- CN205634646U CN205634646U CN201620376366.3U CN201620376366U CN205634646U CN 205634646 U CN205634646 U CN 205634646U CN 201620376366 U CN201620376366 U CN 201620376366U CN 205634646 U CN205634646 U CN 205634646U
- Authority
- CN
- China
- Prior art keywords
- frame
- left frame
- building
- correct
- correct frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a building cableway bucket, includes left frame and right frame, left side frame is formed by many horizontal pole welding, right side frame is formed by many horizontal sealing of tubes, left side frame cup joints with right frame, corresponding position all is equipped with the screw hole on left side frame and the right frame, bottom in the frame of the right side is equipped with the bottom plate, be equipped with the barrel on the bottom plate, bottom in the barrel is equipped with the swash plate, the lower extreme limit portion of barrel is equipped with the discharge gate, be equipped with the control valve on the discharge gate, one end bottom in the frame of a left side is articulated through pivot and layer board. The utility model is suitable for a concrete, scaffold frame etc. Hang the work of unloading among the building engineering, make simply convenient to use.
Description
Technical field
This utility model relates to a kind of building suspension bucket.
Background technology
Suspension bucket is the most commonly used means of transports such as concrete unloading in building engineering construction, scaffold unloading, embedded part unloading, but existing suspension bucket cannot use at handling scaffold, springboard etc., and efficiency of construction is the lowest.
Summary of the invention
The purpose of this utility model is for above-mentioned deficiency, it is provided that a kind of building suspension bucket.
Described purpose is achieved by the following scheme: a kind of building suspension bucket, including left frame and correct frame, described left frame is welded by many cross bars, described correct frame is welded by many transverse tubes, described left frame is socketed with correct frame, the described left frame position corresponding with on correct frame is equipped with screwed hole, bottom in described correct frame is provided with base plate, described base plate is provided with cylinder, bottom in described cylinder is provided with swash plate, the lower end edge of described cylinder is provided with discharging opening, described discharging opening is provided with control valve, rotating shaft is passed through hinged with supporting plate bottom one end in described left frame, corresponding position, both sides, described cylinder upper end is provided with hanging hole.
It is equipped with hanger on described left frame and correct frame.
Screwed hole in described left frame is two.
This utility model has the advantage that this utility model unloading such as concrete, scaffold work be applicable to architectural engineering, is simple to manufacture, easy to use.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Wherein, 1-left frame, 2-correct frame, 3-screwed hole, 4-base plate, 5-cylinder, 6-swash plate, 7-discharging opening, 8-control valve, 9-rotating shaft, 10-supporting plate, 11-hanger, 12-hanging hole.
Detailed description of the invention
Elaborate this utility model below in conjunction with the accompanying drawings preferred embodiment.
A kind of building suspension bucket, including left frame 1 and correct frame 2, described left frame 1 is welded by many cross bars, described correct frame 2 is welded by many transverse tubes, described left frame 1 is socketed with correct frame 2, described left frame 1 position corresponding with on correct frame 2 is equipped with screwed hole 3, bottom in described correct frame 2 is provided with base plate 4, described base plate 4 is provided with cylinder 5, bottom in described cylinder 5 is provided with swash plate 6, the lower end edge of described cylinder 5 is provided with discharging opening 7, described discharging opening 7 is provided with control valve 8, rotating shaft 9 is passed through hinged with supporting plate 10 bottom one end in described left frame 1.Corresponding position, both sides, described cylinder 5 upper end is provided with hanging hole 12.Described left frame 1 is equipped with hanger 11 on correct frame 2.Screwed hole 3 in described left frame 1 is two.
Screwed hole 3 is arranged on cross bar and transverse tube, and the screwed hole 3 on cross bar is arranged on the two ends of cross bar, and cross bar is slidably arranged in transverse tube, forms left frame 1 and is socketed with correct frame 2.The edge of supporting plate 10 with left frame 1 being merged by rotating shaft 9, now supporting plate 10 is longitudinally disposed, left frame 1 is disposed entirely within correct frame 2, fixing bolt is screwed in screwed hole 3, make left frame 1 fix with correct frame 2, cylinder 5 is surrounded, it is to avoid rocking of cylinder 5 simultaneously.Concrete is flowed out by discharging opening 7 by the gradient of swash plate 6.When transporting built-in fitting and scaffold, after making cylinder 5 hang out in correct frame 2 in hook hangs over hanging hole 12, stretched out in correct frame 2 by left frame 1, fixing bolt is screwed in the screwed hole 3 of the cross bar other end, making left frame 1 and correct frame 2 fix, left frame 1 strengthens with the inner space of correct frame 2, and supporting plate 10 is arranged on the bottom of left frame 1 by rotating shaft 9, now, supporting plate 10 is horizontally set.The construction material that convenient transport is longer.Hanger 11 is connected with the suspension hook on tower crane by steel wire rope.
