接头件控制主吊臂相对于移动横轴上、下移动或左、右移动。The present invention is achieved through the following technical solutions: a high-altitude mobile construction basket, including a hanging basket and a hanging arm assembly fixed on the hanging basket, the hanging arm assembly includes a main boom and a secondary boom; The lower part of the main boom is the main boom, the upper part of the main boom is the main hook; the auxiliary boom is a U-shaped structure, the left side of the auxiliary boom is the first auxiliary boom, the auxiliary The right side of the boom is the second secondary boom, and the moving horizontal axis is between the first secondary boom and the second secondary boom; the upper ends of the first secondary boom and the second secondary boom are equipped with Auxiliary hook; the main boom and the moving transverse axis are arranged perpendicular to each other, the moving transverse axis is connected with the main boom by adjusting the joint of the cross axis, and the movement of the transverse axis relative to the main boom is controlled by adjusting the joint of the cross axis. The boom moves up and down or left and right. Or, control the main boom to move up and down or move left and right relative to the moving transverse axis by adjusting the cross axis joint.
所述的主吊钩内上部设置滚轴,所述的滚轴靠近主吊臂一端设置有滚轴链轮,所述的主吊臂上设置有链轮手摇装置,所述的链轮手摇装置包括手摇链轮和手轮组件,所述的手轮组件插设在主吊臂上自由摇动,所述的手摇链轮与滚轴链轮上下对应并通过链条传动连接。The upper part of the main hook is provided with a roller, the end of the roller near the main boom is provided with a roller sprocket, the main boom is provided with a sprocket manual device, and the sprocket hand The cranking device includes a hand sprocket and a handwheel assembly. The handwheel assembly is inserted on the main boom to swing freely. The hand sprocket corresponds to the roller sprocket up and down and is connected through a chain drive.
进一步的,所述的调节十字轴接头件包括纵向轴套和横向轴套,所述的主吊臂插设在纵向轴套内,所述的移动横轴插设在横向轴套内;所述的纵向轴套一端设置有升降调节机构;所述的横向轴套一端设置有横向移动调节机构。Further, the adjusting cross shaft joint includes a longitudinal bushing and a transverse bushing, the main boom is inserted in the longitudinal bushing, and the moving transverse shaft is inserted in the transverse bushing; One end of the longitudinal sleeve is provided with a lifting adjustment mechanism; one end of the horizontal sleeve is provided with a lateral movement adjustment mechanism.
进一步的,所述的升降调节机构包括升降手轮、升降蜗杆、升降涡轮、升降轴和升降齿轮,所述的升降轴与主吊臂垂直设置,所述的升降涡轮和升降齿轮均设置在升降轴上,所述的升降蜗杆一端头安装有升降手轮,所述的升降蜗杆另一端部与升降涡轮啮合;所述的主吊臂上设置有条型齿,所述的升降齿轮与主吊臂上的条型齿相互啮合连接,转动升降手轮通过升降蜗杆和升降涡轮使升降轴转动,固定在升降轴上的升降齿轮通过与主吊臂上的条型齿相互啮合从而带动调节十字轴接头件升降。Further, the lifting adjustment mechanism includes a lifting hand wheel, a lifting worm, a lifting worm gear, a lifting shaft and a lifting gear, the lifting shaft is arranged perpendicular to the main boom, and the lifting worm gear and the lifting gear are both arranged on the lifting gear. On the shaft, one end of the lifting worm is equipped with a lifting hand wheel, and the other end of the lifting worm is meshed with the lifting worm gear; the main boom is provided with bar teeth, and the lifting gear is connected to the main crane. The bar-shaped teeth on the arm are meshed and connected with each other. Turning the lifting hand wheel makes the lifting shaft rotate through the lifting worm and the lifting worm gear. The lifting gear fixed on the lifting shaft is meshed with the bar-shaped teeth on the main boom to drive and adjust the cross axis. Connector lifts.
进一步的,所述的横向移动调节机构包括移动手轮、移动蜗杆、移动涡轮、移动轴和移动齿轮,所述的移动轴与移动横轴垂直设置,所述的移动涡轮和移动齿轮均设置在移动轴上,所述的移动蜗杆一端头安装有移动手轮,所述的移动蜗杆另一端部与移动涡轮啮合;所述的移动横轴上设置有条型齿,所述的移动齿轮与移动横轴上的条型齿相互啮合连接,转动移动手轮通过移动蜗杆和移动涡轮使移动轴转动,固定在移动轴上的移动齿轮通过与移动横轴上的条型齿相互啮合从而带动移动横轴左右移动。横向移动调节机构和升降调节机构结构原理相同。Further, the lateral movement adjustment mechanism includes a moving handwheel, a moving worm, a moving worm gear, a moving shaft and a moving gear, the moving shaft is arranged perpendicular to the moving horizontal axis, and the moving worm gear and moving gear are both arranged on On the moving shaft, a moving hand wheel is installed at one end of the moving worm, and the other end of the moving worm is meshed with the moving worm gear; the moving horizontal axis is provided with bar teeth, and the moving gear and the moving The bar-shaped teeth on the horizontal axis are meshed with each other. Turning the moving hand wheel makes the moving shaft rotate through the moving worm and the moving worm gear. The moving gear fixed on the moving shaft drives the moving horizontal The axis moves left and right. The structural principle of the horizontal movement adjustment mechanism is the same as that of the lifting adjustment mechanism.
进一步的,所述的主吊钩内设置滚轴链轮的一侧设置有链轮保护板,所述的链轮保护板通过支架板连接在主吊钩内侧壁上。在实际使用过程中,经常发现滚轴链轮挤压在檩条上,导致滚轴链轮被挤死无法转动,为了使滚轴链轮与檩条隔离设计了链轮保护板。Further, a sprocket protection plate is provided on the side where the roller sprocket is arranged in the main hook, and the sprocket protection plate is connected to the inner wall of the main hook through a bracket plate. In actual use, it is often found that the roller sprocket is squeezed on the purlin, causing the roller sprocket to be squeezed and unable to rotate. In order to isolate the roller sprocket from the purlin, a sprocket protection plate is designed.
本发明的通过下述另一技术方案实现:一种高空移动施工吊篮移动方法,当施工吊篮需要在平滑的檩条上移动时,采用如下步骤:转动手轮组件带动手摇链轮,所述的手摇链轮通过链条依次带动滚轴链轮和滚轴,所述的滚轴在平滑的檩条上移动从而带动整个施工吊篮移动;The present invention is realized through the following another technical solution: a method for moving the construction hanging basket at high altitude, when the construction hanging basket needs to move on the smooth purlin, the following steps are adopted: turn the handwheel assembly to drive the hand sprocket, the The above-mentioned hand-operated sprocket drives the roller sprocket and the roller in turn through the chain, and the roller moves on the smooth purlin so as to drive the entire construction basket to move;
当施工吊篮在檩条上移动碰到障碍凸起时,采用如下步骤:When the construction basket moves on the purlin and encounters an obstacle protrusion, the following steps are taken:
步骤1:在主吊杆靠近障碍凸起时,通过手摇升降手轮调节副吊杆升高,使副吊钩脱离檩条;Step 1: When the main boom is close to the raised obstacle, adjust the lifting of the auxiliary boom through the manual lifting handwheel, so that the auxiliary hook is separated from the purlin;
步骤2:副吊钩脱落檩条后,通过手摇移动手轮调节副吊杆横向移动,使第二副吊臂上的副吊钩跨过障碍凸起;Step 2: After the auxiliary hook falls off the purlin, adjust the lateral movement of the auxiliary boom by moving the hand wheel by hand, so that the auxiliary hook on the second auxiliary boom can cross the obstacle protrusion;
步骤3:然后通过手摇升降手轮调节副吊杆降低,当副吊钩挂在檩条上时;继续调节副吊杆降低,直至主吊杆上的主吊钩脱离檩条;Step 3: Then adjust the lowering of the auxiliary boom through the manual lifting handwheel, when the auxiliary hook is hung on the purlin; continue to adjust the lowering of the auxiliary boom until the main hook on the main boom is separated from the purlin;
步骤4:然后通过手摇移动手轮调节主吊杆向右移动跨过障碍凸起;Step 4: Then move the handwheel by hand to adjust the main boom to move to the right to cross over the obstacle bump;
步骤5:然后通过手摇升降手轮调节主吊杆下降,直至主吊杆上的主吊钩挂在檩条上完成跨越移动。Step 5: Then adjust the lowering of the main suspender through the manual lifting handwheel until the main hook on the main suspender hangs on the purlin to complete the spanning movement.