Present embodiment does not simply limit its protection domain to the exemplary illustrated of this patent; those skilled in the art can also carry out local to it and change; as long as no the spirit beyond this patent, all it is considered as the equivalent to this patent, all at the protection domain of this patent.
Claims (3)
- null1. a building suspension bucket,Including left frame (1) and correct frame (2),It is characterized in that: described left frame (1) is welded by many cross bars,Described correct frame (2) is welded by many transverse tubes,Described left frame (1) is socketed with correct frame (2),Described left frame (1) corresponding position upper with correct frame (2) is equipped with screwed hole (3),Bottom in described correct frame (2) is provided with base plate (4),Described base plate (4) is provided with cylinder (5),Bottom in described cylinder (5) is provided with swash plate (6),The lower end edge of described cylinder (5) is provided with discharging opening (7),Described discharging opening (7) is provided with control valve (8),Rotating shaft (9) is passed through hinged with supporting plate (10) bottom one end in described left frame (1),Corresponding position, described cylinder (5) both sides, upper end is provided with hanging hole (12).
- Building suspension bucket the most according to claim 1, it is characterised in that: it is equipped with hanger (11) on described left frame (1) and correct frame (2).
- Building suspension bucket the most according to claim 1, it is characterised in that: the screwed hole (3) in described left frame (1) is two.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620376366.3U CN205634646U (en) | 2016-04-29 | 2016-04-29 | Building cableway bucket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620376366.3U CN205634646U (en) | 2016-04-29 | 2016-04-29 | Building cableway bucket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205634646U true CN205634646U (en) | 2016-10-12 |
Family
ID=57061842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620376366.3U Expired - Fee Related CN205634646U (en) | 2016-04-29 | 2016-04-29 | Building cableway bucket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205634646U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106490646A (en) * | 2016-11-29 | 2017-03-15 | 巫山县纯源农产品开发有限公司 | Bamboo sprout cleaning equipment |
-
2016
- 2016-04-29 CN CN201620376366.3U patent/CN205634646U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106490646A (en) * | 2016-11-29 | 2017-03-15 | 巫山县纯源农产品开发有限公司 | Bamboo sprout cleaning equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106677513A (en) | Moveable fabricated construction operating platform mechanism and construction method thereof | |
CN204715721U (en) | The removable Hanging Basket of a kind of Steel Structure Installation | |
CN110407108A (en) | A kind of gantry crane device for bridge construction | |
CN205634646U (en) | Building cableway bucket | |
CN204342298U (en) | A kind of double track transfer crane | |
CN207093932U (en) | Construction spring hanger | |
CN104196249B (en) | A kind of concrete slab special hanger with T-shaped rib | |
CN202346578U (en) | Beam turning-over and lifting device | |
CN205709477U (en) | Hexagonal block special hanger and matching used hexagonal block thereof | |
CN105888255A (en) | Building cableway bucket | |
CN209443497U (en) | Prefabricated pipe gallery | |
CN203568661U (en) | Built-in tail-sliding lifting lug | |
CN207048087U (en) | A kind of energy saving environmental protection building | |
CN208393396U (en) | A kind of building trolley | |
CN204980798U (en) | There is not staircase of support host computer base additional strengthening | |
CN205472231U (en) | Gallows is transported to aluminium bar | |
CN205134923U (en) | Adjustable distance of encorbelmenting hang mechanism | |
CN204110075U (en) | Bridge fender wall template transhipment mounting transport vehicle | |
CN205023729U (en) | Gallows frame | |
CN109382809A (en) | What a kind of scene used has the reinforcing bar storage rack for blocking function | |
CN219384478U (en) | Precast beam template hoist | |
CN206667069U (en) | A kind of bridge construction bearing frame | |
CN212687323U (en) | Hoisting system for hoisting converter vaporization cooling system equipment | |
CN210508490U (en) | Temporary reinforcing device for unitized partition wall of historical building | |
CN210215504U (en) | Hanger frame convenient to galvanized fitting hangs material fast |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 Termination date: 20170429 |