本发明与现有技术相比,具有如下的优点和有益效果:Compared with the prior art, the present invention has the following advantages and beneficial effects:
1、当施工吊篮需要在平滑的檩条上移动时,通过设置链轮手摇装置和滚轴,通过摇动链轮手摇装置可以带动滚轴前进或后退,制作简单,反复利用率高,成本低,不造成浪费,厂房类结构均可使用;安全性强;1. When the construction hanging basket needs to move on the smooth purlin, by setting the sprocket hand-operated device and the roller, the roller can be driven forward or backward by shaking the sprocket hand-operated device. The production is simple, the repeated utilization rate is high, and the cost is low Low cost, no waste, can be used in factory buildings; strong safety;
2、当施工吊篮在檩条上移动碰到障碍凸起时,通过挂臂组件采用主吊杆和副吊杆结构,移动横轴通过调节十字轴接头件与主吊臂连接,并通过调节十字轴接头件控制移动横轴相对于主吊臂上、下移动或左、右移动;或者,并通过调节十字轴接头件控制主吊臂相对于移动横轴上、下移动或左、右移动;从而实现主吊杆和副吊杆交替跨越障碍凸起。2. When the construction hanging basket moves on the purlin and encounters an obstacle protrusion, the main boom and auxiliary boom structure are adopted through the hanging arm assembly, and the moving horizontal axis is connected with the main boom by adjusting the cross shaft joint, and by adjusting the cross The shaft joint controls the movement of the transverse axis relative to the main boom to move up and down or to move left and right; or, by adjusting the cross axis joint to control the movement of the main boom to move up and down or to move left and right relative to the movement transverse axis; Thereby it is realized that the main boom and the auxiliary boom alternately cross over the obstacle protrusion.
附图说明Description of drawings
此处所说明的附图用来提供对本发明实施例的进一步理解,构成本申请的一部分,并不构成对本发明实施例的限定。在附图中:The drawings described here are used to provide a further understanding of the embodiments of the present invention, constitute a part of the application, and do not limit the embodiments of the present invention. In the attached picture:
图1为本发明一种高空移动施工吊篮的主视结构示意图;Fig. 1 is the front view structure schematic diagram of a kind of high-altitude mobile construction hanging basket of the present invention;
图2为本发明一种高空移动施工吊篮的侧视结构示意图;Fig. 2 is a side view structural schematic diagram of a high-altitude mobile construction hanging basket of the present invention;
图3为本发明图2中的A处放大图;Fig. 3 is an enlarged view at A place in Fig. 2 of the present invention;
图4为本发明图2中的B处放大图;Fig. 4 is an enlarged view at B place in Fig. 2 of the present invention;
附图中标记及相应的零部件名称:Marks and corresponding component names in the attached drawings:
1-吊篮,2-挂臂组件,3-主吊杆,4-副吊杆,5-主吊臂,6-主吊钩,7-第一副吊臂,8-第二副吊臂,9-移动横轴,10-副吊钩,11-调节十字轴接头件,12-纵向轴套,13-横向轴套,14-升降调节机构,15-横向移动调节机构,16-升降手轮,17-升降蜗杆,18-升降涡轮,19-升降轴,20-升降齿轮,21-条型齿,22-移动手轮,23-移动蜗杆,24-移动涡轮,25-移动轴,26-移动齿轮,27-檩条,28-滚轴,29-滚轴链轮,30-链轮手摇装置,31-手摇链轮,32-手轮组件,33-链轮保护板,34-支架板,35-链条。1-Basket, 2-Hanging arm assembly, 3-Main boom, 4-Auxiliary boom, 5-Main boom, 6-Main hook, 7-First auxiliary boom, 8-Second auxiliary boom , 9-Moving horizontal axis, 10-Auxiliary hook, 11-Adjustment cross shaft joint, 12-Longitudinal bushing, 13-Transverse bushing, 14-Elevating adjustment mechanism, 15-Lateral movement adjustment mechanism, 16-Elevating hand Wheel, 17-lifting worm, 18-lifting worm, 19-lifting shaft, 20-lifting gear, 21-bar tooth, 22-moving handwheel, 23-moving worm, 24-moving worm, 25-moving shaft, 26 -Moving gear, 27-purlin, 28-roller, 29-roller sprocket, 30-sprocket hand crank device, 31-hand sprocket, 32-hand wheel assembly, 33-sprocket protection plate, 34- Bracket plate, 35-chain.
具体实施方式detailed description
为使本发明的目的、技术方案和优点更加清楚明白,下面结合实施例和附图,对本发明作进一步的详细说明,本发明的示意性实施方式及其说明仅用于解释本发明,并不作为对本发明的限定。In order to make the purpose, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the examples and accompanying drawings. As a limitation of the present invention.
实施例1Example 1
如图1-4所示,本发明一种高空移动施工吊篮,包括吊篮1及固定设置在吊篮1上的挂臂组件2,挂臂组件2包括主吊杆3和副吊杆4;主吊杆3下部为主吊臂5,主吊杆3上部为主吊钩6;副吊杆4为U型结构,副吊杆4左侧为第一副吊臂7,副吊杆4右侧为第二副吊臂8,第一副吊臂7和第二副吊臂8之间为移动横轴9;第一副吊臂7和第二副吊臂8上端均设有副吊钩10;主吊臂5与移动横轴9相互垂直设置,移动横轴9通过调节十字轴接头件11与主吊臂5连接,当主吊臂5挂在檩条27固定时,通过调节十字轴接头件11控制移动横轴9相对于主吊臂5上、下移动或左、右移动;当移动横轴9挂在檩条27固定时,通过调节十字轴接头件11控制主吊臂5相对于移动横轴9上、下移动或左、右移动。As shown in Figures 1-4, a high-altitude mobile construction hanging basket of the present invention includes a hanging basket 1 and a hanging arm assembly 2 fixedly arranged on the hanging basket 1, and the hanging arm assembly 2 includes a main boom 3 and an auxiliary boom 4 The lower part of the main boom 3 is the main boom 5, the upper part of the main boom 3 is the main hook 6; the auxiliary boom 4 is a U-shaped structure, the left side of the auxiliary boom 4 is the first auxiliary boom 7, and the auxiliary boom 4 The right side is the second auxiliary boom 8, between the first auxiliary boom 7 and the second auxiliary boom 8 is a moving horizontal axis 9; the upper ends of the first auxiliary boom 7 and the second auxiliary boom 8 are equipped with auxiliary cranes Hook 10; the main boom 5 and the moving cross shaft 9 are arranged perpendicular to each other, and the moving cross shaft 9 is connected to the main boom 5 by adjusting the cross shaft joint 11. When the main boom 5 is hung on the purlin 27 and fixed, by adjusting the cross shaft joint Part 11 controls the moving cross axis 9 to move up and down or left and right relative to the main boom 5; when the moving cross shaft 9 is fixed on the purlin 27, the main boom 5 is controlled to move relative to the main boom 5 by adjusting the cross shaft joint part 11. Horizontal axis 9 moves up and down or left and right.
主吊钩6内上部设置滚轴28,在滚轴2靠近主吊臂5一端设置有滚轴链轮29,所述的主吊臂5上设置有链轮手摇装置30,链轮手摇装置30包括手摇链轮31和手轮组件32,所述的手轮组件32插设在主吊臂5上自由摇动,所述的手摇链轮31与滚轴链轮29上下对应并通过链条35传动连接。The upper part of the main hook 6 is provided with a roller 28, and the end of the roller 2 close to the main boom 5 is provided with a roller sprocket 29. The main boom 5 is provided with a sprocket manual device 30, and the sprocket is manually The device 30 includes a handwheel sprocket 31 and a handwheel assembly 32, the handwheel assembly 32 is inserted on the main boom 5 to swing freely, and the handwheel sprocket 31 corresponds up and down with the roller sprocket 29 and passes through Chain 35 drive connections.
吊篮1主体结构采用无缝钢管直径为30mm,厚度为3mm,材质为Q345B;吊篮1下方采用铺花纹钢板(防滑),厚度为3mm;焊接均采用二氧化碳保护焊,制作完成后采用银粉漆涂装,厚度为80um。The main structure of the hanging basket 1 is made of seamless steel pipe with a diameter of 30mm and a thickness of 3mm, and the material is Q345B; the bottom of the hanging basket 1 is made of patterned steel plate (anti-skid), and the thickness is 3mm; the welding is carbon dioxide shielded welding, and silver powder paint is used after the production is completed Coating, the thickness is 80um.
使用时,施工吊篮通过主吊钩6和副吊钩10挂在檩条27上,作业人员可以通过钢结构厂房上的檩条爬进吊篮1;作业人员身上的安全绳挂在吊篮1上,工人有双重保护在吊篮内即可安装底板(头部顶着底板,这时双手就可安装自攻钉);速度快,工人自身用手即可滑动吊篮,便于工人作业。When in use, the construction hanging basket is hung on the purlin 27 through the main hook 6 and the auxiliary hook 10, and the operator can climb into the hanging basket 1 through the purlin on the steel structure workshop; the safety rope on the operator's body is hung on the hanging basket 1 , the worker has double protection and can install the bottom plate in the hanging basket (the head is against the bottom plate, and self-tapping screws can be installed with both hands at this time); the speed is fast, and the worker can slide the hanging basket with his own hands, which is convenient for workers to work.
当施工吊篮需要在平滑的檩条27上移动时,转动手轮组件32带动手摇链轮31,所述的手摇链轮31通过链条35依次带动滚轴链轮29和滚轴28,所述的滚轴28在平滑的檩条27上移动从而带动整个施工吊篮移动。When the construction hanging basket needs to move on the smooth purlin 27, turn the hand wheel assembly 32 to drive the hand sprocket 31, and the hand sprocket 31 drives the roller sprocket 29 and the roller 28 in turn through the chain 35, so The above-mentioned roller 28 moves on the smooth purlin 27 so as to drive the whole construction hanging basket to move.
当施工吊篮在檩条27上移动碰到障碍凸起时,在副吊钩10靠近障碍凸起时,通过手摇升降手轮16调节副吊杆4升高,使副吊钩10脱离檩条27。在副吊钩10脱离檩条27后,通过手摇移动手轮22调节副吊杆4横向移动,使第二副吊臂8上的副吊钩10跨过障碍凸起。然后通过手摇升降手轮16调节副吊杆4降低,当副吊钩10挂在檩条27上时;继续调节副吊杆4降低,直至主吊杆3上的主吊钩6脱离檩条27。然后通过手摇移动手轮22调节主吊杆3向右移动跨过障碍凸起。跨过障碍凸起后,通过手摇升降手轮16调节主吊杆3下降,直至主吊杆3上的主吊钩6挂在檩条27上完成跨越移动。制作简单,反复利用率高,成本低,不造成浪费,厂房类结构均可使用;安全性强。When the construction hanging basket moves on the purlin 27 and encounters an obstacle protrusion, when the auxiliary hook 10 is close to the obstacle protrusion, the auxiliary suspension rod 4 is adjusted to rise by the hand-operated lifting hand wheel 16, so that the auxiliary hook 10 is separated from the purlin 27 . After the secondary hook 10 breaks away from the purlin 27, the secondary suspension rod 4 is regulated to move laterally through the handwheel 22, so that the secondary suspension hook 10 on the second secondary suspension arm 8 can straddle the obstacle protrusion. Then adjust the auxiliary suspension rod 4 by hand lifting handwheel 16 and lower, when the auxiliary suspension hook 10 is hung on the purlin 27; Then move the handwheel 22 by hand and adjust the main boom 3 to move to the right and step over the obstacle protrusion. After crossing the obstacle protrusion, the main suspension rod 3 is adjusted to descend by the hand-operated lifting hand wheel 16 until the main suspension hook 6 on the main suspension rod 3 is hung on the purlin 27 to complete the spanning movement. The production is simple, the repeated utilization rate is high, the cost is low, no waste is caused, and the structure of the factory building can be used; the safety is strong.
实施例2Example 2
如图1-4所示,本发明一种高空移动施工吊篮,在实施例1的基础上,调节十字轴接头件11包括纵向轴套12和横向轴套13,主吊臂5插设在纵向轴套12内,移动横轴9插设在横向轴套13内;纵向轴套12一端设置有升降调节机构14;横向轴套13一端设置有横向移动调节机构15。As shown in Figures 1-4, the present invention is a high-altitude mobile construction basket. On the basis of Embodiment 1, the adjustment cross shaft joint 11 includes a longitudinal bushing 12 and a transverse bushing 13, and the main boom 5 is inserted in the In the longitudinal bushing 12, the moving horizontal shaft 9 is inserted in the transverse bushing 13; one end of the longitudinal bushing 12 is provided with a lifting adjustment mechanism 14; one end of the transverse bushing 13 is provided with a lateral movement regulating mechanism 15.
升降调节机构14包括升降手轮16、升降蜗杆17、升降涡轮18、升降轴19和升降齿轮20,升降轴19与主吊臂5垂直设置,升降涡轮18和升降齿轮20均设置在升降轴19上,升降蜗杆17一端头安装有升降手轮16,升降蜗杆17另一端部与升降涡轮18啮合;主吊臂5上设置有条型齿21,升降齿轮20与主吊臂5上的条型齿21相互啮合,转动升降手轮16通过升降蜗杆17和升降涡轮18使升降轴19转动,固定在升降轴19上的升降齿轮20通过与主吊臂5上的条型齿21相互啮合从而带动调节十字轴接头件11升降。The lifting adjustment mechanism 14 includes a lifting hand wheel 16, a lifting worm 17, a lifting turbine 18, a lifting shaft 19 and a lifting gear 20. Above, one end of the lifting worm 17 is equipped with a lifting handwheel 16, and the other end of the lifting worm 17 meshes with the lifting turbine 18; The teeth 21 are meshed with each other, and the lifting hand wheel 16 is rotated to rotate the lifting shaft 19 through the lifting worm 17 and the lifting worm gear 18, and the lifting gear 20 fixed on the lifting shaft 19 is driven by intermeshing with the bar teeth 21 on the main boom 5. Adjust the lifting of the cross shaft joint part 11.
横向移动调节机构15包括移动手轮22、移动蜗杆23、移动涡轮24、移动轴25和移动齿轮26,移动轴25与移动横轴9垂直设置,移动涡轮24和移动齿轮26均设置在移动轴25上,移动蜗杆23一端头安装有移动手轮22,移动蜗杆23另一端部与移动涡轮24啮合;移动横轴9上设置有条型齿21,移动齿轮26与移动横轴9上的条型齿21相互啮合,转动移动手轮22通过移动蜗杆23和移动涡轮24使移动轴25转动,固定在移动轴25上的移动齿轮26通过与移动横轴9上的条型齿21相互啮合从而带动移动横轴9左右移动。The lateral movement adjustment mechanism 15 comprises a mobile hand wheel 22, a mobile worm 23, a mobile worm gear 24, a mobile shaft 25 and a mobile gear 26, the mobile shaft 25 is vertically arranged with the mobile horizontal shaft 9, and the mobile worm wheel 24 and the mobile gear 26 are all arranged on the mobile shaft. 25, one end of the moving worm 23 is equipped with a moving hand wheel 22, and the other end of the moving worm 23 is engaged with the moving worm gear 24; The profile teeth 21 are meshed with each other, turning the mobile hand wheel 22 makes the mobile shaft 25 rotate through the mobile worm 23 and the mobile worm wheel 24, and the mobile gear 26 fixed on the mobile shaft 25 is meshed with the bar-shaped teeth 21 on the mobile horizontal shaft 9. Drive and move horizontal axis 9 to move left and right.
实施例3Example 3
如图1-4所示,本发明一种高空移动施工吊篮,在实施例1的基础上,吊钩6内设置滚轴链轮29的一侧设置有链轮保护板33,链轮保护板33通过支架板34连接在主吊钩6内侧壁上。在实际使用过程中,经常发现滚轴链轮29挤压在檩条27上,导致滚轴链轮29被挤死无法转动,为了使滚轴链轮29与檩条27隔离设计了链轮保护板。As shown in Figures 1-4, the present invention is a high-altitude mobile construction basket. On the basis of Embodiment 1, a sprocket protection plate 33 is provided on the side where the roller sprocket 29 is installed in the hook 6, and the sprocket protection The plate 33 is connected to the inner wall of the main hook 6 through the bracket plate 34 . In actual use, it is often found that the roller sprocket 29 is squeezed on the purlin 27, causing the roller sprocket 29 to be squeezed and unable to rotate. In order to isolate the roller sprocket 29 from the purlin 27, a sprocket protection plate is designed.
实施例4Example 4
如图1-4所示,一种高空移动施工吊篮移动方法,当施工吊篮需要在平滑的檩条27上移动时,采用如下步骤:转动手轮组件32带动手摇链轮31,手摇链轮31通过链条35依次带动滚轴链轮29和滚轴28,滚轴28在平滑的檩条27上移动从而带动整个施工吊篮移动;As shown in Figure 1-4, a method for moving a construction hanging basket at high altitude, when the construction hanging basket needs to move on a smooth purlin 27, the following steps are adopted: turn the hand wheel assembly 32 to drive the hand sprocket 31, hand crank The sprocket 31 drives the roller sprocket 29 and the roller 28 sequentially through the chain 35, and the roller 28 moves on the smooth purlin 27 so as to drive the entire construction basket to move;
当施工吊篮在檩条27上移动碰到障碍凸起时,采用如下步骤:When the construction basket moves on the purlin 27 and encounters an obstacle protrusion, the following steps are adopted:
步骤1:在主吊杆3靠近障碍凸起时,通过手摇升降手轮16调节副吊杆4升高,使副吊钩10脱离檩条27。Step 1: When the main suspender 3 is close to the obstacle protrusion, the auxiliary suspender 4 is adjusted to rise by the manual lifting handwheel 16, so that the auxiliary suspender 10 is separated from the purlin 27.
步骤2:在副吊钩10脱离檩条27后,通过手摇移动手轮22调节副吊杆4横向移动,使第二副吊臂8上的副吊钩10跨过障碍凸起。Step 2: After the auxiliary hook 10 is detached from the purlin 27, adjust the lateral movement of the auxiliary boom 4 by manually moving the handwheel 22, so that the auxiliary hook 10 on the second auxiliary boom 8 crosses over the obstacle protrusion.
步骤3:然后通过手摇升降手轮16调节副吊杆4降低,当副吊钩10挂在檩条27上时;继续调节副吊杆4降低,直至主吊杆3上的主吊钩6脱离檩条27。Step 3: Then adjust the lowering of the auxiliary boom 4 through the manual lifting handwheel 16, when the auxiliary hook 10 is hung on the purlin 27; continue to adjust the lowering of the auxiliary boom 4 until the main hook 6 on the main boom 3 is disengaged Purlins27.
步骤4:然后通过手摇移动手轮22调节主吊杆3向右移动跨过障碍凸起。Step 4: Then move the hand wheel 22 by hand to adjust the main boom 3 to move to the right and cross over the obstacle protrusion.
步骤5:跨过障碍凸起后,通过手摇升降手轮16调节主吊杆3下降,直至主吊杆3上的主吊钩6挂在檩条27上完成跨越移动。Step 5: After crossing the raised obstacle, adjust the lowering of the main boom 3 through the manual lifting handwheel 16 until the main hook 6 on the main boom 3 is hung on the purlin 27 to complete the spanning movement.
以上所述的具体实施方式,对本发明的目的、技术方案和有益效果进行了进一步详细说明,所应理解的是,以上所述仅为本发明的具体实施方式而已,并不用于限定本发明的保护范围,凡在本发明的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The specific embodiments described above have further described the purpose, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above descriptions are only specific embodiments of the present invention and are not intended to limit the scope of the present invention. Protection scope, within the spirit and principles of the present invention, any modification, equivalent replacement, improvement, etc., shall be included in the protection scope of the present invention.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610233286.7A CN105645323B (en) | 2016-04-15 | 2016-04-15 | A kind of high-altitude movement construction hanging basket and moving method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610233286.7A CN105645323B (en) | 2016-04-15 | 2016-04-15 | A kind of high-altitude movement construction hanging basket and moving method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105645323A CN105645323A (en) | 2016-06-08 |
| CN105645323B true CN105645323B (en) | 2017-10-24 |
Family
ID=56496423
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610233286.7A Active CN105645323B (en) | 2016-04-15 | 2016-04-15 | A kind of high-altitude movement construction hanging basket and moving method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105645323B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117211503B (en) * | 2023-09-13 | 2025-03-28 | 中国二十冶集团有限公司 | An operating platform for construction of an inverted ceiling panel |
| WO2025138841A1 (en) * | 2024-08-08 | 2025-07-03 | 中交第三公路工程局有限公司 | Large-span steel structure high-altitude hoisting auxiliary device |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB174704A (en) * | 1920-10-27 | 1922-01-27 | Arthur Hogg | Improvements in means for supporting a basket or the like from the coping of a building |
| CN2036982U (en) * | 1988-06-08 | 1989-05-03 | 浦生喜 | Automatic elevating platform for wall treatment of storied building |
| CN103510692A (en) * | 2013-10-28 | 2014-01-15 | 金陵科技学院 | Scaffold hanging basket |
| CN203961243U (en) * | 2014-04-29 | 2014-11-26 | 武汉一冶建筑安装工程有限责任公司 | Automatic control moving nacelle device |
| CN104817045A (en) * | 2015-03-27 | 2015-08-05 | 大连橡胶塑料机械股份有限公司 | Synchronous lifting device |
| CN204715721U (en) * | 2015-06-27 | 2015-10-21 | 中交第一公路工程局有限公司 | The removable Hanging Basket of a kind of Steel Structure Installation |
| CN204754167U (en) * | 2015-07-06 | 2015-11-11 | 上海中建八局装饰有限责任公司 | Walking hanging flower basket |
| CN205153509U (en) * | 2015-11-27 | 2016-04-13 | 中铁五局集团建筑工程有限责任公司 | Skin whitewashes uses support body |
| CN205472520U (en) * | 2016-04-15 | 2016-08-17 | 中国五冶集团有限公司 | Hanging flower basket is removed in high altitude |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20090002074U (en) * | 2007-08-29 | 2009-03-04 | 주식회사 현대미포조선 | Safety device for ship work |
-
2016
- 2016-04-15 CN CN201610233286.7A patent/CN105645323B/en active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB174704A (en) * | 1920-10-27 | 1922-01-27 | Arthur Hogg | Improvements in means for supporting a basket or the like from the coping of a building |
| CN2036982U (en) * | 1988-06-08 | 1989-05-03 | 浦生喜 | Automatic elevating platform for wall treatment of storied building |
| CN103510692A (en) * | 2013-10-28 | 2014-01-15 | 金陵科技学院 | Scaffold hanging basket |
| CN203961243U (en) * | 2014-04-29 | 2014-11-26 | 武汉一冶建筑安装工程有限责任公司 | Automatic control moving nacelle device |
| CN104817045A (en) * | 2015-03-27 | 2015-08-05 | 大连橡胶塑料机械股份有限公司 | Synchronous lifting device |
| CN204715721U (en) * | 2015-06-27 | 2015-10-21 | 中交第一公路工程局有限公司 | The removable Hanging Basket of a kind of Steel Structure Installation |
| CN204754167U (en) * | 2015-07-06 | 2015-11-11 | 上海中建八局装饰有限责任公司 | Walking hanging flower basket |
| CN205153509U (en) * | 2015-11-27 | 2016-04-13 | 中铁五局集团建筑工程有限责任公司 | Skin whitewashes uses support body |
| CN205472520U (en) * | 2016-04-15 | 2016-08-17 | 中国五冶集团有限公司 | Hanging flower basket is removed in high altitude |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105645323A (en) | 2016-06-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105735140B (en) | An aerial work platform device on the side of a bridge | |
| CN201056828Y (en) | Liftable worktable for building construction | |
| CN102877637B (en) | Method for implementing operating platform in bottom wall construction of cantilever beam | |
| CN205472520U (en) | Hanging flower basket is removed in high altitude | |
| CN113968543A (en) | Assembled building hoisting accessory | |
| CN114382296B (en) | Adjustable tooling for truss installation and construction method thereof | |
| CN106348185A (en) | Adjustable lifting device of outdoor unit of air conditioner | |
| CN205502556U (en) | Construction hanging flower basket with stride across and remove function | |
| CN110638384A (en) | Curtain wall cleaning robot | |
| CN109775625A (en) | An adjustable multifunctional building construction platform | |
| CN116573530A (en) | A kind of hoisting device and installation method for installing bridge body of road and bridge construction | |
| CN103821341A (en) | Attached automatic lifting multilayer construction platform | |
| CN105645323B (en) | A kind of high-altitude movement construction hanging basket and moving method | |
| CN206971764U (en) | The purlin crane system of Steel Structure Installation | |
| CN105715032B (en) | It is a kind of that there is the construction hanging basket for crossing over locomotive function and moving method is crossed over | |
| CN207582929U (en) | Adhesion type elevating construction platform | |
| CN207436471U (en) | Decorative engineering construction automatic lifting split heads | |
| CN212101771U (en) | A hoist device for air condensing units | |
| CN105731313A (en) | Movable high-altitude construction basket | |
| CN217205197U (en) | An adjustable construction frame for construction engineering | |
| CN107165399A (en) | A kind of high-altitude external wall maintenance unit | |
| CN205472505U (en) | Movable high altitude construction hanging flower basket | |
| CN215803031U (en) | Scaffold frame that engineering construction operation was used is built in room | |
| CN106348186B (en) | Tower type multifunctional truck crane | |
| CN212127314U (en) | A large-span truss transfer device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |